PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 1 6 2002 0 PSEG LR-N02-0192 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 CORRECTION OF TECHNICAL SPECIFICATION PAGE ISSUED WITH AMENDMENT 245 SALEM GENERATING STATION UNIT NO. I DOCKET NO. 50-272 Ladies and Gentlemen: On September 19, 2001, the NRC issued Amendment No. 245 for Salem Unit 1. This amendment revised Technical Specification Bases page 3/4 9-4 for the Fuel Handling Area Ventilation System. After subsequent review of the bases page, PSEG Nuclear has determined that the page 3/4 9-4 issued with Amendment No. 245 did not include changes to the same page that were previously approved under Amendment No. 231 issued on June 15, 2000. The changes proposed under Amendment No. 245 did not delete this information and therefore the page issued for Amendment No. 245 should have included these changes. The attached bases page B 3/4 9-4 contains the information from Amendment No. 231 that was inadvertently omitted during issuance of Amendment No. 245. If you have any questions regarding this submittal, please contact Brian Thomas at 856-339-2022. XSincerell G. Salamon Nuclear Safety and Licensing Manager 95-21-8 ýE" - 99

Upload: others

Post on 12-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236

MAY 1 6 2002 0 PSEG

LR-N02-0192

United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

CORRECTION OF TECHNICAL SPECIFICATION PAGE ISSUED WITH AMENDMENT 245 SALEM GENERATING STATION UNIT NO. I DOCKET NO. 50-272

Ladies and Gentlemen:

On September 19, 2001, the NRC issued Amendment No. 245 for Salem Unit 1. This amendment revised Technical Specification Bases page 3/4 9-4 for the Fuel Handling Area Ventilation System. After subsequent review of the bases page, PSEG Nuclear has determined that the page 3/4 9-4 issued with Amendment No. 245 did not include changes to the same page that were previously approved under Amendment No. 231 issued on June 15, 2000. The changes proposed under Amendment No. 245 did not delete this information and therefore the page issued for Amendment No. 245 should have included these changes.

The attached bases page B 3/4 9-4 contains the information from Amendment No. 231 that was inadvertently omitted during issuance of Amendment No. 245.

If you have any questions regarding this submittal, please contact Brian Thomas at 856-339-2022.

XSincerell

G. Salamon Nuclear Safety and Licensing Manager

95-21-8 ýE" - 99

Page 2: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

Document Control Desk 2 MAY 1 6 2002 LR-N020192

C Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

U. S. Nuclear Regulatory Commission ATTN: Mr. Robert Fretz, Licensing Project Manager - Salem Mail Stop 0882 Washington, DC 20555

USNRC Senior Resident Inspector- Salem (X24)

Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625

Page 3: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

REFUELING OPERATIONS BASES

A listing of the active (air/motor operated) valves in the affected flow path to be locked open or disabled.

Note that four filled reactor coolant loops, with at least two steam generators with at least their secondary side water level greater than or equal to 5% (narrow range), may be substituted for one residual heat removal loop. This ensures that a single failure does not cause a loss of decay heat removal.

With the reactor vessel head removed and 23 feet of water above the reactor pressure vessel flange, a large heat sink is available for core cooling. Thus, in the event of a failure of the operating RHR loop, adequate time is provided to initiate emergency procedures to cool the core.

3/4.9.9 CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF ISOLATION SYSTEM

The OPERABILITY of this system ensures that the containment vent and purge penetrations will be automatically isolated upon detection of high radiation levels within the containment. The OPERABILITY of this system is required to restrict the release of radioactive material from the containment atmosphere to the environment.

3/4.9.10 and 3/4/9/11 WATER LEVEL - REACTOR VESSEL AND STORAGE POOL

The restrictions on minimum water level ensure that sufficient water depth is available to remove 99% of the assumed 10% iodine gap activity released from the rupture of an irradiated fuel assembly. The minimum water depth is consistent with the assumptions of the accident analysis.

3/4.9.12 FUEL HANDLING AREA VENTILATION SYSTEM

The limitations on the fuel handling area ventilation system ensure that all radioactive material released from a dropped irradiated fuel assembly will be filtered through the HEPA filters and charcoal adsorber prior to discharge to the atmosphere. The OPERABILITY of this system is consistent with the assumptions of the accident analyses. Laboratory testing of the carbon adsorber is performed in accordance with ASTM D3803-1989 with an acceptance criteria that is determined by applying a minimum safety factor of 2 to the charcoal filter removal efficiency credited in the design basis dose analysis as specified in Generic Letter 99-02.

The operability of the Fuel Handling Area Ventilation System during movement of irradiated fuel ensures all building exhaust flow is processed through the HEPA/charcoal filter train whenever a Fuel Handling Accident is possible. This will minimize offsite doses following the postulated Fuel Handling Accident.

Amendment No. 245SALEM - UNIT 1 B 3/4 9-4

Page 4: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

LEGEND:

[E U A STATIONS

M]

,Fm

HII

ATCH FLO LEVL

INIT01 CEIIN LEVEL

-iA-A--1FOOC

SNO DETECTION

COVERAGE (DETECTION)

NOTE: THERE IS NO SUPPRESSION

LAM•

HOS STATION OAfl STANDPI

WIREGATE

PORTABE MY DEKi EXTDCURSH

PIRTABLE WTiER EXTINISER

PORTABLE aý EXTINnLn E

SRWIE WE NEEL FFER NOA BOUDAY

01-01

FIGURE 1 FIRE AREA 1FA-AB-64B

I

Page 5: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

r-. -� -� -

15.8

15.

ZD

45.

14.

LEGEND:

1 KOK ALAR S'TAMPSm

z PATCH FLOOR D FlPATCH LEVEL

C RO STATION CHARGED STMEPIPE

SWE TE

L•o ooo A• PHYCS

A RTABTE RY •E EXTINUM ER

A rTALE WATER EXTMG.ER

� PORTaLE CO, EnDos • th SPARE HOSE REL.

IIIE FOE RA BOUNWY

NO OETECTION

COVERAGE (DETECTIOiD

NOTE: THERE IS NO SUPPRESSION

C

ý-2FA-AB-1OC

c -bZ-FIGURE 2 FIRE AREA 2FA-AB-64B

Page 6: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

-i

16'-0"90'-0" 20'-0"

0- ' t .i .u .i . . . . . . . I . I

I YAA Pp N

T VT

A NI

77,7 7

c'

20'-0"

I

3

� \ \ \Iy

N z

.4 ,- N

N a

20'-0"

I16'-" 20'-0">I

201-0" t 201-011 20t-0" 20I-0"' 201-0" 201-0" 20'-0"

EVAT~~~ - -- - ----- ,

io0

-1FA-AB-100Crz W--\(

\i

Co

ril

04

N

K

Hmr4 rnrd

I-I..............-

\ N\

I I

K'

S

III I I

"Dcv I**.��-�-I* -- , 1-x-----v -N- � N

C

Co

Y-IAF 1I'l

;END:

IWNWM A& I STATIONS

HTCH FLOOR LEVEL

HATCH CEILING LEVEL

rnNO DETECTION [F- SPRINKLER COVERAGE

COVERAGE (DETECTION)

ROSE STATION OMFD STKFDIPE

WIE GATE

AFW ACTLUTION STATION

LOCIO ~ 5 DOOR Es EURITY Wl-- HEALTH PHYSICS

PORTA.E DRY CHEKEXTWISIHER

POlRTABLE WATR EXTINGUJISHER

PORTABLE CO2 EXTIICJIS*ER

SPWARE OSE REEL

FINE AEA BOUNDA Y

FIGURE 3 FIRE AREA 1FA-AB-848 AND 1FA-AB-84C

2 ........ ..- \pop F I

-177,777

WNI'l

rLI • $11

Im

iiii

I

17ý\\ I

r\

Page 7: Salem Generating Station, Unit 1, Correction of Technical ...c ro station charged stmepipe swe te l•o ooo a• phycs a rtabte ry •e extinum er a rtale water extmg.er portale co,

16'-0" 20'-0" 20'-0" 201-0"

LiIIEEIIEgllEIIIIIllllEllllllllllllllillll

Was r/

P

a

/

/ •4 , /' / /'*

L/ //

.-t--7- --..2 U U

K,

..... !12FA-AB-EL-2J i

L /

/

/

201-0"

L-J

20'-0" 20'-0" 20'-0"

I I II flu fliflnu

20'-0" 20'-0" (' 20'-0"

PIPE ALLE

F- m-

'A

1immF-

- - _____________

mm

I

FL a

W// / V/ /A/^/A

/ / / // -

/ A

'r- - - L

-/ - '- 7 7

9//

d zi

illlililUJ I

11

7az , ' xlRT-700EUPrv

zV/

z•

, , , , , , , , , '1

�/1Zv1X1z§Z>�A'.AV �w"s�A/J��t///7/t/'/77/I/77x

I 2FA-AB-100C

J-

20-0'"

-ND:

MANUL ALA STATIONS

HATCH FLOO LEVEL

HATCH CELING LEVEL

m NO DETECTION

_--- SPRINKLER COVERAGE

r COVERAGE (DETECTION) LADDER

E SATION CWHRGED SIAhDPM 1

WIRE GATE

AFW ACTUATION STATION LOWD OOmR ES- SE1JRITY

H-- HEAL.TH PHYSICS

PORTABLE DY CDK EXTIRO ER

PORTABLE WATER EXTINIJSHfR

PORTABLE C02 EXTKUISiNE

SPA HOSE REEL

FIRE AMA BOUNDW Y c-Ct FIGURE 4 FIRE AREA 2FA-AB-84B AND 2FA-AB-84C

"/ //

Li

I16.

jI

Co

0

N

ifs

I -. II,

L

Li

! ,Li i/ mml

A • • i J

E

I I I I li

Tg•

1jL

F

!F•