sap pm level-1 material
TRANSCRIPT
-
7/29/2019 SAP PM Level-1 Material
1/79
Page 1Page 1
Satyam SAP Level -1Training for MPT
Plant Maintenance Module
-
7/29/2019 SAP PM Level-1 Material
2/79
Page 2Page 2
Plant Maintenance Overview
Unit:1Organization Levels
Unit:6Preventive Maintenance
Unit:2Technical Objects
Unit:3Breakdown Maintenance
Unit:4Corrective Maintenance
Unit:5Refurbishment
Unit:7Reporting
-
7/29/2019 SAP PM Level-1 Material
3/79
Page 3Page 3
-
7/29/2019 SAP PM Level-1 Material
4/79
Page 4Page 4
Location Based Organizational Structure
MaintenancePlant
At which operational system
of company are installed
LocationIt Subdivide a maintenance
Plant according to Spatial criteria
Maintenance Work CentreIts an organizational unit where
Work can be carried out
e.g. site, buildingetc.
e.g.technicianmachine
-
7/29/2019 SAP PM Level-1 Material
5/79
Page 5Page 5
Planning based Organizational Structure
Maintenance Planning plant
Where maintenance requirementsare planned
Maintenance Planner groups
They defines planners within themaintenance planning plante.g. mech. planner, electrical planner etc.
-
7/29/2019 SAP PM Level-1 Material
6/79
Page 6Page 6
Types of Planning
Plant-Specific Planning(Decentralized Planning)
In mostorganizationalstructures, the maintenance requirement
is planned in the same plant where it occurs ,the maintenance ordersare executed by workshops from the same plant and inventory is
maintained at same plant
Cross-Plant Planning(Centralized Planning)
Multiple planning plants are assigned to a planning plant. In one
plant there is a need for maintenance, as a technical system thererequires maintenance.(= maintenance plant). All further functions
maintenance ,order execution, inventory management) are however,the responsibility of another plant maintenance plant)
-
7/29/2019 SAP PM Level-1 Material
7/79
Page 7Page 7
De-centralized Planning
Planning Types
Plant 1000 WarehouseInventory
Workshops
Maintenancerequirement
Planning ofMaintenancerequirements
Plant 1100
Workshops
Maintenancerequirement
Planning ofMaintenancerequirements
-
7/29/2019 SAP PM Level-1 Material
8/79
Page 8Page 8
De-centralized Planning
Planning Types
Plant 1000 WarehouseInventory
Workshops
Plant 1200 Plant 1100
Workshops
Maintenancerequirement
Maintenancerequirement
Maintenancerequirement
Planning ofMaintenancerequirements
Centralized Planning
-
7/29/2019 SAP PM Level-1 Material
9/79
Page 9Page 9
Work Center
A work center is an organizational unit within an operational system.
A work center can be one of the following:
MachineGroup of machinesPersonGroup of people
In Plant Maintenance, work centers are used as:
- Main work center in the master record for the equipment or functional location- Main work center in a maintenance item- Main work center in the task list header- Performing work center in the operations for a task list
- Main work center in the order header- Performing work center in the operations for an order
Work centers belong to the master data in PM and provide the capacityrequired to perform a task.
-
7/29/2019 SAP PM Level-1 Material
10/79
Page 10
Work center data
Work center data is used for the following business functions:
Basic Data - contains the description, work center category (for example,Plant Maintenance) and planned usage, person responsible.
Capacities - The available capacity is usually the standard available capacitywith the specifications - factory calendar, work start and end, number of
individual capacities (= number of people) and shift time per capita. Theavailable capacity can be restricted according to time, or organized in shiftsdifferent from the standard available capacity.
Scheduling - the operation dates are calculated based on the lead times(duration of operation), starting from the basic start and end dates.
Personnel Data - in addition to defining available capacity, people (=personnel numbers from Human Resources) or positions can be assigned inthe work center.
-
7/29/2019 SAP PM Level-1 Material
11/79
Page 11
Available capacity in work center
Available capacity is the work that can be provided by a unit of
capacity at a work center for each working day.
The available capacity refers to the capacity available within a certain period. Theavailable capacity is determined by:
1. Work start and finish times.2. Break lengths.3. Capacity utilization level of the capacity units.4. Number of individual capacity units that constitute the capacity.
The system stores the working time and the daily available capacity for eachwork center.
The available capacity can be defined for one work center or for all work centers.
-
7/29/2019 SAP PM Level-1 Material
12/79
Page 12Page 12
-
7/29/2019 SAP PM Level-1 Material
13/79
Page 13Page 13
Technical Objects
-
7/29/2019 SAP PM Level-1 Material
14/79
Page 14Page 14
Function Location
Function Locations are hierarchically ordered
structures that represent a technical system,building, or part thereof
They are structured according to :
Spatial: E.g. Building 1, building 2
Technical : E.g. Press, Press frame, presshydraulics
Functional: E.g. Polymerization, condensation
-
7/29/2019 SAP PM Level-1 Material
15/79
Page 15Page 15
Criteria for Functional Location
To represent the structure of technical systems
according to functional criteria
Recording of Maintenance tasks
Storage and Evaluation of Technical data
Cost monitoring by area
Effects of usage condition on the installedequipment
-
7/29/2019 SAP PM Level-1 Material
16/79
Page 16Page 16
Function Location (Master Record)
General
Location
Organization
Structure
Equipments
Classification
Documents/Technical Drawings
Multilingual text
Address/Partner
Measuring Points/Counters
Permits
-
7/29/2019 SAP PM Level-1 Material
17/79
Page 17
To define the Functional Locations a template has to be used which is
called Structure Indicator.
The Structure Indicator helps in maintaining the hierarchies & control
usage of alphabets & numericals.
The newly created Functional Locations are automatically assigned to
its Superior Functional Location based on the Structure Indicator
Hierarchy.
The Functional Locations though assigned automatically, it can be
changed from the Structure tab in the Functional Location, by changing
the Superior FL.
Function Location Features
-
7/29/2019 SAP PM Level-1 Material
18/79
Page 18
Function Location Structure - Example
MPT
MPT-MOHP MPT-NMOHP
MPT-
MOHP-
UNLOAD
MPT-
MOHP-
CONV
MPT-
MOHP-
RECLAIM
MPT-
NMOHP-
SCHOOL
MPT-
NMOHP-
QUARTER
-
7/29/2019 SAP PM Level-1 Material
19/79
Page 19Page 19
Equipment
Equipment is an individual physical object that is to be maintained
as an autonomous unit and for which maintenancehistory should be constructed.
E.g. pumps, motors, vehicles etc.
Purpose of equipment :
To manage individual data for the object
Recording of maintenance tasks
Monitoring of maintenance tasks costs
Usage time of the object
-
7/29/2019 SAP PM Level-1 Material
20/79
Page 20
Machines
Fleet Objects
PRTs
Customer Equipment
Equipment Categories
Equipment categorisation is carried out using Equipment Category like
-
7/29/2019 SAP PM Level-1 Material
21/79
Page 21Page 21
Equipment (Master Record)
General
Location
Organization
Structure
Equipment Usage
Documents/ClassificationTechnical Drawings
Multilingual text
Address/Partner
Measuring Points/Counters
Permits
Internal Note
-
7/29/2019 SAP PM Level-1 Material
22/79
Page 22
Fleet Objects have specific data like
Identification Data
Dimension Data
Transport Relevant
data
Planning Data
Other Features
Engine Data
Fuel & Lub Data
Number Plate, Chassis Number
Height, Width, Length
Weight, Max Load, Loading Volume
Counter Reading data
Fuel card Number, key Number
Engine Type, Engine perf, RPM, CC
Fuel Type, Oil Type
Fleet Objects - Features
-
7/29/2019 SAP PM Level-1 Material
23/79
Page 23
Using FLs & Equipment
A Functional Location having some
equipment installed.
One such equipment is a DG Set
Level-1 Sub equipment
Engine
Level -2 Sub Equipment Engine Head
Level-3 Sub Equipment
Injectors
-
7/29/2019 SAP PM Level-1 Material
24/79
Page 24
Sub-Equipment
-
7/29/2019 SAP PM Level-1 Material
25/79
Page 25
Classification of Equipment
Classification is a cross-application function in the R/3 System that
is used by other application as well as Plant Maintenance.
One aim of classification is to assign features in detail to a technicalobject that the master record cannot handle in this quantity.
A classificationsystem describesobjects usingcharacteristics, andgrouping similar
objects into classes, toclassify them andmake them easier tofind.
-
7/29/2019 SAP PM Level-1 Material
26/79
Page 26
Characteristics
-
7/29/2019 SAP PM Level-1 Material
27/79
Page 27
Class Hierarchy
Classes can be used in hierarchy for better classification of the equipment.
Multiple levels of Class Hierarchy is possible.
-
7/29/2019 SAP PM Level-1 Material
28/79
Page 28
Object Networks
In a Industry different Networks could be there like, Eg: Water, Electricity,
Computer LAN, etc . These are to be defined in the system.
-
7/29/2019 SAP PM Level-1 Material
29/79
Page 29
Object Links
Reclaimer
Conveyor - 1
Conveyor - 2 Ship
By using the Object Links, the material flow can be easily known.
By taking a equipment for Maintenance, what other equipment are to be
stopped is also easily identifiable.
The Object links in reality can be Wires, Pipelines, etc.
-
7/29/2019 SAP PM Level-1 Material
30/79
Page 30Page 30
Bill of Material (BOM)
Bill of Material is a list of Materials for different uses in
different Modules
BOM Usage
Maintenance
Production
Engineering
Costing
-
7/29/2019 SAP PM Level-1 Material
31/79
Page 31Page 31
BOM Usages
BOM is a list of materials which are relevant for a usage.
The Engineering /Design usage BOM records all components of a
product according to engineering/design criteria and contains their
technical data.
The Production usage BOM records the items according to
production criteria and assembly status.
The costing usage BOM maps the product structure and provides
the basis for automatic determination of the direct material costs for
a product.
The Plant Maintenance usage BOM contains items only relevant tomaintenance only.
And like wise other usages of the BOM.
-
7/29/2019 SAP PM Level-1 Material
32/79
Page 32Page 32
BOM Use in Plant Maintenance
Structuring the Object
An Object should be structured as clearly as possible from a Maintenance
view point.
Spare Parts Planning
If a bill of Material is available for a maintenance object, this cab be easilyused to plan spares when planning a Maintenance Order.
Types of BOM in Plant Maintenance
BOMs for technical Objects ( FLs & Equipment).
BOMs for Materials.
-
7/29/2019 SAP PM Level-1 Material
33/79
Page 33Page 33
BOM Records
The BOM is stored in the Master Record of the respective Object.
For a Equipment BOM, it is stored in the Master Record of the Equipment.
For a Functional Location BOM, it is stored in the Master Record of the
Functional Location.
For a Material BOM, it is stored in the Master Record of the Material.
-
7/29/2019 SAP PM Level-1 Material
34/79
Page 34Page 34
-
7/29/2019 SAP PM Level-1 Material
35/79
Page 35Page 35
Breakdown Maintenance
Business Scenario
For breakdown maintenance, the data required for the other businessprocesses needs to entered quickly and easily so that the
subsequent steps can be executed.
-
7/29/2019 SAP PM Level-1 Material
36/79
Page 36Page 36
Breakdown Maintenance order
Malfunction/Maintenance order
Execution
Completion
Starting point is the creation of maintenanceorder (possibly using data from the
maintenance notification) for damage or amalfunction. This is not a planned maintenanceorder, but it is immediately released forprocessing.
It comprises the removal of spare parts fromstock and the actual execution of the order.
The actual time required is confirmed.
Technical confirmation are also entered torecord the repair and condition of thetechnical system.
-
7/29/2019 SAP PM Level-1 Material
37/79
Page 37Page 37
Breakdown Maintenance Order
OrderCreate
andRelease
BreakdownReport/call/
message
Production Maintenance Planner
Technician
Malfunction
Correct/
Confirm
Maintenance Supervisor
OrderComplete
O d h h f
-
7/29/2019 SAP PM Level-1 Material
38/79
Page 38Page 38
Order with or without Notification
Order withoutNotification
Order withNotification
Breakdown order can be created
directly without any previousrequisition. It usually refers to atechnical object (Function Location orEquipment) and is configured at WorkCenter.
Breakdown Order can also becreated in combination with amaintenance notification, The orderthereby contains the same data asin above case and the notification
contains all the data relevant forthe documentation or history e.g.malfunction start or damage
-
7/29/2019 SAP PM Level-1 Material
39/79
Page 39Page 39
C ti M i t
-
7/29/2019 SAP PM Level-1 Material
40/79
Page 40Page 40
Corrective Maintenance
Notification
Planning
Scheduling
Execution
Completion
Malfunctions and other requirements are recordedE.g. Technical Object, Description, date,
Malfunction.
Order puts into processE.g. Order Release, Printout, Capacity LevelingAvailability Check
Order ExecutedE.g. Planned/Unplanned Material Withdrawn
Settlement of order done before or after this processE.g.Time Confirmation, Order Settlement, Technical
Completion, Technical Confirmation
Orders are created and planned on the basis of notificationE.g. Work to be performed, Material, Tools,
Internal/external resources
N tifi ti C t & N tifi ti T
-
7/29/2019 SAP PM Level-1 Material
41/79
Page 41Page 41
Notification Category & Notification Type
The List of Standard Notification Categories & Types is shown below.
M i t N tifi ti
-
7/29/2019 SAP PM Level-1 Material
42/79
Page 42Page 42
Maintenance Notification
It refers to a technical object and contains a description of themalfunction or requirement like modification work it can also contain
data for constructing a history e.g. damage, causes and so on.
Notification
Notification items
Activities
Tasks
Date time reported by
Description
Maintenance Object
Location data
Damage Location
Damage
Cause of Damage
Execution factors
Activity
Dates
Task description
Priority
-
7/29/2019 SAP PM Level-1 Material
43/79
Page 43Page 43
Priority
A priority can be assigned to each maintenance notification and order. Thispriority defines the required start and end dates for the notification or order,
relative to the creation date.
During maintenance processing, you can work with internal priority types for
notifications and orders. Since you can define an unlimited number of prioritiesfor each priority type, it is easier for the user to utilize the same priority typesfor notifications and orders; the same priority keys have the same meaning.
Startmaintenancenotification
Notificationsequence
Priority Type
PM
.
.
.
Priorities
1
2..
Relevant endand unit
Relevant startand unit
Catalog
-
7/29/2019 SAP PM Level-1 Material
44/79
Page 44Page 44
Catalog
Catalog
Code
Group
Damage
Mech-anical
For the coded entry of results and activities whilemaintaining notifications which is useful for analysis
Catalogs
-
7/29/2019 SAP PM Level-1 Material
45/79
Page 45Page 45
Catalogs
A cross-application catalog system is used for reporting maintenancenotifications. This catalog system has a hierarchical structure.
1. The first level of the catalog system is the catalog type. Each PM catalogtype represents a certain directory.
2. Each catalog type can be further subdivided using code groups.3. You can define individual codes within each group.
Catalog Type
DamageCause of damage
Activities
Object partsTasks
Code groups
VehiclesBuildingsMachines
.
.
Catalog Type
Torn drive beltBroken axle
Ripped oil pan
.
.
Order Creating & Planning
-
7/29/2019 SAP PM Level-1 Material
46/79
Page 46Page 46
Order Creating & Planning
Elements of Maintenance Order
Order Header Order Type, Dates, Plant, Reference Object,Priority, Description, etc.
Object list
Operation
Material list
Productionresources/tools
Settlement Rule
Costs
Equipment (assembly), function location,maintenance notification, etc.
Work Center, control key, description, standard
time, activity type, salary details etc.
Material, Quantity, Storage Location
Scheduling
-
7/29/2019 SAP PM Level-1 Material
47/79
Page 47Page 47
Scheduling
Scheduling in Preventive Maintenance orders
Scheduling is carried out for the operations based on different relationships
like FS,SS,FF,SF and also the logic backward or forward scheduling.
This will change the order basic start and end dates accordingly.
Scheduling in Corrective and Breakdown orders.
For breakdown orders there is no scheduling and only immediate execution
of the operations.
For corrective maintenance order there is no scheduling but earliest
execution of the operations in order.
Scheduling Parameters
-
7/29/2019 SAP PM Level-1 Material
48/79
Page 48Page 48
Scheduling Parameters
During Scheduling, the lead times for the operations are totaled and either added to
Basic Start Data (Forward Scheduling) or subtracted from the Basic Finish date
(Backward Scheduling). These dates may differ from basic dates
Scheduling
-
7/29/2019 SAP PM Level-1 Material
49/79
Page 49Page 49
In this order is subjected to various checks like materialavailability and capacity requirements and required shop
papers are printed.System can check in a single step whether all thematerials in the order are available, we useavailability check function for this.
System informs the result in an online message
Iftheres a lack of availability an error log can bedisplayed that contains detail data about theresult of the check.
Depends upon availability check if plannedmaterials are not available in sufficient quantity,system may or may not be able to release theorder depending upon customizing settings.
Material availability list can be displayed.
Scheduling
Permits
-
7/29/2019 SAP PM Level-1 Material
50/79
Page 50Page 50
Permits
Permits are used to adhere to health and safety regulations, and
control order processing. Permits can be used in two different ways.
As Technical permits assigned directly to the Technical Objects.
As process oriented permits with automatic assignment to the
order.
Technical Permits are assigned manually to the technical Object andnot classified (Eg: welding permit). If an order is created for the
technical object. The permits are copied to the order and can influence
the order release with a corresponding setting.
Process Oriented permits are determined automatically based on a
field in the order header (for Eg: Planned costs) and can likewise
influence the order release. Automatic determination is based on the
classified of the permit.
Order Release
-
7/29/2019 SAP PM Level-1 Material
51/79
Page 51Page 51
Reservation Effective
Papers can be printed
Confirmation Possible
Material can be withdrawn
Book good receipts
Complete Task
Order Release
Maintenenance Order - Printing Papers
-
7/29/2019 SAP PM Level-1 Material
52/79
Page 52Page 52
Job TicketIt gives the personexecuting the mainten-ance work a completeoverview of the order.
Control TicketShows to maintenanceengg. a completeoverview of the order.
Material Pick ListShows which material
has been planned forthe order. Object ListShows overview of theObject (Technicalobject, notifications)in the order
Time TicketTime required toexecute the operation
Confirmation slipUsed by workers as anentry sheet for theirwork times
Material withdrawlslip
Authorizes the personto take material fromwarehouse fororder
Maintenenance Order Printing Papers
Execution
-
7/29/2019 SAP PM Level-1 Material
53/79
Page 53Page 53
It Involves the withdrawl of spare parts from thewarehouse and actual execution of the order.
Pick List
Planned/unplannedmaterial withdrawl
OrderExecution as
peroperations
Execution
Completion
-
7/29/2019 SAP PM Level-1 Material
54/79
Page 54Page 54
After the work has been completed, the actual time required isconfirmed in the fifth and final step in Time Confirmation.
The Technical findings (damage, repairs performed, and so on..) and
the effects on the assets condition are recorded in the TechnicalConfirmation (TECO).
Technical confirmation indicates that the order is finished for PlantMaintenance.
Completion
Time Confirmation
-
7/29/2019 SAP PM Level-1 Material
55/79
Page 55Page 55
Individual Entry
Collective entry
Collective Entryusing
operation list
Overallcompletion
confirmation
Time Confirmation
Results of TECO
-
7/29/2019 SAP PM Level-1 Material
56/79
Page 56Page 56
Limited ability to change
order
Status Technically completed
Create Settlement rule
Deletion flag for purchaserequisition
Close open reservation
Close open capacities
Results of TECO
-
7/29/2019 SAP PM Level-1 Material
57/79
Page 57Page 57
Refurbishment
-
7/29/2019 SAP PM Level-1 Material
58/79
Page 58Page 58
Refurbishment
Production
Workshop / External Place
StoresNew
Intact
Refurbished To be Refurbished
Defect
To Scrap
Valuation Category & Types
-
7/29/2019 SAP PM Level-1 Material
59/79
Page 59Page 59
Valuation Category & Types
ConditionReference Origin
IInternal
EExternal
C1New Part
C2Refurbished
C3Defective
DDomestic
AAbroad
Valuation
categories
ValuationTypes
Price of Split Valuated Material
-
7/29/2019 SAP PM Level-1 Material
60/79
Page 60Page 60
Price of Split Valuated Material
Refurbishment - Cycle
-
7/29/2019 SAP PM Level-1 Material
61/79
Page 61Page 61
Equipment Removal+ Goods Receipt
Issue +Refurbishment
Goods Issue +
Equipment Installation
Return to Warehouse
FunctionalLocation
(SerializedEquipment)
WorkCentre
Warehouse
Warehouse
1 2
34
Refurbishment Cycle
Refurbishment
-
7/29/2019 SAP PM Level-1 Material
62/79
Page 62Page 62
Refurbishment
Process in SAP
A refurbishment Order is created in Order type PM 04
The Order is to be created on the material with respective plant &storage Location.
The Order should contain the number of pieces to be refurbished.
Plan the material & Manpower required for the refurbishment.
Withdraw the material from the stores.
Carryout the refurbishment of spares.
Carryout the Complete confirmation.
Post the Refurbished goods posting back to Stores.
-
7/29/2019 SAP PM Level-1 Material
63/79
Page 63Page 63
Preventive Maintenance
-
7/29/2019 SAP PM Level-1 Material
64/79
Page 64Page 64
Preventive Maintenance
To keep downtime and maintenance costs to a minimum, the technical
system in a company are inspected and maintained regularly.
Preventive maintenance is performed based on time, the condition or
the performance of the technical object.
Preventive
Maintenance
Performance
based
Time -based
Preventive Maintenance
-
7/29/2019 SAP PM Level-1 Material
65/79
Page 65Page 65
Preventive Maintenance
Process for Preventive Maintenance
-
7/29/2019 SAP PM Level-1 Material
66/79
Page 66PM-03Page 66
MFG. COMPETENCY(PP,PM&QM)
Task ListIt defines the steps to be carried
out on an object-dependent or
object independent basis
MaintenancePlan
It is created for the object and is
used to automatically generate
orders, notification or service entry
sheet with certain specification
Schedule
It is used to regularly call orders,
notification or service entry sheetand to recalculate planned dates
MaintenanceOrder
Order is automatically generated
from the maintenance plan and
included in the order list, where it
is processed like other orders
TechnicalCompletion
It flags the order and planned date
in the maintenance plan as complete,
date of technical completion is
used to calculate next planned date
Task List
-
7/29/2019 SAP PM Level-1 Material
67/79
Page 67Page 67
Task List
Maintenance task lists describe a series of individual maintenance
activities.
Task lists also specify which spare parts and tools are required foroperations and the time needed to perform the work.
If maintenance task lists is created, Maintenance orders can be createdand maintenance plans very easily, as operations and processes are
already entered in the maintenance task list.
If the same task is required again shortly afterwards, maintenance ordercan be created with reference to the maintenance task list.
Single Cycle maintenance Planning
-
7/29/2019 SAP PM Level-1 Material
68/79
Page 68Page 68
Scheduling data
Single Cycle maintenance Planning
A maintenance plan is used to generate a call objectautomatically for a particular date.
A call object can be a maintenance order, notification orservice entry sheet. Order and notification can also begenerated at the same time.
Structure of Maintenance Plan
Maintenance item
It contains the scheduling parameters for
the plan
It contains following data entries :
> Planning data> Reference object
> Task list
Single Cycle Plan Scheduling Parameters
-
7/29/2019 SAP PM Level-1 Material
69/79
Page 69Page 69
g y g
While creating single cycle plan, the cycle is assigned, that is, theperiod until eachplanned date(which is the due date of the measure.
Orders are generated based on planned date.
However , the call date (which is the order creation date) falls beforethe planned date, to allow a certain lead time (for material
procurement).
Cycle3 months
Single Cycle Plan Scheduling Parameters
-
7/29/2019 SAP PM Level-1 Material
70/79
Page 70Page 70
g y g
Cycle startdefines the date from which the calculation of the planneddates should begin.
Scheduling periodspecifies the period for which planned dates should becalculated in advance. It can be used for time-based and performance
based preventive maintenance.
Planneddate
Scheduling Period(1 Year)
Strategy Plan
-
7/29/2019 SAP PM Level-1 Material
71/79
Page 71Page 71
gy
Business Scenario
Maintenance work and inspections are performed in different cycles.
Example: Service record for a fleet object (excerpt)
o Check fan belt: every 12 months
o Change fan belt: every 24 monthso Change oil: every 6 monthso Change oil filter: every 12 monthso Check air filter: every 12 monthso Change air filter: every 24 months
Single Cycle Plan Scheduling Parameters
-
7/29/2019 SAP PM Level-1 Material
72/79
Page 72Page 72
Cycle start & Offsetdefines the date from which the calculation of theplanned dates should begin & which package should be in sequence.
Scheduling periodspecifies the period for which planned dates should becalculated in advance. It can be used for time-based and performance
based preventive maintenance.
Planneddate
Scheduling Period(1 Year)
H Q Y Q
Performance based strategy planning
-
7/29/2019 SAP PM Level-1 Material
73/79
Page 73Page 73
Preventive maintenance can be planned and performed using aperformance-based strategy and regularly entered counter
readings. The maintenance dates calculated are adjusted
automatically based on the counter readings entered.
Basic Scheduling Functions
-
7/29/2019 SAP PM Level-1 Material
74/79
Page 74Page 74
The scheduling of performance-based maintenance plans is based on the estimatedannual performance, which has been entered in the counter for the referenceobject.
The daily performanceis then calculated from the estimated annual performance.
A time period is then calculated from the daily performance andmaintenance cycle.By adding this time period to the start date of the maintenance plan,a newplanned dateis reached.
Example:
Estimated annual performance: 36,500 liters
Internal calculation of daily performance: 36.500 : 365 days = 100 liters per dayPlanned date for a cycle of 20,000 liters: 20.000 : 100 = 200 days,This means that, beginning from the cycle start, the first planned date is set after 200days.
CalculatedPlanned
date
Cycle :20,000 liters.
Multiple counter Plan
-
7/29/2019 SAP PM Level-1 Material
75/79
Page 75Page 75
For an airline company, changing the engine is dependent on two criteria: Number of flying hours
Number of take-offs/landingsThe engine should be replaced eitherafter 18,000 flying hours or after12,000 take-offs/landings.Amultiple counter plan, in which the two characteristics "Flying hours" and "Take-offs/landings" are linked, can be used here for planning and executing this task.
A multiple counter plan is a maintenance plan that can have cycles of differentdimensions. You can assign cycles freely to the multiple counter plan. A strategy cannotbe used here.
Based on the cycles entered, the counters from the reference object are proposed bycomparing the units.
BusinessScenario
-
7/29/2019 SAP PM Level-1 Material
76/79
Page 76Page 76
Usage List History
-
7/29/2019 SAP PM Level-1 Material
77/79
Page 77Page 77
g y
It displays phases, during which the equipment was installed at a functionallocation, assigned directly to a usage site (for example, a cost center), or stored ina warehouse.The usage list displays all the pieces of equipment that have been installed inchronological order.
Maintenance history
-
7/29/2019 SAP PM Level-1 Material
78/79
Page 78Page 78
Analyses in maintenance processing are based on completed notifications or orders and historical orders.Completed notifications and ordersA notification is transferred to the notification history when completed, whereas an order istransferred to the section for completed orders.Evaluations can be performed in the corresponding list editing function, where the status "Completed"must be set each time.Historical ordersHistorical orders are generated when completed orders are archived and they form the basis for long-termanalyses. They are transferred to the order history. Evaluations can be performed in the list editingfunction for the orders, where the status "Historical" must be set.
Maintenance Cost Analysis
-
7/29/2019 SAP PM Level-1 Material
79/79
Standard Maintenance Cost Analysis are present in SAP.
Analysis based on
Functional Locations
Equipment
Work Center
Object Type
Order Types
Maintenance Activity Types
Plant Sections
ABC Analysis
MTBF, MTTR etc.