Salimus Consultancy Solar Energy and Sustainability

Upload: others

Post on 09-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

Salimus ConsultancySolar Energy and Sustainability

Page 2: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Solar Energy from Sustainability Perspective⚫ Sustainability’s Pyramid of Priorities:

⚫ Priority 1: Reduce Demand: Passive Design.

⚫ Priority 2: Energy Efficient Equipment.

⚫ Priority 3: Renewable Sources.

⚫ Case Studies:

⚫ DEWA HQ – Dubai, Al Jaddaf.

⚫ Saint-Gobain Multi Comfort House – Masdar City.

⚫ Ain Al Fayda 2000 Villas

⚫ Modern Trends⚫ Solar Roofs for RTA’s New Bus Stations

⚫ Dubai Clean Energy Strategy 2050

⚫ Mohammed bin Rashid Al Maktoum Solar Park

⚫ Shams Dubai Initiative, Dubai, UAE.

Contents

Page 3: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

Solar Energy from Sustainability Perspective

Page 4: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Priority 1: Reduce Demand⚫ Implement Passive Design.

⚫ Priority 2: Energy Efficiency⚫ Use highly-efficient mechanical and

electrical equipment.

⚫ Priority 3: Renewable Sources⚫ Facilitation of renewable energy

installations.

Sustainability’s Pyramid of Priorities

Page 5: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Abu Dhabi – Estidama Building Rating System⚫ RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through onsite renewable energy

⚫ Dubai – Al Saafat⚫ 504.04 On site Renewable Energy – Electrical power

generation Commissioning

UAE Sustainable Certification Schemes

For all new buildings, renewable energy must be generated on-site using solar panels, according to the following percentages of the actual electrical load of the building:a - 5% of the Bronze and Silver Sa’fa.b - 10% for Golden and Platinum Sa’fa.

Page 6: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

Case Studies

Page 7: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Salimus Role:⚫ Energy Modeler (helped Obermeyer winning the competition).

⚫ Project Certification Target:⚫ LEED Platinum⚫ WELL Silver

DEWA - Al Sheraa Headquarters, Dubai, UAE.

Project: DEWA HQ - Al SheraaService: Energy ModelerTarget: LEED PlatinumLocation: Dubai, UAEGFA: 139,354 m2

Floors: B+G+4P+15F

Source: Obermeyer website.

Page 8: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Nearly Zero Energy Building (NZEB)⚫ Solar Roof: Shading and Energy Generation

⚫ Very efficient mechanical and electrical systems:⚫ Very efficient Cooling::

⚫ Chillers with magnetic bearings

⚫ Thermal storage

⚫ High COP 5.4 and NPLV 11.16

DEWA - Al Sheraa Headquarters, Dubai, UAE.

Project: DEWA HQ - Al SheraaService: Energy ModelerTarget: LEED PlatinumLocation: Dubai, UAEGFA: 139,354 m2

Floors: B+G+4P+15F

Source: Obermeyer website.

Page 9: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Very efficient lighting and automatic controls

⚫ LPDs 60% < ASHRAE 90.1-2007 baseline.

⚫ Daylight and Occupancy Sensors.

⚫ Very efficient AC and Ventilation Systems.

⚫ FCU Specific Fan Power of 0.3 W/l/s (50% < ASHRAE 90.1-2007 baseline).

⚫ FAHU 2.3 W/l/s (25% < ASHRAE 90.1-2007 baseline).

⚫ CHW Pumps Specific Pump Power of 279 [W/l/s] (20% < ASHRAE 90.1-2007 baseline).

DEWA - Al Sheraa Headquarters, Dubai, UAE.

Project: DEWA HQ - Al SheraaService: Energy ModelerTarget: LEED PlatinumLocation: Dubai, UAEGFA: 139,354 m2

Floors: B+G+4P+15F

Source: Obermeyer website.

Page 10: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Project Achievements:⚫ Nearly Zero Energy Building

(NZEB) ⚫ EUI 46.78 [kWh/m2/year]

⚫ Energy Savings 78.2%

⚫ Energy Simulation as per ASHRAE 90.1-2007.

DEWA - Al Sheraa Headquarters, Dubai, UAE.

Page 11: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Project Overview:

⚫ Positive-Energy Building.

⚫ Meeting & exceeding Masdar’s requirements.

⚫ Excellence in light, air quality, temperature and acoustics comfort.

⚫ Equipped with latest technologies:

⚫ Electrochromic Glass (Sage Glass).

⚫ High-efficiency building materials.

⚫ Solar PV Roof.

⚫ High-efficiency HVAC system (VRF type).

Saint Gobain’s Multi Comfort House, Masdar, UAE.

Project: Saint Gobain’s MCHService: Energy Modeler, ICA, CxA.Target: LEED Gold, Estidama 4-PearlLocation: Masdar, Abu Dhabi, UAEGFA: 400 m2

Floors: G+2

Source: Obermeyer website.

Page 12: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Project Sustainability Targets:⚫ LEED Gold certification⚫ Estidama 4-Pearl certification⚫ Masdar Environmental KPIs compliance

⚫ Salimus Role:⚫ Energy Modeler (LEED, Estidama & Masdar).⚫ Commissioning Consultant (LEED & Estidama).

Saint Gobain’s Multi Comfort House, Masdar, UAE.

Project: Saint Gobain’s MCHService: Energy Modeler, ICA, CxA.Target: LEED Gold, Estidama 4-PearlLocation: Masdar, Abu Dhabi, UAEGFA: 400 m2

Floors: G+2

Source: Obermeyer website.

Page 13: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Project Achievements:

⚫ Positive Energy Building:

114.6% Energy Savings

⚫ Estidama Energy Simulation as per ASHRAE 90.1-2007.

⚫ Masdar Energy Simulation as per Masdar Energy Design Guidelines (MEDG v3).

⚫ LEED Energy Simulation as per ASHRAE 90.1-2010.

Saint Gobain’s Multi Comfort House, Masdar, UAE.

Page 14: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

Dubai Clean Energy Strategy

Page 15: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ The Dubai Clean Energy Strategy

2050 was launched by HH Sheikh

Mohammed bin Rashid Al Maktoum,

to provide 7% of Dubai’s total power

output from clean energy by 2020. This

target will increase to 25% by 2030 and

75% by 2050.

Dubai Clean Energy Strategy 2050HH Sheikh Mohammed bin

Rashid Al Maktoum

Dubai Clean Energy Strategy 2050

Clean energy = 75% of Dubai power output

Solar Park is the first milestone

Shams Dubai Initiative: Solar energy by Dubai

citizens, businesses and industries contribution.

Page 16: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Launched in 2012 by HH Sheikh Mohammed bin

Rashid Al Maktoum.

⚫ The largest single-site solar park in the world.

⚫ The solar park will generate:

⚫ 1,000MW by 2020

⚫ 5,000MW by 2030

⚫ Total investments up to AED 50 billion.

⚫ Upon completion, the solar park will reduce over

6.5 million tonnes of CO2 emissions annually.

Mohammed bin Rashid Al Maktoum Solar Park

Source: DEWA website.

Page 17: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Easy steps:

⚫ After obtaining the necessary approvals, site

works are undertaken.

⚫ Once the installation is complete, the contractor

or consultant submits a notification,

⚫ DEWA then conducts a technical inspection of

the site and install the required smart meters to

complete the connection process.

Shams Dubai Initiative, Dubai, UAE.

Source: DEWA website.

⚫ A total of 1,354 photovoltaic installations on residential,

commercial and industrial buildings in Dubai have been

connected by DEWA as part of the Shams Dubai initiative.

Page 18: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ DEWA encourages

household and building

owners to install PV

panels to generate

electricity and connect

them to DEWA's grid.

The electricity is used

on site and the surplus

is exported to DEWA's

network.

Shams Dubai Initiative, Dubai, UAE.

Source: DEWA website.

Page 19: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

⚫ Solar Roof features:⚫ Translucent Photovoltaic Panels. ⚫ Adequate balance of daylighting, shading and energy generation.

Solar Roofs for RTA’s New Bus Stations

Source: RTA Twitter page.Source: RTA Twitter page.

Page 20: Salimus Consultancy€¦ · ⚫Abu Dhabi – Estidama Building Rating System ⚫RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through

Salimus ConsultancyThank you!

A: Unit 111, 1st floor, Concorde Tower, Cluster H, Jumeirah Lakes Towers,

Dubai, UAE. P.O. Box 450224.

T: +971 4 447 1776 / M: +971 50 104 1376

W: www.salimus.com / E: [email protected]