santa cruz chp collision summary for sr-17...santa cruz chp collision summary for sr-17 2010 2011...

7
Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49 44 11 INJURY 13 9 10 3 3 4 14 20 22 21 9 FATAL 1 0 0 0 1 0 0 0 0 0 0 TOTAL 38 20 21 14 13 14 70 66 71 65 20 FEBRUARY PDO 20 15 23 8 32 36 17 23 17 46 17 INJURY 4 7 10 5 14 7 5 11 11 21 11 FATAL 0 0 0 0 0 0 0 0 1 1 0 TOTAL 24 22 33 13 46 43 22 34 29 68 28 MARCH PDO 26 26 30 16 20 17 55 25 56 41 18 INJURY 7 14 20 6 13 8 22 11 30 18 2 FATAL 0 0 1 0 0 0 0 0 0 0 0 TOTAL 33 40 51 22 33 25 77 36 86 59 20 APRIL PDO 28 18 15 13 19 18 31 48 20 25 7 INJURY 6 4 9 10 8 7 9 16 7 11 3 FATAL 0 0 0 0 0 0 0 0 0 0 0 TOTAL 34 22 24 23 27 25 40 64 27 36 10 MAY PDO 26 18 11 11 16 23 29 16 12 26 13 INJURY 8 7 6 8 9 7 10 10 11 5 1 FATAL 0 0 0 0 0 0 0 0 0 0 0 TOTAL 34 25 17 19 25 30 39 26 23 31 14 JUNE PDO 11 9 14 11 11 14 18 20 10 22 15 INJURY 4 9 10 9 6 4 10 13 10 10 4 FATAL 0 0 0 1 0 0 0 0 0 0 0 TOTAL 15 18 24 21 17 18 28 33 20 32 19 JULY PDO 11 19 24 9 12 15 15 22 11 19 12 INJURY 9 5 9 10 9 7 8 9 9 9 6 FATAL 0 0 0 0 0 0 0 0 0 0 0 TOTAL 20 24 33 19 21 22 23 31 20 28 18 AUGUST PDO 11 11 9 8 12 14 28 13 13 13 11 INJURY 5 2 4 4 5 4 7 3 8 3 7 FATAL 0 0 0 0 0 0 0 0 0 0 0 TOTAL 16 13 13 12 17 18 35 16 21 16 18 SEPTEMBER PDO 11 7 14 14 22 14 24 22 11 15 INJURY 7 7 4 5 9 11 8 11 9 4 FATAL 0 0 0 0 0 0 0 0 0 0 TOTAL 18 14 18 19 31 25 32 33 20 19 0 OCTOBER PDO 12 25 15 17 19 15 89 26 21 19 INJURY 13 8 10 4 14 7 20 9 8 9 FATAL 0 0 0 0 0 0 0 0 0 0 TOTAL 25 33 25 21 33 22 109 35 29 28 0 NOVEMBER PDO 27 16 29 20 39 15 48 30 36 20 INJURY 11 6 8 3 10 6 13 12 8 9 FATAL 0 0 0 0 0 0 0 0 0 0 TOTAL 38 22 37 23 49 21 61 42 44 29 0 DECEMBER PDO 45 7 30 13 20 49 52 16 22 19 INJURY 16 6 8 2 9 21 19 5 10 9 FATAL 0 0 0 0 0 0 0 0 0 0 TOTAL 61 13 38 15 29 70 71 21 32 28 0 TOTAL PDO: 252 182 225 151 231 240 462 307 278 309 104 TOTAL INJURY: 103 84 108 69 109 93 145 130 143 129 43 TOTAL FATALITIES: 1 0 1 1 1 0 0 0 1 1 0 TOTAL COLLISIONS: 356 266 334 221 341 333 607 437 422 439 147

Upload: others

Post on 21-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

Santa Cruz CHP Collision Summary for SR-17

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020JANUARY PDO 24 11 11 11 9 10 56 46 49 44 11

INJURY 13 9 10 3 3 4 14 20 22 21 9FATAL 1 0 0 0 1 0 0 0 0 0 0TOTAL 38 20 21 14 13 14 70 66 71 65 20

FEBRUARY PDO 20 15 23 8 32 36 17 23 17 46 17INJURY 4 7 10 5 14 7 5 11 11 21 11FATAL 0 0 0 0 0 0 0 0 1 1 0TOTAL 24 22 33 13 46 43 22 34 29 68 28

MARCH PDO 26 26 30 16 20 17 55 25 56 41 18INJURY 7 14 20 6 13 8 22 11 30 18 2FATAL 0 0 1 0 0 0 0 0 0 0 0TOTAL 33 40 51 22 33 25 77 36 86 59 20

APRIL PDO 28 18 15 13 19 18 31 48 20 25 7INJURY 6 4 9 10 8 7 9 16 7 11 3FATAL 0 0 0 0 0 0 0 0 0 0 0TOTAL 34 22 24 23 27 25 40 64 27 36 10

MAY PDO 26 18 11 11 16 23 29 16 12 26 13INJURY 8 7 6 8 9 7 10 10 11 5 1FATAL 0 0 0 0 0 0 0 0 0 0 0TOTAL 34 25 17 19 25 30 39 26 23 31 14

JUNE PDO 11 9 14 11 11 14 18 20 10 22 15INJURY 4 9 10 9 6 4 10 13 10 10 4FATAL 0 0 0 1 0 0 0 0 0 0 0TOTAL 15 18 24 21 17 18 28 33 20 32 19

JULY PDO 11 19 24 9 12 15 15 22 11 19 12INJURY 9 5 9 10 9 7 8 9 9 9 6FATAL 0 0 0 0 0 0 0 0 0 0 0TOTAL 20 24 33 19 21 22 23 31 20 28 18

AUGUST PDO 11 11 9 8 12 14 28 13 13 13 11INJURY 5 2 4 4 5 4 7 3 8 3 7FATAL 0 0 0 0 0 0 0 0 0 0 0TOTAL 16 13 13 12 17 18 35 16 21 16 18

SEPTEMBER PDO 11 7 14 14 22 14 24 22 11 15INJURY 7 7 4 5 9 11 8 11 9 4FATAL 0 0 0 0 0 0 0 0 0 0TOTAL 18 14 18 19 31 25 32 33 20 19 0

OCTOBER PDO 12 25 15 17 19 15 89 26 21 19INJURY 13 8 10 4 14 7 20 9 8 9FATAL 0 0 0 0 0 0 0 0 0 0TOTAL 25 33 25 21 33 22 109 35 29 28 0

NOVEMBER PDO 27 16 29 20 39 15 48 30 36 20INJURY 11 6 8 3 10 6 13 12 8 9FATAL 0 0 0 0 0 0 0 0 0 0TOTAL 38 22 37 23 49 21 61 42 44 29 0

DECEMBER PDO 45 7 30 13 20 49 52 16 22 19INJURY 16 6 8 2 9 21 19 5 10 9FATAL 0 0 0 0 0 0 0 0 0 0TOTAL 61 13 38 15 29 70 71 21 32 28 0

TOTAL PDO: 252 182 225 151 231 240 462 307 278 309 104TOTAL INJURY: 103 84 108 69 109 93 145 130 143 129 43

TOTAL FATALITIES: 1 0 1 1 1 0 0 0 1 1 0TOTAL COLLISIONS: 356 266 334 221 341 333 607 437 422 439 147

anaranjo
Typewritten Text
Replacement pages for Item 5a
Page 2: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

Santa Cruz Area CHP SR-17 Citation Summary

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020JANUARY PCF 287 396 401 368 413 354 201 89 112 259 133

Other 68 84 68 69 43 26 15 12 12 128 1Mechanical 16 30 21 17 73 44 41 15 37 - 48TOTAL 371 510 490 454 529 424 257 116 161 387 182

FEBRUARY PCF 303 420 478 309 325 253 286 78 92 414 248Other 65 70 68 63 22 18 68 5 4 150 1Mechanical 10 19 19 23 38 51 37 5 9 - 40TOTAL 378 509 565 395 385 322 391 88 105 564 289

MARCH PCF 322 351 422 354 273 341 286 60 113 225 150Other 44 42 86 111 29 33 46 13 19 0 0Mechanical 21 29 11 20 40 38 27 7 19 10 27TOTAL 387 422 519 485 342 412 359 80 151 235 177

APRIL PCF 324 431 283 365 346 290 278 100 187 184 44Other 86 49 88 29 22 22 72 10 57 0 2Mechanical 36 23 15 16 36 30 20 10 36 4 7TOTAL 446 503 386 410 404 375 370 120 280 188 53

MAY PCF 429 505 455 444 375 310 296 280 199 247 54Other 46 82 77 27 22 32 54 20 22 0 1Mechanical 69 14 25 45 22 33 34 12 23 4 31TOTAL 544 601 557 516 419 375 384 312 244 251 86

JUNE PCF 523 391 291 339 303 154 152 102 302 248 47Other 42 68 58 29 33 21 54 20 49 0 2Mechanical 68 3 13 65 24 55 46 20 66 2 25TOTAL 633 462 362 433 360 230 252 142 417 250 74

JULY PCF 446 378 288 331 220 245 159 232 191 242 76Other 38 67 69 35 21 31 62 46 13 0 0Mechanical 82 4 8 74 34 50 33 44 29 4 25TOTAL 566 449 365 440 275 326 254 322 233 246 101

AUGUST PCF 498 585 317 477 317 289 106 135 117 179 131Other 84 35 78 32 56 27 41 54 40 0 0Mechanical 24 18 25 34 55 23 21 24 30 4 37TOTAL 606 638 420 543 428 339 168 213 187 183 168

SEPTEMBER PCF 389 472 334 338 240 284 99 147 370Other 95 37 58 31 43 31 7 10 163Mechanical 32 18 19 31 45 36 19 12 -TOTAL 516 527 411 400 328 351 125 169 533 0 0

OCTOBER PCF 307 540 457 381 224 229 88 82 400Other 47 47 57 24 31 33 9 3 350Mechanical 10 14 15 41 32 36 10 16 -TOTAL 364 601 529 446 287 298 107 101 750 0 0

NOVEMBER PCF 267 449 327 319 238 199 123 295 396Other 80 25 53 31 24 6 16 9 180Mechanical 15 18 17 47 28 2 16 20 -TOTAL 362 492 397 397 290 207 155 324 576 0 0

DECEMBER PCF 209 454 297 264 170 137 75 320 480Other 65 43 75 24 4 13 24 17 173Mechanical 11 16 14 42 16 2 9 30 -TOTAL 285 513 386 330 190 152 108 367 653 0 0

ANNUAL TOTALS:

5,458 6,227 5,387 5,249 4,237 3,811 2,930 2,354 4,290 2,304 1,130

Regular Citations

Page 3: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

Santa Cruz Area CHP SR-17 Citation Summary

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020JANUARY PCF 32 0 49 6 56 0 51 0 31 43 0

Other 5 0 6 0 5 0 2 0 4 1 0Mechanical 0 0 0 0 12 0 3 0 8 16 0TOTAL 37 0 55 6 73 0 56 0 43 60 0

FEBRUARY PCF 24 0 43 52 55 74 62 0 2 4 60Other 5 0 7 2 1 2 10 0 0 1 0Mechanical 0 0 1 5 2 3 2 0 0 0 7TOTAL 29 0 51 59 58 79 74 0 2 5 67

MARCH PCF 16 14 46 57 50 51 44 0 42 38 48Other 3 0 4 4 4 2 5 0 3 0 0Mechanical 1 0 5 11 11 2 3 0 13 0 1TOTAL 20 14 55 72 65 54 52 0 58 38 49

APRIL PCF 38 56 40 112 61 75 70 17 30 64 72Other 3 6 7 1 4 2 2 1 7 0 0Mechanical 0 0 0 2 10 6 2 2 12 1 0TOTAL 41 62 47 115 75 83 74 20 49 65 72

MAY PCF 24 64 84 112 50 32 34 43 36 62 138Other 12 4 9 8 1 3 0 1 2 0 0Mechanical 2 0 5 16 2 3 2 4 8 1 3TOTAL 38 68 98 136 53 38 36 48 46 63 141

JUNE PCF 31 36 47 85 51 0 26 24 122 46 27Other 6 8 5 6 5 0 2 3 10 0 0Mechanical 2 0 1 14 7 0 4 2 35 0 0TOTAL 39 44 53 105 63 0 32 29 167 46 27

JULY PCF 27 49 0 64 38 75 62 0 0 38Other 2 8 0 4 4 5 3 0 0 0Mechanical 1 0 0 24 10 2 14 0 0 3TOTAL 30 57 0 92 52 82 79 0 0 0 0

AUGUST PCF 15 51 7 107 61 30 26 24 0 32Other 3 5 4 4 8 1 1 7 0 0Mechanical 0 2 0 6 7 0 1 2 0 1TOTAL 18 58 11 117 76 31 28 33 0 33 0

SEPTEMBER PCF 14 46 74 83 47 55 14 0 31 77Other 1 5 14 0 4 3 3 0 3 0Mechanical 0 1 5 1 6 0 0 0 10 10TOTAL 15 52 93 84 57 58 17 0 44 87 0

OCTOBER PCF 0 44 87 63 30 58 13 0 0 0Other 0 11 10 4 4 3 2 0 0 0Mechanical 0 2 2 2 2 3 2 0 0 0TOTAL 0 57 99 69 36 64 17 0 0 0 0

NOVEMBER PCF 0 49 63 61 59 0 14 30 15 0Other 0 4 3 7 5 0 6 7 2 0Mechanical 0 5 0 7 5 0 5 4 11 0TOTAL 0 58 66 75 69 0 20 41 28 0 0

DECEMBER PCF 0 43 37 0 25 0 9 47 29 0Other 0 1 9 0 1 0 0 9 3 0Mechanical 0 4 0 0 0 0 2 1 8 0TOTAL 0 48 46 0 26 0 11 57 40 0 0

ANNUAL TOTALS:

267 518 674 930 703 489 496 228 477 397 356

Overtime Citations

Page 4: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

1 | P a g e

PROJECT UPDATE – SANTA CRUZ COUNTY

PREPARED FOR THE SEPTEMER 6, 2020 SAFE ON 17 MEETING

PROJECTS UNDER CONSTRUCTION

Project

Location

Post Mile (PM)

Description Construction Timeline

Construction Cost

Funding Source

Project Manager (Resident Engineer)

Contractor Comments

1.

Highway 17 Pasatiempo

Shoulder Widening

(1C670)

South of Pasatiempo

overcrossing (PM 0.2/0.5)

Shoulder widening and soil nail wall

Spring 2019- Winter 2020 $5.7 million SHOPP Luis Duazo

(BR)

Graniterock Company

Watsonville, CA

Work continues to finish the paving, signage and miscellaneous work. Work to be completed by winter.

2.

Highway 17 North Route 17

CAPM

(1F760)

Scotts Valley from just north of the Granite Creek

Road over-crossing to SCL (PM 6.0/12.5)

Maintenance pavement overlay

Summer 2020 $19 million SHOPP

SB-1

Doug Hessing

(JW)

Granite Construction

Company, Watsonville,

CA

Work substantially complete. Minor punch list work remains.

3.

Pedestrian Signal

Upgrades

(1G160)

Various Locations: Highways 1, 9, 17,

129, and 152

Install Accessible Pedestrian

Signal (APS)

January 2020 – Summer

2020 $ 1.8 million SHOPP

Mike Lew (FA)

Crosstown Electrical &

Data, Inc

Contract was accepted on July 8 and we are currently in the closeout phase. Accessible Pedestrian Signals installed at Mt. Hermon Road/La Madrone St. and Granite Creek Rd./Santa Village Road

PROJECTS IN DEVELOPMENT

Project Location Post Mile (PM) Description

Construction

Timeline

Estimated Construction

Cost

Funding Source

Project

Manager

Phase Comments

4.

Highway 1/ Highway 17 Ramp

Safety Improvements

(1H060)

From the fishhook to Pasatiempo overcrossing

(PM 16.7)

Construct ramp safety

improvements Summer 2020 $5.8 million SHOPP Luis Duazo PS&E/RW

PS&E and R/W phase to be completed in June. Re-alignment of a portion of SB 17 exit ramp with a larger radius curve.

anaranjo
Typewritten Text
Replacement pages for Item 6a
Page 5: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

2 | P a g e

PROJECT UPDATE – SANTA CRUZ COUNTY

PREPARED FOR THE SEPTEMER 6, 2020 SAFE ON 17 MEETING

PROJECTS IN DEVELOPMENT (Cont’d.)

Project Location Post Mile (PM) Description

Construction

Timeline

Estimated Construction

Cost

Funding Source

Project

Manager

Phase Comments

5

Highway 17 Wildlife Habitat

Crossing

(1G260)

From Laurel Road to just north of Laurel Road

(PM 9.442-9.692)

Construct wildlife

undercrossing Summer 2021 $7 million SHOPP Aaron

Henkel PS&E/RW Project is in design and on schedule.

6.

Santa Cruz & San Benito

Rumble Strip & Striping

Safety Project (1M330)

Various-multi-county locations.

For SCr, the project includes 1,

9, 17, 129

Update Striping and

Install Edgeline and

Center Rumble Strips at Various

Locations

2023 $4.7 million

SHOPP Safety

Collision Reduction

Doug Hessing (J.W.)

PS&E

Improvements at various highway locations, various postmiles: Rte. 17: Edge Line/Shoulder Rumble Strip;

ACRONYMS USED IN THIS REPORT: ADA Americans with Disabilities Act CEQA California Environmental Quality Act CMAQ Congestion Mitigation Air Quality CMIA Corridor Mobility Improvement Account CTC California Transportation Commission ED Environmental Document EIR Environmental Impact Report PA&ED Project Approval and Environmental Document PM Post Mile PS&E Plans, Specifications, and Estimates RW Right of Way

Page 6: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

3 | P a g e

PROJECT UPDATE – SANTA CRUZ COUNTY

PREPARED FOR THE SEPTEMER 6, 2020 SAFE ON 17 MEETING

SB1 Senate Bill 1, the Road Repair and Accountability Act of 2017 SCL Santa Clara County Line SHOPP State Highway Operation and Protection Program SR State Route STIP State Transportation Improvement Program TMS Traffic Management System

Page 7: Santa Cruz CHP Collision Summary for SR-17...Santa Cruz CHP Collision Summary for SR-17 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 JANUARY PDO 24 11 11 11 9 10 56 46 49

State of California • Department of Transportation

__________________________________________________________

Wednesday, September 16, 2020 District 05 – Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa Cruz Counties Contact: Kevin Drabinski Phone: (805) 549-3138 Office or (805) 748-1858 Cell

CALTRANS RESPONDS TO HIGHWAY DAMAGE IN SANTA CRUZ COUNTY FOLLOWING CZU LIGHTNING COMPLEX FIRE

SANTA CRUZ COUNTY – Caltrans District 5 has awarded Granite Construction of Santa Cruz a $6 million emergency contract to clear, repair and restore segments of Highway 1, 9 and 236 in Santa Cruz County that were impacted as a result of the CZU Lightning Complex Fire. Caltrans has mobilized contractors and sub-contractors to respond to this damage which includes hundreds of fallen and hazardous trees, a dozen locations of burned guardrail, numerous destroyed traffic signs and markers and damage to the lagging/facing of a retaining wall. Tree removal is underway and Caltrans engineers and maintenance forces are continuing to assess the damage and prioritize the areas in most need of response while at the same time supporting the needs of emergency responders who continue to respond to this active fire. It is not known when this reconstruction effort will be completed. As of this date, the only Caltrans road closure in Santa Cruz County is on a segment of Hwy 236, and various gates have been installed inside the closure to prevent public access to State Parks.

Photos of fire damage on State Route 236 in Santa Cruz County