Page 1 of 8 SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08 SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER SAIC-N-2034 15-Dec-09 MECH- PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRA SAUDI ARAMCO USE ONLY SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-I A. General Requirements (SAES-N-120 procedure, See Note 1) A1 As Referenced B. Repair Extent & Excavation Requirements (SAES-N-120 Procedure) B1 B2 B3 B4 B4 C. Relining of Repair Areas (SAES-N-120 Procedure) C1 C2 C3 C4 Inspection of Repairs to Extreme Erosion Resistant Refractory ITEM No. Checklist SAIC-N-2033 was completed for Post-Application inspection of applied extreme erosion resistant refractory. Defective refractory (voids, honeycombs, insufficient cure, damage, etc) was marked for repair, totally removed to the full layer thickness. The extent of repair was approved by a SA Refractory Inspector. SAES-N-120, Para. 12.4.1 The removal of defective lining was restricted to the use of hand tools. Power tools (electric, pneumatic) were not used to remove refractory. SAES-N-120, Para. 12.4.2 All hexagons adjacent to a repair area were found with sound refractory prior to the execution of the repair (Hammer Test, visual). See Note 2. SAES-N-120, Para. 12.4.3 Refractory lining cracks (Width of 1/8″ and larger, Depth above 20%) thoroughly excavated to their full depth to sound refractory. See Note 3. SAES-N-120, Para. 12.4.4 Refractory lining areas for which the production samples failed the Density check and/or Cold crushing test are identified* and marked for replacement. *Lining Areas shall be Identified from the sketch and log maintained by Refractory Installer for applied lining and location of sampling. (Refer to SAIC-N-2032 item G5 & G6) SAES-N-120, Para. 10.5.9 Linings backing surface temperatures are monitored & do not exceed 32°C during repairs (this includes curing). SAES-N-120, Para. 10.1.6 Protective Steps are taken to maintain a maximum temperature of 32°C for a minimum of 24 hours after installation. Linings are protected from heat-induced accelerated setting. SAES-N-120, Para. 10.1.7 Linings & lining materials are kept above 10°C during the lining application and for a period 48 hours after the lining application. SAES-N-120, Para. 10.1.9 Surfaces are kept dry after installation (during curing). No spraying! SAES-N-120, Para. 10.1.10

Upload: aamirapi

Post on 19-Nov-2015

247 views

Category:

Documents


5 download

DESCRIPTION

refractory

TRANSCRIPT

Multipage SAIC Page 1SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008)Rev 330-Jun-08SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBERDATE APPROVEDQR NUMBERInspection of Repairs to Extreme Erosion Resistant RefractorySAIC-N-203415-Dec-09MECH-PROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTOREQUIPMENT ID NUMBER(S)EQUIPMENT DESCRIPTIONEQPT CODESYSTEM ID.PLANT NO.LAYOUT DRAWING NUMBERREV. NO.PURCHASE ORDER NUMBEREC / PMCC / MCC NO.SCHEDULED INSPECTION DATE & TIMEACTUAL INSPECTION DATE & TIMEQUANTITY INSP.MH's SPENTTRAVEL TIMESAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBERSAUDI ARAMCO ACTIVITY NUMBERWORK PERMIT REQUIRED?SAUDI ARAMCO INSPECTION LEVELCONTRACTOR INSPECTION LEVELITEM No.ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-INSP DATEA. General Requirements (SAES-N-120 procedure, See Note 1)A1Checklist SAIC-N-2033 was completed for Post-Application inspection of applied extreme erosion resistant refractory.As ReferencedB. Repair Extent & Excavation Requirements (SAES-N-120 Procedure)B1Defective refractory (voids, honeycombs, insufficient cure, damage, etc) was marked for repair, totally removed to the full layer thickness. The extent of repair was approved by a SA Refractory Inspector.SAES-N-120, Para. 12.4.1B2The removal of defective lining was restricted to the use of hand tools. Power tools (electric, pneumatic) were not used to remove refractory.SAES-N-120, Para. 12.4.2B3All hexagons adjacent to a repair area were found with sound refractory prior to the execution of the repair (Hammer Test, visual). See Note 2.SAES-N-120, Para. 12.4.3B4Refractory lining cracks (Width of 1/8 and larger, Depth above 20%) thoroughly excavated to their full depth to sound refractory. See Note 3.SAES-N-120, Para. 12.4.4B4Refractory lining areas for which the production samples failed the Density check and/or Cold crushing test are identified* and marked for replacement.*Lining Areas shall be Identified from the sketch and log maintained by Refractory Installer for applied lining and location of sampling.(Refer to SAIC-N-2032 item G5 & G6)SAES-N-120, Para. 10.5.9C. Relining of Repair Areas (SAES-N-120 Procedure)C1Linings backing surface temperatures are monitored & do not exceed 32C during repairs (this includes curing).SAES-N-120, Para. 10.1.6C2Protective Steps are taken to maintain a maximum temperature of 32C for a minimum of 24 hours after installation. Linings are protected from heat-induced accelerated setting.SAES-N-120, Para. 10.1.7C3Linings & lining materials are kept above 10C during the lining application and for a period 48 hours after the lining application.SAES-N-120, Para. 10.1.9C4Surfaces are kept dry after installation (during curing). No spraying!SAES-N-120, Para. 10.1.10

Page &P of &N

Multipage SAIC Pages 2,3,4...SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008)Rev 330-Jun-08SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBERDATE APPROVEDQR NUMBERInspection of Repairs to Extreme Erosion Resistant RefractorySAIC-N-203415-Dec-09MECH-PROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTORITEM No.ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-INSP DATED. Curing of Repaired Areas (SAES-N-120 Procedure)D1Applied linings are allowed an air set (48 hour minimum) & are protected from injury at all times, particularly during the early stages of hardening.SAES-N-120, Para. 11.2.1D2During a 48-hour air set, applied lining is not sealed from contact with the atmosphere (Air dried). No water is allowed to contact the lining i.e. moist curing is not permitted.SAES-N-120, Para. 11.2.2E. Repair Areas Dryout (SAES-N-120 Procedure)E1See SAIC-N-2030 for Furnace Dry Out (as applicable)As ReferencedE2Adequately calibrated temperature measuring devices are installed to monitor temperature. When dryout is by auxiliary burners, temperature monitoring is provided on the gas outlet and burner areas.SAES-N-120, Para. 11.3.1E3Maximum dryout temperature is controlled & does not reduce chemical composition or mechanical properties of lined equipment materials.SAES-N-120, Para. 11.3.2E4Dryout done in furnace has temperature measuring devices installed on the refractory side & on external surfaces of equipment to indicate differentials between metal and refractory temperatures.SAES-N-120, Para. 11.3.3E5Minimum holding times during dryout are 1 hour per 25 mm refractory thickness, unless otherwise specified by the Refractory Manufacturer.SAES-N-120, Para. 11.3.4F. Inspection of Relined/Repaired Areas (SAES-N-120 Procedure)F1The repair, testing, and inspection procedure was the same as the procedure used for the original installation, carried out in accordance with Saudi Aramco Inspections Requirement Form 175-328110 and the requirements of SAES-N-120SAES-N-120, Para. 12.4.3& Para 12.1.1F2At completion of curing & drying of repairs, linings are checked by lightly tapping them with a 1-pound hammer and are found acceptable, free of voids, honeycombing, insufficient curing, or construction damage.SAES-N-120, Para. 12.4.1F3Repaired areas are free from lining cracks with a width of 1/8" & larger and a depth of more than 20% of refractory thickness.SAES-N-120, Para. 12.4.4REMARKS:REFERENCE DOCUMENTS:1. SAES-N-100 -- Refractory Systems (30 Jan 2007)2. SAES-N-120 -- Installation Requirements-Extreme Erosion Resistant Refractories (30 Jan 2007)ATTACHMENTS: 1. Attachment 1 -- SA INSP FORM 175-328110 (Refractories)NOTES: 1. This checklist applies to Inspection of repairs for extreme erosion resistant refractory systems per procedure of SAES-N-120 only.2. Repair attempts often result in loose "biscuits" (defined as a small section of refractory shaped like a biscuit that is loose within the hexsteel). After hand excavation, a thorough visual inspection reveals sound refractory & no disbond to the base metal of the equipment when hammer tested.3. No portion of the original crack rejected remains after excavation.Contractor / Third-PartySaudi AramcoConstruction Representative*PMT RepresentativeName, Initials and Date:Work is Complete and Ready for Inspection:Name, Initials and Date:T&I WitnessedQC Record ReviewedWork VerifiedQC InspectorPID RepresentativeName, Initials and Date:Performed InspectionWork / Rework May ProceedName, Initials and Date:T&I WitnessedQC Record ReviewedWork VerifiedQC SupervisorProponent and OthersName, Sign and Date:Quality Record Approved:Name, Organization,Initials and Date:T&I WitnessedQC Record ReviewedWork Verified*Person Responsible for Completion of Quality Work / TestY = YES N = NO F = FAILED

Page &P of &N

Attachment 1SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008)Rev 330-Jun-08SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBERDATE APPROVEDQR NUMBERInspection of Repairs to Extreme Erosion Resistant RefractorySAIC-N-203415-Dec-09MECH-Attachment 1 -- SA INSP FORM 175-328110

Page &P of &N