civil

TRANSCRIPT

  • PASS

    A3

    Fill Material' shall be used for all fills except where 'Select Fill Material' is

    specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m

    (2 ft) of the bottom elevation of foundations, spread footings, or slabs-on-

    grade when fill is required to achieve final grade. 'Select Fill Material'

    shall also be specified for backfill which will be in contact with concrete

    or steel structures.

    SAES-A-114

    Sec. 6.2

    FAIL N/A

    A Fill Materials

    SAES-A-114

    Sec. 6.2.1

    B Select Fill Materials

    A1

    Gravel, sand and/or marl materials-maximum size shall be 75mm.

    Note:If of lift thickness is less than 75mm, the maximum sieve size

    allowed shall be equal to of lift thickness.

    A2Delivered fill materials shall be free of frozen lumps, organic material,

    trash, chunks of highly platic clay or other unsatisfactory materials.

    SAES-A-114

    Sec. 6.2.1

    CONTRACTOR INSPECTION LEVEL

    RE-INSP DATE

    31-Aug-10Rev 5SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - AUGUST 2010)

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE

    SAUDI ARAMCO INSPECTION LEVEL

    REV. NO. PURCHASE ORDER NUMBER

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    LAYOUT DRAWING NUMBER EC / PMCC / MCC NO.

    SCHEDULED INSPECTION DATE & TIME TRAVEL TIMEQUANTITY INSP.

    EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION PLANT NO.EQPT CODE SYSTEM ID.

    WORK PERMIT REQUIRED?

    ACTUAL INSPECTION DATE & TIME

    SAUDI ARAMCO USE ONLYMH's SPENT

    QR NUMBER

    PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    Fill, Select-Fill and Marl Cap Materials Receiving Inspection

    SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBER DATE APPROVED

    SAIC-A-1002 31-Aug-11 CIVIL-

    C Marl Cap Materials

    C1

    Maximum size of marl materials being received shall be 75mm, and shall

    have between 11-35% passing the No. 200 sieve. The capping material

    shall have a maximum liquid limit of 35 and maximum plasticity index of

    12, per D4318.

    SAES-A-114

    Sec. 6.3.2.10

    B2Select fill are composed only of inorganic materials and are free of

    frozen lumps, trash, or other unsatisfactory materials.

    B1Maximum size of sand and gravel materials being received shall be

    50mm diameter particles.

    SAES-A-114

    Sec. 6.2

    SAES-A-114

    Sec. 6.2.2

    Page 1 of 2

  • *Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

    QC Inspector

    Name, Initials and Date:

    Contractor / Third-Party

    Name, Initials and Date:

    QC SupervisorQC Record Reviewed

    Work Verified

    Name, Sign and Date:

    Work Verified Quality Record Approved:Name, Organization,

    Initials and Date:

    T&I Witnessed

    Proponent and Others

    DATE APPROVED QR NUMBER

    SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0(Standards Cutoff - AUGUST 2010) Rev 5 31-Aug-10

    SAUDI ARAMCO INSPECTION CHECKLISTSAIC NUMBER

    CONTRACTOR / SUBCONTRACTOR

    Fill, Select-Fill and Marl Cap Materials Receiving Inspection SAIC-A-1002 31-Aug-11 CIVIL-

    PROJECT TITLE WBS / BI / JO NUMBER

    Work is Complete and Ready for Inspection:

    PASS FAIL N/A RE-INSP DATE

    REMARKS:

    C2

    1- SAES-A-114 -- Excavation and Backfill, 23 February 2010

    Work Verified

    Delivered fill materials shall be free of orgainic material, trash, or other

    unsatisfactory materials.

    SAES-A-114

    Sec. 6.2.1

    PMT Representative

    REFERENCE

    Name, Initials and Date:

    Performed Inspection Work / Rework May Proceed

    ITEM

    No.ACCEPTANCE CRITERIA

    T&I Witnessed QC Record Reviewed

    PID Representative

    REFERENCE DOCUMENTS:

    QC Record Reviewed

    Construction Representative*

    Name, Initials and Date:

    T&I Witnessed

    Saudi Aramco

    Page 2 of 2