safety engineering for oil gas industry operational plant
DESCRIPTION
oil n gasTRANSCRIPT
-
TECHNICAL MEETTECHNICAL MEETTECHNICAL MEETTECHNICAL MEET----
TAMILNADU TAMILNADU TAMILNADU TAMILNADU
ENGINEERS FORUM, ENGINEERS FORUM, ENGINEERS FORUM, ENGINEERS FORUM,
KUWAITKUWAITKUWAITKUWAIT
TECHNICAL MEETTECHNICAL MEETTECHNICAL MEETTECHNICAL MEET----
TAMILNADU TAMILNADU TAMILNADU TAMILNADU
ENGINEERS FORUM, ENGINEERS FORUM, ENGINEERS FORUM, ENGINEERS FORUM,
KUWAITKUWAITKUWAITKUWAIT
Safety Engineering for Oil & Gas Industry Operational Plants
J RAMESH BABU
-
Page 1
Private and Confidential
AGENDAAGENDA
About Cholamandalam MS Risk Services Ltd.About Cholamandalam MS Risk Services Ltd.
Safety Engineering studies for Operational plantsSafety Engineering studies for Operational plants
Case studiesCase studies
-
Page 2
Private and Confidential
CMSRS SERVICES POTFOLIOCMSRS SERVICES POTFOLIO
-
Page 3
Private and Confidential
Services Offered by CMSRS Contd.,Services Offered by CMSRS Contd.,
-
Page 4
Private and Confidential
Our Global Foot PrintsOur Global Foot Prints
-
Page 5
Private and Confidential
Global Risk Technology Center [GRTC]Global Risk Technology Center [GRTC]
-
Page 6
Private and Confidential
AccoladesAccolades
-
Page 7
Private and Confidential
WINNER OF RISK MANAGER OF THE YEAR AWARDWINNER OF RISK MANAGER OF THE YEAR AWARD
-
Page 8
Private and Confidential
NAPESCO our partner in Kuwait
a leading national oil field services provider
-
Page 9
Private and Confidential
OTHER ACCOLADESOTHER ACCOLADES
APPROVED HEALTH & SAFETY CONSULTANTS FOR KUWAIT APPROVED HEALTH & SAFETY CONSULTANTS FOR KUWAIT OIL COMPANY UNDER 31 S CATEGORY ( ONLY ASIAN OIL COMPANY UNDER 31 S CATEGORY ( ONLY ASIAN COMPANY)COMPANY)
APPROVED FOR CONSULTANCY STUDIES AT KUWAIT APPROVED FOR CONSULTANCY STUDIES AT KUWAIT NATIONAL PETROLEUM COMPANY ON PROJECT TO NATIONAL PETROLEUM COMPANY ON PROJECT TO PROJECT BASISPROJECT BASIS
APPROVED FOR CONSULTANCY STUDIES AT AL KHAFJI APPROVED FOR CONSULTANCY STUDIES AT AL KHAFJI JOINT OPERATIONS OF SAUDI ARAMCO OIL COMPANY AT JOINT OPERATIONS OF SAUDI ARAMCO OIL COMPANY AT SAUDI ARABIA ON PROJECT TO PROJECT BASISSAUDI ARABIA ON PROJECT TO PROJECT BASIS
-
Page 10
Private and Confidential
Risk Based Inspection
Identification of risks of each equipment on the risk matrix
Selection of type of maintenance and frequency of inspection
-
Page 11
Private and Confidential
Risk & Reliability Management - Concept
-
Page 12
Private and Confidential
RRM Process
-
Page 13
Private and Confidential
Standards adopted
API publication 581- Base Resource Document: Risk Based Inspection
API 580 Recommended Practice for Risk Based Inspection
-
Page 14
Private and Confidential
Health Safety Environment Critical Equipment System (HSECES) for Refinery and Off shore Facilities
-
Page 15
Private and Confidential
HSECES
HSE Critical Equipment and Systems (HSECES)
Parts of an installation and such of its structures, plant equipment and systems (including computer programmes) or any part thereof, the failure of which could cause or contribute substantially to; or a purpose of which is to prevent or limit the effect of a major accident or any accident with severe or catastrophic consequences
-
Page 16
Private and Confidential
CRITICAL EQUIPMENT
-
Page 17
Private and Confidential
Fire Safety Audit / Fire Risk Assessment
Identification of fire risks and assessment of fire risks based on Risk Assessment technique suggested by Fire Precautions at Workplace Act, UK
Recommendation of fire prevention measures
Fire / smoke spread hazards and suggesting control measures
Review of Passive Fire Protection System (PFPS)
Identification of heat / smoke detection requirements
Review of Active Fire Protection System (AFPS) as per TAC & NFPA standards
-
Page 18
Private and Confidential
Fire & Explosion Hazard Management system
-
Page 19
Private and Confidential
Process of FEHM
-
Page 20
Private and Confidential
CHAZOP STUDY FOR ELECTRICAL/ ELECTRONIC/ PL SYSTEMS
OBJECTIVE
To analyze the types of failure modes of new system (independently and in conjunction with other new/existing equipment) and to ensure that sufficient redundancy/fall back arrangement is provided and the introduction of the new system does not result in unsafe plant operation
SCOPE
Hazards and Operability Study, HAZOPS, is a Systematic Structured Discovery technique to identify hazardous consequences due to deviations from designers intentions. The scope of the study covers all the Instruments and Control systems like DCS, ESD, Field Instruments, Local Control Panel, UPS, paging system, etc. including new design andrevamping of existing facilities.
The study will also undertake a Safety Integrity Level (SIL) assessment for all safety related electrical/ electronic/ programmable electronic systems
-
Page 21
Private and Confidential
PROCESS SAFETY AUDITS/ SAFETY AUDITS
Comprehensive Safety Audit as per IS 14489 /OHSAS 18001
Review of 31 SMS elements
Combination of Engineering and System based solutions
Comprehensive Approach similar to that of a health check up
Should address ground level realities
Should have performance based approach
Can be objective (Adoption of Scoring Pattern)
-
Page 22
Private and Confidential
Process Safety Management
14 Elements of PSM
Employee Participation
Process Safety Information
Process Hazard Analysis
Operating Procedures
Training
Contractors
Pre-startup Safety Review
Mechanical IntegrityHot-work PermitsManagement of ChangeIncident InvestigationsEmergency Planning & ResponseCompliance Safety AuditsTrade Secrets
-
Page 23
Private and Confidential
Safety Perception Survey
SPS part of culture change management, a step
further to OHSAS 18001, to understand employees
safety perception better
Specific SPS questionnaire for each employee category
Developed a software to analyze survey data collected
Carried out SPS for a 9 MMTPA refinery93.75
90.62
72.5
0
62.5
79.83 79.21
84.55 83.8586.59
0
10
20
30
40
50
60
70
80
90
100
Category 1 93.75 90.62 72.5 0 62.5
Category 2 79.83 79.21 84.55 83.85 86.59
EMPLOYEE EMPOWERMENT
MANAGEMENT CLIMATE MANAGEMENT
COMMITMENT QUALITY OF
SUPERVISON RECOGNITION OF
PERFORMANCE
-
Page 24
Private and Confidential
Disaster Management Planning
Disaster Management Plan can be evolved
as per standards US EPA, NFPA 1600,
local statutes and corporate standards
Should be scenario based
Specific and detail procedures should be
developed
Periodically rehearsed
Periodically updated
-
Page 25
Private and Confidential
ELECTRICAL SAFETY AUDIT
Comprehensive Electrical Safety Reviews
(Earthing, ESD, HAC, Lightning, accidents, protection,WPs, sample tests)
Lightning Protection Reviews
Electrical Hotspot Detection Surveys
Thermographic Surveys
-
Page 26
Private and Confidential
LIGHTNING PROTECTION REVIEW
Review of LP based on IS 2309 /NFPA 780/API RP 2003/OISD 180
Use of LP Risk Assessment software, based on BS 6651
Risk Based design preferred
-
Page 27
Private and Confidential
Thermography Surveys
Part of E-RBM Programme
In the De-Tariff scenario, may be offered free by ge neral insurance companies
Identification of potential survey points / equipme nt and interpretation - very crucial
NFPA 70 E recommends Thermographic surveys
-
Page 28
Private and Confidential
Accident Investigation
-
Page 29
Private and Confidential
The Aim of the Investigation
THE KEY RESULT SHOULD BE TO PREVENT A RECURRENCE OF THE SAME ACCIDENT
-
Page 30
Private and Confidential
INVESTIGATION STRATEGY
GATHER INFORMATION & ESTABLISH FACTS
ISOLATE ESSENTIAL CONTRIBUTORY FACTORS
DETERMINE CORRECTIVE ACTIONS
IMPLEMENT CORRECTIVE ACTIONS
-
Page 31
Private and Confidential
Accident Investigation Techniques
Fault Tree Analysis
Fishbone / Ischikawa Diagram
Why Why Analysis
-
Page 32
Private and Confidential
Fault Tree Analysis
-
Page 33
Private and ConfidentialFish bone / Ischikawa Diagram
-
Page 34
Private and Confidential
F a i l s t o i n s p ec t
N o r e c o g n i t i o n p l a nI n a d e q u a t e t r a i n i n g p l a n
N o a c c o u n t a b i l i t y p o l i c y N o i n s p e c t i o n p o l i c y
N o d i s c i p l i n e p r o c e d u r e s
O u t d a t e d h a z c o m p r o g r a mN o o r i e n t a t i o n p r o c e s s
U n g u a r d e d ma c h i n e
H or s e
p l ay
F a i l s t o t r a i nT o m u c h
w o r k
D e f e c t i v e P P EF a i
l s to r e
p or t i
n j ur y
I n a d e q u a t e t r a i n i n g
C r ea t e
a h az a r d
F a i l s t o e n f o r c e
U n t r a i n e d w o r k e r
B r o k e n t o o l sI g n o
r e a h a z
a r d
L a c k o f t i m e
I n a d e q u a t e l a b e l i n g
N o r e c o g n i t i o n
C u t sB u r n s
Lack
of v
isio
n
S t r a i n s
No
mis
sion
sta
tem
ent
C h e m i c a l s p i l l
17
-
Page 35
Private and Confidential
-
Page 36
Private and Confidential
Moving towards Excellence
Imma
ture
Orga
nizati
ons
Time
TQ
M M
atu
r ity
Ad-Hoc Annual AuditsAd-Hoc Management Reviews
Ad-hoc Training
SHEQ Strategic Planning
ISO 9000. ISO 14001, OHSAS 18001Satisfaction Surveys,
Supporting MIS
Ad-Hoc Risk Assessments
Measurement ProgramImprovement program
Stage 1CrisisManagement
Crisis Management
Stage 3Enlightenment
Behavior basedInterventions
Stage 4Wisdom
Self Assessments
Sustainability
Stage 5Certainty
10 12 Years
Stage 2Awakening(Cosmetic)
Low
Hig
h
Business Processes Mapped