safety at forestry corporation · forestry corporation safety at forestry . whs tool / resource ....
TRANSCRIPT
-
Forestry Corporation
□ □ □ □ □
Safety at Forestry
WHS Tool / Resource 2.1.3 Site Safety Plan
This site safety plan is for all FCNSW operations of more than one day duration or where an operational plan is in place. Where a contractor is responsible for the work to be undertaken, the contractor must develop their own site safety plan. A Medical Emergency Evacuation Plan (MEEP) has been developed and is included below
Location Forest Name: Cathcart Specific location details: Compartment 1375, 1376, 1377, 1380
Date work commenced:
Description of Work to be undertaken on site: Forest mark-up, road maintenance and/or construction, harvest supervision, compliance monitoring
On site communication: Radio channel number VHF UHF Other (e.g. mobile phone numbers of other workers on site, hand signals):
Site Supervisors Name: Contact number:
Site workers including contractors Name: Contact number:
First Aid Kit locations
All FCNSW & Contractor Vehicles
First Aiders on site
Hazardous chemicals on site Safety Data sheet location
Mandatory PPE required Task specific PPE required
Appropriate safety footwear High visibility clothing Long sleeve shirt and trousers
Hearing Protection Gloves Eye Protection
Hard hat Other
A number of hazards are common to all forest sites. All workers should be aware of the following hazards and ensure appropriate control measures are in place.
Element Type Number Version Owner Date Effective Review Date Page 1 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
Forestry Corporation
Safety at Forestry
Common forest and outdoor hazards Control Responsibility
Exposure to sun Long sleeve clothing, sunscreen, work in shade where possible, All workers
Exposure to heat, rain and cold Appropriate clothing, adequate water supply, plan work for cooler times of the day where possible
All workers
Overhead hazards/dangerous trees
Identify and remove dangerous trees in work area. Where unable to remove, mark trees. Assessment of work areas prior to commencement and ongoing with changing weather and wind. Wear hard hat
Supervisors, contractors and all workers
Bites and stings Permethrin treated clothing Insect repellent Long sleeved shirt/long trousers
All workers
Slips and trips/uneven ground
Boots worn and maintained in good condition Use of aids- walking poles, carry bags, spikes etc
All workers
Mobile Plant Safe zones established Traffic management systems in place Supervisors and workers
Vehicle collision at road intersections and road sides
Warning signs at FCNSW road intersections, implement traffic control plans, 60km/hr speed limit on unsealed forest roads, vehicle headlights on at all time when driving.
All workers
Overhead powerlines or cables
Assess every individual tree for directional felling and degree of risk. Do not fall trees towards overhead hazard if within two tree lengths.
Supervisors and contractors
Cliff lines & rocky very steep terrain
Operators to assess work site within two tree lengths to identify immediate hazards. Communicate to other operators and mark sites.
Supervisors and contractors
Mine shafts/quarries Assess snig track routes and tree felling paths prior to operating. Identify and mark site accordingly.
All workers
Dust from passing vehicles along dirt haulage routes
Restrict speed to minimise dust generation, slow down when passing vehicles. Turn on driving and hazard lights to increase visibility.
All workers
Trucks colliding with oncoming school buses on Mount Darragh Road weekdays 7:00 – 8:30am and 3:30 – 5:30 pm.
Use UHF channel 40 (channel used by school buses) whilst travelling along Mount Darragh Road. When approaching corners communicate trucks location and/or direction of travel to alert bus drivers.
Supervisors and contractors
The following additional hazards are present at this site: Examples include but are not limited to: other contractors/workers in vicinity, mine shafts, cliffs, underground cables, overhead power lines, mobile plant, traffic, school bus route, log trucks on road, work on or near roads, difficult site access, unauthorised visitors, quarries, asbestos etc
Element Type Number Version Owner Date Effective Review Date Page 2 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
Forestry Corporation
Safety at Forestry
Site Specific Hazards Control Responsibility Mine shaft located off 1377-3 Trail in SEZ. Coordinates: 723408 / 5918712
PA’s and harvesting crews to be made aware. Mark site if safe. Supervisors and contractors
Powerlines in private property on opposite side of Mount Darragh Road, adjacent compartment 1377
Safe Work Practice for working near overhead power lines must be implemented by the crew before any work is undertaken within 2 tree lengths
Supervisors and contractors
Safe Work Practices
The following Safe Work practices are relevant for work conducted on this site (site supervisor to document):
Element Type Number Version Owner Date Effective Review Date Page 3 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
Forestry Corporation
Safety at Forestry
SAFETY DIARY
This diary should be used to record daily safety matters such as toolbox talks, safety inspections etc.
Date Issue Initials
Element Type Number Version Owner Date Effective Review Date Page 4 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
Forestry Corporation
Safety at Forestry
SITE SAFETY PLAN DEVELOPMENT
Date of of initial plan development Developed By Position Signature
30/05/2018 Melanie Dyne Senior Planner
SITE SAFETY REVIEW
The site safety plan must be reviewed by the site supervisor at a minimum of every 3 months and reviews recorded below. Where changes are made to the site safety plan, these must be recorded on the plan. A new plan may need to printed where changes are significant.
Date of review Changes made? If yes, document changes Conducted by Initials
Element Type Number Version Owner Date Effective Review Date Page 5 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
Forestry Corporation
Safety at Forestry
SITE INDUCTION
I have been briefed by the Forestry Corporation supervisor on-site before starting work or entering the worksite. I have noted and understand my safety responsibilities. I have taken note of and understand the site safety plan and the medical emergency evacuation plan and the attached location map.
Name Company Activity Signature Date
Element Type Number Version Owner Date Effective Review Date Page 6 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
Forestry Corporation
Safety at Forestry
3.5.3 Medical Emergency Evacuation WHS Tool/Resource
Plan Emergency Meeting points are shown on the attached Locality Map
Phone Reception Emergency Meeting Point
Description
Nil reception. Nearest reliable available at Cathcart Intersection of Rayners Road and Mount Darragh Road (EMP 38)
MGA; Zone for EMP; and Lat/Long for helicopter landing point
Lat/Long:-36° 50 28.34" S / 149° 30 10.32" E MGA: 723178 E 5919819 N
Helicopter Landing point
Intersection of Rayners Road and Mount Darragh Road (EMP 38)
Lat/Long:-36° 50 28.34" S / 149° 30 10.32" E MGA: 723178 E 5919819 N
Procedures to obtain ambulance assistance
1. Dial 000 2. If there is no mobile coverage, dial 112 (which will work on
any accessible mobile phone system). 3. If no response on 112:
• use a radio link (TARA, be discrete with personal information)
• move to an area with mobile coverage • find a landline • use another network (e.g. a contractor’s VHF radio)
The nearest Forestry Corporation of NSW office
is: Eden
Contact on:- Phone or SF Radio
Channel: 247
Telephone: 1300 880 548
Give details of the situation and ask for a 000 call to be placed.
000 operator question: Response:
1. Police, Fire, Ambulance? Ambulance is required Nearest control centre for ambulance: Bombala 2. Suburb? State Forest name: Cathcart
Nearest town or locality: Cathcart
Nearest ambulance station: Bombala
3. Address? Cathcart State Forest 4. Nearest road junction/cross street? Intersection of Rayners Road and Mount Darragh Road
5. Local Government Area? Bega Valley Shire
6. Nature of the problem? Describe the accident, number, age and condition of casualties. Are they conscious, are they breathing? 7. Where is the accident? Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point.
Head east from Bombala on the Mount Darragh Road for approx. 27km until reaching the intersection with Rayners Road (Emergency Meeting Point 38).
8. 4WD ambulance required? Yes/No: UHF radio channel to use:
9. Injuries? Give detailed information about the condition of the casualty (do not mention names over radio system) 10. Your name and call back number:
Element Type Number Version Owner Date Effective Review Date Page 1 of 72 Tool/Resource 2.1.3 1.0 H & S Manager July 2014 July 2016
Site Safety Plan This document is not controlled when printed
-
FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION HARVEST PLAN LOCALITY MAP AForestry Plan Name: HP _ED_1375_1376_1377_1380_17_v3 CATHCART State Forest Corporat ion
NO. 607 Plan No: 56878·':,Hl! l,l,·1 1:100.000 CptNo: 1375, 1376, 1377, 1380 VERSION: 3Management Area: EDEN
Mapsheet: CATHCART (8724-2N); CANDELLO (8824-3N) Date Printed: 4/01/2018 v GDA_1994_MGA_Zone_55
Emergency Meeting Point (EMP 38) .....------. & Helicopter Landing Site
Intersection Mount Darragh Road & Rayners Road
~ Sealed Hardwood Plantations (Zone 5) -+ Evacuation Route - Major Forest Road • Softwood Plantations (Zone 6) -+ Haulage Route D Compartment of Interest Non Forestry Use (Zone 7) Helicopter Landing Site • Harvesting Exclusion (Zone 3A) D National Park Estate + Emergency Meeting Point
Special Prescription (Zone 38) Vacant Crown Land
General Management (Zone 4)
Kilometres 2 3
-
·
ForestryCorporation
1:15,000
Contour Interval 1Orn
GDA 1994 MGA Zone 55
FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION
HARVEST PLAN OPERATIONAL MAP CATHCART Forest NO. 607 Plan Name: HP ED 1375 1376 1377 1380 17 v3 Cpt No:1375,1376,1377,1380
Plan No:56878Management Area: EDEN VERSION: 3 Mapsheet:CATHCART(8724-2N);CANDELO(8824-3N) Date Printed: 23/05/2019
721000 722000 723000 724000
Lot 74 DP264511
- ...
I \
I I
I \ \ I
I \
'~ ~ ot232 : DP756826
I\ \ _ t ,,.~·.,•·'-!'.;I:.. -~- ~ -----..... / ... .~ ~ ·,- • - ..:..•- , • • • ' _.,, . C
, I ' / - - e -'--~✓ '--, • • .
, ....... ',-· ...) '
I I I '.
/ - ""..,, 1' --.,__-~
' \
721000 722000 723000 724000
(!) Temporary Dry Weather Dump - Major Roads (EPL Standard) MAF (verified) Cool Temperate Rainforest EZ Non-forestry Use (FMZ 7)Yellow-bellied Glider (Heard)♦ Minor Roads (EPL Standard) -Mapped IHL4 Exclusion Zone [X) FMZ 3B -Special Prescription I Private PropertyTemporary Wet Weather Dump0 ♦ Yellow-bellied Glider (Feed Tree) Proposed New Road (EPL Standard) [J] LiDAR Slope>30 (==< Existing Crossing Major Road (other) FMZ4 -MSW -Stream PZ 1st Order (15m) t::. Rocky Terrain (not yet verified) -X Proposed Control Line Shire Road Excluded Forest -Stream PZ 2nd Order (20m) ~ Mine Shafts State Forest Boundary• LiDAR Corrected Drainage /// Owl Landscape -Stream PZ 3rd Order (30m) Emergency Meeting Point Compartment Boundary+ • Indicative Unmapped Drainage Features -Cool Temperate Rainforest Stream PZ 4th Order (50m)Coupe Boundary•
Prepared By melanie.dyne Date: 30/05/2018
Kilometres © Crown Copyright 2013. The information and data contained in this map is to the best of Forestry Corporation's belief, true and correct at the time of 0 0.5 1.5 publication. However, changes in circumstances after the publication may impact upon the accuracy of the material. No warranty or guarantee is provided
by the State of New South Wales, Forestry Corporation and its employees and agents and no liability is accepted for any loss or damage, costs or expense resulting from the use or reliance upon the information and data contained in this map
-
.
ForestryCorporation
1:15,000
Contour Interval 1Orn
GDA 1994 MGA Zone 55
FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION
FOREST TYPE MAPCATHCART Forest NO. 607 Plan Name: HP ED 1375 1376 1377 1380 v3 Cpt No:1375,1376,1377,1380
Plan No:56878Management Area: EDEN VERSION: 3 Mapsheet:CATHCART(8724-2N);CANDELO(8824-3N) Date Printed: 23/05/2019
721000 722000 723000 724000
I I
r"-----.... • : I
I ,, I
I I I \ I
I 1377-2 Trail I
0 0 0 0 N./ . f/l
·,· r. • ·· ;• j1,.' I I,.• ; I' 2 I
;• --..Mount DarraghiJl.oad \ -,,, . I \ •
:•' \ I
; -- ;I •,.~, ; ./ • I ,_ .. ' •
' ' --- --- ,,. •- ..... L_,,,." .......--. " f . •,, __ ..,,,,,-, > '1. I
I .• , ♦ I\ 0 f c I • ----- ....... 0 0 1 0 0 0 0) I 0) '....... • • f/l f/l' 'I ' '. ... ,. '' ~ 1376
', I e ' I\ • • * \,,,~. • I --- •'I
\ ·-' ..... \ •• I• ~• I•
___:: · ~. " ~ \ __.J· ;
* 721000 722000 723000 724000
Emergency Meeting Point ♦ Yellow-bellied Glider (Feed Tree) Compartment Boundary Indicative Unmapped Drainage Features+ • Prasophyllum sp. Majors Creek Major Roads (EPL Standard) Type 114 SilvertopAsh - Stringybark -24.0 haGang-gang Cockatoo• Minor Roads (EPL Standard) Type 152 Messmate - Gum - 26.5 haEB Eucalyptus parvula Greater Glider *♦
Proposed New Road (EPL Standard) Type 154 Brown Barrel - 296.0 haSooty Owl Koala• Minor Roads (other) Type 155 Brown Barrel - Gum - 10.4 ha* Yellow-bellied Glider (heard) .. ScMet Robin♦
Major Road (other) Type 156 Brown Barrel / Messmate - Ash 89. 7 ha.. Olive Whistler,$, Powerful Owl Shire Road Coupe Boundary
Spotted-tailed Quall • Li DAR Corrected Drainage State Forest Boundary* •
Prepared By melanie.dyne Date: 30/05/2018
Kilometres © Crown Copyright 2013. The information and data contained in this map is to the best of Forestry Corporation's belief, true and correct at the time of 0 0.5 1.5 publication. However, changes in circumstances after the publication may impact upon the accuracy of the material. No warranty or guarantee is provided
by the State of New South Wales, Forestry Corporation and its employees and agents and no liability is accepted for any loss or damage, costs or expense resulting from the use or reliance upon the information and data contained in this map
-
Forestry Corporation NSW Hardwood Forests Traffic Control Plan 78 & 57: Harvesting within 2 Tree Lengths of Mount Darragh Road in Compartment 1377 Cathcart State Forest (modified from RTA Traffic Control at Work Site TCP 78 & 57) Speed limit 100km/hr, ADT
-
200m
.lrt,,,;A;") Corporation Forestry 100m 100mI· l ~ Forestry Corporation NSW Southern Region Traffic Control Plan 195:
200 m ON RIGHT
1377-1 Trail, 1377-2 Trail, Stoves Road & Mount Darragh Intersections (modified from RTA Traffic Control at Work Site TCP 195)
€> Haulage direction
Mount Darragh Road (1 00km/hr)
G)
-~ I-N
I t--t--C"') T""
"C ro 0 0:: 1/) Q) >0.....
Cl)
Direction to Compartment
€> I0~ LE~ 100m -1- 100m ·I
200m ·I
Notes:
C) Intersection of 1377-1 Trail & Mount Darragh Road. Sight distance restricted to 194m when travelling in a easterly direction & 178m in a westerly direction along Mount Darragh Road.
G) Intersection of 1377-2 Trail & Mount Darragh Road. Sight distance restricted to 105m when travelling in a easterly direction along Mount Darragh Road.
LONG TERM USE ADT > 1500,
-
Forestry Corporation Traffic Management Plan Log Haulage from Compartment 1377 Cathcart State Forest
SIGHT DISTANCE TO 1377-1 Trail INTERSECTION
194m-Right turn onto 1377-1 Trail Not Permitted1
-------
Worksite: Cpt 1377
Mount Darragh Road (1 00km/hr)
------SIGHT DISTANCE TO
177-1 Trail INTERSECTION 178m-left turn onto 1377-1 Trail Permitted2
Worksite: Cpt 1377
North
TRAFFIC MANAGEMENT PLAN FOR LOG TRUCK HAULAGE FROM CPT 1377 CATHCART STATE FOREST Truck Movements
-
Forestry Corporation Traffic Management Plan Log Haulage from Compartment 1377 Cathcart State Forest
SIGHT DISTANCE TO 1377-2 TRAIL INTERSECTION 105m-Right turn onto Mount Darragh Road NOT Permitted unless TCP78_57_Mount Darragh Road_Cpt 1377 implemented1 ---------
Worksite: Cpt 1377
NAGEMENT PLAN FOR LOG TRUCK HAULAGE FROM CPT 1377, STATE FOREST
TRAFFIC MA CATHCART Truck Move on eastern a Notes:
ments
-
Forestry Corporation Traffic Management Plan Log Haulage from Compartment 1377 Cathcart State Forest
SIGHT DISTANCE TO STOVES RD INTERSECTION
160m-Right turn onto Mount Darragh Permitted2
---------
TRAFFIC MANAGEMENT PLAN FOR LOG TRUCK HAULAGE FROM CPT 1377 CATHCART STATE FOREST
Truck Movements
-
r'-----=-=-~ ;/,/ / .__.. . ~..,.. __ .., .p.,1--i ..... .____ ..._,I .,..
~~
Forestry Gorporation
Hardwood Forests Division
Harvest and Haul Plan
State Forest Cathcart Compartments 1375, 1376, 1377, 1380
Management Area Eden IFOA Region Eden
Harvest Plan No. 56878 Coupes Cpt 1375 – coupe 1 (part);
Cpt 1376 – coupe 1 (part);
Cpt 1377 – coupe 2 (part), coupe 3 (part); coupe 4
Cpt 1380 – coupe 1 (part).
Legal Conditions Native Forest Harvesting in accordance with IFOA conditions.
Harvesting and Roading activities must have EPL coverage.
To implement this plan you must hold a current Contractors Licence.
Standard Harvest Plan Conditions and Operating Procedures apply.
Survey expiry date for this plan is 21/02/2021.
Certification Timber products removed from the plan area are within the Defined Forest Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224
Prepared by Planner Date: 18/12/2018 Melanie Dyne
Approved by Operation Planning Mgr Date: 19/12/2018 Shane Clohesy
Abbreviations PA = Production Assistant, PS = Production Supervisor, RC = Roading Coordinator, Crew = Harvest Contractor/Forest Operators, IFOA = Integrated Forestry Operations Approval, TSL = Threatened Species Licence, EPL = Environment Protection Licence, FL = Fisheries Licence, CH = Cultural Heritage, SOP = Standard Operating Procedure, HPOM = Harvest Plan Operational Map.
1. Harvest Area Details Cpt 1375 Cpt 1376 Cpt 1377 Cpt 1380 Total
Plan Compartment ID 126368 126369 126370 126371 N/A
Gross Area (ha) 147.3 91.7 160.6 54.1 453.7
Harvest Area (ha) 35.9 40.9 36.5 8.1 121.4
Estimated Yield (t) 3400 2290 2770 590 9050
Yield/ha (t/ha) 94.8 56.0 76.0 72.4 74.6
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 1 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
Slope (% 0-20 degrees) 87.7 88.6 84.7 49.9 N/A
Slope (% 20-25 degrees) 9.4 11.4 12.5 27.2 N/A
Slope (% 25-30 degrees) 2.2 0.1 0.4 19.4 N/A Contractor must ensure timber removed is allocated to the correct compartment when entered onto Delivery Docket.
2. Management Conditions on Boundaries Boundary Conditions
Private Property
FMZ FMZ 3A – Harvesting Excluded, FMZ 3B – Special Prescriptions (Visual & Road Maintenance), and FMZ 4 – General Management occur within the compartment and are shown on the HPOM.
FMZ 3A – Harvesting and harvesting machinery are not permitted in these areas. The crew is to protect all areas of FMZ 3A exclusion.
FMZ 3B (Visual) – A visual protection zone exists along the Mount Darragh Road in compartment 1377, coupe 4. The PA is not required to mark this boundary but must supervise implementation of a modified harvesting prescription (see table 7).
FMZ 3B (Road Maintenance) – A 20-metre-wide road maintenance zone exists on South East Forests National Park’s side of Stoves Road and Maidens Road. Only routine road maintenance activities are permitted (eg: road side clearing, road drainage and road re-alignment). The PA is not required to mark this boundary but must ensure Stoves Road and Maidens Road are used as the harvest boundary.
Research Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area.
National Park National Park forms part of the western boundary of the compartment 1377, and the southern boundary of compartment 1380, and is shown on the HPOM. crew must ensure access roads to the National Park are not impeded by forestry activities and the roads condition is maintained.
Cultural Heritage
*Where field boundary marking instructions differ from SOP2: Exclusion Zone Boundary Management, the instructions in this Harvest Plan apply.
3. Expected Yields
Product Estimates Volume
Sawlog (m3) 550
Pulp (t) 8400
Total (t) 9050
Species Species Mix (Sawlog)
FAS 35%
STA 35%
MM 30%
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 2 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
4. Haulage Haul Route North out of Stoves Road and Rayners Road onto Mount Darragh Road. East on
Mount Darragh Road.
School Bus Routes Mount Darragh Road is used by a school buses between the hours of 7:00 am to 8:30 am, and 3:30 pm to 5:30 pm. On weekdays, to the greatest extent practicable, log haulage should avoid school bus times on the above roads.
Log trucks are to call up on UHF 40 when leaving Rayners Road and Stoves Road onto Mount Darragh Road.
Traffic Control Plan Traffic control is required for this event. Traffic control plans (attached) have been prepared for:
- Harvesting within 2 tree lengths of Mount Darragh Road: TCP78_57_Mount Darragh Road_Cpt 1377 (RC responsibility)
- Sight distance for 1377-1 Trail, 1377-2 Trail & Stoves Road: TCP195_Mount Darragh Road (RC responsibility)
Due to sub-optimal sight distance east on 1377-2 Trail, log haulage trucks can either turn west from 1377-2 Trail onto Mount Darragh Road and turn around down Rayners Road, before travelling east down Mount Darragh Road; or implement TCP78_57_Mount Darragh Road_Cpt 1377 to reduce speed of traffic.
5. Community Issue Detail Conditions
Notifications Required
Neighbours NPWS Adhere to the agreed Stoves Road & Maidens Road tenure boundary with 20m road maintenance offset.
Pests/Weeds Myrtle Rust Is known to occur in Bega Valley & Cooma-Monaro Shires. To prevent further spread the crew and haulage operators must ensure all harvesting machinery, equipment and vehicles are checked and all infected vegetation removed.
Forest Permits
6. Infrastructure Infrastructure Conditions
Utilities Underground Telecommunication cable owned by Telstra runs along the northern side of the Mount Darragh Road in the Private Property, adjacent to compartment 1377.
Essential Electricity underground infrastructure occurs on the northern side of the Mount Darragh Road in the private adjacent to compartment 1377.
Transmission lines Essential Energy overhead powerlines occur on the northern side of the Mount Darragh Road in the private adjacent to compartment 1377.
Safe Work Practice for working near overhead power lines must be
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 3 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
implemented by the crew before any work is undertaken within 2 tree lengths.
Stoves Road & Maidens Road
Stoves Road & Maidens Road have been identified as a strategic access routes to South East Forest National Park. The crew must maintain access to these roads, except when harvesting within 2 tree lengths. Stoves Road and Maidens Road must be kept to the standard prior to operations commencing.
Control Lines for Post Log Burning
In these compartments, post log burning must be prevented from entering the private property and National Park.
Control lines to be constructed by the crew are indicatively mapped on HPOM, however final location will depend on snig tracks and areas harvested.
The PA must liaise with the Protection Coordinator during harvesting to more accurately plan where control lines are required.
Existing Fire Trails Existing fire trails and through access should be left in a trafficable condition, free of harvesting debris and any installed rollovers must be trafficable.
7. Harvesting Conditions
Silviculture Type Harvesting Objectives and Condition
Modified Shelter-wood (MSW)
The harvest area is predominately mature to over-mature Brown Barrel, Silvertop Ash and Messmate in mixed aged stands. The objective is to harvest all commercially available trees to create canopy openings and ensure mechanical disturbance creates a suitable seed bed for regeneration of the stands.
Crew to target sawlogs, pulpwood and other miscellaneous products as markets allow.
Crew to remove all merchantable stems not marked for retention.
The crew is responsible for protecting retained seed trees and retaining patches of advanced regeneration.
FMZ 3B – Special Prescription (Visual)
The objective is to harvest commercially available trees to create canopy openings and ensure mechanical disturbance creates a suitable seed bed for regeneration of the stands.
Target trees containing a sawlog product for removal.
50% canopy cover to be retained.
IFOA Limits Cpt 1375 Cpt 1376 Cpt 1377 Cpt 1380 Net Harvestable Area 110.1 71.8 112.7 37.4 Harvest Area 35.9 40.9 36.5 8.1 Planned Removal (%) 32.6 57.0 32.4 21.7
8. Tree Retention - refer to TSL booklet for full conditions
Prescription Condition/Responsibility
Mark-Up – the PA is responsible for marking up the forest ahead of harvesting operations consistent with Forest Mark Up and Tree Retention SOP
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 4 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
I I I I
I I I I
Compartment Mark-Up Survey
(5.1, 5.2)
Compartment mark-up surveys must be conducted at least 100m in advance of operations. The survey must search for threatened and protected species features listed in conditions 5.1 and 5.2 of the TSL.
Hollow-bearing and Recruitment tree retention (H and R)
Non-Regrowth Zone - 5.6, conditions apply.
Additional H trees for Greater Glider condition does apply.
PA must verify the habitat quality and record on the habitat quality map. PA must select and mark H and R trees as per the habitat quality.
Habitat Quality H Trees/2ha R Trees/2ha High 12 12 Moderate 8 8 Low 4 4
Significant Food Resources
(5.6 k)
PA must mark for retention - 6 Eucalypt feed trees/2 ha where they occur, glider sap feed trees, stands of forest oak and forest oak feed trees.
Species Coordinate Comments
YBG Feed Tree 722082E/5918808N old record not marked.
YBG Feed Tree 723970E/5918590N old record not marked.
E. viminalis, is a suitable E tree species present in this compartment.
Harvesting - crew and PA responsibilities
Protection of Retained Trees (5.6g)
Trees marked or selected for retention must not be felled.
The crew must minimise damage to H, R and E trees by using directional felling.
Harvesting debris should not accumulate within 5 m of retained trees. Where debris does accumulate the crew must remove or flatten to < 1m high.
The PA must be notified of any badly damaged retained trees and they must assess and record if a replacement retained tree is required.
Stag Retention (Dead standing trees 5.6e)
The crew should retain stags where safe to do so.
The crew must record the date, DBH, risk and location of unsafe stags removed
Significant food resources The crew should avoid damaging flowering or fruiting banksias or grass trees.
Impenetrable Understory In areas mapped by the PA as Impenetrable Understory procedures for harvesting in un-marked forest must be implemented by the PA and Crew.
9. Site-Specific Flora and Fauna
Condition Boundary Type
Prescription
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 5 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
Riparian Habitat Protection (5.7)
(Lidar Corrected)
Pink Tape Implement filter strip/stream exclusion zone around drainage features as shown on the HPOM. Refer to SOP1.
PA must mark the location of all mapped 1st order drainage line and UMDL exclusion zones.
The crew will locate and protect all 2nd order and above streams with GPS.
Ground Habitat (5.17 d)
N/A Commercial firewood may be produced from standing trees only.
No commercial firewood collection of pre-existing fallen material in these compartments due to Scarlet Robin records.
Rainforest (5.4) Pink Tape Rainforest is mapped in the compartment. Following verification of forest structure and species composition the extent of mapped RF has been changed on the HPOM.
The PA must mark as an exclusion the Rainforest exclusion zone as shown on the HPOM.
Possible rainforest was detected during ecology surveys at point E722691 N5918509, and requires further field validation by the PA.
The PA must search for and mark all areas of unmapped rainforest.
The crew must protect all areas of marked Rainforest.
Ridge & Headwater Habitat (RHH) (5.8)
N/A RHH is mapped in the compartment.
The crew must protect all areas of marked RHH.
Rocky Outcrops and Cliffs (5.11)
Pink Tape Rocky outcrop is mapped in compartment 1380 outside of the net harvest area. The HPOM specifies the EZ width applied to the mapped rocky outcrop.
Rocky Terrain (not yet verified) is also mapped in the compartments. The PA must assess these areas and determine if a rocky outcrop exclusion is required.
The PA must mark as an exclusion the rocky outcrop + relevant exclusion zone as it occurs on the ground.
The crew must protect all areas of marked rocky outcrop.
Feed trees for Yellow Bellied Glider
(6.13)
Pink Tape and paint
PA must ensure mapped feed trees are marked prior to harvesting.
Crew must protect all marked feed trees.
Yellow-bellied Glider (Heard)
(6.13)
Pink Tape and paint
PA must mark trees for retention as per TSL conditions 6.13.
Majors Creek Leek Orchid (Prasophyllum sp. Majors Creek)
N/A A record of a Majors Creek Leek Orchid is located within 2km of the compartment boundaries. A flora profile has been attached to the harvest plan for reference. If any individuals are identified within any of the compartments, contact the Eden Ecologist immediately.
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 6 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
Small-leaved Gum (Eucalyptus parvula)
N/A A record of a Small-leaved Gum is located within 2km of the compartment boundaries. A flora profile has been attached to the harvest plan for reference. If any individuals are identified within any of the compartments, contact the Eden Ecologist immediately.
Owl Landscape
(6.3.2)
N/A Owl landscape habitat exclusions are mapped in each of the compartments.
The crew must protect areas of Owl Landscapes.
Fish N/A Compartment contains Class 2 Aquatic Habitat. All streams, drainage lines, wetlands and other water bodies within the compartment are Class 2 Aquatic Habitat. Only crossings shown on the HPOM can be used.
*Where field boundary marking instructions differ from SOP2: Exclusion Zone Boundary Management, the instructions in this Harvest Plan apply.
10. Soil & Water – Refer to EPL Booklet for full conditions
Issue Assessment Conditions
EPL Scheduled Activity Yes
Inherent hazard level 2 Nil
Inherent Hazard Level 4 Areas
Yes The crew is required to protect areas of IHL 4.
Dispersible Soils No Nil
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 7 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
Mass Movement / Instability
Yes – localized mass movement identified in compartment 1380.
A rock/landslip (50mᶟ - 80mᶟ) is present in compartment 1380 at 723154E / 5917527N. The landscape is subject to slumping on the steeper and lower slopes on the coarser grained soils.
Harvesting conditions for compartment 1380:
The site of localized mass movement has been excluded from harvesting. A 30m harvesting exclusion zone has been placed around the head of the landslip.
The construction of new snig tracks should not involve side cuts greater than 2m batter height.
Where ever possible, snig tracks should follow the terrain rather than side cut across contours, particularly where the slope exceeds 20°.
Roading conditions compartment 1380:
When reopening 1380-1 Trail, minimise road side clearing and/or scalping batters. If unavoidable, top soil, mulch and seed batters.
Do not hang up fill batters with trees or other debris.
Where fill batters exceed 1m in height, install drop down structures using either gutters or geotextile (earthen contour drains should not be used in this instance). If possible, do not place drain outlets along sections of the road on the steep side slopes.
If rocky outcrops are identified, do not undercut them, due to potential of boulders dislodging and causing small rock slides.
Nil mass movement harvesting or roading conditions for compartments 1375, 1376 & 1377.
Seasonality conditions No Nil
Historical or existing erosion
No Nil
Ground cover >70% Nil
Seasonal Burning conditions
No Nil
Log Dumps SOP 5 PA is responsible for authorising moving the location of a log dump.
Roading management during harvesting
SOP 6 Refer to SOP 6.
PA is responsible for monitoring road and crossing drainage during haulage.
Wet Weather and Rutting
SOP 6 Crew is responsible for implementing automatic closures and following notified closures.
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 8 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
PA is responsible for ensuring crew notified when notified closure is lifted.
Snigging SOP 8 Crew is responsible for progressive drainage of snig tracks
Snig Track Crossings SOP 9 PA is responsible to ensure snig track crossings are approved prior to use and rehabilitated upon completion.
11. Snig Track Crossing Approvals All crossing approvals are shown on the operational map – any other feature crossings must be assessed, recorded below and approved by the Operations Planning Manager before use.
Crossing EPA
Approval
Conditions
S1, Mapped 1st order DL N/A Install temporary slash crossing (expected side cut
-
12. Operational Plan Briefing: A briefing of this operational plan was conducted by Person Role Nature of Briefing Date
13. Acknowledgement of Briefing: I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions relevant to my responsibilities
Name Role Signature Date
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 10 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
14. Standard Operating Procedures: The following SOP’s apply to this plan. FCNSW staff and the crew must hold a copy on site whilst operating and comply with the conditions set out in each SOP.
Procedure Number
Title
1 Drainage Feature Protection
2 Exclusion Zone Boundary Management
3 Forest Mark-Up
4 Operating in Inherent Hazard Level 3 Areas
5 Log Dump Operation and Use
6 Road and Crossing Management and Wet Weather Controls
7 Safety Requirements
8 Snigging and Snig Track Crossing
9 Documentation and approvals
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 11 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
Operational Diary: Action Action Date Issue Initials Required Completed
Record: Daily activities (eg tree marking, dump 2); Condition 5.2 of TSL items - EEC locations, rocky outcrops, koala scats, feed tree identification etc), discussions with stakeholders/neighbours/ site visitors; areas of impenetrable understorey; unviable areas not marked, non-conformances; harvesting issues identified, twice weekly road and crossing drainage checks
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 12 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
15. Roading Plan: Maintenance works not completed by RC must be recorded and passed onto the PA for completion and documentation. The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations. All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation.
Summary of roading requirements Feature Details Works Required Existing roads to be used 9810m/11 Yes New roads to be constructed 140m/2 NA Existing crossings used 15 Yes New crossings to be constructed 0 NA Length of road >10° 350m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply Yes Yes Dispersible soil conditions apply No NA Seasonality provisions apply No NA
Checklist of works required on roads & crossings Road/Crossing Name Works Required
Date Started
Date Finished Initials
Rayners Road
Length: 2850m
FCNSW Responsibility
Scrub/reopen up to 3m either side of road prism.
Maintenance grade, reopen mitres.
Clean out existing pipe culverts.
RC/PA Comments:
C1
1st order drainage feature
722083 E / 5918916 N
Clean out pipe inlets & outlet.
Reinstate mitres for 5m & 30m drainage.
C2
1st order drainage feature
722151 E / 5919210 N
Clean out pipe inlets & outlet.
Reinstate mitres for 5m & 30m drainage.
C4
1st order drainage feature
723242 E / 5919511 N
Clean out pipe inlets & outlet.
Install mitres for 5m & 30m drainage.
Install gabion rock in the table drain
Armour road pavement.
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 13 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
Stoves Road Scrub/reopen up to 3m either side of road prism.
Length: 1670m Maintenance grade, reopen mitres.
Clean out existing pipe culverts. FCNSW Responsibility RC/PA Comments:
C5
1st order drainage feature
723848 E / 5919511 N
Clean out pipe inlets & outlet.
Reinstate mitres for 5m & 30m drainage.
C6
1st order drainage feature
723860 E / 5919803 N
Clean out pipe inlets & outlet.
Reinstate mitres for 5m & 30m drainage.
C7
1st order drainage feature
724128 E / 5919456 N
Clean out pipe inlets & outlet.
Reinstate northern mitres.
C8
1st order drainage feature
724158 E / 5919371 N
Clean out pipe inlets & outlet.
Reinstate southern mitres.
C9
1st order drainage feature
723930 E / 5919060 N
Clean out pipe inlet and outlet.
Armour table drain with coarse, clean gravel.
Armour crossing pavement.
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 14 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
C10
1st order drainage feature
724042 E / 5918926 N
Clean inlet and outlet.
Armour table drain with coarse, clean gravel.
Armour crossing pavement.
C11
1st order drainage feature
724192 E / 5918743 N
Maintain existing spoon drains.
Maidens Road Scrub/reopen up to 3m either side of road prism.
Length: 130m Maintenance grade, reopen mitres.
Clean out existing pipe culverts. FCNSW Responsibility RC/PA Comments:
1375-1 Trail Scrub/reopen up to 3m either side of road prism.
Length: 950m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
1375-2 Trail Scrub/reopen up to 3m either side of road prism.
Length: 130m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
1376-1 Trail Scrub/reopen up to 3m either side of road prism.
Length: 1000m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 15 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
C3
1st order drainage feature
722808 E / 5918978 N
Reopen existing crossing.
Install mitres for 5m & 30m drainage.
Install mulch/hay & seed.
1376-2 Trail Scrub/reopen up to 3m either side of road prism.
Length: 400m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
1377-3 Trail Scrub/reopen up to 3m either side of road prism.
Length: 1900m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
C12
1st order drainage feature
724192 E / 5918743 N
Reopen existing crossing.
Install 5m & 30m drainage.
Install mulch/hay & seed on disturbed batters.
C13
1st order drainage feature
723438 E / 5918513 N
Reopen existing crossing.
Install 5m & 30m drainage.
Install mulch/hay & seed on disturbed batters.
C14
1st order drainage feature
Reopen existing crossing.
Install 5m & 30m drainage.
Install mulch/hay & seed on disturbed batters.
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 16 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
723335 E / 5918258 N
1377-4 Trail Scrub/reopen up to 3m either side of road prism.
Length: 120m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
1377-5 Trail Scrub/reopen up to 3m either side of road prism.
Length: 110m Reshape road pavement.
Install drainage as per EPL. Contractor Responsibility RC/PA Comments:
1380-1 Trail Reopen road.
Length: 1020m Reshape road pavement
Install drainage as per EPL. Contractor REFER TO MASS MOVEMENT CONDITIONS IN Responsibility SECTION 10: SOIL & WATER
RC/PA Comments:
C15
1st order drainage feature
723545 E / 5917334 N
Reopen existing crossing.
Install 5m & 30m drainage.
Install mulch/hay & seed on disturbed batters.
Document title: HP_ED_1375_1376_1377_1380_17_v3 Version No.: 3 Page 17 of 17 Harvest Plan no.: 56878 Approval Date: 19/12/2018 Expiry Date: 21/02/2021
Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.
-
-v (,,
HP _ED_ l375_ 1376_1377_ 1380_17
Cpt 1375 WAYPOINT# 722083 / 5918916 CROSSING NAME: C1, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat (select appropriate class for your crossing). Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing Pipe
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment N/A Bed and Banks Clean inlet and outlets Backhoe Erosion and Sediment Control
Nil N/A
Disposal of excess spoil Remove out of stream exclusion zone
Backhoe
Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type outlet control •
• table drain checking devices
Mitres N/A
Date of Assessment: 27/8/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1:5 450 20 100mm+ Rock
N
A
Date Work Started:
Date Work Finished ;
Soil stabilisation must be completed within 5 days
Record implementation date here:
➔ Ru Rubber strip I ➔ M Mitre drain XXX Roadside clearinQ ➔ Ro Rollover drain \jJ Sill Log 00000 Rock \jJ Seeding V Sediment control
Gravel
-
HP_ED_ 1375 _ 1376_1377_ 1380_ 17
Cpt 1375 WAYPOINT# 722151 / 5919210 CROSSING NAME: C2, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat (select appropriate class for your crossing). Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing Pipe
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment N/A Bed and Banks Clean inlet and outlets Backhoe Erosion and Sediment Control
Nil NIA
Disposal of excess spoil Remove out of stream exclusion zone
Backhoe
Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type outlet control •
• table drain checking devices
Mitres N/A
Date of Assessment: 27/8/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1:5 450 20 100mm+ Rock
_,,-~-\~-~-"'7=--_-_===-,=ri-:-~/---;/-:-_~~--')\--'\ _.l-----1--~~
¥ N
A
0
Date Work Started:
Date Work Finished;
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip ~ M Mitre drain XXX Roadside clearing -t Ro Rollover drain \jf Sill Log 00000 Rock \jf Seeding V Sediment control
Gravel
-
HP_ED_l375_1376_1377 _1380_17
Cpt 1376 WAYPOINT# 722808 / 5918978 CROSSING NAME: C3, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing Pipe
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment. Reopen/scrub
crossing pavement and aooroaches Dozer
Bed and Banks Stable at time of assessment. Clean inlet and outlets. Minimise disturbance to bed and banks.
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable Seed and mulch as required. Install rock in wet conditions
Seed &mulch. 100GB rock if required.
Disposal of excess spoil Remove out of stream exclusion zone and/or re-spread &consolidate onto crossing and aooroaches.
Backhoe
Soil Stabilisation within 20m Seed and mulch disturbed areas Seed &mulch Road drainage within 5-30m
• Type outlet control •
• table drain checking devices
Install miters. Install slash/dissipaters at outlet of 5m &30m drainage. Install rollovers at Sm &30m on completion of operations.
N/A
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1 :5 450mm 20 100mm+ Rock
-.
\ N
A
Date Work Started :
Date Work Finished :
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -+M Mitre drain XXX Roadside clearing .+Ro Rollover drain \jJ Sill Log 00000 Rock \jJ Seeding V Sediment control
Gravel
-
HP ED 1375_1376_1377_1380_ 17
Cpt 1376 WAYPOINT# 723242 / 5919511 / 5918978 CROSSING NAME: C4, (mapped DD) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Nil works
N/A
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the qreatest extent practicable
Disposal of excess spoil N/A N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Install mitres Install clean rock dissipater in table drain. Armor crossing
Grader Backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1 :5 450mm N/A 100mm+ Rock
' o' 0 0 0 0 c) I c) 0 °
I
Date Work Started: ______ Key
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip ,+ '·I Mitre drain XXX Roadside clearinq -+ Ro Rollover drain
\\I Sill Log 00 0 00 Rock
\\I Seeding v' Sediment control
Gravel
-
HP_ED_ 1375_ 1376_ 1377 _ 1380_ 17
Cpt 1377 WAYPOINT# 723848 / 5919845 CROSSING NAME: CS, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Clean inlets and outlets Minimise disturbance to bed and banks
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the qreatest extent practicable
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Install mitres Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1:5 525 N/A 100mm+ Rock
..
t> 0
N
A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -t M Mitre drain XXX Roadside clearinq -+Ro Rollover drain \J/ Sill Log 00000 Rock
\JI Seeding V Sediment control
Gravel
-
HP _ED_ 1375_ 1376_ 1377 _ 1380_ 17
Cpt 1377 WAYPOINT# 723860 / 5919803 CROSSING NAME: C6, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Clean inlets and outlets Minimise disturbance to bed and banks
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type outlet control • table drain checking • devices
Install mitres Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1 :5 525 N/A 100mm+ Rock
\)
~
't N ~ A➔ ,Joi\
➔t"
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -+ f.1 Mitre drain XXX Roadside clearing -+ Ro Rollover drain \j/ Sill Log 00000 Rock \j/ Seeding V Sediment control
Gravel
-
HP ED 1375 1376 1377 1380 17
Cpt 1377 WAYPOINT# 724128 / 5919456 CROSSING NAME: C7, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Clean inlets and outlets Minimise disturbance to bed and banks
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the qreatest extent practicable
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Existing mitres north approach Existing rubber flap south approach
Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe size(mm)
Min. Fill (cm) Outlet Protection
1 :5 600 N/A 100mm+ Rock
N
A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip 1-+M Mitre drain
XXX Roadside clearinq -t Ro Rollover drain \JI Sill Log 00000 Rock
\JI Seeding V Sediment control
Gravel
-
HP_ED_ 1375_1376_ 1377_ 1380_17
Cpt 1377 WAYPOINT# 724158 / 5919371 CROSSING NAME: CS, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Clean inlets and outlets Minimise disturbance to bed and banks
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the qreatest extent practicable
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type outlet control •
• table drain checking devices
Existing mitres south approach Existing rubber flap north approach
Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1:5 450 N/A 100mm+ Rock
-)~v
• I
C:~ 0 0 .. I)
l) b
V ~ N ~M A~""
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip ➔ M Mitre drain I I XXX Roadside clearing
Rollover drain -+ Ra \j/ Sill Log 00000 Rock \j/ Seeding V Sediment control
Gravel
-
HP_ED_ 1375_ 1376_ 1377 _ 1380_17
Cpt 1377 WAYPOINT# 723930 / 5919060 CROSSING NAME: C9, (mapped DD) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Clean inlets and outlets Minimise disturbance to bed and banks
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Side-cut road with mitres on western outfall. Site specific technique: clean course gravel on pavement and table drain.
Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe size(mm)
Min. Fill (cm) Outlet Protection
., :5 450 N/A 100mm+ Rock
I , / V ·-?("\ D c,1
:01I
/ ~• I/ ~
• 0 .. ~ o
0 ~ /
/ ~ N
/ A ~
-\J Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
➔ Ru Rubber strip ➔ M Mitre drain XXX Roadside clearing ➔ Ro Rollover drain
\If Sill Log 00000 Rock
\If Seeding V Sediment control
Gravel
-
- - -HP ED 1375 1376 1377 1380 17 Cpt 1377 WAYPOINT# 724042 / 5918926 CROSSING NAME: C10, (mapped DD) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Clean inlets and outlets Minimise disturbance to bed and banks
Backhoe
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type • outlet control
table drain checking • devices
Side-cut road with mitres on western outfall. Site specific technique: clean course gravel on pavement and table drain.
Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. pipe Min. Fill (cm) Outlet size(mm) Protection
1:5 450 N/A 100mm+ Rock
f' I t •
, r
I/ ) -
✓
II • I I
... ~/
N
~/ I A ./
I
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip ~ M Mitre drain XXX Roadside clearinq ➔ Ro Rollover drain \jf Sill Log 00000 Rock \jf Seeding V Sediment control
Gravel
-
HP ED 1375 1376 1377 1380 17
Cpt 1377 WAYPOINT# 724192 / 5918743 CROSSING NAME: C11, (mapped DL) Waterway Classification: Fish Passage Class 3- Minimal fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Pipe culvert
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Nil works N/A
Bed and Banks Stable at time of assessment. Minimise disturbance to bed and banks
N/A
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the qreatest extent practicable
Disposal of excess spoil Nil N/A Soil Stabilisation within 20m N/A N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Spoon drains north and south approaches Grader or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. Fill cm Outlet Protection 1 :5 N/A 100mm+ Rock
N
A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -4 M Mitre drain XXX Roadside clearinq + Ro Rollover drain \j/ Sill Log 00000 Rock
\If Seeding V Sediment control
Gravel
-
- - - - - -HP ED 1375 1376 1377 1380 17 Cpt 1377 WAYPOINT# 724192 / 5918743 CROSSING NAME: C12, (mapped DD} Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing causeway
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Reopen/scrub crossinq pavement and aooroaches. N/A
Bed and Banks Stable at time of assessment. Minimise disturbance to bed and banks
N/A
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install rock in wet conditions.
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
• Type outlet control •
• table drain checking devices
Install mitres and cross fall. Install slash/dissipaters at outlet of 5m & 30m drainage. Install rollovers at 5m & 30m on completion of operation
Dozer or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. Min. Fill cm Outlet Protection 1:5 N/A N/A
rl(,'\
r· ;J I ou
I t(.7 C,l r¥. (;( 0 I
C,
I D C 0., ( I ~
0/ . i l 0 N ~ 0 ~
I 0 A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -+M Mitre drain XXX Roadside clearinq .+Ro Rollover drain \j/ Sill Log 00000 Rock
\j/ Seeding
V Sediment control Gravel
-
HP ED 1375 1376_1377 _1380_17
Cpt 1377 WAYPOINT# 723438 / 5918513 CROSSING NAME: C13, (mapped DD) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing causeway
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Reopen/scrub crossinQ pavement and aooroaches. N/A
Bed and Banks Stable at time of assessment. Minimise disturbance to bed and banks
N/A
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install rock in wet conditions.
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within S-30m
• Type outlet control •
• table drain checking devices
Install mitres and cross fall. Install slash/dissipaters at outlet of Sm & 30m drainage. Install rollovers at Sm & 30m on completion of operation
Dozer or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. Min. Fill cm Outlet Protection 1:5 N/A N/A
6/.t
,, 0 c)
0
N
u I A0
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip ➔ \1 Mitre drain XXX Roadside clearing -+Ro Rollover drain
\If Sill Log 00000 Rock
\If Seeding v' Sediment control
Gravel
-
HP _ ED_ 1375 1376_ 1377_1380_17
Cpt 1377 WAYPOINT# 723335 / 5918258 CROSSING NAME: C14, (mapped DD) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing causeway
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Reopen/scrub crossinq pavement and aooroaches. N/A
Bed and Banks Stable at time of assessment. Minimise disturbance to bed and banks
N/A
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install rock in wet conditions.
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
• Type outlet control •
• table drain checking devices
Install mitres and cross fall. Install slash/dissipaters at outlet of 5m & 30m drainage. Install rollovers at 5m & 30m on completion of operation
Dozer or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. Min. Fill cm Outlet Protection 1:5 N/A N/A
~M
0 o C,/ ci .J¥
C,0
(:, ~ 'J
\v D0 ,:;7 0
¥ G/ C)
~f"\
Date Work Started:
Date Work Finished :
Soil stabilisation must be completed within 5 days
Record implementation date here:
t 6 N
t \, A
Key
-+Ru Rubber strip -+ \1 Mitre drain ~
XXX Roadside clearinq -+ Ro Rollover drain \If Sill Log 00000 Rock
\If Seeding V Sediment control
Gravel
-
- - - - -HP ED 1375 1376 1377 1380 17 Cpt 1377 WAYPOINT# 723545 / 5917334 CROSSING NAME: C15, (mapped DD) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing causeway
Features Works (As per EPL Schedule 5) Plant/Materials Structure Stable at time of assessment.
Reopen/scrub crossinQ pavement and aooroaches. N/A
Bed and Banks Stable at time of assessment. Minimise disturbance to bed and banks
N/A
Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install rock in wet conditions.
Disposal of excess sooil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Install mitres and cross fall. Install slash/dissipaters at outlet of 5m & 30m drainage. Install rollovers at 5m & 30m on completion of operation
Dozer or backhoe
Date of Assessment: 16/10/2018 Final Crossing Use: Retain
Event Min. Min. Fill cm Outlet Protection 1:5 N/A N/A
-~ N
V 0'\I 0 0 b
0.........
CJ
6 0
D-V
0J
-7}("\. A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -+M Mitre drain XXX Roadside clearing
. -:li Ro Rollover drain
\JI Sill Log 00000 Rock
\JI Seeding
V Sediment control Gravel
-
- - - - - -HP ED 1375 1376 1377 1380 17 Cpt 1377 WAYPOINT # 723502 / 5919985 CROSSING NAME: 51, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: New snig crossing
Features Works (As per EPL Schedule 5) Plant/Materials Structure Construct temporary sniq crossinq Dozer/excavator Bed and Banks Stable at time of assessment N/A Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install slash and/or corduroy.
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Install mitres and cross fall. Install slash/dissipaters at outlet of 5m & 30m drainage. Install rollovers at 5m & 30m on completion of operation
Dozer/excavator
Date of Assessment: 16/10/2018 Final Crossing Use: Temporary
Event Min. Min. Fill cm 1 :5 N/A
Outlet Protection N/A
Date Work Started: ______ Key
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -+M Mitre drain XXX Roadside clearing -+ Ro Rollover drain \If Sill Log 00000 Rock
\If Seeding v' Sediment control
Gravel
-
HP _ED_ l375_ 1376_1377 _1380_ 17
Cpt 1377 WAYPOINT # 723923 / 5919044 CROSSING NAME: S2, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: Existing snig crossing
Features Works (As per EPL Schedule 5) Plant/Materials Structure Reinstate temporary snig crossing Dozer/excavator Bed and Banks Stable at time of assessment N/A Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install slash and/or corduroy in wet conditions .
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Install mitres and cross fall. Install slash/dissipaters at outlet of Sm & 30m drainage. Install rollovers at Sm & 30m on completion of operation
Dozer/excavator
Date of Assessment: 16/10/2018 Final Crossing Use: Temporary
Event Min. i e size mm Min. Fill cm Outlet Protection 1:5 N/A N/A N/A
N
A
Date Work Started :
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -¼ I\~ Mitre drain XXX Roadside clearinq --t Ro Rollover drain \II Sill Log 00000 Rock
\JI Seeding V Sediment control
Gravel
-
HP_ED_ l375_1376_1377_1380 17
Cpt 1377 WAYPOINT # 724101 / 5918777 CROSSING NAME: 53, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Melanie Dyne Crossing Type: New snig crossing
Features Works (As per EPL Schedule 5) Plant/Materials Structure Install temporary sniq crossinq Dozer/excavator Bed and Banks Stable at time of assessment NIA Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install slash and/or corduroy in wet conditions.
Disposal of excess spoil Remove out of stream exclusion zone. NIA Soil Stabilisation within 20m Seed and mulch disturbed areas NIA Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Install mitres and cross fall. Install slash/dissipaters at outlet of 5m & 30m drainage. Install rollovers at 5m & 30m on completion of operation
Dozer/excavator
Date of Assessment: 16/10/2018 Final Crossing Use: Temporary
Event Min. i e size mm Min. Fill cm Outlet Protection 1:5 N/A N/A NIA
N
Date Work Started: ______ Key
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here:
-+Ru Rubber strip -+M Mitre drain XXX Roadside clearing -½ Ro Rollover drain \j/ Sill Log 00000 Rock \j/ Seeding V Sediment control
Gravel
-
HP_ED_ 1375_ 1376_ 1377 _ 1380_ 17_v3
Cpt 1377 WAYPOINT # 723444 / 5920048 CROSSING NAME: 54, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: Sharon Fyffe Crossing Type: New temporary snig crossing
Features Works (As per EPL Schedule 5) Plant/Materials Structure Install temporary snig crossing Dozer/excavator Bed and Banks N/AStable at time of assessment Erosion and Sediment Minimise roadside clearing and soil disturbance to Control the greatest extent practicable.
Seed and mulch as required. Install slash and/or corduroy in wet conditions.
Disposal of excess spoil N/ARemove out of stream exclusion zone. Soil Stabilisation within 20m N/ASeed and mulch disturbed areas Road drainage within 5-30m Install rollovers at Sm & 30m on completion of Dozer/excavator
operation.
• outlet control • Type
• table drain checking devices
Date of Assessment: 22/05/2019 Final Crossing Use: Temporary
Event Min. Min. Fill cm Outlet Protection 1:5 N/A N/A
-> R-0
N
A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here;
-+Ru Rubber strip -+M Mitre drain XXX Roadside clearinq -+ Ro Rollover drain \jl Sill Log 00000 Rock \If Seeding v' Sediment control
Gravel
-
HP _ED_ l375_ 1376_ 1377_ 1380_ 17_v3
Cpt 1377 WAYPOINT # 723799 / 5920167 CROSSING NAME: SS, (unmapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: James Flanagan Crossing Type: New temporary snig crossing
Features Works (As per EPL Schedule 5) Plant/Materials Structure Install temporary sniq crossinq Dozer/excavator Bed and Banks Stable at time of assessment N/A Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install slash and/or corduroy in wet conditions.
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
• Type • outlet control • table drain checking
devices
Drainage between 5m & 30m not appropriate on sealed road verge. Install mulch & seed on nay disturbed areas.
Dozer/excavator
Date of Assessment: 22/05/2019 Final Crossing Use: Temporary
Event Min. Fill cm Outlet Protection 1:5 N/A N/A
N
A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here;
-+Ru Rubber strip ➔ M Mitre drain XXX Roadside clearing
, _. Ro Rollover drain \jJ Sill Log 00000 Rock \jJ Seeding V Sediment control
Gravel
-
HP_ED_1375_ 1376_ 1377 _1380_17_v3
Cpt 1377 WAYPOINT # 723851 / 5920157 CROSSING NAME: S6, (mapped DL) Waterway Classification: Fish Passage Class 4- Unlikely fish habitat Fisheries Licence Aquatic Habitat: Class 2
Assessors Name: James Flanagan Crossing Type: New temporary snig crossing
Features Works (As per EPL Schedule 5) Plant/Materials Structure Install temporary sniq crossinQ Dozer/excavator Bed and Banks Stable at time of assessment N/A Erosion and Sediment Control
Minimise roadside clearing and soil disturbance to the greatest extent practicable. Seed and mulch as required. Install slash and/or corduroy in wet conditions.
Disposal of excess spoil Remove out of stream exclusion zone. N/A Soil Stabilisation within 20m Seed and mulch disturbed areas N/A Road drainage within 5-30m
Type• • outlet control • table drain checking
devices
Drainage between 5m & 30m not appropriate on sealed road verge. Install mulch & seed on nay disturbed areas.
Dozer/excavator
Date of Assessment 22/05/2019 Final Crossing Use: Temporary
Event Min. Min. Fill cm Outlet Protection 1:5 N/A N/A
-·
N
A
Date Work Started:
Date Work Finished:
Soil stabilisation must be completed within 5 days
Record implementation date here;
➔ Ru Rubber strip ➔ M Mitre drain XXX Roadside clearing +Ro Rollover drain
\JI Sill Log 00000 Rock
\JI Seeding V Sediment control
Gravel
-
Region Management Area State Forest Compartment NHA Surveyed Area (ha)
Southern Eden Cathcart 1375, 1376, 1377, 1380 110 140
Eucalyptus parvu/apr□file
.Small-leaved Gum1 Eucalyptus parvula
i..,........,..,.,..._l!,_.u,.~ lwlip'""" lllit,_
IDJ:O._y:.,_g._~~J - ,01-~nftiipqm llifll!,1ijja_.,.!J!, _.__,..,,.. -- .....
Survey Expiry 2110:
Review Date 31/0!
12
-
Region Management Area State Forest Compartment NHA Surveyed Area (ha)
Southern Eden Cathcart 1375, 1376, 1377, 1380 110 140
Prasopl,y//um sp, l,faiors Creekpr□file
Maijors Creek IL.eek Ore hid Prasophyllum sp. Majors Creek
ap II,. Uic llowcnllil; (lll'I re.Kb w ' tm illld lffl between IJlilin!Cd purpl l'lin ~r,, be trl'Plit wl>c:n E!'Vl'lll'll 11
i tn il1D11111l Iii ER= ~ t ll'owullr!,m WClbcr , D·
•· Grvvn"" ~ WOOllltPII dliimaRtc b'i' s-ll'IP Gum. wilhin ~ Gtiu tlllll Po. !fOlb llktriaurion:
•· t.rc;nll'y 0 flum onc 5ilC' n 'Ml!lll'fl 1Crcck :iwdl at 1Jqido!!0Gd.
"'
Survey Expiry 2110:
Review Date 31/0!
13