SAFETY AND ENVIRONMENT FOR CONTRACTORS ON THE SANDVIK INDUSTRIAL SITE IN SANDVIKEN VALID UNTIL APRIL 2020

Upload: others

Post on 12-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

SAFETY AND ENVIRONMENTFOR CONTRACTORS ON THE SANDVIK INDUSTRIAL SITE IN SANDVIKEN

VALID UNTIL APRIL 2020

Page 2: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

2 Safety and environment EMERGENCY NUMBER

EMERGENCY NUMBER+46 (0)26 26 10 00 - Tell us who you are, where you are

calling from and what happened. - State a reference location. - Meet emergency vehicles at the

specified reference location.

Page 3: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

3Safety and environment CONTENTS OF FOLDER

CONTENTS OF FOLDERGENERAL RULESAccess, SSG Entre, vehicle searches, entry for individuals, prohibition of photography, pets, prohibition of smoking, drugs and alcohol, age limit, confidentiality

COORDINATIONCoordination meeting, local safety information, coordination form

TRAFFICSpeed, idling, parking, pedestrians and cyclists, forklift trucks, traffic insurance

LIABILITY AND INSURANCE POLICIESLiability, insurance policies, reporting theft

ACCIDENTS AND EMERGENCIESRaising the alarm, reference location, evacuation, reporting of accidents

ALARMSFire alarms, evacuation alarms, LPG alarms, oxygen level alarms, personal meters, VMA

MAP SHOWING REFERENCE LOCATIONS

FIRE SAFETYFire prevention, hot work

PERSONAL PROTECTIVE EQUIPMENTGeneral rules for personal protective equipment.

PAGE5–7

8–9

10–12

12–13

14–15

15–17

18–19

20–21

21-22

Page 4: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

4 Safety and environment CONTENTS OF FOLDER

22–26

26–33

34

35

CONTRACT WORKLifting gear and forklift trucks, Safe Stop, electrical and pipe connections, power cables, ground excavation and pumping, clean and tidy surroundings, staff rooms, sewage

EXTERNAL ENVIRONMENTNoise, chemicals, dust and particles, waste

POLICIES

TELEPHONE NUMBERS TO REMEMBER

Page 5: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

5Safety and environment GENERAL RULES

GENERAL RULESThe contractor must study the contents of this folder before starting work. Breaching or failing to comply with the rules and instructions provided in this folder constitutes a breach of the contract which the contractor has with Sandvik and gives Sandvik the right to terminate the contract with immediate effect.

ACCESSAll contractors (not visitors) who are going to perform work at Sandvik in Sandviken must complete two SSG training courses. These are SSG Entre Grund (Available in multiple languages) and SSG Entré Sandviks indutriområde I Sandviken (Available in English).

SSG ENTRESSG Entre training is an industry-wide initiative and a prerequisitefor access to the industrial sites of affiliated companies inSweden.

If you have any questions about SSG Entre Training please contact:- Telephone: +46 (0) 60 14 15 10- Email: [email protected] Internet: www.ssg.se

CONTRACTOR PASSESFor admittance to the Sandvik facilities in Sandviken, contractors need a contract card, issued by the contractor’s Sandvik representative.

The contractor pass is collected by the contractor in person from the Central Gate. The contractor pass is personal and provides access to the industrial site. The client will arrange necessary access rights to buildings for the period when work is to be carried out.

Page 6: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

6 Safety and environment GENERAL RULES

The contractor pass must be returned to the Central Gate when the work is completed.

CONTRACTOR’S TRAINEES/APPRENTICESContractors have full responsibility for compliance with laws and regulations applicable to trainees and apprentices, what work they are permitted to do and supervision of trainees/apprentices. SSG Entre is not required for trainees or apprentices who are under supervision by an instructor.

VEHICLE SEARCHESDrivers of vehicles are obliged to grant access to their vehicles for searching at the request of site security staff when driving on the industrial site and exiting the industrial site. The driver must open/show the trunk and cargo bay in the vehicle himself.

ENTRY FOR INDIVIDUALSAll contractors at Sandvik must have a personal contractor pass which must be signed in and out individually when entering and exiting the industrial site.

Page 7: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

7Safety and environment GENERAL RULES

PROHIBITION OF PHOTOGRAPHYPhotography and filming are generally prohibited on the industrial site. Photo permits are issued only by the information officer at the relevant Sandvik company.

PROHIBITION OF SMOKINGSmoking is prohibited at all Sandvik premises.

PETSPets must not be brought onto the industrial site.

DRUGS AND ALCOHOLSandvik is an alcohol- and drug-free work area. Passing on, being in possession of, or using alcohol or drugs or working under the influence of alcohol or drugs on the Sandvik industrial site is prohibited. This is also applicable to other Sandvik office operations and production facilities in Sandviken. The contractor is obliged to undergo the random drug tests which are carried out.

AGE LIMITSVisitors must be aged 13 or over to be allowed to access the industrial site. If visitors are minors (under 18), the visitor must also be accompanied by an adult during the visit. Minors are not permitted to work at Sandvik.

CONFIDENTIALITYInformation on Sandvik, regardless of whether it has been obtained verbally, in writing, via data media, or in some other manner, must not be used or passed on other than as permitted by the responsible Sandvik unit.

Page 8: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

8 Safety and environment COORDINATION

COORDINATIONThe work of contractors must be coordinated with other activities in order to create safe working conditions. This is done by means of a special coordination meeting before work commences. New coordination must take place in the event of replanning.

COORDINATION MEETINGThe coordination meeting focuses on any risks involved in the work to be carried out and on coordinating the temporary work with the regular activities and surrounding area. It is important for the coordination meeting to be planned in plenty of time before work commences and for all participants to take responsibility for their part of coordination.

THE CONTRACTOR MUST:- Contact the coordinator in order to book a coordination

meeting. Contact details are available from the client.- Take along conditions, instructions, and information on risks

involved in the specific task (contractors risk assessment) to the coordination meeting.

- Notify its own staff and subcontractors of the risks, measures, rules, and decisions reviewed at the coordination meeting, if these people do not take part in the meeting.

- Request the approval of the client and coordinator to be allowed to engage any subcontractors.

- Comply with the instructions issued by the coordinator.- Sign in and out whenever working at the site in accordance

with the agreement made at the coordination meeting.

Page 9: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

9Safety and environment COORDINATION

THE FOLLOWING RULES ARE APPLICABLE TO THE COORDINATION MEETING:- The coordinator, the contractor, and any subcontractors

must participate.- A joint review must take place of local safety information

for the work area.- A work permit for works performed in common work areas

are to be drawn up and signed by all persons concerned.- A decision must be made regarding which measures are

required before work commences in order to intercept any new coordination risks or other risks involved with the work in the area.

- Decisions must be made on working hours, who is to carry out the work, and how people are to sign in and out.

- If work is to be performed where there is an electrical hazard (close to, next to or on), Sandvik’s electrical opera-tions manager, or someone designated by the electrical operations manager, must take part in the coordination meeting. Sandvik’s Electrical Safety Guidelines and ESA Industri & Installation, edition 1 must be followed.

Coordination meetings for repetitive tasks, such as cleaning or recurring maintenance work, will be held at each work area when the assignment begins and every time the assignment is changed. If the work involves particular risks, a specified person must be contacted in plenty of time before work commences in order to check facts so that work can take place safely.

Page 10: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

10 Safety and environment TRAFFIC

TRAFFIC Special traffic rules apply within the industrial area. The fenced-in industrial area has several exceptions and differences compared to customary traffic rules. This document refers to the most important differences. The local traffic regulations can be found in their entirety in the site manual.

A basic precautionary principle applies within the industrial area. This means that all road users (drivers, cyclists and pedestrians) have an obligation to use precaution at all times and that regular traffic rights cannot be invoked inside the area in the same way as outside of the area.

Neither major road nor right-of-way rules exist in the area. Traveling more quickly than will allow you to stop for any obstacles or other road users is never permitted.

The safety approach is based on attentiveness, interplay and observance of the greatest possible prudence in all encounters and interactions between road users.

GENERAL INFORMATION- The speed limit at the industrial site is 30 km/h.

Lower speed limits occur.- Hidden exits, indistinct areas and traffic coming

out through gates are common within the area. - Pedestrian, bicycle and vehicle traffic at loading

sites and goods storage points is prohibited unless necessary for performing work.

- Keep your distance and make sure that you are visible. Always use high-visability clothing outdoors in the

industrial area.- Drivers of vehicles must immediately stop when ordered to

do so by security guards or red lights, or when emergency vehicles are called out.

Page 11: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

11Safety and environment TRAFFIC

- Contractors’ vehicles must be clearly labeled with a company name/logo.

- Idling is permitted for no more than 1 minute.- Traffic violations will be recorded and may result in withdrawal

of the vehicular access permit.

PARKINGVehicles may only be parked in designated parking areas. Parking is prohibited elsewhere. Parking spaces are available with engine preheater sockets with free access, but designated parking bays (service vehicles, company cars, visitors, disabled spaces, etc.) are intended for the users for whom they are designated. Visitor parking spaces are provided for internal and external short-term visitors, for part of the day.

Bicycles, scooters, and motorcycles must be parked in designated racks. Vehicles may not be driven onto work premises or into other buildings on the industrial site. Permits to bring vehicles required for the work onto the site may be issued at the coordination meeting in exceptional cases.

FORKLIFT TRAFFIC- Forklift traffic is very frequent.- Show great consideration to forkilft transports.

Forklifts require space to operate – have foresight, keep your distance and make sure you are visible.

- Forklift trucks are heavily loaded with projecting or wide loads which have no warning signs or lighting.

- Forklift truck drivers generally have limited visibility, and it is important to remember that forklifts often require a long braking distance and sometimes have unsecured loads.

Page 12: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

12

PEDESTRIANS AND CYCLISTSPedestrians and cyclists move around on the site and cross roads. Be alert and try to make eye contact. Cyclists and pedestrians in the area are always obliged to give way to vehicles when crossing roads. At marked thoroughfares, however, vehicles on the road have a similar obligation always to be able to stop for people who have already started crossing the road. Designated footpaths and bicycle routes and designated crossing points in the area are to be used wherever possible.

RAIL TRAFFICThere is intersecting rail traffic on site, and some crossings are unmonitored. Rail traffic always has right of way.

CLEARANCEMedia routes for both risky and valuable media intersect roads at several locations on site. Clearance may vary.

TRAFFIC INSURANCEMotor vehicles must hold traffic insurance.

Remember that forklift trucks and trains can appear very quickly and that these vehicles have a limited chance of stopping.

Safety and environment LIABILITY AND INSURANCE POLICIES

LIABILITY AND INSURANCE POLICIESRESPONSIBILITYSandvik accepts no liability for damage/injury beyond what is required according to mandatory Swedish law. No compensation will be paid by Sandvik for damage/injuries occurring due to the specific conditions which may prevail on the industrial site or

Page 13: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

13Safety and environment LIABILITY AND INSURANCE POLICIES

which have been caused through negligence or by breaching applicable regulations.

Anyone bringing a vehicle onto the industrial site must be aware that the risk of damage due to factors such as falling industrial dust or metal shavings or other objects being dropped which may cause damage to – for example – car paintwork, windows, and tires is considerably greater than off the industrial site. No compensation will be paid by Sandvik for damage to vehicles outside designated areas and caused by the specific conditions prevailing on the industrial site.

Compensation may be paid by Sandvik for any damage to vehicles on the Sandvik industrial site only if the damage has been caused during a work element linked with the assignment which the contractor has been engaged to implement.

The contractor must compensate Sandvik for all damage caused by the contractor to Sandvik or a third party when carrying out work at Sandvik.

INSURANCE POLICIESContractors working for Sandvik must have the following insurance cover as a minimum in order to cover their liabilities:- Liability insurance must cover general liability and product

liability.- Liability insurance must be applicable to the work being

carried out by the contractor.- The sum insured must be at least SEK 25,000,000.- The insurance policy must cover property liability.- Security insurance for occupational injuries (TFA)

or equivalent insurance for own and hired staff.

REPORTING THEFTAll thefts at Sandvik must be reported immediately to the Central Gate, telephone +46(0) 26-26 40 00.

Page 14: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

14 Safety and environment ACCIDENTS AND EMERGENCIES

ACCIDENTS AND EMERGENCIESALARMCall: +46 (0)26 26 10 00

Your call will be routed to the Central Gate, which will connect the call to the emergency services. Note that this may take a few seconds. Do not hang up!

- Say who you are, where you are calling from, and what has happened.

- State your nearest reference location.- Make sure that somebody meets the emergency vehicles

at the reference location you specified.

TIP: Save the emergency number on your cell phone with the contact name ”Sandvik emergency number”.

REFERENCE LOCATIONSA reference location is the place which the emergency vehicles will attend if the alarm gets activated.

These reference locations are marked with green signs bearing a number, plus a red flashing light above, and they are marked on the map in the centerfold of this folder.

All contractors are obliged to find out which reference location is nearest to the area where they are doing their work.

EVACUATION AND ASSEMBLYFor fast, safe evacuation, all contractors must follow instructions for:

Page 15: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

15Safety and environment ALARMS

- Evacuation routes, fire escapes/emergency exits

- Assembly points- Visual and audible alarm signals

(p. 16–17)

Evacuation plans are posted up on Sandvik premises. Make sure an evacuation strategy has been devised for each task planned.

REPORTING OF ACCIDENTS AND INCIDENTSAccidents and incidents must be reported immediately to your own supervisor and your coordinator at Sandvik.

Prevent accidents by always reporting accidents and incidents occurring, as well as observed risks.

ALARMSThere are several different types of alarm at Sandvik. Most alarms are linked to Sandvik’s own alarm center, which alerts the relevant resources. Alarms are often supplemented with signs which explain what they relate to.

FIRE ALARMSAre present throughout or in parts of many workshop premises and office premises. These alarms can be triggered automatically by heat and smoke, or manually by means of special red alarm buttons (secondary fire alarm boxes). When an alarm is triggered,

Page 16: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

16 Safety and environment ALARMS

a signal sounds at regular intervals together with a red light. Evacuate the premises and go to an assembly point.

EVACUATION ALARMSTriggered automatically via the fire alarm or manually via separate green alarm buttons, marked ”Utrymningslarm” [Evacuation alarm]. This alarm signal is similar to the fire alarm signal. Evacuate the premises and go to an assembly point.

LPG ALARMS (LIQUIFIED PETROLEUM GAS)Are present in many of the workshops. When an LPG alarm is trig-gered, audible and visual signals are activated and safety valves shut off the LPG supply.

- Low alarm: Yellow pulsating light (rotating light) and audible signal with a steady or pulsating tone from a small siren.

Action: As per the instructions issued during the coordination meeting.

- High alarm: Red pulsating light (rotating light). Straight blasts from a powerful compressed air siren or electrical equivalent.

Action: Immediate evacuation to an assembly point.

OXYGEN LEVEL ALARMSAlarms providing warnings of low oxygen levels are installed on a number of the company’s premises. These alarms are supple-mented with carbon monoxide detection in some locations.- Low alarm: Blue flashing light. Action: As per the instructions issued during

the coordination meeting.- High alarm: Blue flashing light and siren. Action: Immediate evacuation of the location in question.

Page 17: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

17

EMERGENCY POPULATION WARNING, VMAThis signal consists of a 7-second tone followed by 14 seconds of silence. This alarm continues for at least 2 minutes.

WHEN YOU HEAR THIS SIGNAL, YOU MUST:- Go indoors.- Close all doors and windows, along with the ventilation.- Listen to the radio, P4 in the first instance.

HOW WILL I KNOW THAT THERE IS NO FURTHER DANGER?The emergency warning signal is followed by the ”All clear” signal, which lasts 30–40 seconds.

These signals are tested at 3 pm on the first working Monday in March, June, September and December.

OTHER ALARMSSome areas use other types of alarm for entry into buildings or to warn people of chemicals or other hazards. Information on alarms and expected measures is provided at the coordina-tion meeting.

Safety and environment ALARMS

PERSONAL GAS METERSPersonal gas meters must be used as a supplement to the permanent alarms if there is any risk of asphyxiant, toxic, or explosive gases. Information on where meters are to be carried is provided at the coordination meeting or by signs in the workplace.

Page 18: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

18

!!

!! !

!

! !!!

!

! ! !!

!!! !

!!!!

!

!!!

!

!!

!

!!

!

!

!

!! !

!! !

!

!!

!!

!

!

!!

!

!

!

6

9

4

75

2

30

31

2B

51

53

24

2211

4A

2C

63

26

2555

28

33

42

36

6234

101

102

607

609

401

201

Vägport

88

21

4B

65

2A

38 4023

44

5729

32

24B24B

24A

103

36A

202

101A

Centralport

! Hänvisningsplats

Gång och cykelstråk

Övriga vägar

Lokalt förbudsområde*

* Gång-, cykel- och fordonstrafik på lastingsplatser och materialupplag, som inte är nödvändig för arbetets utförande är förbjuden.

Centralport

KARTA ÖVER SANDVIKS INDUSTRIOMRÅDEI SANDVIKEN

© Copyright Sandvik AB

!!

!! !

!

! !!!

!

! ! !!

!!! !

!!!!

!

!!!

!

!!

!

!!

!

!

!

!! !

!! !

!

!!

!!

!

!

!!

!

!

!

6

9

4

75

2

30

31

2B

51

53

24

2211

4A

2C

63

26

2555

28

33

42

36

6234

101

102

607

609

401

201

Vägport

88

21

4B

65

2A

38 4023

44

5729

32

24B24B

24A

103

36A

202

101A

Centralport

! Hänvisningsplats

Gång och cykelstråk

Övriga vägar

Lokalt förbudsområde*

* Gång-, cykel- och fordonstrafik på lastingsplatser och materialupplag, som inte är nödvändig för arbetets utförande är förbjuden.

Centralport

KARTA ÖVER SANDVIKS INDUSTRIOMRÅDEI SANDVIKEN

© Copyright Sandvik AB

!!

!! !

!

! !!!

!

! ! !!

!!! !

!!!!

!

!!!

!

!!

!

!!

!

!

!

!! !

!! !

!

!!

!!

!

!

!!

!

!

!

6

9

4

75

2

30

31

2B

51

53

24

2211

4A

2C

63

26

2555

28

33

42

36

6234

101

102

607

609

401

201

Vägport

88

21

4B

65

2A

38 4023

44

5729

32

24B24B

24A

103

36A

202

101A

Centralport

! Hänvisningsplats

Gång och cykelstråk

Övriga vägar

Lokalt förbudsområde*

* Gång-, cykel- och fordonstrafik på lastingsplatser och materialupplag, som inte är nödvändig för arbetets utförande är förbjuden.

Centralport

KARTA ÖVER SANDVIKS INDUSTRIOMRÅDEI SANDVIKEN

© Copyright Sandvik AB

!!

!! !

!

! !!!

!

! ! !!

!!! !

!!!!

!

!!!

!

!!

!

!!

!

!

!

!! !

!! !

!

!!

!!

!

!

!!

!

!

!

6

9

4

75

2

30

31

2B

51

53

24

2211

4A

2C

63

26

2555

28

33

42

36

6234

101

102

607

609

401

201

Vägport

88

21

4B

65

2A

38 4023

44

5729

32

24B24B

24A

103

36A

202

101A

Centralport

! Hänvisningsplats

Gång och cykelstråk

Övriga vägar

Lokalt förbudsområde*

* Gång-, cykel- och fordonstrafik på lastingsplatser och materialupplag, som inte är nödvändig för arbetets utförande är förbjuden.

Centralport

KARTA ÖVER SANDVIKS INDUSTRIOMRÅDEI SANDVIKEN

© Copyright Sandvik AB

!!

!! !

!

! !!!

!

! ! !!

!!! !

!!!!

!

!!!

!

!!

!

!!

!

!

!

!! !

!! !

!

!!

!!

!

!

!!

!

!

!

6

9

4

75

2

30

31

2B

51

53

24

2211

4A

2C

63

26

2555

28

33

42

36

6234

101

102

607

609

401

201

Vägport

88

21

4B

65

2A

38 4023

44

5729

32

24B24B

24A

103

36A

202

101A

Centralport

! Hänvisningsplats

Gång och cykelstråk

Övriga vägar

Lokalt förbudsområde*

* Gång-, cykel- och fordonstrafik på lastingsplatser och materialupplag, som inte är nödvändig för arbetets utförande är förbjuden.

Centralport

KARTA ÖVER SANDVIKS INDUSTRIOMRÅDEI SANDVIKEN

© Copyright Sandvik AB

Safety and environment MAP OF THE SANDVIK INDUSTRIAL SITE

* Pedestrian, cycle, and vehicle traffic at loading sites and material stockyards is prohibited if it is not necessary for carrying out the work.

MAP OF THE SANDVIK INDUSTRIAL SITE IN SANDVIKEN

Central Gate

Reference locations

Footpaths and cycle paths

Other roads

Local prohibited area*

Page 19: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

19Safety and environment MAP OF THE SANDVIK INDUSTRIAL SITE

© Copyright Sandvik AB

Page 20: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

20 Safety and environment FIRE SAFETY

FIRE SAFETYSandvik performs systematic fire safety work which aims to reduce the risk of fire breaking out and minimizing the conse-quences should fire break out. As a contractor, you must take responsibility for your own safety and comply with the fire safety rules applicable on site.

When carrying out work as a contractor, the Sandvik Fire Service may need to be contacted for advice and support if you have any questions on preventive fire safety. The Fire Service can also switch off parts of fire alarm systems. The fire officer on duty can be contacted by calling +46(0)26-26 90 00 twenty-four hours a day.

EVACUATIONEvacuation routes must always be kept clear. You must find out where the nearest evacuation route and alternative evacuation routes are before starting work.

FLAMMABLE GOODSOnly the quantity of flammable liquids and gases required for that day’s use may be stored in Sandvik workshop premises. Larger quantities must be stored outdoors or in a self-contained fireproof area.

HOT WORKSandvik applies the regulations of the Swedish Fire Protection Association (SBF) as regards hot work. This means that before starting hot work in a temporary work area, a permit officer for hot work must work together with the person carrying out the hot work and a fire watch to review the Sandvik Permits and Control List. This review must take place at the location where the work is to be carried out. When the necessary measures have been taken to achieve sufficient safety, the permit can be issued. Hot work must not be carried out in work areas where fire risks cannot be eliminated or controlled reliably.

Page 21: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

21Safety and environment FIRE SAFETY

Sandvik requires permit issuers, people carrying out hot work and fire watches to have valid certificates issued or approved by the Swedish Fire Protection Association. The person carrying out the hot work is responsible for ensuring that there is sufficient extinguishing equipment at the work area in question.

Information on who the permit officer is for the area in question will be provided at the coordination meeting. Sandvik Fire Service can be contacted for permit issuing in the event of urgent out- of-hours work.

REMEMBER- Gas cylinders must be stored in a designated location

or outdoors when not in use.- Find out where the nearest fire hydrant is located before

starting work.- Contact Sandvik Fire Service on +46(0)26-26 90 00 for

enabling and disabling fire alarms and/or extinguishing systems during hot work.

PERSONAL PROTECTIVE EQUIPMENTAll contractors are obliged to comply with the local safety rules and regulations applicable at the work site and which are issued by the client or coordinator.

GENERAL RULES FOR PERSONAL PROTECTIVE EQUIPMENTThe contractor himself is responsible for having the necessary protective equipment which meets Sandvik’s requirements. All protective equipment used must bear the CE label.

HELMETS MUST ALWAYS BE WORN (APPLICABLE TO SMT IN SANDVIKEN):- When lifting and transporting equipment is used 3.5 meters

Page 22: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

22 Safety and environment PERSONAL PROTECTIVE EQUIPMENT

CONTRACT WORKLIFTING GEAR AND FORKLIFT TRUCKSWhen working while production is in progress, the normal department’s regular overhead crane/forklift truck operators must operate the equipment in question.

The contractor may himself also be granted permission to use Sandvik’s lifting gear and forklift trucks if so agreed with the supervisor. In these cases, the following are required: - An operating permit must be obtained from the Sandvik

supervisor.

above ground, or higher.- When people work above each other at different levels, or if the

work involves other risks that could lead to head injuries.

OTHER PERSONAL PROTECTION:- Protective footwear is compulsory on all production premises.- Hearing protection must always be worn if the daily noise level

exceeds permitted limits: see signs on the premises.- Eye protection (goggles or visors) is required in work areas

where there is a particular risk of eye injuries, see the signs.- When working outdoors, high-visibility clothing of a minimum

safety class 2 in accordance with EN ISO 20471 must be worn.

The need for further protective equipment is assessed at each work area for the work to be carried out.

Page 23: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

23Safety and environment CONTRACT WORK

- An operating permit must be issued by the contractor’s own supervisor.

- The contractor’s personnel must have the necessary training on the equipment question. All training courses must be repeated every 5 years.

- Forklift truck training in accordance with TLP10 (TLP 2 is applicable until March 1, 2017) - Training on lifting gear in accordance with ISO 9926-1 and ISO 15513- The contractor must make sure that the lifting gear/forklift

truck is safe and appropriate for the task in hand.- The contractor must comply with specified regulations for the

lifting gear/forklift truck, such as the maximum permitted load.

It must be possible to present a valid training certificate on request.

HIRED EQUIPMENTHired forklift trucks, mobile work platforms and cranes must be inspected and approved for the intended lifting work and must only be operated by authorized operators. If training, instruction,information and test drives are required, the contractor can contact Sandvik Utbildnings AB (SUAB) on +46 (0)26 26 50 00.

It must be possible to present a valid training certificate, operating permit, and any inspection reports upon request.

SAFE STOPContractors must comply with Sandvik’s Safe Stop procedures (Lockout tagout) to prevent accidental starting of machines and to discharge and block accumulated energy. Information on how Safe Stop procedures are to be implemented will be provided at the coordination meeting. A personal risk assessment must always be carried out before starting work.

Page 24: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

24 Safety and environment CONTRACT WORK

ELECTRICAL AND PIPE CONNECTIONSThe contractor is not entitled to make connections to Sandvik’s pipe systems without agreement with the site owner. This is also applicable to electrical work.

POWER CABLES/ELECTRICAL WORK CLOSE TO ELECTRICAL HAZARDSWhen carrying out construction work and/or other work near to power cables/electrical hazards, the electrical manager for the production area must be contacted.

When working near to electrical systems over 1000V, it is necessary to get in touch with Power Distribution on +46(0) 26-26 45 00.

GROUND EXCAVATION AND PUMPINGExcavation permits are required for groundwork (excavation, drilling, piling, etc.). The contractor must check that an excavation permit exists for planned groundwork and comply with restrictions specified in the permit (e.g. handling of soil, pit distance from pipes). The contractor must also ensure that no damage is done to pipes, power cables, etc. which may be in the ground. If you have any queries, contact Facility Management customer support on +46(0) 26-26 14 00.

The contractor must be aware that the soil and water may be contaminated. The quantity of water and contamination content must be assessed prior to pumping. Contaminated water may require treatment. Contact environment staff at Sandvik Materials Technology on +46(0)26-26 50 59 for assessment before starting work.

SEWAGEThere are three sewage systems on the industrial site:- Sanitary sewage from staff rooms, toilets, etc.- Acidic and alkaline sewage (wastewater from pickling

in the first instance).

Page 25: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

25Safety and environment CONTRACT WORK

- Stormwater and cooling water sewage (precipitation and cooling water from processes).

Wastewater produced during cleaning must not be diverted to the sewage system. The same is true of hazardous waste (liquids). These waste liquids must be collected and processed separately. Contact the waste contractor on +46(0) 26-26 33 99.

TEMPORARY STORAGE OF FUELSAll temporary storage of fuels (diesel, gasoline, or other flammable products) must be approved by the client and the flammable product manager prior to establishment.

CLEAN AND TIDY SURROUNDINGSThe contractor is responsible for ensuring that the work area, the area on the work site, and around the areas used by the contractor are kept clean and tidy. Cleaning must take place every day at the operating departments. All premises or areas must be accessible for inspection by Sandvik’s and the municipality’s emergency services.

Contractor who, in agreement with Sandvik, lends and uses Sandvik’s tools, material or equipment is responsible for returning it in a clean and undamaged condition. All loans must be agreed with Sandvik.

When working on a crane, roof beams, gangways, or any other work at altitude is complete, the contractor’s operations mana-gement is responsible for ensuring that the work site is inspected to ensure that no materials or tools have been left behind.

STAFF ROOMSAt existing facilities:- Staff rooms may be used only with the agreement of the client.- Coordinators will indicate changing areas.

Page 26: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

26 Safety and environment CONTRACT WORK

During new construction works:- The contractor is responsible for organizing staffroom

for his own staff.

EXTERNAL ENVIRONMENTIncidents/accidents which may harm the environment must be reported immediately to environment staff at Sandvik Materials Technology on +46(0) 26-26 50 59.NOISESandvik operations are restricted by guideline values for noise in the surrounding area. Particularly noisy work such as crushing, chipping and piling must be reported to environment staff at Sandvik Materials Technology before work commences.

CHEMICALSThe contractor must:- Submit to Sandvik’s central chemicals coordinator a list

of the chemicals that will be used.- Await approval of chemicals before bringing chemicals

onto the site and using them.- Make sure that safety data sheets are close to hand

when chemicals are used for work. - Store and manage chemicals in a manner which prevents

spills and leakage.

If you have any queries, contact Sandvik’s central chemicals coordinator on +46(0) 26-26 05 14.

DUST AND PARTICLESDusty activities must be avoided as far as possible.

Page 27: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

27Safety and environment EXTERNAL ENVIRONMENT

WASTEWaste generated as a result of a contractor’s work is to be taken care of and removed from the industrial area by the contractor personally (leftover materials and chemicals brought in by the contractor).

Waste generated by Sandvik’s activities must be sorted at source (for example during tear down and maintenance). At local collecting centers, alternatively in containers specially ordered for the work. Ensure coordination of how to manage, sort and mark respective waste fraction after performed work.

For more information on sorting at source in addition to what is specified in the following spread, get in touch with your local contact for sorting at source (Available at the recycling station) or the waste contractor on +46(0) 26-26 33 99.

HAZARDOUS WASTEAll hazardous waste must be sorted at a local recycling center, or in containers specially commissioned for the work. Containers with hazardous waste must be clearly marked with:

• ”Farligt avfall” [Hazardous waste]• Description of the contents, such as ”waste oil”.• Descriptions according to the waste sorting manual, alter natively consultation with the waste contractor.• Identification of the department that was point of origin (ex SVVÄ).

Ensure coordination of how to manage, sort and mark respective waste fraction after performed work.

For more information about recycling than what you can find in the following pages, please contact the local contact for sorting (available at the recycling station) or the waste contractor, phone +46(0) 26-26 33 99.

Page 28: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

28 Safety and environment EXTERNAL ENVIRONMENT

Batteries (others)Standard small removable batteries and built-in rechargeable batteries. Batteries are collected in a appropriate container. For emptying outdoors, place an order with thewaste contractor on +46(0) 26-26 33 99.

Electrical wasteControl cabinets, control and regulation equipment, switches, and other permanent electrical installations, etc. Electrical waste must be decontaminated to remove environmentally harmful components such as capacitors, mercury switches, etc. Electrical waste is collected in a box designated for the purpose. In the event of questions, contact Råvarugården by phone at +46(0) 26-26 92 12 or +46(0) 26-26 47 50. For emptying outdoors, place an order with Sandvik’s transport department on +46(0) 26-26 40 04.

Electronic wasteMonitors, hard disks, printers, typewriters, TVs and videos, hi-fi equipment, calculators, etc. Electronic waste is collected in a box designated for the purpose. In the event of questions, contact Råvarugården by phone at +46(0) 26-26 92 12 or +46 (0) 26-26 47 50. For emptying outdoors, place an order with Sandvik’s transport department on +46(0) 26-26 40 04.

Electric motorsElectrical waste is collected in pallet collars at each electrical workshop. In the event of questions, contact Råvarugården by phone at +46(0) 26-26 92 12 or +46(0) 26-26 47 50. For emptying of containers in the yard, place an order with Sandvik’s transport department by phone at +46(0) 26-26 40 04.

Waste containing chlorinated oilAbsorbents which were used for decontamination or to clean up chlorine oil spills, e.g. ABSOL, snakes, sawdust and rags.

Page 29: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

29Safety and environment EXTERNAL ENVIRONMENT

These absorbents are collected in sealed containers. For emptying outdoors, place an order with the waste contractor on +46(0) 26-26 33 99. See the separate folder for further information about chlorine oil (available in the Site Manual, ask your coordinator).

Other bulbs Low-energy bulbs, light bulbs, street lighting bulbs, sodium bulbs, halogen bulbs, fluorescent tubes shorter than 60 cm and fluorescent tubes which are not straight are collected in a container set out. Handle the bulbs carefully so that the mercury is not released and to prevent cuts. For emptying outdoors, place an order with the waste contractor on +46(0) 26-26 33 99.

Fluorescent tubes longer than 60 cmFluorescent tubes are collected in a container set out. Handle the fluorescent tubes carefully so that the mercury is not released and to prevent cuts. For emptying outdoors, place an order with the waste contractor on +46(0) 26-26 33 99.

Waste containing oilAbsorbents which were used for decontamination or to clean up oil spills, e.g. ABSOL, snakes, sawdust and rags. These absorbents are collected in sealed containers. For emptying outdoors, place an order with the waste disposal department on +46(0) 26-26 33 99.

Small amount of chemicalsSmall amounts of hazardous waste or chemical residue such as paint, acids, solvents, etc. are to be collected and placed in a suitable container at the designated location. It is important to clearly mark this type of waste. For emptying of containers, place an order with the waste contractor by phone at +46(0) 26-26 33 99.

Page 30: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

30 Safety and environment EXTERNAL ENVIRONMENT

Waste oilWaste oil is collected in drums or IBCs or is collected with a slurry exhauster and temporarily stored centrally within the industrial area. For emptying out doors, place an order with the waste disposal department on +46(0) 26-26 33 99.

Spray cansUsed spray cans (pressurized aerosols) are collected in approved packaging. Spray cans must not be punctured! For emptying outdoors, place an order with the waste contractor on +46(0) 26-26 33 99.

Pressure-treated timberImpregnated boards, planks, and sleepers. There is a collection site, contact the waste contractor on +46(0) 26-26 33 99.

NON-HAZARDOUS WASTEAll non-hazardous waste should be sorted at the local recycling center or in containers specially commissioned for the work.

Ensure coordination of how to manage, sort and mark respective waste fraction after performed work.

For more information about recycling than what you can find in the following pages, please contact the local contact for sorting (available at the recycling station) or the waste contractor, phone +46(0) 26-26 33 99.

Combustible waste Hard plastic, textiles, pieces of rubber, cloths (non-absorbent), work gloves, plastic cups, conta-minated cardboard, contaminated plastic, binders, notepads, small pieces of wood, paper towels,

Page 31: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

31

trash from cleaning, laminated or waxed paper, envelopes, post-it notes, plastic packaging, strips.

LandfillMaterials which cannot be recycled or used for energy recovery. Examples of landfill waste include insulation, glass, porcelain, grinding wheels, abrasive belts (not oily), cutting discs (not steel), window frames with glass and frame, ceramic and fireproof materials, ceramic cutting inserts, Bakelite pucks (cast metal samples), fire blankets, concrete (small pieces), bricks (small pie-ces). The materials are placed in containers labeled ”Deponi” [Land-fill]. Kaywool and other high-temperature insulation must not be sent for landfill, see high-temperature insulation.

NOTE: If landfill is placed in plastic bags, these must be transparent. For emptying containers, place an order with Sandvik’s transport department on +46(0) 26-26 40 04.

PlasterLarger quantities of plaster are sorted into a separate sealed container. For emptying of containers, place an order with the waste contractor on +46(0) 26-26 33 99.

Plaster recycling requirements:- The plasterboards must be free of insulation, steel studs,

wooden studs, plastic, etc. - The plasterboards must not have tiles on them.- The plaster must be stored dry in containers with lids

to prevent it being contaminated by rainwater.- A sorting charge will be applied to all waste plaster containing

more than 2% by weight of other waste.

High-temperature insulationHigh temperature insulation (ceramic fiber, etc.), fire slabs, kaywool are placed in Big Bags labeled ”HÖGTEMPERATURISOLERING” [HIGH-TEMPERATURE INSULATION]. Heated high-temperature

Safety and environment EXTERNAL ENVIRONMENT

Page 32: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

32 Safety and environment EXTERNAL ENVIRONMENT

insulation must be handled in the same way as asbestos. For emptying, place an order with the waste contractor on +46(0) 26-26 33 99.

Cable scrap (mixed cable) Cable containing copper or aluminum is collected in boxes designated for the purpose. In the event of questions, contact Råvarugården by phone at +46 (0)26-26 92 12 or +46 (0)26-26 47 50. For emptying outdoors, place an order with Sandvik’s transport department on +46(0) 26-26 40 04.

Combustible waste (must not be hazardous waste) is collected in containers which are located on site. For emptying of containers, place an order with the waste contractor on +46(0) 26-26 33 99. Alternatively, these containers are emptied according to a set collection schedule.

Office paperComputer lists, photocopier paper, fax paper, catalogs, advertising, newspapers/magazines, archive documents are emptied into labeled plastic containers. NOTE: Envelopes, laminated paper, post-it notes, etc. are not sorted as waste but as combustible waste. For emptying of containers outdoors, place an order with the waste contractor on +46(0) 26-26 33 99.

Copper scrap, aluminum scrap and brassScrap copper, aluminum and brass are sorted out separately. In the event of questions, contact Råvarugården by phone at +46 (0)26-26 92 12 or +46 (0)26-26 47 50. For emptying of containers outdoors, place an order with Sandvik’s transport department by phone at +46 (0)26-26 40 04.

Pallets, pallet collars and cable reelsPallets and similar which are complete and undamaged are

Page 33: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

33Safety and environment EXTERNAL ENVIRONMENT

collected for reuse. There is a collection site, contact the waste disposal department on +46(0) 26-26 33 99.

Pallet packaging plastic (shrink film/stretch film)Transparent: transport film, shrink film, stretch film, bubble wrap is placed in a bag rack. Labelled, perforated bags are used for this. The full bags are placed next to containers for combustible waste. For emptying outdoors, place an order with the waste contractor on +46(0) 26-26 33 99.

Composite wasteComposite waste is non-hazardous waste that consists of both combustibles and incombustibles (e.g. office furniturethat contains some metal). This type of waste is to be collected in a container or separately. For emptying of containers in the yard, place an order with the waste contractor by phone at +46 (0)26-263399.

Waste timber (untreated)Broken pallets and other untreated timber are collected and placed in containers located outdoors. For emptying containers, place an order with Sandvik’s transport department on +46(0) 26-26 40 04.

Timber recycling requirements:- Timber for recycling must not contain more metal than is found

on a pallet, as this may damage the chipper. This is very costly.

Clean Corrugated cardboardCorrugated cardboard, cardboard, corrugated boxes, cardboard into lay panels are folded together and collected in suitable containers. For emptying of containers outdoors, place an order with the waste contractor on +46(0) 26-26 33 99.Corrugated cardboard recycling requirements:- The boxes must be flattened, crushed or cut into pieces before

being thrown into containers.

Page 34: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

34 Safety and environment POLICIES

POLICIES ENVIRONMENT, HEALTH AND SAFETY POLICY (EHS POLICY) Sandvik has adopted policy regarding environment, health and safety. In these areas, Sandvik must: - Protect the environment, including prevention of pollution from

its activities.- Strive to provide healthy and safe workplaces. - Reduce injuries and illness, as well as offering health

promotion activities to employees.- Comply with or exceed applicable laws and requirements.- Achieve continual improvement through promoting ‘active,

courageous and visible’ EHS leadership and by developing a strong EHS culture and by developing and sharing of best practices throughout the company.

This policy is applicable to employees, hired labor and visitors to Sandvik facilities. The policy in its entirety can be viewed at home.sandvik.

DRUG POLICY Sandvik has adopted a collective drug policy together with trade union organizations. This policy involves the following: - Sandvik must be an alcohol- and drug-free work site. - Everyone has an obligation to act if drug abuse is suspected

in the workplace. - Drug abuse must be prevented by means of information

and education.

The objective is to eliminate the abuse and retain the staff member. Contractors engaged by Sandvik must review and comply with this drug policy.

Page 35: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

35

IN ALPHABETICAL ORDERSandvik Materials Technology work environment staff .................................................

Waste disposal ...................................................................

Central Gate .........................................................................Power Distribution ...........................................................Facility Management, customer support ..........Emergency number ........................................................

Media supply – gases, compressed air, steam, oil, acid ....................................................................Environment staff (Sandvik Materals Technology) ...............................E-mail [email protected]

Sandvik AB central office .............................................Sandvik Utbildnings AB (SUAB) ...............................Taxi .............................................................................................Teknikutbildarna, reception .......................................Fire officer on duty ...........................................................Transport ...............................................................................Water and sewage ...........................................................

Water and treatment plant ..........................................

Opinions on this folder can be emailed to [email protected].

Safety and environment TELEPHONE NUMBERS

TELEPHONE

+46 (0) 26-26 50 28+46 (0) 26-26 50 96+46 (0) 26-26 33 99+46 (0) 26-26 44 99+46 (0) 26-26 40 00+46 (0) 26-26 45 00+46 (0) 26-26 14 00 +46 (0) 26-26 10 00

+46 (0) 26-26 42 87

+46 (0) 26-26 50 59

+46 (0) 26-26 00 00+46 (0) 26-26 50 12+46 (0) 26-27 40 00+46 (0) 26-23 57 00+46 (0) 26-26 90 00+46 (0) 26-26 40 04+46 (0) 26-26 42 87+46 (0) 26-26 43 65+46 (0) 26-26 33 87

TELEPHONE NUMBERS TO REMEMBER

Page 36: SAFETY AND ENVIRONMENT - SSG Standard Solutions Group · SSG Entre training is an industry-wide initiative and a prerequisite ... and regulations applicable to trainees and apprentices,

HOME.SANDVIK.COM

ENG

. Ver

sion

06:

2019

. Utg

iven

av:

FM

Sec

urity

. T

ryck

: San

dvik

ens

Tryc

keri.