Page 1 of 4 HANDOVER NOTES Station: SSJ Sungai Perak Position: Mechanical Maintenance Engineer Grade: E11 Prepared by: Name: Staff No: Date: Received by: Name: Staff No: Date: Approved by: Name: Designation: Date:

Upload: faiz

Post on 17-Aug-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1 of 4 HANDOVER NOTES Station:SSJ Sungai Perak Position:Mechanical Maintenance Engineer Grade:E11 Prepared by: Name: Staff No: Date: Received by: Name: Staff No: Date: Approved by: Name: Designation: Date: Page 2 of 4 Handover Notes 1. Description of Duties ToassistinAssetsManagement(maintenance)ofTBKhydroelectricpowerplant equipmentsparticularlySJ Bersiaincludingmainequipments(turbine,turbine governor system, shaft seal system) and auxiliary systems (greasing system, cooling watersystem,brakingsystem,compressedairsystem,generatorandturbine bearingscoolingsystem.)thatisunderscopeofMechanicalMaintenanceSection includingmanagementofresources(workforce,financial,spare&materials)and managing new improvement or rehabilitation projects. 2. Key Activities 2.1 Preventive Maintenance Management To assist in conducting, facilitating implementation & review RCM initiatives for TBKTo assist in analyzing maintenance recordsTo attend TBK weekly morning meeting and update daily Mechanical section activity and status of SJBersia to Senior Engineer of Mechanical Section Minor & Major Brushgear Outage Testing and Commissioning 2.2 Corrective Maintenance Management To monitor and ensure CM work were done as per schedule/plan 2.3 Engineering, Improvement and Project To assist in identifying and encourage plan improvement ProjectTo assist in planning and executing the new plant improvement projectTo assist in planning and manage Major Overhaul activities for Electrical Section 2.4 Plant Performance Reporting To assist in reviewing SJBersia Major Overhaul Mechanical progress reportTo assist in presenting Mechanical performance and activity report during weekly station gathering Page 3 of 4 3. Regular Meetings 3.1 Regular Meetings Stations Weekly MeetingFrequency : Every Thursday morning Venue : Meeting Room Bersia Office Agenda : Plant status, defects, other matters 4. Documents and Filings 4.1 Softcopy No. File Name/No. Contents1 Wicket Gate Leakage Rate for KNRG Unit 2 Leakage Rate calculations in Ms. Excel 2Post Mortem BSIA Unit 1 and 3 Major Overhaul Slides in Ms. Powerpoint 3Bill of Material for SJBersia(PA3 & PA4 Compressor, Greasing System, Bottom Ring, Outer Top Cover, Runner Assembly)Material list for BOM in Ms. Excel 4.2 Hardcopy (Sections filing. Excluding office filing) No. File Name/No. Contents1 RCM Centralized Lubrication System (BSIA/KNRG)RCM Analysis on Greasing System 5. Status of Current Activity/Project(s) 5.1 RCM Initiatives FY2010-2011See attachments for details 6. Future Improvement Initiatives 6.1 Temengor Unit 3 and 4 valve system for raw cooling waterReason: Currently Unit 3 and 4 utilises cooling water from Unit 2 as water is of better quality and has less tendency to cause blockage in the cooling water pipe. Status : To discuss a practical system whereby main valve that controls cooling water for Unit 3 and 4 will be automatically opened and regulated should Unit 2 intake gate close due to tripping.

Page 4 of 4 Hand Over notes prepared by: _________________________________SignatureName:Position:Date: Hand over notes reviewed / verified by Senior Engineer: ____________________________________SignatureName:Position:Date: