SAM Engineering & Equipment (M) BHD
25th AGM Presentation
28th August 2019
Our Business
SAM EE Footprints
PE1 – Special Process (54K sqft)
SPA – Large Format Aerospace Machining
(140K sqft)
PE3 – Big Format Machining (131K sqft)
PE5 – Small Format Machining (131K sqft)
PE6 – Sheet Metal & Special Process
(177K sqft)
PE7 – Equipment Integration (148K sqft)
Tuas, Singapore (62K sqft)
Jurong, Singapore (180K sqft)
Ayuttaya, Thailand
Operations Update Equipment Aerospace
Equipment Aerospace
Semicon Equipment• Good progress on larger market share and higher level
integration for existing main assembly product. First articlein progress.
• Winning few new projects.
Storage Device Equipment• Big Data Generation for enterprise market has
driven bigger customer orders in a more consistent basis.
• Good progress made for the Semiconductor sector.
Equipment : Contract Manufacturing
Machining Technology
• Customer’s approval granted to run mass production for Semiconductor FrontEnd Business and complex parts on the new machines (4 units of 5 axismachines and 1 unit of turn-mill 9 axis).
Equipment : Machining
Aerospace Equipment
Aerospace Core Products
Nacelle Beams
Engine Cases
Officially opened by Minister of International Trade and Industry, Yang Berhormat Datuk Darell Leiking.
State-of-the-art flexible manufacturing system
Aerospace : Aerostructures
Aerospace : Casings
Automated Line at Singapore Tuas Facility
Machining DeburringNon Destructive Test MeasurementCoating
Towards Industry 4.0Robotic Applications
Deburring EquipmentCoating Equipment
Towards Industry 4.0
Digitalisation with IOT-enabled Production Environment
Full connectivity and visibility of all production operations enable seamless control of the physical production
Financial Highlights
Revenue
312 333 310371
460
140
287
227
248
295
452
620537
619
755
0
100
200
300
400
500
600
700
800
FY2015 FY2016 FY2017 FY2018 FY2019
Aerospace
EquipmentCAGR14%
RM’Mil+136
(+22%)
Revenue By Segment
60%
40%
FY2018
Aerospace Equipment
61%
39%
FY2019
RM619mil
RM755mil
Profit Before Tax
39
69
55
73
95
0
10
20
30
40
50
60
70
80
90
100
FY2015 FY2016 FY2017 FY2018 FY2019
RM’Mil
+22 (+30%)
CAGR24%
Capital Investments
25m
78m
103m
101m
Investment > RM300mil
Aerospace
Equipment
Milling machines & FMS line for A320neo and A350 Beams
Milling machines & FMS line for Leap Casings
Machines for Chambers
FY2016
FY2017
FY2018
FY2019
Machines for Prismatic Parts
Machines for Small Format
Machining
Business Outlook Equipment Aerospace
Equipment Aerospace
Key Industries for Equipment Business
61%
39%
FY2019
RM755mil
Semiconductor
Storage Devices• Solid State Drive• Hard Disk Drive
• Front End• Back End
Others• Medical • Automotive• Telecommunication
Semiconductor Equipment Market Outlook
Source: SEMI/SEAJ Worldwide Semiconductor Equipment Market Statistics report, July 2019
2019 2020
$52bil$59bil
$65bil
Forecast
-18% in 2019+12% in 2020
Storage Devices – Digitizing the World
• Consumer• Enterprise• Public Cloud
Data Demand Ever Expanding
Aerospace Equipment
Aerospace Products and Programs
777
C919
Aerostructure (Small to Large Size)
> 2 meter
Aero-Engine
• A220• A320neo• A350• B787
• A320ceo/neo• B737NG/max• B777• B787
• C919• Global
7500/8000
A220
A320neo
Aerospace Outlook
SAM Aerospace projected order book RM2.7 billion
• Airbus GMF 2018 projected industry growth CAGR 4% over the next 20 years
5,745(7.1 years*)(9.0 years*)7,198
• Healthy aircraft order book for Airbus and Boeing
*Based on 2018 production rate Source: Airbus & Boeing July’19
Boeing 737Max Aircraft
B737Max Crashes
1. Lion Air, JT 610, crashed
on 29th Oct 18 killing all
189 on board
2. Ethiopian Airlines, ET
302, crashed on 10th Mar
19 killing all 157 on boardStatus
1. Investigations on crashes still on-going
2. Boeing is working to fix its anti-stall flight control
software, as well as other issues identified by regulators,
including the FAA (Federal Aviation Administration)
Short Term Uncertainty – Boeing 737Max
13 March 2019737Max grounded by FAA
5 April 2019
Boeing announced production rate cut to 42 aircraft monthly (-20%)
26 June 2019FAA announced potential risks which Boeing need to mitigate
Boeing 737Max contributed <10%
of SAMEE FY2019 Revenue
FY 2019Revenue RM 755mil
25 July 2019
Boeing announced it expected the B737Max to be in operation by Oct 2019. It might further reduce production rate if the schedule changed