SASSA LOW PRESSURE SOLAR WATER
HEATER PROGRAMME HEATER PROGRAMME
May 19, 2011
Department of Energy, Pretoria
THE PROGRAMME
• Installs 110 litre low pressure SWHs in low income
households under PoA approach free of charge.
• The project will see an immediate positive impact on the
social, economic and environmental well-being.
SOLAR WATER HEATING (SWH)
• A water heating system using energy from the sun
• Dark evacuated tubes absorb heat and hot water rises naturally into the tank, while cool water in the tank flows down to the bottom of the vacuum tube.
• Main components:
1) collector,
2) liquid energy transfer medium (water or heat transfer fluid);
3) geyser/tank.
SALINENT PROJECT PARAMETERS
• Supplier Solar Academy of Sub Saharan Africa
(SASSA) distributing the Tasol brand
• 110 litre LP SWH has a daily thermal capacity of a
13.692 MJ, which equals to 1.38 MWh electricity 13.692 MJ, which equals to 1.38 MWh electricity
saving per year.
• Estimated annual emission reduction 1.3 tCO2/SWH
• First CPA includes 59,000 installations. Total
potential: 229 000 installations within 3 years
throughout South Africa.
• Total CER contribution sought 2.3 mil
BACKGROUND FOR THE PROGRAMME
Africa has the highest solar radiation levels in the world, which
makes the concept of SWH logical!
CONTRIBUTION TO SUSTAINABLE
DEVELOPMENT
• Over 50 % or 5 million households in South Africa have
electricity, but do not have a geyser in these households.
• The provision of SWHs free of charge for the targeted
households will result improved service delivery to residents households will result improved service delivery to residents
and to major social upliftment.
• The project will lead to employment opportunities in the solar
sector, with training provided for technicians .
• Current electricity supply is not enough to meet projected
future demand in South Africa. The proposed PoA will reduce
electric water heating loads and help the country to correct
the energy mix, with a greater focus on renewable energy.
• Reduction of greenhouse gas emissions.
PROJECT PARTICIPANT AND
IMPLEMENTING FRAMEWORKProject Participants:
• Solar Academy of Sub-Saharan Africa - Managing Entity
• International Carbon - CDM Cycle Management
• Standard Bank - CER Offtaker
SASSA(project owner)
HOUSEHOLDS
ESKOM
INTERNATIONAL CARBON INSTALLATION and
MANAGEMENT COMPANY(installation, maintenance, monitoring)
Subsidy
Carbon and
Subsidy Rights
CDM
Management
ERPASTANDARD BANK
Transport Entity
Data Capturing Entity
Community Development
Entity
SWH
SWH
MANAGEMENT STRUCTURE OF THE POA
ESKOMSubsidy
Data Capturing Entity
SASSA(project owner)
InternationalCarbon
SWH Data
HOUSEHOLDS
INSTALLATION and MANAGEMENT COMPANY(installation, maintenance, monitoring)
Carbon and
Subsidy RightsTransport Entity
Community Development
Entity
Registered Plumber(s)
Installer(s)
Assistant 2Assistant 1
Area Inspector(s)
Queries Coordination Officer & Administration
SWH
SWH Data
CLEAN DEVELOPMENT MECHANISM
1. Applies the Programme of Activities Approach (PoA)
� First registered PoA in South Africa
� First SWH specific PoA worldwide
2. Methodology:
� Simplified modalities and procedures for small scale CDM � Simplified modalities and procedures for small scale CDM
projects
� AMS.I.C – Thermal energy for user with or without electricity
Comprise renewable energy technologies that supply users
with thermal energy that displaces fossil fuel based gird
energy (par 1 and17)
� Displacement of electricity is calculated as per the procedures
detailed in AMS-I.D; option b weighted average emissions of
the current generation mix has been applied
CLEAN DEVELOPMENT MECHANISM3. Baseline:
� Suppressed demand argumentation - Para 46 of the CDM
Modalities and Procedures state that “The baseline may
include a scenario where future anthropogenic emissions by
sources are projected to rise above current levels, due to the
specific circumstances of the host Party.”
� Determined based the energy output as per SABS test � Determined based the energy output as per SABS test
(13.692 MJ/day/SWH)
4. Additionality:
� “Attachment A to Appendix B” of the simplified modalities and
procedures has been applied identifying the following barriers
for the CPA:
� Financial Resources - cash flow model
� Capacity to Absorb New Technologies - Comprehensive
argumentation
� Limited Information - Comprehensive argumentation
� Simplified Additionality for Micro scale Activities
CLEAN DEVELOPMENT MECHANISM5. Unique identification and record keeping system for each CPA:
� Site Details: street address and GPS coordinates and ERF
number
� Residence details: first name, surname, ID number and contact
details
� Installer Details: installation date, installer name, company
and contact detailsand contact details
� Installation Details: Serial Number, SWH type, size and
collector area
� Residence Agreement to cede subsidy and carbon rights to
SASSA
The ERF number, is used to locate each SWH in a Geographical
Information System (GIS) tool to enable spatial integration. The GIS
(spatial view) can be used to identify candidate installations, as
well as inform relevant parities when the status of the installation
changes (e.g. finalized installation or failure).
6. Monitoring:
Has three measurement and verification levels that are applied
to ensure the operation of the SWH’s and to calculate the ex-
post emission reductions:
1) Real-time measurement (done in 1/10 000 of the SWHs),
CLEAN DEVELOPMENT MECHANISM
2) Inspection of operationally (done in 1/100 of the SWHs), and
3) Simulation approach to determine energy provide for each SWH
passed on level 1 and 2 measurements.
Note: real time mesurment shall happen in max 50 km radius
from each installed SWH.
ONCE
PROJECT PHASE / DOCUMENT
Project Idea Note (PIN)
TIMELINES
August 2009
Eskom notification: rebate (bases on the thermal performance output ) applicable for LP SWH October 2009
March 2010
April 2010MoU SASSA and NMBM was signed
May 2010
Term Sheet on Carbon was signed between Standard Bank, IC and SASSA
PoA and CPA Design Documentation (“PDD”)
Start of Validation (GSC)
SABS testing (first approval)
June 2010
ONCE
Letter of No Objection (LoNO)
SABS test completed (3. test)
Onsite Audit
Letter of Approval (LoA)
REGISRATION by UNFCCC
July 2010
August 2010
Final Validation ReportNovember 2010
December 2010Requesting Registration by UNFCCC
January 2011
April2011
To date 45,000 SWHs have been installed!
Start of Installations
INTERNATIONAL CARBON
An African carbon development, trading and advisory
company, with expertise in the fields of carbon and energy.
Presence in UK and SA.
Our technical and commercial teams have many years of Our technical and commercial teams have many years of
experience in the Carbon and Renewable Energy sectors, and
have assisted various companies and governments to realise
the Carbon potential in their portfolios. We also have long
established links with other industry leaders, and we bring a
total solutions package for our clients.
Advisory
• Strategy and Master Planning: minimising risk and maximising value.
• Technology Consultancy for low Carbon options
Capacity Building
• Knowledge and expertise while contributing to sustainable development.
• Design and implement training programs
Financial
INTERNATIONAL CARBON
BUSINESS LINES
Financial
• Brokerage/Trading: with access to various trading options for Certified Emission Reduction
(CERs) and Voluntary Emission Reductions (VERs) credits.
• Work with financial institutions to provide unique and innovative financial solutions to the
customer.
Development
• CDM Cycle Management: PINs, PDDs, Monitoring Reports, assistance of validation,
registration, verification and issuance
• Technology partners: established partnerships with recognised technology and equipment
suppliers.
• CDM project development: origination and development of CDM projects in Africa.