Fill Material' shall be used for all fills except where 'Select Fill Material' is
specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m
(2 ft) of the bottom elevation of foundations, spread footings, or slabs-on-
grade when fill is required to achieve final grade. 'Select Fill Material'
shall also be specified for backfill which will be in contact with concrete
or steel structures.
SAES-A-114
Sec. 6.2
FAIL N/A
A Fill Materials
SAES-A-114
Sec. 6.2.1
B Select Fill Materials
A1
Gravel, sand and/or marl materials-maximum size shall be 75mm.
Note:If of lift thickness is less than 75mm, the maximum sieve size
allowed shall be equal to of lift thickness.
A2Delivered fill materials shall be free of frozen lumps, organic material,
trash, chunks of highly platic clay or other unsatisfactory materials.
SAES-A-114
Sec. 6.2.1
CONTRACTOR INSPECTION LEVEL
RE-INSP DATE
31-Aug-10Rev 5SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - AUGUST 2010)
ITEM
No.ACCEPTANCE CRITERIA REFERENCE
SAUDI ARAMCO INSPECTION LEVEL
REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
LAYOUT DRAWING NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME TRAVEL TIMEQUANTITY INSP.
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION PLANT NO.EQPT CODE SYSTEM ID.
WORK PERMIT REQUIRED?
ACTUAL INSPECTION DATE & TIME
SAUDI ARAMCO USE ONLYMH's SPENT
QR NUMBER
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Fill, Select-Fill and Marl Cap Materials Receiving Inspection
SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBER DATE APPROVED
SAIC-A-1002 31-Aug-11 CIVIL-
C Marl Cap Materials
C1
Maximum size of marl materials being received shall be 75mm, and shall
have between 11-35% passing the No. 200 sieve. The capping material
shall have a maximum liquid limit of 35 and maximum plasticity index of
12, per D4318.
SAES-A-114
Sec. 6.3.2.10
B2Select fill are composed only of inorganic materials and are free of
frozen lumps, trash, or other unsatisfactory materials.
B1Maximum size of sand and gravel materials being received shall be
50mm diameter particles.
SAES-A-114
Sec. 6.2
SAES-A-114
Sec. 6.2.2
Page 1 of 2
-
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED
QC Inspector
Name, Initials and Date:
Contractor / Third-Party
Name, Initials and Date:
QC SupervisorQC Record Reviewed
Work Verified
Name, Sign and Date:
Work Verified Quality Record Approved:Name, Organization,
Initials and Date:
T&I Witnessed
Proponent and Others
DATE APPROVED QR NUMBER
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0(Standards Cutoff - AUGUST 2010) Rev 5 31-Aug-10
SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBER
CONTRACTOR / SUBCONTRACTOR
Fill, Select-Fill and Marl Cap Materials Receiving Inspection SAIC-A-1002 31-Aug-11 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER
Work is Complete and Ready for Inspection:
PASS FAIL N/A RE-INSP DATE
REMARKS:
C2
1- SAES-A-114 -- Excavation and Backfill, 23 February 2010
Work Verified
Delivered fill materials shall be free of orgainic material, trash, or other
unsatisfactory materials.
SAES-A-114
Sec. 6.2.1
PMT Representative
REFERENCE
Name, Initials and Date:
Performed Inspection Work / Rework May Proceed
ITEM
No.ACCEPTANCE CRITERIA
T&I Witnessed QC Record Reviewed
PID Representative
REFERENCE DOCUMENTS:
QC Record Reviewed
Construction Representative*
Name, Initials and Date:
T&I Witnessed
Saudi Aramco