Section A: Background information (Please type X in the relevant box) This section reviews the participant’s professional background and attributes. 1.0 Professional Field: Architecture Project management Quantity Surveying Structural/Civil Engineering Mechanical Engineering Electrical Engineering X 2.0 Categorization of role in the organization: Director Managing Partner Senior Management Mid-level Management X Others 3.0 Professional Experience: 5-10 years X 11-15years 16-20 years >20 years 4.0 Number of Construction projects actively involved in during the last 10 years: <5 5-10 11-15 16-20 >20 X 5.0 Have you been involved in value management sessions for construction projects? Yes X No

Upload: fabien-musoke

Post on 17-Feb-2016

15 views

Category:

Documents


0 download

DESCRIPTION

Research Guidelines

TRANSCRIPT

Page 1: Sample Rsearch Questionnaire

Section A: Background information (Please type X in the relevant box)

This section reviews the participant’s professional background and attributes.

1.0 Professional Field:

Architecture

Project management

Quantity Surveying

Structural/Civil Engineering

Mechanical Engineering

Electrical Engineering X

2.0 Categorization of role in the organization:

Director

Managing Partner

Senior Management

Mid-level Management X

Others

3.0 Professional Experience:

5-10 years X

11-15years

16-20 years

>20 years

4.0 Number of Construction projects actively involved in during the last 10 years:

<5

5-10

11-15

16-20

>20 X

5.0 Have you been involved in value management sessions for construction projects?

Yes X

No

Page 2: Sample Rsearch Questionnaire

The following sections explore your views on the value management (VM) concept that involves

processes linked to ensuring achievement of maximization of functional requirements of the

client at a minimal cost without comprising quality. It is intended to gather consensus on

effectiveness of existing value management practices in influencing achievement of expected

project performance from a view point of construction professionals as applied to our local

construction industry within the private sector.

Please respond to the questions below as per the following instructions.

Please use the 5-point scale shown below to indicate your view (by typing X) on each of the

following statements, placing your rating in the box to the right hand side of each statement.

Scale:- Strongly Disagree

(SD)

Disagree

(D)

Neutral

(N)

Agree

(A)

Strongly Agree

(SA)

Section B-Perceptions and opinions of value management adoption

1. The following are the opinions/beliefs of value management on construction projects.

SD D N A SA

Cost cutting exercise X

Time consuming exercise X

Design improvement exercise X

Is the Qs and Architect’s responsibility X

Value enhancing exercise X

2. The main importance of implementing value management on construction projects

SD D N A SA

Confirming project brief: client requirements, project

objectives as well as project stakeholder requirements

X

Achieve reduction in project budget X

Achievement of value for money for funds invested X

Section C -Value management practices adopted in local construction industry

1. At what stage of a project life is value management executed

SD D N A SA

Inception stage- project briefing X

Feasibility stage X

Concept design X

Scheme design X

Page 3: Sample Rsearch Questionnaire

Detailed design & BOQ X

Tender stage X

Construction stage X

Defects/maintenance period X

Throughout the entire project X

2. The value management team comprise of the following stakeholders:

SD D N A SA

Client X

Financiers X

Design team ( Architect, engineers, QS) X

Project manager/ team leader X

Facilitator X

Others/Specify X

3. The selection of project alternatives during value management is influenced by the following

factors:

SD D N A SA

Risk factors X

Cost factors X

Quality factors X

Time related factors X

Safety and environmental factors X

4. Decision making process of design alternatives involves the following :

SD D N A SA

Group decision making/ consensus group

decision making after collaborative

discussions with value management team

members regarding design alternatives

X

Decisions are made by the team leader

/project manager after consultations with

value management team members

regarding design alternatives

X

5. Value management methods/techniques commonly adopted:

SD D N A SA

Value management workshops( brainstorming sessions

involving iterative discussions of suitable design

alternatives)

X

Value engineering change proposal provision in contracts (

Contracts designed to allow contractors suggest improvement

X

Page 4: Sample Rsearch Questionnaire

in design and specifications without affecting project budget)

Life cycle costing(evaluation of design options based on total

cost of acquisition, ownership, operation and disposal of a

facility)

X

6. Which value management method/techniques would most effectively influence achievement

of anticipated project performance?

SD D N A SA

a. Value management workshops

b. Value engineering change proposal

c. Life cycle costing

f. Combination of a,b,c X

g. Others/specify

Section D-Impact of value management practices on project performance

1. Based on the value management practices/techniques commonly adopted above( section C),

what impact have they had on the following project objectives:

SD D N A SA

Fully achieved all project objectives X

Partially achieved all project objectives

Fully achieved cost objectives only

Fully achieved quality/functional objectives only

Fully achieved time objectives only

Others/specify