GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 1 of 30 GUJARAT ENERGY TRANSMISSION GUJARAT ENERGY TRANSMISSION GUJARAT ENERGY TRANSMISSION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. CORPORATION LTD. CORPORATION LTD. CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA – 390 007. TECHNICAL SPECIFICATIONS FOR CIVIL WORKS FOR 220KV GIS (INDOOR/OUT DOOR) GETCO/C/TS-Civil Works for 220KV GIS-050 /R0/ JUNE.12

Upload: trinhtram

Post on 08-Mar-2018

221 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 1 of 30

GUJARAT ENERGY TRANSMISSION GUJARAT ENERGY TRANSMISSION GUJARAT ENERGY TRANSMISSION GUJARAT ENERGY TRANSMISSION

CORPORATION LTD.CORPORATION LTD.CORPORATION LTD.CORPORATION LTD.

SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA – 390 007.

TECHNICAL SPECIFICATIONS

FOR

CIVIL WORKS FOR 220KV GIS

(INDOOR/OUT DOOR)

GETCO/C/TS-Civil Works for 220KV GIS-050 /R0/ JUNE.12

Page 2: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 2 of 30

TECHNICAL SPECIFICAITONS OF CIVIL WORKS FOR GIS s/s

The scope of work under this contract shall include design and construction of all the items mentioned hereunder, but not limited to, which are required for satisfactory & successful completion and commissioning of 220kv GIS Sub-station(INDOOR/OUTDOOR) at place in the state of Gujarat. The exact place is mentioned elsewhere in tender document.

1.0 GENERAL

The intent of specification covers the following.

Design, engineering & construction of all civil works at sub-station. All civil works shall also satisfy the general technical specifications specified in other sections of this specification as detailed below. Civil works shall be designed to the service conditions / loads as specified elsewhere in this specification or as implied as per National / International standards.

The building and all civil works will be provided as per recommendation from the manufacturer. Special attention shall be given to an optimized design with small space requirements and therefore the bidder input is essential. An overhead crane will be supplied for installation and maintenance work. The bidder shall specify the lifting height and capacity necessary for lifting of the heaviest peace during installation of maintenance. The Bidder shall have to obtain required approvals of statutory authorities wherever applicable.

All civil, structural and architectural works shall be designed, provided and constructed as per latest editions of Indian Codes and Standards with addendums and supplements as issued by ISI. Wherever Indian Standards are not available/formulated, applicable BS or international standards shall be used. In case of ambiguity between codes, specifications and drawings, the most stringent of them shall govern.

The contractor shall provide all design, drawings, labor, tools, equipments, material, temporary works, construction plants & machinery, fuel supply, transportation and all other incidental items not specified but as they may be required for complete performance of the works in accordance with approved drawings, specifications & direction of the GETCO.

The work shall be carried out according to design & drawings to be developed by the contractor and approved by GETCO based on the tender drawings specified by GETCO to the contractor. For all buildings ,structures, foundations etc. necessary layout & details shall be developed by the contractor keeping in view the functional requirement of the substation, required facilities & providing enough space to access for operation, use & maintenance based on the inputs provided by GETCO. Certain minimum requirements are indicated hereunder for guidance purpose only. However, contractor shall quote the rates according to the complete system requirements.

All the design and drawings shall be submitted in five set of hard copy and two set of soft copy. Drawing shall be submitted in ‘AutoCAD’ format. Submitted design and drawings will be property of GETCO. Also design basis document for civil and architectural work shall be submitted for approval. 3D model based on architectural drawing with all possible views shall be prepared and submitted.

Page 3: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 3 of 30

All the work shall be strictly executed as per FIELD QUALITY PLAN approved by GETCO which is shown as ANNEXTURE ‘B’ & Approved technical specification of GETCO for civil works. If opted for 220kv Outdoor GIS, It is important that bidder shall study and include full requirements- functional, operational and maintenance, safety and grid code which are essential and necessary for outdoor 220kv GIS as per standards in their bids. Civil work for the outdoor GIS module/Equipment( as replica to indoor GIS) in all respect including associated works related to cable trench, Control panels, LCP etc.shall be considered in their bids. Foundations for outdoor GIS shall also be considered.

2.0 The scope of work under this contract shall include following.

1. Site Preparation

2. GIS building (INDOOR/OUTDOOR) with crane arrangement and control room building. (GF + FF)

3. Security Cabin.

4. Foundations for Switch Yard Structures, Equipments and support structure for GIS Bus.

5. Cable Trenches & Earthing Chambers

6. Transformer Foundations with marshalling work & its track up-to road

7. Fire Protection Wall

8. Roads, Culverts, Paving & Storm water Drains

9. Bore wells

10. Water Supply System internal & external with (U/G + OH tanks)

11. Chain link Fencing with Gate

12. Septic Tank with Soak Pit and drainage system (Internal & External)

13. Car / Scooter Parking Sheds.

14. Metal spreading with micro-levelling & anti-weed treatment

15. Rain Water Harvesting.

16. Tree Plantation – (Green Belt) & Horticultural Work

17. Specific Requirement

18. Any other civil work that is required for successful completion & commissioning of 220 KV GIS( INDOOR/OUTDOOR) Sub-station.

(1) Site Preparation:

Page 4: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 4 of 30

Levelling of the plot area (i.e.) grading prior to EPC contractor commencing work in plot boundary area, will be done by others to a formation level as per site condition for the formation level to be fixed . The final grading to the required finished level, with slopes to drainage system final landscaping etc. shall be done by the bidder as per approved Construction Drawings. Water supply system, Storm water drainage system, Sewage system, Septic Tank and disposal system shall be designed and constructed by the bidder. The drainage and treated effluent from the plot area shall be disposed up to disposal point (outside) including development of drain beyond disposal point.

(2) 220KV GIS( INDOOR/OUTDOOR) & Control Room Building (as per scope of the Tender):

GIS & Control Room Building shall be RCC Framed Structure having GF + FF. Shall be made of RCC frame structure of minimum concrete grade of M25 and Room for electrical installations must be designed such that no water can penetrate and such that condensation is kept to a minimum. The details of the same are as under.

NAME OF FLOOR

FUNCTIONAL PURPOSE APPROX.CARPET

AREA ( m2 )

GROUND FLOOR

220kV GIS Room 250

484

Control and protection panel room

103

LVAC room 82

AHU room 19

Toilet block/pantry 30

FIRST FLOOR

Conference room with attached toilet

75

200 Store room 33

PLCC room 33

Battery room 59

NOTE: (1) CERTAIN MINIMUM REQUIREMENTS ARE INDICATED ABOVE FOR 22OKV GIS (INDOOR) FOR GUIDANCE PURPOSE ONLY. HOWEVER, BIDDER SHALL QUOTE THE RATES ACCORDING TO THE COMPLETE SYSTEM REQUIREMENTS FOR 220KV INDOOR GIS OR OUT DOOR GIS AS THE CASE MAY BE.

(2) AREA FOR TOILET BLOCK, PASSAGE, STAIR CABIN AT TERRACE AND OTHER NECESSARY AREA AS REQUIRED SHALL BE ADDED IN ABOVE. The walls in the building shall be non-load bearing in-filled panel walls. All external and internal walls will be of Brick masonry. All the walls shall be supported on RCC wall beams and plinth beams such that unsupported length is not more than about 3m. The walls shall be laid in 1:4 cement: sand mortar.

- The Finished Floor level of the Ground floor Building shall be EL (+) 1.0 m.

Page 5: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 5 of 30

- The external wall surfaces will be provided with 20 mm thick plaster in two layers, with exterior Acrylic Paint (Apex or Equivalent). Internal plastering will be of 12 mm thick in 1:3 cement mortars. Ceiling in areas where false ceiling is not provided will be given ceiling plaster 12 mm thick.

- 50mm thick Damp Proof Course (DPC) shall be provided at plinth level before starting the masonry work. The DPC shall be in PCC M20 grade with water proofing compound followed by two layers of bitumen coating 85/25 grade as per IS 702.

- Height of skirting above finished floor level shall be 150mm.

Parapet wall

The parapet wall over the building shall be 900mm high from the finished roof level.

Plinth Protection

Entire area around the GIS building shall be provided with M20 grade PCC paving of minimum 100 mm thickness over consolidated/compacted earth, starting from the building edge up to 750mm clear distance for the entire periphery of the building.

Roof / Floor Finishes

Roof Finish

The water proofing treatment of RCC slab roof of building shall consist of the following operations: (a) The roof shall be provided with China Mosaic flooring water proofing.

(b) For sufficient disposal of rain water, the run-off gradient for the roof shall not be less than 1:200. Screed concrete of M20 grade or cement sand mortar 1:3 with approved water proofing material shall be used to provide the gradient.

The rain water down comers shall be of uPVC conforming to IS- 4985. The number and size of down-comers shall be governed by IS -1742 and IS- 2527.

Rainwater pipes from roof shall be fixed on the outside face of the column and encased later with concrete.

Floor Finish

Floor finishing schedule of GIS & Control room building shall be as per Annexure – A.

Doors and windows

1. All the windows and ventilators of building shall be of anodised aluminium. Main entrance shall have aluminium framework with glazing. Doors shall be of swing type.

2. WC/ toilets shall be single leaf PVC door.

3. For aluminium door the aluminium section to be utilized shall confirm to IS 1285/1980 and IS 1869/1968 for the material grade and anodizing respectively. The frame section shall be of standard size and as directed by Engineer-in-charge. Minimum of section no 8687 Jindal Aluminium Ltd. Make or its equivalent and section for shutter shall be of standard size. Minimum of section No 8305 of Jindal aluminium Ltd. Make or its equivalent. Necessary additional / special sections shall be used to facilitate locking arrangement, handle stay if necessary as directed by EIC. For aluminium window and ventilator the aluminium section to

Page 6: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 6 of 30

be utilized shall confirm to IS 1285/1980 and IS 1869/1968 for the material grade and anodizing respectively. The frame section shall be 61.85mm x 31.75mm weighing 0.695kg per mtr. Minimum of section No 8687 Jindal Aluminium Ltd. Make or its equivalent and section for shutter shall be of 50 mm x 20 mm size weighing 0.571kg per Mtr. Minimum of section No 8305 of Jindal aluminium Ltd. Make or its equivalent. Necessary additional / special sections shall be used to facilitate locking arrangement, handle stay if necessary as directed by EIC.

4. Rolling shutters with manual operating arrangement according to size shall be provided in GIS room (Control Room Building) to facilitate handling and transportation of dry type transformer.

5. All doors/shutters/windows shall be provided with all standard accessories such as handles, tower bolts, locks, stoppers, floor mounted spring type door closure etc. of best quality as approved by the GETCO.

Glazing and its thickness

1. Minimum thickness of glazing shall be 6.0 mm. Glazing shall have fire rating of minimum 1 hour.

False ceiling

The Luxalon/ Interarch False ceiling shall be provided in all air- conditioned area.

Providing and Fixing Luxalon (Hunter Douglas) made Techstyle panel type FALSE CEILING with using Install standard 15/16" T-Grid, level and square, per code standards. T-Grid must be installed at a height 1-1/8"above finished ceiling height (Flange of T-Grid should lay on top flange of wall channel for proper height). Fasten Tees to top of wall channel on proper centers (24" or 48") with pop rivet. T-Grid module to be 24" x 24" for 2x2 Techstyle panel, 24" x 48" for 2x4 panel, and 48" x 48" for 4x4 panel. (Note: Recommend using standard double-web grid. Do not recommend using single-web grid, without flange cap). Position all fixtures in place (lights, air, etc.) in accordance with project requirements, in the same manner as required for standard lay-in tile ceilings. For other panel sizes, lay out grid to meet code requirements and finished panel size as per detailed drawing in proper line & level section shall be fastened to the internal grid in such a way that no nail/screw shall be visible including all cost of fixtures & fastenings, materials,scaffolding required for satisfactory completion of works etc. complete as directed by consultant's detailed drawing & specification & directed by Engineer in charge.

Toilet details including plumbing and sanitation

-Two toilets, one for gents and other for ladies, shall be provided in the building.

-Galvanized MS pipe of medium class conforming to IS-1239 shall be used for internal piping works for potable water supply.

-uPVC pipes conforming to IS: 4985 shall be used for sanitary works above ground level.

- A shaft shall be provided in the Toilet Area for water supply, soil and vent pipes.

-Each toilet shall have the following minimum fittings:

a) WC (Western type) 390mm high with toilet paper roll holder and all fittings with flushing system arrangement. b) Urinal (430x260x350 mm size) with all fittings (Fully sealed). c) Wash basin (550x440 mm) with all fittings (Fully sealed). d) Bathroom mirror (600x450x5.5mm thick). e) CP brass towel rail (600x20mm)

Page 7: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 7 of 30

f) Soap holder

Projection over doors and windows:

Doors and windows on external walls buildings shall be provided with RCC sun-shade over the openings. Projection of sunshade from the wall shall be minimum 600 mm over window openings and 600 mm over door openings.

(3) Security Cabin:

Security Cabin shall be constructed with approximate size of 3.00 mtr x 4.00 meter. with attached toilet near main gate with RCC structure & slab as per approved design and drawing.

(4) Foundation for Switch Yard Structures, Equipments & Support structure of GIS Bus:

The foundations for switch yard Structures, equipments & support structure for GIS Bus shall be constructed as per approved layout plan of switch yard. Major structural & equipment foundations shall be cast in RCC minimum grade M20. The TOC shall be 300 mm above FGL unless otherwise specified. The grouting of foundation bolts shall be done with GP-2 or equivalent high strength non-shrink type material.

Equipment foundations shall be analysed for all possible load combinations both static and dynamic, wherever applicable. However, if the dynamic load component is very less when compared to static loads and or if the requirement of plinth / pedestal size is more, then static analysis will be adopted by considering 3 times the static weight of the equipment.

(5) Cable trenches for Switch yard:

Cable trench shall be constructed as per approved drawing with RCC walls and RCC prestressed covers. The cable trays shall be fabricated with structural steel and fixed with vertical walls of cable trench with suitable grouting or with anchor bolts. The cable trays shall be applied with one coat of red-oxide & three coats of oil paint of approved brand & shade. All cable trench bed shall have slope of 1/500 along the run and 1/250 perpendicular to the run. All the construction joints of cable trenches i.e. between base slab to base slab, the junction of vertical wall to base slab from vertical wall to wall and all the expansion joints shall be provided with approved quality PVC water stops of approximately 230 x 6 mm size for those sections where the ground water table is expected to rise above the junction of base slab and vertical wall of cable trenches. Cable trenches shall be blocked at the ends if required with RCC wall. Cable trenches at road crossing shall be designed in such a way that it can take minimum load of 220/66kv Transformer with trailer.

(6) Transformer Foundations with marshalling work & its track up-to road:

This shall be provided as per approved drawing with RCC M20 grade of concrete. The guide rail as per drawing shall be grouted in the foundation. The marshalling arrangement with rail shall be provided up-to the road.

Transformer foundations shall be analysed for all possible load combinations both static and dynamic, wherever applicable. However, if the dynamic load component is very less when compared to static loads and or if the requirement of plinth / pedestal size is more, then static analysis will be adopted by considering 3 times

Page 8: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 8 of 30

the static weight of the equipment. A rail cum road system integrated with the transformer foundation to enable installation and the removal of any failed unit shall be provided. The Rail cum Road shall have RCC type foundation.

This work includes radiator bank and other foundations required for commissioning of transformer successfully.

(7) Fire Protection Wall:

Fire Protection wall shall be provided as per design & drawing at locations marked in approved layout plan. The wall shall be of RCC column and Beam frame work with BB masonry & cement plaster finish. The height of wall shall be minimum 600mm more than the height of the bushing. The wall shall have a minimum fire resistance of 2 hours.

(8) Roads, Culverts, Paving & Storm water Drains:

Main road of width 4.50 meter shall be of RCC supported by WBM road( minimum thickness 350 mm), C.D Works designed to IRC Standards. RCC paving of 1500 width for main road from entrance gate to front end of main Switchyard. Open storm water RCC rectangular drains will be provided on both sides of road or one side of the road as per the layout with RCC.The drains will have a longitudinal slope of 1 in 1000. Storm water drain crossing the roads shall be of RCC Hume pipe class NP2 with RCC encasement shall be provided. Also 300 dia. pipe class NP2 across the road shall be provided at suitable distance to pass the cables below road.

Also, RCC garland drain around the control room and other building shall be provided with prestressed covers. The prestressed cover shall be provided. The storm water drain shall be provided with sufficient gradient and connected up to disposal point at approved location outside the battery limit. The quantity shall be measured as mentioned in BOQ complied with the required specifications. At cross drainage work minimum load of 220/66kv Transformer with trailer shall be considered while designing.

(9) Bore wells:

Bore well of minimum 200 mm dia. shall be provided in all type of soil strata by checking availability of water from Geologist including column pipes, providing submersible pump of required capacity with all electrical accessories & ‘C’ class GI pipeline up to OHT & or UG Sump & commissioning the same.

(10) Water Supply System internal & external with (U/G + OH tanks):

Internal & external Water supply system with ‘C’ class GI pipeline with required fixture , fastening & required valves etc for drinking water, service water & for earthing pits shall be provided.

(11) Chain link fencing with Gate:

Chain link fencing & gate shall be provided as per drawing. The angle posts of fencing shall be rested on suitably designed foundations. The Grade of foundation shall be M20.

(12) Septic Tank with Soak Pit and drainage system (Internal & External):

Page 9: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 9 of 30

Septic tank with soak pit for 50 users shall be provided with internal & external drainage system. Rate is inclusive of providing and installing submersible sewage pump of approved quality and make as per relevant codes and standards.

(13) Car / Scooter parking shed (If asked in the scope):

The parking Shed for six scooters and two cars with MS tubular sections with PVC Fire retardant roofing system shall be provided. The foundation for shed shall have RCC grade M20 with rain water draining arrangement. Flooring shall be done with paver block of 80mm thick with screened sand bedding as per relevant standards. The scope of work also includes the approach from adjoining road to shed with paver blocks.

(14) Metal spreading with micro-levelling & anti-weed treatment:

The entire yard surfacing with 50 mm thick sand filling & 100 mm thick 25-40 mm size metal shall be provided after carrying out approved antiweed treatment.

(15) Rain Water Harvesting:

Adequate rain water harvesting system shall be provided with all required sumps, drains & piping as per relevant codes and standards.

(16) Tree Plantation & Landscaping:

The landscaping with flower beds at available places shall be provided. The tree plantation suitable to the prevailing environment in consultation with Horticulturist shall be provided.

(17) Specific Requirement:

Adequate fire protection measures must be taken between switchgear rooms and transformers and also between switchgear rooms and cable basements. After installation, ceiling and wall penetrations must be sealed in such a way that the fire prevention specifications applying to the building are fully complied with. In event of fire, escape routes, rescue routes and emergency exits must be usable and unobstructed.

(18) Any other civil work that is required for successful completion & commissioning of 220kv GIS Sub-station.

Codes & Standards

The following Indian Codes and Standards shall generally be used for design of civil and structural works. In all cases, the latest revisions with amendments, if any, shall be followed. SP: 6 ISI handbooks for structural engineers. IS: 2062 Specification for Structural Steel (Standard quality). IS: 456 Code of practice for plain and reinforced concrete. IS: 800 Code of practice for general construction in steel. IS: 806 Code of practice for use of steel tubes in general building

construction, IS: 808 Rolled steel beam, channel & angle sections IS: 813 Scheme of symbols for welding. IS: 816 Code of practice for use of metal arc welding for general

construction in mild steel.

Page 10: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 10 of 30

IS: 875 Code of practice for design loads (other than earthquake) for buildings and structures.

IS: 1038 Steel doors, windows and ventilators. IS: 1080 Code of practice for design and construction of shallow foundations

in soils (other than raft, ring and shell). IS: 1172 Code of basic requirements for water supply, drainage and

sanitation. IS: 1230 Cast iron rain water pipes and fittings. IS: 1346 Code of practice for water proofing of roofs with bitumen felts. IS: 1361 Steel windows for industrial buildings. IS: 1742 Code of practice for Building Drainage IS: 1893 Criteria for earthquake resistant design of structure IS: 1904 Code of practice for foundations in soil:-General requirements IS: 1905 Code of practice for structural safety of buildings IS: 2065 Code of practice for water supply in buildings IS: 2074 Ready mixed paint, air drying, red oxide chrome, priming IS: 2212 Code of practice for brick work IS: 2470 Code of practice for installation of septic tank IS: 2527 Code of practice for fixing rain water gutters and down pipes for roof

drainage IS: 2911 Code of practice for design & construction of pile foundation IS: 2950 Code of Practice for design and construction of raft foundations IS: 2974 Code of Practice for design and construction of machine

foundations IS: 3067 Code of Practice for general design details for prepatory work for

damp proofing and water proofing buildings IS: 3370 Code of Practice for concrete structures for the storage of liquids IS: 3414 Code of Practice for design and installation of joints in buildings IS: 3614 Fire check doors & TAC rules IS: 4326 Code of Practice for earthquake resistant design and construction of

buildings IS: 4971 Recommendations for selection of industrial floor finishes IS: 5624 Specification for Foundation bolts IS: 8009 Code of Practice for calculation of settlement of foundations: (parts 1

& 2) IS: 1829 Code practice for protection of iron and steel (Part I to III) structures

for atmosphere corrosion IS: 13301 Guidelines for design of flexible pavements IS: 13920 Code practice for ductile detailing of reinforced concrete structure

subjected to seismic force IRC: 37 Guide lines for design of flexible pavements IRC: 73 Geometric designs of roads DIN: 4024 Machine foundations: - Flexible supporting structures for machine

with rotating masses. SP 16 Design Aids for Reinforced Concrete to IS: 456-1978.

(A) Design Criteria

The Soil investigation report furnished with tender document is for reference purpose only. The bidder has to conduct geotechnical investigation and decide on the various design parameters one proposes to adopt for foundation design. No commercial implications for any variations in this regard during execution shall be entertained for Soil Test Results as well as any of foundation design.

Page 11: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 11 of 30

All structures and portions thereof shall be analysed and designed to sustain various loads and combinations thereof, conforming to the latest revision of applicable Indian Standards, Specifications, engineering practice and other technical requirements.. All structures shall be designed to sustain dead loads plus assigned live loads, impact load equipment, wind, seismic or other loads it is being subjected to.

(A-1) Dead Loads

Dead load shall include the weight of all structural components and architectural appurtenances incorporated in the structures plus hung loads and any other permanent, externally applied loads including equipment dead load.

(A-2) Live Loads

Live load reductions as per provisions of IS: 875. Special use areas shall be investigated and loading revised upward as necessary. Hung loads shall be based on minimum loading equivalents of 100 Kgs. / Sqm. for piping and 50 Kgs/.Sqm. for electrical, ventilation and air conditioning. Loading due to concentrations of facilities in specific areas shall be considered.

(A-3) Equipment Loads

a. Loads (both static and dynamic) of major equipment shall be considered as per manufacturer's certified drawings. Equipment foundations shall be analysed for all possible load combinations both static and dynamic, wherever applicable. However, if the dynamic load component is very less compared to static loads and or if the requirement of plinth / pedestal size is more, then static analysis will be adopted by considering 3 times the static weight of the equipment.

b. Crane girders and supporting columns shall be designed for vertical and horizontal forces (including impact forces) as developed from the crane weights and wheel loads.

(A-4) Wind Loading

Wind loads shall be considered in accordance with Indian Standard Code IS: 875 for a basic wind speed of 50m/sec. up to height of 10 meters above mean ground level.

(A-5) Seismic Loading

Seismic Zone – V shall be considered as per latest IS: 1893. Importance factor of 1.5 shall be considered as per latest IS code.

(A-6) Combination of Loads

a. All structures shall be analyzed for the load combinations in accordance with the requirements of IS: 456 and IS: 875 for all possible combination of loads e.g. Dead load, live load, crane loads, wind or seismic loads, soil loads and surcharge loads.

Appropriate allowable increase in permissible stresses as per IS codes, shall be taken except where as per above load combinations, load factors shall be used.

(B) Cement & Concrete Grades

The cement shall be OPC / PPC cement for all civil works. The following minimum grades of concrete as per provisions of IS: 456 and other applicable codes shall generally be used for concrete structures

Page 12: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for 220kv GIS- 167 R1 Dt.25-02-2013 Page 12 of 30

(B-1) M-25: All reinforced concrete structures of GIS BUILDING /Control Room, etc (Min. cement consumption shall be 400 Kg. Per cmt of concrete).

(B-1) M-20: All reinforced concrete structures of Fire water Pump house, Foundations for outdoor GIS, important equipment foundations, structural concrete for foundation, super structure, reinforced concrete in Pavement, plinth protection etc (Min. cement consumption shall be 350 Kg. Per cmt of concrete).

(B-2) M-10: Levelling course (Min. 100 mm thick) Below footings, Tanks, base slab for drains, fill concrete etc (Min. cement consumption shall be 225 kg. Per cmt of concrete.

(C) Reinforcement: The reinforcing bars shall be TMT bars generally conform to various requirements of IS: 1786 (for High Strength deformed steel bars and wires for concrete reinforcement)

(D) Special requirements:

� Excavation shall be carried out in all sort of soil for any depth and throwing away the extra stuff with in the lead of 2.0 KM radius and its dressing etc. Complete as directed by site in charge. � Plinth level of all buildings shall be maintained at not less than 1000 mm above the plot formation level herein. � All Brick work shall be CM (1:6) both faces of the brick work shall be

plastered in CM. The inside plaster shall be finished in CM (1:3) with smooth cement Neeru Finish and outside shall be finished with sand faced plaster in two coats with cement mortar. The brick shall have min. compressive strength of 35 Kg / Cm2 for non load bearing wall.

� All building shall be provided with U-PVC rain water down takes pipes, plinth protection and drainage system connected to main storm water drain. Plinth protection shall be in the form of 1000 mm wide and 100 mm thick (M20 grade) concrete laid over 230 mm thick rubble soiling, interstices filled with small stone chips and sand. The air-conditioning system shall be provided for Control Room. The Luxanol / Interarch False Ceiling shall be provided in all air-conditioned area. � False flooring shall be providing at first floor whenever required as per system requirement. � The Switch Yard area will be graded and covered with metal of size 25 to 40 mm. in layer of 100 mm thickness Also, the RCC path way shall be provided in Switch Yard as per the requirement. � Plinth protection 1000mm wide shall be provided around all buildings. � Required no of PVC service water tank of approved make shall be provided on Control Room building./ GIS building. � Suitable Plantation shall be done as directed within S/S premises.

Page 13: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 13 of 30

ANNEXTURE - A Sr. no.

Type of Foundation & Structure

Wall Wall finishing

Floor finish Ceiling Doors windows

Painting

1 GIS AND CONTROL ROOM BUILDING ( GF + FF)

Foundation as per Soil Condition with RCC framed structure. As approved by GETCO

BB Masonry in CM 1:6

B GROUND FLOOR a 220KV GIS ROOM Inside: 15

mm thick Cement smooth Plaster in CM 1:3 on walls Outside: 20mm thk sand faced plaster in two coats.

12 mm thick floor hardening topping over 50 mm thick M15.

Slab thickness as per approved design with 15mm thk plaster in CM 1:3 on ceiling

Aluminium doors , windows, Ventilator glazing and Heavy type rolling shutter

* Plastic paint for interior walls & Apex or equivalent paint for outside portions for complete building

b CONTROL & PROTECTION PANEL ROOM

Aluminium partition (Partly Glazed and partly panelled)

Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on

Vitrified ceramic tiles 8 mm thick as per design with 100 mm

Slab thickness as per approved design with

Aluminium doors & windows & glazing.

* Plastic paint for interior walls & Apex or equivalent paint for outside

Page 14: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 14 of 30

walls Outside: 20mm thk sand faced

skirting. OR Flooring suitable to CABLE ROOM as approved by GETCO

15mm thk plaster in CM 1:3 on ceiling

portions for complete building

C LVAC ROOM Aluminium partition (Partly Glazed and partly panelled

Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on walls Outside: 20mm thk sand faced

12 mm thk floor hardening topping over 50 thk M15.

Luxalon / interarch make false ceiling

Aluminium doors & windows & glazing.

* Plastic paint for interior walls & Apex or equivalent paint for outside portions for complete building

d AHU ROOM Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on walls Outside: 20mm thk sand faced

12 mm thk floor hardening topping over 50 thk M15.

Slab thickness as per approved design with 15mm thk plaster in CM 1:3 on ceiling

Aluminium doors & windows & glazing.

Plastic paint for interior walls & Apex or equivalent paint for outside portions for complete building

e TOILET Inside: 15 mm thick Cement

Anti skid ceramic tiles for flooring

Slab thickness as per

Aluminium doors & windows &

Glazed tiles for full height of wall & Apex

Page 15: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 15 of 30

smooth Plaster in CM 1:3 on walls Outside: 20mm thk sand faced

and Dado of full height

approved design with 15mm thk plaster in CM 1:3 on ceiling

glazing. Exhaust fan with GI mesh

or equivalent paint for outside portions for complete building except for battery room.

f STAIR CASE WITH STAIR CABIN ON TERRACE

Railing of steel pipe with glass of approved quality and make and design

Marbo granite tiles OR Granite of approved quality with non slippery arrangement

Slab thickness as per approved design with 15mm thk plaster in CM 1:3 on ceiling

Aluminium doors & windows & glazing.

Plastic paint for interior walls & Apex or equivalent paint for outside portions for complete building

g INSIDE CABLE TRENCH

Cable trench with RCC raft and RCC walls as approved by GETCO.

C FIRST FLOOR a MEETING ROOM Aluminium

partition (Partly Glazed and partly panelled)

Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on walls Outside:

Vitrified ceramic tiles 8 mm thick as per design with 100 mm skirting. OR Flooring

Luxalon / Interarch make false ceiling

Aluminium doors & windows & glazing.

*

Page 16: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 16 of 30

20mm thk sand faced

suitable to CABLE ROOM as approved by GETCO

b TOILET Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on walls Outside: 20mm thk sand faced

Anti skid ceramic tiles for flooring and Dado of full height

Slab thickness as per approved design with 15mm thk plaster in CM 1:3 on ceiling

Aluminium doors & windows & glazing. Exhaust fan with GI mesh

Glazed tiles for full height of wall & Apex or equivalent paint for outside portions for complete building except for battery room.

b STORE ROOM Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on walls Outside: 20mm thk sand faced

12 mm thk floor hardening topping over 50 thk M15

Slab thickness as per approved design with 15mm thk plaster in CM 1:3 on ceiling

Aluminium doors & windows & glazing.

*

c PLCC ROOM Aluminium partition (Partly Glazed and partly

Inside: 15 mm thick Cement smooth Plaster in

Vitrified ceramic tiles 8 mm thick as per design with

Luxalon / Interarch make false ceiling

Aluminium doors & windows & glazing.

*

Page 17: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 17 of 30

panelled) CM 1:3 on walls Outside: 20mm thk sand faced

100 mm skirting. OR Flooring suitable to CABLE ROOM as approved by GETCO

d BATTERY ROOM Inside: 15 mm thick Cement smooth Plaster in CM 1:3 on walls Outside: 20mm thick sand faced

Acid resistasnt non skid tiles.

Luxalon / Interarch make false ceiling

Fire resistant steel doors and window

Acid/Alkali resistant painting on walls&ceiling

* In corridor false ceiling shall be provided of ‘Luxalon / Interarch make false ceiling’.

Note: (1) China Mosaic flooring water proofing as per technical specification shall be done for the above buildings on terrace slab of the above buildings with guarantee of water proofing for at least five years from date of completion (2) In toilet block, there shall be approved quality of European WC with flush tank, Wash basin, Glass mirror etc for complete function of Toilet block. (3) RCC stair case from GF to FF, FF to SF & SF to terrace shall be provided including cabin at top. (4) In GIS control room as the height is more, a care shall be taken for sufficient lighting and ventilation. (5) Aesthetic view of building as a whole shall be maintained. (6) GIS Housing staircase railing shall be of stainless grill of approved design with polished hand rail of appropriate size. (7) Aluminium doors and windows shall

Page 18: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 18 of 30

be heavy type as per latest IS codes and practices. (8) Leak proof test shall be given for water supply and drainage line.

(9) False flooring of approved make and pattern shall be provided at first floor as per system requirements.

ANNEXTURE ‘B’

STANDARD FIELD QUALITY PLAN

FOR CIVIL WORKS OF GETCO PROJECTS

Sr No.

Component/Operation & Description of Test

Sampling Plan With Basis

Ref. Document & Acceptance

Norm

Testing Agency

Remarks Check

1 MATERIAL A CEMENT

(i) (ii)

Fineness Compressive Strength

As per mix Design requirement

IS: 456,IS: 269 IS: 8112,IS: 12269

Govt. Approved Lab

The tests for cementCoarse aggregates &

B

Page 19: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 19 of 30

(iii) (iv) (v)

Initial & final setting time Soundness Chemical Composition of Cement

IS: 1489

Fine aggregate shallbe conducted duringMix design for Concrete. Mix designshall be subject to approval by GETCO

B COARSE AGGREGATES

(I) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix

Determination of Particle size (Sieve Analysis) Flakiness Index Crushing Value Specific Gravity Bulk Density Absorption Value Moisture Content Soundness of Aggregate Presence of deleterious materials.

As per mix Design requirement

IS: 383,IS: 2386 IS: 456

Govt. Approved Lab

In case of change of source of coarse & Fine aggregates, mix Design should be revised.

B

C FINE AGGREGATE

(I)

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

Gradation /Determination of Particle size Specific Gravity and density. Moisture content Absorption Value Bulking Silt Content Test Presence of deleterious materials

As per mix Design requirement

IS: 383, IS: 2386, IS:456

B

Page 20: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 20 of 30

D BRICKS

(i)

(ii)

(iii)

(iv)

Dimensional tolerance Compressive Strength Water Absorption Efflorescence

As per relevant IS.

GETCO Specs. IS: 3495) (Part I to Iv)

Govt. Approved Lab

To be approved by GETCO

B

E WATER

(i) (ii)

Cleanliness (Visual Check) Chemical and physical properties of water for checking its suitability for construction proposes.

Random One sample per Source

IS: 456,IS: 3025 and Specification. The Water used for mixing concrete shall be fresh, clean and free from oil, acids and alkalis, organic materials, or other deleterious materials IS: 456,IS: 3025 and GETCO Specification

Contractor / GETCO Govt. Approved Lab

Each source to be Approved by GETCO

C

Page 21: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 21 of 30

F REINFORCEMENT STEEL

(i) (ii) (iii) (iv) (v) (vi) (vii)

Identification & size Chemical Analysis Test Tensile Test Yield stress\proof stress Percentage Elongation Bend/Re-bend Test Reverse Bend Test for HYSD Wire

Random One sample per Heat One sample per Each size One sample per Each size One sample per Each size One sample per Each size

IS: 432,IS: 1139, IS: 1786 & GETCO Specification

Contractor Should produce manufacturer’s test Certificate. i.e. from approved Manufacturer. Govt. Approved Lab

Approved by GETCO.

B

2 WORKS

GANTRY/EQUIPMENT FOUNDATION/CABLE TRENCH

A BEFORE EXCAVATION

(i)

(ii)

Checking of pegs location as Per line and alignment Checking of pit making as per Drawing & RL

100% on each Location 100% on each Location

IS: 4091,IS: 3764 & GETCO approved Drawing/ specification

Contractor

Approved by GETCO.

C

B EXCAVATION

Page 22: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 22 of 30

(i)

(ii)

(iii)

Dimensional conformity Verticality/slopes & Square ness of each pit Verification of classification of foundation wherever applicable.

Each location Each location Each location

IS: 4091,IS: 3764 & GETCO approved Drawing/ Specification.

Contractor Contractor Joint inspection By GETCO. And Contractor

Approval by GETCO. (1) Foundations will not be placed on filled up soil (2) Minimum depth of foundation will be 750 mm in Virgin soil.

B

C FOUNDATION BOLT/METALLIC INSERTS

(i) (ii) (iii) (iv)

Check for proper identification of foundation bolts w.r.t. type of foundation Visual check for mechanical damage and galvanising/painting if applicable for metallic insert Alignment & Level Grouting/Underpinning of foundation base plate

100% on each Location

As per approved drawings

Contractor

B

D P.C.C. Padding

For all locations

IS:456,GETCO Approved foundation Drawing & specification

Joint inspection By GETCO. And Contractor

Approval by GETCO.

C

E SHUTTERING (Form work)

(i) (ii)

Check for materials, breakage Or damage Check for plumb, alignment Parallelism, square ness and equidistance from stub

C

Page 23: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 23 of 30

(ii) (iii) (iv) (v) (vi) (vii)

Dimensional check Check for level & height Check for rigidity of frame/tightness Cleaning and oiling Diagonal bracing if required as Per drawings/site conditions. Checking of joints to avoid undue loss of cement slurry

100%

IS: 456,GETCO Specification/ approved drawings.

Joint inspection By GETCO. And Contractor

Approved by GETCO.

F PLACEMENT OF REINFORCEMENT STEEL.

(i) (ii) (iii) (iv) (v) (vi)

Check the steel bars for rust,cracks,surface flaws, laminate etc. (Visual check) Check as per the bar bending Schedule before placement of Concrete. Check cutting tolerance for bars as per check List/drawings. Check whether all bent bars and lap lengths are as per approved bar bending schedule. Check whether all joints & crossing of bars are tied properly with right gauge & annealed wire as per specification. Check for proper cover distance spacing of bars, spacers, & chairs after the reinforcement cage has been put inside the formwork. Check whether lapping of bars are tied properly with right gauge and annealed wire as per specification.

100% 100%

IS: 456,GETCO Specification/ Approved drawings.

Joint inspection By GETCO. And Contractor

Approved by GETCO.

B

Page 24: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 24 of 30

G PILE FOUNDATION (Additional Tests)

(i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (a) (b)

Check of centre line of pile group Check pile location Temporary casing tube & permanent line also check thickness of liner material (if applicable) Bentonite slurry (if applicable) Pile depth, level, size and alignment Chipping of pile head Pile load testing Standard Penetration Test Anchor bolts if applicable Level, centre to centre distance of bolts. Visual check for galvanizing

Each pile group Each pile Each pile Each pile Each pile Each pile As per GETCO BOQ/Specification As per GETCO BOQ/Specifica- tion, IS: 2911 100% on each Location 100% on each Location

IS:2911 & GETCO approved pile foundation Drawings/ Specification. GETCO approved pile foundation Drawings/ specification

Joint inspection By GETCO. And Contractor

Checklist to be prepared And signed jointly

B

Page 25: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 25 of 30

3 CONCRETING

A APPROVAL OF MIX DESIGN

For each grade of Concrete.

IS: 456 & GETCO Approved specifications

Contractor

Approval by GETCO

A

B BATCHING, MIXING & PLACING OF CONCRETE AND COMPACTING

Each Mix.

IS: 456 & GETCO Approved drawings and specifications

Contractor

Approval by GETCO

B

C FIXING OF CHIMNEY COLUMN: Check for width/length squareness, parallelism & equidistance

100% IS:456, IS:2502 and as per approved drgs.

Joint inspec- tion by GETCO and Contractor

Approval by GETCO

B

E CONCRETE TESTING

(i) (ii)

Slump test

Check for quantities for cement, fine aggregate, coarse aggregate and water while batching

One sample per foundation 100% on all locations

IS:456,IS:516, IS:1199 And GETCO Specifications

Contractor

Results to be recorded and signed Jointly

B

F CONCRETE CUBE TESTING

(i)

Compressive Strength

Sample (Consisting of minimum 3 cubes) (i) For Footing column & plinth beam shall be tested for 28 days strength. (ii)For slab, 2

Is:1199,IS:456, IS:516

Govt. Approved lab

To be witnessed & Approved by GETCO

A

Page 26: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 26 of 30

sample to be collected for 7days & 28 days strength test.

G CHECK FINISHING, DIMENSIONAL CONFORMITY AND WORKMANSHIP BEFORE & AFTER BOX REMOVAL

100% IS:456, IS:516, IS:1199

Contractor

Approval by GETCO

4 BACKFILLING

(i) (ii) (iii)

Check for thickness of Layer & watering Visual check for correction/ramming Compaction test (Percentage of Max dry density)

100%

GETCO Specifications.

Govt. Approved lab

To be witnessed & Approved by GETCO

C

5 BRICK-WORK

(i) (ii) (iii)

Mortar mix/proportion Plumb & Alignment Joints

Random Random Random

IS:2250, GETCO Specification

Contractor. Approval by GETCOC

6 PLASTERING

(i) (ii)

Plastering thickness and evenness Mortar mix proportion

Random Random

GETCO Specification GETCO Specification

Contractor. Approved by GETCO

7 CURING FOR CONCRETE, MASONRY,PLASTERING ETC.

100% on all locations

IS 5613 & GETCO Specification,

Contractor. Approval by GETCO

C

Page 27: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 27 of 30

8 SITE SURFACING

(i) (ii) (a) (iii) (iv)

Levelling Soil Sterilization Spraying of chemicals Grading of 20/40/60 mm Stone Compacted thickness of 20/40/60 mm stone layers as applicable

100% 100% One sample Random

GETCO Specification GETCO Specification IS383 & 2386 GETCO Specs. GETCO Specification

Contractor Approval by GETCO

B

Page 28: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 28 of 30

:GENERAL GUIDELINES FOR IMPLEMENTATION: 1. Details of categories of check codes A,B & C including accepting and

deviation disposing authorities are indicated at Annexure-I. 2. GETCO specification shall mean GETCO technical specification, approved

drawings, data sheets and law provisions applicable for the specific contract.

3. Acceptance criteria and permissible limits shall be as per relevant Indian Standards and / or prevalent code of practice / GETCO specifications.

4. It is clarified that the tests indicated at column 2 of this FQP i.e. Against

column “component operation & Description of test “, are only generally required to be conducted. However GETCO reserves the right to carry-out any additional tests at any stage if the situation so warrants.

5. SE (TR) of circle shall approve testing laboratory before accepting the test

results from the lab. 6. SE (TR) of circle shall approve the sources for cement, coarse aggregate, fine

aggregate & water before actual utilization.

7. All the testing & measuring equipments used by the contractor for testing are required to be calibrated. A copy of valid calibration report shall be retained by GETCO based on the joint inspection.

8. Classification of foundations shall be approved by GETCO based on the joint

inspection report & Soil investigation reports.

9. Zone-IV fine aggregate shall be used for nominal mix Reinforced cement concreting work.

9.1 Zone-IV fine aggregate shall be avoided for design mix reinforced cement concreting work unless tests have been done to ascertain the suitability of proposed with the prior approval GETCO sit.

10. CC Blocks/Bricks should be free from cracks, flaws and modules of free lime.

They should have smooth rectangular faces with sharp corners and should be uniform in colour.

11. Cement:

11.1 In case of cement is in the scope of the contractor, the same shall be procured from sources approved by GETCO site and got tested on sample basis for specified acceptance tests as specified in the FQP at a reputed third party lab approved by GETCO site.

11.2 The samples of cement for site testing shall be taken within three week of the delivery and all the tests shall be commenced within one week of sampling. If the cement remains in store for a period of more than Six months, all the site tests are required to repeat before usage.

11.3 The source and grade of cement shall be as per approved design mix.

Page 29: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 29 of 30

12. Reinforcement steel & structural steel used in cable trenches & foundations:

12.1 In case supply of steel is in the scope of the contractor, the same shall be procured from the main producers i.e. SAIL, TISCO, IISCO or Rashtriya Ispat Nigam or the rerollers approved by main producers.

12.2 The results of testing of cement and reinforcement steel referred in 11.1 and 12.1 above shall be got approved from GETCO site before cement and reinforcement steel are put to use. However, in exceptional cases due to exigencies of work, GETCO site may authorize the contractor to use cement and reinforcement steel even before the test results are received. However, in all such cases, if the test results subsequently received are found to be not complying with the specified acceptance criteria, the contractor shall have to dismantle and recast all such foundations cast with such non-conforming materials at his own cost. Confirmation to this effect shall be obtained from the contractor by the project authorities beforehand in all such cases. 13. The contractor shall submit welding procedure specification (WPS) including

the type of electrode used for approval of GETCO site before staring the welding work. The welder with proper certificate shall be deployed.

14. Approval / acceptance of individual test results by GETCO in the course of

execution of contract will neither relieve the contractor from his contractual obligations and responsibilities, nor does it limit the owner’s right under the contract.

15. In case, requirement of special items like super sulphated cement, corrosive

resistant reinforcement steel (CRS) etc. arise due to site conditions, the specific approval of GETCO may be obtained before using the same and all the tests as per relevant standards shall be carried out.

16. All the materials shall be stored by the contractor in a manner affording

convenient access for identification and inspection at all the times. Storage of material shall be in accordance with IS: 4032 (latest edition).

Page 30: SARADAR PATEL VIDYUT BHAVAN, - Welcome to GUVNL Office/2013/260413/3_ T… · The scope of work under this contract shall include design and construction of ... Control and protection

GETCO/C/TS/Civil Works for GIS- 050 R2 Dt.08-03-2011 Page 30 of 30

ANNEXURE-I

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED

Accepting and deviation disposing authorities for different Categories of checks as envisaged in field quality plan

Category Type

of Check

100% Checking/ witnessing by

Counter check/

Surveillance check by

Accepting authority, if test results are within

permissible limit

Deviation disposing authority

A

Critical

Executing dept. Plus EE (civil) of circle With Contractor’s Engineer

SE (TR) Plus EE(C)

SE (TR) Plus EE(C)

CE, Corporate

Office

B Major Executing deptt. plus DE(C)

EE(C) EE(C) SE(TR)

Plus EE(C)

C Minor Executing deptt. plus JE(C)

DE(C) DE(C) EE(C)

Plus DE(C)