samarinda baru airport

Upload: basuki-rahardjo

Post on 03-Apr-2018

235 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Samarinda Baru Airport

    1/15

    MASTER PLAN

    REVIEW

    SAMARINDA - BARU AIRPORT

    EAST INDONESIA AIRPORTS

    PROJECT

    THE GOVERNMENT OF THE REPUBLIC OF INDONESIA

    MINISTRY OF COMMUNICATIONS&

    TELECOMMUNICATIONS

    DIRECTORATE GENERAL OF AIR COMMUNICATIONS

    November 2000

  • 7/29/2019 Samarinda Baru Airport

    2/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Location map

  • 7/29/2019 Samarinda Baru Airport

    3/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Traffic forecast

    Beginning Phase 1

    in 2006

    Beginning phase 2in 2010

    Year Freight Movements

    Domestic International Total (tons)

    1998 55,059 0 55,059 81 6,103

    1999 56,327 0 56,327 130 8,876

    2000 60,014 0 60,014 120 8,573

    2001 63,949 0 63,949 128 9,136

    2002 68,150 0 68,150 136 9,736

    2003 72,636 0 72,636 145 10,377

    2004 77,425 0 77,425 155 11,061

    2005 82,539 0 82,539 165 11,791

    2006 88,000 0 88,000 176 12,571

    2007 271,869 0 271,869 2,175 13,593

    2008 287,199 0 287,199 2,298 14,360

    2009 302,963 0 302,963 2,424 15,148

    2010 319,593 0 319,593 2,557 15,980

    2011 749,188 0 749,188 11,238 21,405

    2012 790,311 0 790,311 11,855 22,262

    2013 833,690 0 833,690 12,505 23,1582014 873,357 0 873,357 13,100 23,928

    2015 914,912 0 914,912 13,724 24,727

    2016 958,444 0 958,444 14,377 25,559

    2017 1,004,047 0 1,004,047 15,061 26,422

    2018 1,051,820 0 1,051,820 15,777 27,320

    Passenger traffic A+D+T

  • 7/29/2019 Samarinda Baru Airport

    4/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Peak traffic forecast

    Phase 1

    Sizing for 2008

    Peak hour traffic in passenger terminal

    140 passengers 8 movements (2 CN 235, 2 commuter)

    Apron capacity

    4 CN 235 and 5 CN 212

    Phase 2

    Sizing for 2018

    Peak hour traffic in passenger terminal608 passengers 10 movements (2 B737-400, 2 CN 235, 1 commuter)

    Apron capacity

    4 B737-900, 4 CN 235 and 2 CN 212

  • 7/29/2019 Samarinda Baru Airport

    5/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Existing situation

    Developmentconstraints

    Site located onhilly and

    swampy area

    Existing mainaccess roads

    Rivers on thesite

  • 7/29/2019 Samarinda Baru Airport

    6/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Airside development phase 1

    Largest aircraft CN 235

    Runway 1600 m x 30 m

    Runway strip 1720 m x 300 m

    Partial parallel taxiway 2 exit taxiways

    2 taxiways to apron

    16200 sqm apron 1 VOR DME

    Non precision approach lighting system

  • 7/29/2019 Samarinda Baru Airport

    7/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    General layout phase I

  • 7/29/2019 Samarinda Baru Airport

    8/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Airside development phase 2

    Largest aircraft B737-400 Runway 2100 m x 45 m

    Runway strip for cat I operations 2220 m x 300 m

    1 full parallel taxiway

    3 exit taxiways

    3 taxiways to apron

    32000 sqm apron

    1 cat I ILS 1 VOR DME

    Cat I precision approach lighting system

  • 7/29/2019 Samarinda Baru Airport

    9/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    General layout phase II and ultimate

  • 7/29/2019 Samarinda Baru Airport

    10/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Landside organization

  • 7/29/2019 Samarinda Baru Airport

    11/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Landside traffic flows

  • 7/29/2019 Samarinda Baru Airport

    12/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Landside development phase 1

    Passenger terminal 1 900 m2 Total useful surface

    Cargo terminal 600 m2 Buildings ground floor surface

    Public car park 73 cars

    Access roads 1 x 7 m

    Control tower/operations

    building

    300 m2 Ops building ground floorsurface only

    VVIP building 200 m2 Buildings ground floor surface

    Administration building 600 m2 Buildings ground floor surface

    Fire station Cat. 4

    Fuel farm 3 400 m2 Land area

    Fuel capacity 350 m3

  • 7/29/2019 Samarinda Baru Airport

    13/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Landside layout phase I

  • 7/29/2019 Samarinda Baru Airport

    14/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Landside development phase 2

    Passenger terminal 5 600 m2 Total useful surface

    Cargo terminal 1 800 m2 Buildings ground floor surface

    Public car park 216 cars

    Access roads 1x15m

    (+2x7m possible)

    Control tower/operations

    building

    300 m2 Ops building ground floorsurface only

    VVIP building 200 m2 Buildings ground floor surface

    Administration building 600 m2 Buildings ground floor surface

    Fire station Cat. 6

    Fuel farm 7 000 m2 Land area

    Fuel capacity 750 m3

  • 7/29/2019 Samarinda Baru Airport

    15/15

    November 2000 Master Plan ReviewSamarinda - Baru Airport

    Landside layout phase II