safeline profile 21213 (2)

Upload: atk0404

Post on 02-Apr-2018

240 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 Safeline Profile 21213 (2)

    1/31

    P O.BOX:81063

    DUBAI U.A.E

    TEL: 04 -2588773

    FAX:04 -2588778

    E-mail: [email protected] , www.safelineuae.com

    OUR BANKERS

    RAK BANK

    &

    MASHREQ BANK

  • 7/27/2019 Safeline Profile 21213 (2)

    2/31

  • 7/27/2019 Safeline Profile 21213 (2)

    3/31

    We are very proud and delighted to introduce ourselves as an integral and pivotal part of

    M/s. SAFE LINE TECHNICAL SERVICES LLCM/s. SAFE LINE TECHNICAL SERVICES LLC

    SAFE LINE, the best formatted unison and synchronization of well equipped and accomplished fire protectionengineers has the capability of designing full fledged in-house Fire Protection Systems. Our ProjectsDepartment, Maintenance, Service & Trading Departments employ experienced Engineers and Techniciansto install and maintain equipments delivered by us as well as to service systems/equipments installed byothers. We have vast experience in the Fire protection field and are capable of handling any system for

    , , .

    SAFELINES Design Engineering facility offers a comprehensive package for most typeof fire protection systems consisting inter alia, the following

    y Analogue addressable Fire Alarm System.

    y Conventional Fire Alarms System.

    y pr n er systems.

    y Water Spray Fixed Systems.

    y Deluge Foam-Water Sprinkler & Foam Water Spray System.

    y Fire Mains & High Extinguishing System.

    y Dry & Wet Chemical Extinguishing system.

    y Fire Detection & Alarm System.

    y Carbon Dioxide Extinguishing System.

    y ean gen re x ngu s ng ys em. rgon e

    y Gas Fire Suppression System. (FM-200)

    y Wet Chemical System for Kitchen Hood.

    y Fire stopping materials.

    y Fire Hose Reel System.

    y Emergency/Exit Lights.y Fire Extinguisher.

    y Our Engineers together with the client's representative conduct frequent site surveysto ensure that the best design and service is offered to the end user of the fireprotection system.

    y Our Maintenance & Servicin facilit offers com lete s stem maintenance for a troublefree operation.

    y Maintenance :24 hours efficient services.

    y Maintenance Work :Monthly, Quarterly or Yearly basis; of any brand of Fire Alarm

    and Fire Fighting System.

  • 7/27/2019 Safeline Profile 21213 (2)

    4/31

    S A F E T Y P O L I C Y

    The personal safety and health of each employee of Safe Line is of primary importance. The prevention of occupational-induced injuriesand illnesses are of such untoward consequence that as a curative policy

    S A F E T Y P O L I C Y

    The personal safety and health of each employee of Safe Line is of primary importance. The prevention of occupational-induced injuriesand illnesses are of such untoward consequence that as a curative policythey are being addressed whenever felt expedient, preference andprecedence over the Companys own operational productivity. To thegreatest degree possible, management will provide all mechanical andphysical facilities required for personal safety and health of the workers,being highly conscious and concerned a company in these realms andalso in the business as we are. We maintain a safety and health programconforming to the best practices of organizations of this type. To be

    they are being addressed whenever felt expedient, preference andprecedence over the Companys own operational productivity. To thegreatest degree possible, management will provide all mechanical andphysical facilities required for personal safety and health of the workers,being highly conscious and concerned a company in these realms andalso in the business as we are. We maintain a safety and health programconforming to the best practices of organizations of this type. To besuccess u , suc a rogram mus em o y e roper a u es owarsafeguards against injury and prevention from illness of bothsupervisors and employees. It is also required to resort to concertedefforts to maintain cooperation in safety and health, not only betweensupervisor and employee, but also between an employee and his fellowworkers .Our objective is a safety and health program that will reducethe number of disabling injuries and illnesses to a minimum if not a

    success u , suc a rogram mus em o y e roper a u es owarsafeguards against injury and prevention from illness of bothsupervisors and employees. It is also required to resort to concertedefforts to maintain cooperation in safety and health, not only betweensupervisor and employee, but also between an employee and his fellowworkers .Our objective is a safety and health program that will reducethe number of disabling injuries and illnesses to a minimum if not a

    , , ,best experience of other operations similar to ours. Our goal is ZEROaccidents and injuries. Our safety and health program will include:

    y

    , , ,best experience of other operations similar to ours. Our goal is ZEROaccidents and injuries. Our safety and health program will include:

    y possible.

    y Conducting a program of safety and health inspection to identify andeliminate unsafe working conditions or practices, to control healthhazards, and to comply fully with the safety and health standards forevery job.

    y Training all employees in good safety and health practices.

    possible.y Conducting a program of safety and health inspection to identify and

    eliminate unsafe working conditions or practices, to control healthhazards, and to comply fully with the safety and health standards forevery job.

    y Training all employees in good safety and health practices.y Provi ing necessary persona protective equipment an instructions or

    its use.y

    Developing and enforcing safety and health rules and requiring everyemployee to co-operate with these rules as a Condition of employment.y Thoroughly and promptly investigating every accident to determine and

    uproot the cause, correct the problem and prevent recurrence.

    y Provi ing necessary persona protective equipment an instructions orits use.

    y

    Developing and enforcing safety and health rules and requiring everyemployee to co-operate with these rules as a Condition of employment.y Thoroughly and promptly investigating every accident to determine and

    uproot the cause, correct the problem and prevent recurrence.

  • 7/27/2019 Safeline Profile 21213 (2)

    5/31

    1.11.1ActivitiesActivities

    Design, supply, installation, Commissioning, Testing, Servicing and Maintenance of FIRE

    PROTECTION SYSTEMS.

    Description of Products:-

    Fire Fighting Systems, Conventional & Analogue Addressable Fire Alarm Systems,Wet Chemical Systems, Dry Chemical Systems, and Sprinkler & Deluge

    Systems, Halon Recycling, Gas Detection Systems, Foam systems and FireExtinguishers & Reel cabinets.

    Argonite TM Systems, Wet Sprinkler Systems, Deluge Water Spray Systems, Deluge

    , , , ,Conventional Fire Alarm Systems, Analogue Addressable Fire Alarm Systems, WetChemical Fire Dry Riser System, Gas Detection Systems, Fire Extinguishers, Hose

    Reels & Cabinets, Fire stopping materials and the Wet Chemical System for KitchenHood

    |

    | Safe line is a known name in the fire protection Systems market in U.A.E.

    | Safe line is combination of oriented management and dedicated| Professionals; all committed to high quality services with proven performance records.

    | Safe line has been ver active in man ro ects im lemented with the U.A.E.

    | The activities of Safe line are developed around a total system philosophy.

    | Safe line has established projects management and implementation capabilities, using specializedequipments, thus offering total capability services for turn key projects.

    | For every project undertaken, Safe line appoints a Project Engineer and a Group of highly talented andcompetent Technicians, thus assuring successful completion on time.

    | Safe line undertakes turn key projects, which include Design, supply, Installation, Commissioning, Testingand Maintenance of Fire Protection Systems for industrial, commercial and residential sectors.

    developed by the manufacturers and licensed to use by trained personnel in Safe line and design is done withCAD systems.

    | Safe line represents major suppliers in the field and is an approved subcontractor for the U.A.E. Civil

    Defence authorities.

    | Safe lines works are strictly in accordance with British and American Standards like LPCB, NFPA etc.

  • 7/27/2019 Safeline Profile 21213 (2)

    6/31

  • 7/27/2019 Safeline Profile 21213 (2)

    7/31

  • 7/27/2019 Safeline Profile 21213 (2)

    8/31

  • 7/27/2019 Safeline Profile 21213 (2)

    9/31

  • 7/27/2019 Safeline Profile 21213 (2)

    10/31

  • 7/27/2019 Safeline Profile 21213 (2)

    11/31

  • 7/27/2019 Safeline Profile 21213 (2)

    12/31

  • 7/27/2019 Safeline Profile 21213 (2)

    13/31

  • 7/27/2019 Safeline Profile 21213 (2)

    14/31

    y Mr. Sultan Abdulla : Chairman

    y Mr. Mohan : General Manager

    y Mr. Sajeev : Projects Manager

    y Mrs.Padmaja : Finance Manager

    y Mr. Dileep : Manager (Legal & Public Relations Manager)

    y Mr. Ossama : Public Relations Officer

    y Mr. Mani . Nair : Marketing & Sales Manager

    y Mr. Sreejith : Engineer

    y Mr. A.A Suneer : Mechanical Engineer

    y

    Mr. Unnikrishnan : Electrical En ineer y Mr. Anil Kumar : Accountant

    y Mr. Jins Joseph : Designer / Draughtsman

    y Mr. Rajendra Prasad : Sales Executive

    y Mr. G.S Raju : Project Co-oordinator

    y Mr. N.K. Asokan : Projects Co-oordinator

    y Mr. Rahim : Site Co-oordinator

    y Mr. Baiju : System Programmer

    y Mr. Raveendran : Mechanical Supervisor (Diesel Engines)

    y Mr.Vinod Kumar : Electrical Supervisor

    y Mr.Palani : Electrical Supervisor

    y Mr. Bader : Mechanical supervisor

    y Mr. Basheer : Foreman

    TECHNICAL TEAM

    y Senior Techniciens : 26 Nos.

    y pe tter : os.

    y Electrician : 08 Nos.

    y Diesel Engine Mech. : 02 Nos.y Asst. Pipe Fitter : 16 Nos.

    y Helper : 12 Nos.

    y Drivers : 05 Nos.

  • 7/27/2019 Safeline Profile 21213 (2)

    15/31

    There are much more covetous and glorifying feathers to crown their success in the everincreasing multitudes of work that have been undertaken and victoriously completed duringlater days. The said scenario not only continues, but also raises buoyantly, that too at a rapidrate of growth and progress.

    Despite the current dooming financial recession and crises all the globe over, Safe Line couldmaintain the pace of its never to boast success in the business market concerned, due regardbeing had to the dedicated and selfless Commitments and sincerity shown by their entire teammembers.

    Spanning over the entire UAE, Safe line has undertaken many ventures especially in thenumerous shopping malls and conglomerate projects like Dubai Festival City, Dubai

    International Cit DIFC DIP BUSINESS VILLAGE MEDIA CITY KNOWLEDGE VILLAGE.JEBEL ALI FREE ZONE (JAFZA) JUMEIRAH LAKE TOWERS etc

    That apart, we have done nearly five hundred projects at the various Malls taken together.

    To mention a few, we have executed jobs for about 120 shops @ Dubai Mall, about 50 Shops atthe Mirdif City Centre, about 50 shops @ the Emirates Mall, many projects at the Deira City

    , , , , ,Dubai, Gold Souk, Dubai, Ibn Batuta Mall, Al Khail Mall, Bawadi Mall @ Al Ain, Bawadi mall @

    Abu Dhabi, Abu Dhabi Marina Mall, and like ones. Further we are still continuing many projectworks @ these Malls. As everyone knows, these projects have multinational concerns like WSP.

    Middle East, Al Tayer Stocks LLC, Georgio Armani, Unique Dcor, Hawa Moujaes , Steve Leungetc. as Consultants and Architects. For the purpose of brevity we do not wish to enlist thenames of these projects.

  • 7/27/2019 Safeline Profile 21213 (2)

    16/31

    A PEGION VIEW OF OUR PRESTIGUIOUSPROJECTS

    1. Project : CHINA NATIONAL PETROLEUM CO. (CNPC)Type of Work : (G+8, Office Fit-out Project, 2,485msq X 8Flr. = 19,880msq)

    Fire Fighting SystemMain Contractor : M/s. ISG Middle East LLCClient : CNPCConsultant : SOLUXE International Middle East Co Ltd.

    2. Project : DUBAI PROPERTIES GROUP @ Business BayType of Work : (New Office Fit-Out Works for Level 18th, 19th, 20th, 21st)

    913msqX 4Flr. = 3,652msqFire Alarm, Fire Fighting & Emergency LightMain Contractor : M/s. SUMMER TOWN INTERIORSClient : DUBAI PropertiesConsultant : SUMMER TOWN

    3. Project : GEANT SUPER MARKET AT AL-AINType of Work : (Interior Fit-Out Works, Total area = 7,570msq)

    Fire Fighting SystemMain Contractor : M/s. FYLAKA GROUP OF COMPANIESClient : Mr. SULTAN R.S AL DHAHERIConsultant : ACG

    4. Project : JUMEIRAH BEACH RESORT RENOVATIONType of Work : (Interior Fit-Out Works)

    Fire Alarm & Fire Fighting SystemMain Contractor : M/s. KHANSAHEBClient : Mr. JUMEIRAH BEACH RESORT LLCConsultant : DSA Architects International

    5. Project : DEIRA CITY CENTRE, DUBAI, UAEType of Work : Conversion of Dry Risers to Wet Riser System in the

    Car Park and Mall Building Total Area= 99,835msq

    (Fire fighting work)Main Contractor : M/s. SAFE LINE TECHNICAL SERVICES LLCClient : MAF PropertiesConsultant : WAGNER

    6. Project : PRIME MINISTER OFFICE Level 40th & 43rdEmirates TowerType of Work : Fire Fighting, Fire Alarm Systems & Emergency Exit Light

    Total Area 1,200msqX 2Flr.=2,400msq.Main Contractor : KHANSAHEBSubcontractor : M/s. SAFE LINE TECHNICAL SERVICES LLC

    Client : Govt. OF DUBAI

  • 7/27/2019 Safeline Profile 21213 (2)

    17/31

    7. Project : PARK ROTANA 1st, 2nd, 3rd, 4rh , 5th & 6th FLR

    twofour54, media zone, Abu Dhabi, UAETotal Area 1,200msq X 6Flr.=7,200msq

    Type of Work : Fire Alarm & Fire Fighting System, Emergency & Exit LightMain Contractor : M/s. The Fitout LLCClient : JOHN BUCK INTERNATIONALConsultant : M/s. NOOR

    8. Project : RICHMOUNT Level 36th & 39th @ Emirates TowerTotal Area 1,200msqX 2Flr.=2,400msq.

    Type of Work : Fire Fighting, Fire Alarm Systems & Emergency Exit LightMain Contractor : SUMMERTOWN INTERIORSSubcontractor : M/s. SAFE LINE TECHNICAL SERVICES LLCClient : RICHMOUNT

    9. Project :twofour54 (Bldg C-09), Media Zone, Abu Dhabi, UAETotal Area 1,080msq

    Type of Work : Fire Alarm & Fire Fighting System, Sprinkler SystemEmergency & Exit Light

    Main Contractor : M/s. GECO MECHANICAL & ELECTRICAL Ltd.Client : twofour54Consultant : M/s. NOOR

    10.Project : Al GHURAIR CITY EXPANSION PHASE-IIType of Work : Fire Fighting Systems

    Work Area : Interface area & Basement-03Main Contractor : ETA Mechanical& Electrical DivisionSubcontractor : M/s. SAFE LINE TECHNICAL SERVICES LLCClient : Al GHURAIR CITY

    11. Project : OMNICOM (3B+G+6), Dubai Media City, DubaiTotal Area 813msq X 8Flr. = 6,504msq

    Type of Work : Fire Alarm & Fire Fighting System, Sprinkler SystemEmergency & Exit Light

    Main Contractor : M/s. EBONITE DECOR LLCClient : OMNICOMConsultant : QUADRATURE, DUBAI

    12. Project : MATALAN Mirdif City CentreType of Work : Fire Alarm & Fire Fighting System, Sprinkler System

    Emergency & Exit LightMain Contractor : M/s. Corel Supply & InteriorsClient : MatalanConsultant : M/s. CSI

    13 Project : MATALAN Century Mall FujairahType of Work : Fire Alarm & Fire Fighting System, Sprinkler System

    Emergency & Exit Light

    Main Contractor : M/s. Corel Supply & InteriorsClient : MatalanConsultant : M/s CS

  • 7/27/2019 Safeline Profile 21213 (2)

    18/31

    14. Project : MEYDAN @ Nad Al Sheba, Dubai

    Type of Work : Fire Alarm System, Emergency & Exit LightMain Contractor : M/s. GAK

    F/F Contractor : HONEY WELL / TRIOLITEConsultant : HONEY WELL

    15. Project : MUHASAINAH CLINIC DHOMS, Muhasainah, DubaiType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. MODERN DESIGN CONTRACTING CO LLCClient : DIRECTORATE OF HEALTH, DUBAIConsultant : M/s. MODERN DESIGN CONTRACTING CO LLC

    16. Project : SHOE MART @ ABU DHABI MALL, UAEType of Work : Fire Alarm & Fire Fighting System, Sprinkler SystemEmergency & Exit Light

    Main Contractor : M/s. AL REYAMI INTERIORSClient : SHOE MART LLCConsultant : M/s. AL REYAMI INTERIOR

    17. Project : AL AIN CEMENT FACTORY, AL AIN, UAEType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. NEW AGE COMPANY, ABU DHABIClient : AL AIN CEMENTS COMPANYConsultant : M/s. NEW AGE COMPANY, ABU DHABI

    18. Project : HILL & KNOWLTON @ MEDIA ZONE, ABU DHABIType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. AL REYAMI INTERIORSClient : HILL & KNOWLTONConsultant : M/s. AL REYAMI INTERIORS

    19. Project : YAS ISLAND MOTOR RACE COURSE, ABU DHABI

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. SEBARCOClient : GOVERNMENT OF ABU DHABIConsultant : AL TAAR

    20. Project : Al ROSTAMANI SHOWROOM, AL QUOZ, UAEType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. CITY DIAMOND CONTRACTING

  • 7/27/2019 Safeline Profile 21213 (2)

    19/31

    21. Project : TWOFOUR54 (BLDG.C-09), MEDIA ZONE, ABU DHABI

    Type of Work : Fire Alarm & Fire Fighting System, Sprinkler SystemEmergency & Exit Light

    Main Contractor : M/s. THE FITOUTClient : twofour54Consultant : M/s. NOOR

    22. Project : WAREHOUSE + OFFICE BUILDINGType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. A.M.B.B Contracting

    23. Project : Q HOMES @ DUBAI MALL, DUBAI, UAEType of Work : Fire Alarm & Fire Fighting System,

    Main Contractor : M/s. ARCANE AVENUEClient : Q HOMESConsultant : M/s. ARCANE AVENUE

    24. Project : Q- HOMES (SUPA SHOPS) @ SHARJAH, UAEType of Work : Fire Alarm & Fire Fighting System,

    Main Contractor : M/s. ARCANE AVENUEClient : SUPA Shops , Q HomesConsultant : M/s. ARCANE AVENUE

    25. Project : 2B+G+4P+16+GYM FLOOR, AL NAHDA -1, DUBAIType of Work : Fire Alarm & Fire Fighting System,

    Central Battery & Voice Evacuation SystemMain Contractor : BEST CONTRACTINGConsultant : M/s. AL REYAMI INTERIORS

    26. Project : AL ROSTANMANI SHOWROOM, AL QUOZ, DUBAIType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. CITY DIAMONDClient : AL ROSTANMANI

    27. Project : AL KHAWANEEJ FARM

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : ESSAB MODDLE EASTClient : AL KHAWANEEJ FARM

    28. Project : B+G+11 Floor BUILDING, AL NAHDAType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. AL ABBAR CONTRACTING

    29. Project : B+G+6 Floor, P. T. A HOTEL BUILDING

    Type of Work : Fire Alarm & Fire Fighting System,Main Contractor : M/s. A.M.B.B CONTRACTINGClient : SILICON OASIS, DUBAI

  • 7/27/2019 Safeline Profile 21213 (2)

    20/31

    30. Project : WHEREHOUSE FOR DUCAB, JEBEL ALI, DUBAI

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. A.M.B.B CONTRACTINGClient : DUCAB

    31. Project : SPANISH EMBASSY, @ EMIRATES TOWERDUBAI. UAE

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. SUMMERTOWN INTERIORSClient : GOVERNMENT OF SPAINConsultant : M/s. SUMMERTOWN INTERIORS

    32. Project : MATALAN, DALMA MALL, ABU DHABIType of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. CORAL SUPPLIES & INTERIORS LLCClient : MATALAN

    33. Project : INDIA PALACE RESTURANT, MUSHRIFF MALL, Abu DhabiType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : Coral Supplies & Interiors LLCClient : INDIA PALACE RESTURANT

    34. Project : MATALAN, MUSHRIFF MALL, ABU DHABIType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. CORAL SUPPLIES & INTERIORS LLCClient : MATALAN

    35. Project : GO SPORTS, THE DUBAI MALL, DUBAIType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. CORAL SUPPLIES & INTERIORS LLCClient : GO SPORTS

    36. Project : MATALAN, CENTURY MALL, FUJAIRAHType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. CORAL SUPPLIES & INTERIORS LLCClient : MATALAN

    THE ABOVE ARE ONLY A FRACTION, NOT EVEN A PORTION OFTHE CROSS SECTION OF THE PROJECTS SUCCESSFULLY AND

    FAULTLESSLY COMPLETED AND HANDED OVER BYSAFE LINE ALMOST A COUPLE YEARS AGO

  • 7/27/2019 Safeline Profile 21213 (2)

    21/31

    MAJOR FITOUT & MAINTENANCE WORK

    1. Project : NETHERLAND (DUTCH) CONSULATEType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. SUMMERTOWN INTERIORSClient : DUTCH GOVERNMENTConsultant : M/s. SUMMERTOWN INTERIORS

    2. Project : KONSBERG @ DIP, DUBAI, UAEType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. SUMMERTOWN INTERIORSClient : KONSBERG FINANCIERSConsultant : M/s. SUMMERTOWN INTERIORS

    3. Project : AJMAN CULTURAL DEPARTMENT, AJMAN, UAEType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor :M/s. AL REYAMI INTERIORSClient : GOVERNMENT OF AJMAN

    4. Project : GERMAN INDUSTRIES & COMMERCE@ BUSINESS VILLAGE, DUBAI

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. AL REYAMI INTERIORSClient : GOVERNMENT OF GERMANYConsultant :M/s. AL REYAMI INTERIORS

    5. Project : STANDARD & POOR @ AL FATTAN CURRENCYHOUSE, DIFC, DUBAIType of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. SUMMERTOWN INTERIORSClient : GOVERNMENT OF DUBAIConsultant :M/s. SUMMERTOWN INTERIORS

    6. Project : ABN AMRO @ AL FATTAN CURRENCYHOUSE, DIFC, DUBAI

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. SUMMERTOWN INTERIORSClient : ABN AMRO

  • 7/27/2019 Safeline Profile 21213 (2)

    22/31

  • 7/27/2019 Safeline Profile 21213 (2)

    23/31

    13. Project : HOWARTH MAK, 21ST Floor, Prism Tower,

    Dubai Business Bay, Dubai, UAE

    Type of Work : Fire Alarm & Fire Fighting System,Main Contractor : AB CONCEPTClient : HOWARTH MAKConsultant :AB CONCEPT

    14. Project : M/s. MICHELIN AIM FZE @ 5TH FLOORLOB-14, JAFZA, JEBELALI, DUBAI, UAE

    Type of Work : Supply and Installation of FM-200 SystemMain Contractor : M/s. AL REYAMI INTERIORSClient : MICHELIN AIM FZEConsultant : M/s.AL REYAMI INTERIORS

    15. Project : MASHREQ BANK, .DHCCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. Dan InteriorsClient : Welcare Eye Clinic

    16. Project : AL RAIZ BLD. DHCCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. Dan InteriorsClient : Dr. Brian Symons Family Care Clinic

    17. Project : AL WAHDA MALL, ABU DHABIType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. Dan InteriorsClient : Mikyaji

    18. Project : AL RAHA MALL, ABU DHABIType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. Dan InteriorsClient : Nayomi

    19. Project : SECTOR.05 .JBRType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency Light

    Main Contractor : M/s. Dan InteriorsClient : CoCo

  • 7/27/2019 Safeline Profile 21213 (2)

    24/31

    20. Project : SECTOR 4.JBR

    Type of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. Dan InteriorsClient : Pipe Line Trading

    21. Project : BLD.5.GOLD & DIAMOND PARKType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. Dan InteriorsClient : Eye on Realty

    22. Project : SPINNEYS BLD. QUSAISType of Work : Fire Alarm, Fire Fighting & Sprinkler SystemExit and Emergency Light

    Main Contractor : M/s. Dan InteriorsClient : NBAD

    23. Project : AL RAZI BLD.DHCCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : SPENCERClient : French Pediatric Clinic

    24. Project : AL RAZI BLD.DHCCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : SPENCERClient : Prime Health

    25. Project : AL RAZI BLD.DHCCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : SPENCER

    Client : Canadian Podiatry De Physiotherapy

    26. Project : GATE VILLAGE.05.DIFCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : SPENCERClient : Tokio Marine

    27. Project : SHATHA TOWER, DMCType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency Light

    Main Contractor : SPENCERClient : Taya IT & Jaquard Systems & Group Sat

  • 7/27/2019 Safeline Profile 21213 (2)

    25/31

  • 7/27/2019 Safeline Profile 21213 (2)

    26/31

    36. Project : AMBULANCE SECTION (DHCC)

    Type of Work : Fire Alarm, Fire Fighting & Sprinkler SystemExit and Emergency Light

    Main Contractor : M/s. MODERN DESIGN CONTG.CO.Client : DEPT.OF HEALTH & MEDICAL SERVICES

    37. Project : MAROBANI (17TH FLOOR) BUR JUMAN BUSINESS TOWER, T-11Type of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. RAMI INTERIOR DESIGN.Client : MARBANI

    38. Project : KELE, T-08 (Bur Juman Business Tower)Type of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. RAMI INTERIOR DESIGN.Client : KELE CONTRACTING CO.

    39. Project : SPACE (T 02) Bur Juman Business TowerType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. RAMI INTERIOR DESIGNClient : SPACE GROUP

    40. Project : JAPENGO RESTAURANT (NEW BUR JUMAN CENTRE)Type of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. HAMILTON DESIGN INTERNATIONALClient : BIN HINDI GROUP

    41. Project : DNV (8TH LEVEL) BUR JUMAN BUSINESS TOWERType of Work : Fire Alarm, Fire Fighting & Sprinkler System

    Exit and Emergency LightMain Contractor : M/s. KINNARPS OF SWEEDEN CO.Client : DNVConsultant : BLUEHOSE

    42. Project : ME GLOBAL (T-15) Bur Juman Business TowerType of Work : Fire Alarm, Fire Fighting &Sprinkler System

    Exit and Emergency Light

    Main Contractor : M/s. KINNARPS OF SWEEDEN CO.Client : ME GLOBELConsultant : BLUEHOSE

  • 7/27/2019 Safeline Profile 21213 (2)

    27/31

  • 7/27/2019 Safeline Profile 21213 (2)

    28/31

  • 7/27/2019 Safeline Profile 21213 (2)

    29/31

    58. Project : AL WASHIA (L2-158 @ Dubai Mall)

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light

    Main Contractor : M/s. Makan InteriorsFire Contracter : M/s. Safeline Technical Services L.L.C

    59. Project : FACONNABLE (G-231 @ Dubai Mall)Type of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. Oasis Skey

    Fire Contracter : M/s. Safeline Technical Services L.L.C

    60. Project : MISS SELFRIDGE (Dubai mall)Type of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. TopRock InteriorsFire Contracter : M/s. Safeline Technical Services L.L.C

    61. Project : PURE GOLD (SF-092 @ Dubai Mall)Type of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. Mali Decor

    Fire Contracter : M/s. Safeline Technical Services L.L.C

    62. Project : MIKURAPEARLS(GS-036-2 Gold Souk @ Dubai Mall)Type of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit LightMain Contractor : M/s. Evolve Interiors

    Fire Contracter : M/s. Safeline Technical Services L.L.C

    63. Project : JASHANMAL CONCEPT (L1-111-1 @ Dubai Mall)Type of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit Light, Voice Evacuation SystemMain Contractor : M/s. ARCO

    Fire Contracter : M/s. Safeline Technical Services L.L.C

    64. Project : MUDO CITY (L1-200-201 @ Dubai Mall)

    Type of Work : Fire Alarm & Fire Fighting System,Emergency & Exit Light, Voice Evacuation System

    Main Contractor : M/s. ARCOFire Contracter : M/s. Safeline Technical Services L.L.C

    64. Project : LONGINES(GS-002 @ Dubai Mall)Type of Work : Fire Alarm & Fire Fighting System,

    Emergency & Exit Light, Voice Evacuation SystemMain Contractor : M/s. Oasis Skey

    Fire Contracter : M/s. Safeline Technical Services L.L.C

  • 7/27/2019 Safeline Profile 21213 (2)

    30/31

  • 7/27/2019 Safeline Profile 21213 (2)

    31/31