Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Location: Al Kheesa, Shaft 21, 13, 11 and Road 58 Ref. No.15
Inspection Team: Antonio Resus (Hyder), Loveson Glariyans (CGC-SACYR JV), Ashok Chirra (CGC-SACYR JV), Israr Khan (DDC PM),
Emmanuel Enofor (DDC HSE Manager), Chibuzor Emmanuel (DDCSafety Officer),
Report Issued by: Antonio Resus Date: 9-August-2014
Site Safety Review / Inspection Report
Serialno
Description ItemSerial
noDescription Item
1 Site Access / Egress 2 16 Barricading/Cones/Warning Tapes 2
2 House-keeping 2 17 Signage 3
3 PPE Usage 2 18 Earthmoving machines 3
4 Scaffolds 1 19 Illumination NA
5 Work at heights 1 20 Environment Protection 2
6 Electrical Installations 2 21 Confined Spaces 2
7 Electric Tools NA 22 Chemical Handling NA
8 Lifting gears 4 23 Gas cutting / Welding operations 2
9 Excavations 2 24 Contractor's Weekly Inspections 4
10 Permit to Work 4 25 Speed Control - Vehicles 4
11 Fire Protection 3 26 Relevant Toolbox Talks 4
12 Welfare Facilities 3 27 First - Aid Procedures 3
13 Lifting Operations 4 28 Emergency Procedures 3
14 Ladders 2 29 Traffic Plan 4
15 Edge Protection 1 30 Storage Procedures 2Item Score: 1 = Immediate Action Required; 2 = Action Required; 3 = Observation; 4 = No Problems Found; 5 = Favourable Observation; 6 = Good; X = Not Inspected; NA = Not Applicable
Prepared by: Antonio Resus Date: 9-August-2014 Signature…………………… Hyder Representative: : RE……………………………….
---------------------------------------------------------------------------------------------------------------------
Actions Confirmed by Project Manager: ……………………………… Date: ….………….. Signature: ………………………..
Confirmation by SRE: …………………………………………………….. Date: …..…..……….. Signature: ………………………
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 2/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions DateClosed
Item no. 1 (GOOD PRACTICE) Recommendations / Actions to Improve:
Item 1 –Steels provided with end cap
Recommendations / Actions to Improve:
Item no. 2- Public protection provided, cement block, cableand green nets
Item no. 2 - (GOOD PRACTICE)
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 3/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serial
no.
Observations
(Photograph (7.0x9.3) & Description)
Risk
(H M L)
Time for
Close out
Observations / Actions DateClosed
Item no. 3 (GOOD PRACTICE) Recommendations / Actions to Improve:
Item no. 3- Good traffic management, more blinker lightsprovided onto the concrete blocks along the road
Item no. 4- (GOOD PRACTICE)
.
Recommendations / Actions to Improve:
Item no. 4- Signboard provided with sandbags as ballast toavoid topples down.
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 4/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions Date
Closed
21
Item no. 5. Shaft 21
H Immediate
Recommendations / Actions to Improve:
Item no. 5- Ventilation system should be installed at the topground level to produce/supply fresh air
Action Taken by Contractor:
2,30
Item no 6- Shaft 21
M Immediate
Recommendations / Actions to Improve:
Item no. 6- Poor housekeeping. All rubbish materials shouldbe removed from site and transfer to designated dumping area.
Action Taken by Contractor:
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 5/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions Date
Closed
11
Item no. 7- Shaft 21
M Immediate
Recommendations / Actions to Improve:
Item no. 7- Fire extinguishers should be in good workingconditions and clean, not just using as warning tape holder
Action Taken by Contractor:
Recommendations / Actions to Improve:
Item no 8- All operatives should be inducted and should wearappropriate PPE’s (This is mandatory).
Action Taken by Contractor:3
Item no. 8- Shaft 21
M Immediate
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 6/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions Date
Closed
23
Item no. 9- Shaft 13
H Immediate
Recommendations / Actions to Improve:
Item no 9 – Damaged gauges should be replaced todetermine correct pressure.
Action Taken by Contractor:
Recommendations / Actions to Improve:
Item no. 10- Flashback arrestor should be provided to stopthe flame or reverse flow of gas back up into the equipment orsupply line and it prevents the user and equipment fromdamage or explosions
Action Taken by Contractor:23
Item no.10- Shaft 13
H Immediate
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 7/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions DateClosed
23
Item no.11 -Shaft 13
H Immediate
Recommendations / Actions to Improve:
Item 11 - Damaged gauges should be replaced to determinecorrect pressure.
.
Action Taken by Contractor:
Recommendations / Actions to Improve:
Item 12- Poor housekeeping. All rubbish materials should beremoved from site and transfer to designated dumping area .
Action Taken by Contractor:2,30
Item no.12 Shaft 13
MImmediate
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 8/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions Date
Closed
17,16,30
Item no. 13.-Shaft 13
H Immediate
Recommendations / Actions to Improve:
Item no. 13- Inadequate pipe stop block provided in a sloplocation. No awareness signboards provided
Action Taken by Contractor:
Recommendations / Actions to Improve:
Item no. 14- Access going to the shafts should be providedwith appropriate flooring or fill with gravel to avoid trips
Action Taken by Contractor: Access going to the shafts is filled with gravel to avoid tripsand falls.
1,14
Item no.14 – shaft 13
H Immediate
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 9/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serialno.
Observations(Photograph (7.0x9.3) & Description)
Risk(H M L)
Time forClose out
Observations / Actions Date
Closed
1
Item no. 15.-Shaft 13
H Immediate
Recommendations / Actions to Improve:
Item no. 15- Walkway with pipes should be provided withramps for easy access of operatives and to avoid trips
Action Taken by Contractor:
Recommendations / Actions to Improve:
Item no. 16- Ventilation system is from the cool cabin tosupply cool fresh air to confined space
Item no.16 – Terratest (Good practice) shaft 11
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 10/12
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 11/12
8/11/2019 Safety Joint Inspection Report 9-Reply
http://slidepdf.com/reader/full/safety-joint-inspection-report-9-reply 12/12
Safety Inspection Report
H&S/FM/09/SAF INSP
July 2012
Serial
no.
Observations
(Photograph (7.0x9.3) & Description)
Risk
(H M L)
Time for
Close out
Observations / Actions DateClosed
15
Item no. 21.-Road 58
H Immediate
Recommendations / Actions to Improve:
Item no. 21- Boulders should not be used as geo textile fabricstopper. Bent rebar should be used
Action Taken by Contractor:
Boulders removed and Bent rebar should be used as geotextile fabric stopper.