SAFe Support in RTC V6.0http://bit.ly/ibmsafesupport
• Project Area Initialization– Program/Team Timeline structure– Roles & Permissions– Artifacts
• Work Item Types• Planning• Queries, Templates, Dashboards• Reports
2
SAFe – RTC MappingSAFe Level SAFe Concept RTC Concept NotesProgram
Roadmap & Vision Plan View Vision can be a tab on the plan editor or it can be reflected in an HTML widget on the dashboard
Program Backlog Plan View
Program Roadmap Plan View
Architectural Runway
Plan View
Program Epic Work Item Type Epic Type (Business/Architectural) attribute on the Program Epic work item type
Feature Work Item Type Feature Type (Business/Architectural/NFR*) attribute on Feature work item type * Non Functional Requirement
Program PI Objective Work Item Type PI Objective work item type with Program value for PI Type.
Team
Story Work Item Type Task Work Item TypeTeam PI Objective Work Item Type PI Objective work item type with Team for PI Type.Team Backlog Plan View
QP Planning Views
<All Levels> Role Role Assigned to appropriate Project Area or Team AreaCreated in the Project Area for the right level
4
SAFe RTC Infrastructure
RTC Project Area or Team Area
RTC Project Area
CLM LPA or RTC Project Area
SAFe Portfolio (Coming Soon!)
SAFe Program 1
SAFe Team A
SAFe Team B
SAFe Program 2
SAFe Team C
SAFe Team D
SAFe Team E
Establish new Program with Teams
Establish a new Program that tracks work of existing Teams
New environments
Existing environments
5
FAQsUse the SAFe Program process template to establish a new Program project area. If your Teams have their own RTC project areas already established, track the work of those teams from Features in the Program via the tracks link type.
What if I already have established Teams using
RTC or third-party tooling?
Use the published SAFe RTC Configuration Guidelines document to apply the very same customizations to any other process template already in use in your organization to create the infrastructure, artifacts and plans.
What if I am not moving to RTC V6.0 any time soon?
No, you will need to use the SAFe RTC Configuration Guidelines described above to apply the SAFe-related customizations.
Can I migrate an existing project area to the new SAFe process template?
Yes
Can I use the SAFe process template and apply my own
customizations?
Once you have a project area based on the SAFe process template, you can take advantage of any updates we make to this template going forward.
What is the advantage of establishing a new
environment with the SAFe template?
6
Project Area Initialization SAFe Program Project Area – Initializes Program project area SAFe Team Team Areas – Initializes two Team Areas:
– Team 1 (rename)– Team 2 (rename)
Work Item Categories - Initializes the project area with default categories for Program and Teams:– Team 1 (rename) – Team 2 (rename)
Post-Project Initialization Tasks work item – Created to describe the post-project initialization activities to perform
Artifacts – Initializes the project area with SAFe artifacts and associated dashboards, plans, plan type, and plan views
7
Work Item Types
Program Epic
Story
PI Objective [Team]
Feature
Risk
Task
Ch
ild
ren
[1
-M]
Ch
ild
ren
[1
-M]
Tra
ck
s [
1-M
] (c
ros
s-p
roje
ct)
Tracks [1-1]
Ch
ildre
n [1
-M]
PI Objective [Program] C
hild
ren
[1-M
]
Tracks [1-1]
• Suggested link types/cardinality, not enforced by process
• State constraints in place (cannot resolve parent unless all of the children are resolved)
Defect
Retrospective
8
Work Flow - Plan Items
Draft Reviewed Analyzing Ready (for Approval) Approved Implementing Done
Funnel BacklogAnalysis
Pro
gra
m E
pic
New Implementing Integration Testing Done
New DoneIn Progress
Fea
ture
Closed
9
Work Flow – Execution Items
New Closed
PI
Ob
ject
ive
New Done
New In Progress ClosedRis
k
New DoneIn Progress
10
Work Flow - Execution Items (continued)
New In Development Done
New DoneIn Progress
Task
New In Development In Test Done
New In Progress
Sto
ry
Done
11
Work Item Attributes
Program Epic• Value Statement• Epic Type [Business, Architectural]
Feature • Feature Type [Business, Architectural, NFR]
Program Epic/Feature
• Job Size (1, 2, 3, 5, 8, 13, 20)• User/Business Value (1, 2, 3, 5, 8, 13, 20)• RR/OE (1, 2, 3, 5, 8, 13, 20)• Time Criticality (1, 2, 3, 5, 8, 13, 20)• WSJF [calculated]
PI Objective
• PI Objective Type [Program, Team]• Business Value (planned) [1-10]• Business Value (actual) [1-10]• Planned For , Filed Against
12
Planning• Progress on work items tracked as Time Remaining
– Display estimates in hours selected– In single SAFe Program project area with Team Areas, progress rolls up
from Team Tasks > Stories to Program Features
• Complexity Attribute – Story Points• Custom Attributes – Attribute Mapping• Program Backlog plan type
– Kanban View: Implements SAFe Kanban System for Program Epics– Roadmap: Epic > Feature [> Story > Task]– WSJF Ranked List: Feature ranking by WSJF
• Team plans as per Scrum process template– Except Kanban and Taskboard views customized with updated work
flow
13
Queries, Templates, DashboardsPre-Defined Queries
Work Item Templates
Program/Team DashboardsProgram: Activity-basedTeam: Role-based (as per Scrum and Agile ALM templates)
SAFe Level Predefined Query DescriptionProgram Open features Unresolved open features
Open program epics Program epics that are unresolvedOpen program PI objectives Unresolved program PI objectivesOpen team PI objectives Unresolved team PI objectivesOpen non -feature work items Unresolved open non-feature work items
SAFe Level Template Name DescriptionProgram Program Initiation Use to create work items applicable when a Program is first initiated
Program Increment Use at the start of each Program increment to create work items for the typical program events, activities, requirements and ceremonies
Development Iteration Use before the start of each development iteration and for each team to create work items for typical iteration events
Innovation and Planning Use prior to each Innovation and Planning Sprint and for each team to create work items for typical Sprint events
14
Reports• What I really want to know? Analysis• SAFe Reports
– Out of the box– Additional Program-level reports as downloadable bundle
• Self-Assessments– Linked from tasks created by Program Increment and Development
Iteration work item templates
15
What I really want to know and how I find out…
16
Look at status of Tasks, Stories, Features and PI Objectives What is behind?
Explore burn down of Stories, Features, PI Objectives
How much are we behind?
Explore dependencies: who is impacting/impacted; consider changes during execution to time spent and scope added/removed.
What is at risk? Where are there dependencies
that cause risk?
View discussion threads in work itemsWhy are we behind?
Risk ownership
What actions should be taken by whom?
Velocity and predictability data over time
How have we performed so I can plan better?
SAFe OOTB ReportsReport Description SAFe
MetricAnswers the question…
Burndown by Story Points Number of story points assigned to work items that are either open or in progress over daily intervals
M1M4
Are we behind? How much are we behind?
Burnup by Story Points Number of story points associated with completed work over daily intervals
M1M4
Are we green, yellow, orange?
Changes to Time Spent Work items where the time spent has been updated within the last 7 days
M1 Why are we behind? What is at risk?
Defects by Priority Chart (List) Total number of defects by priority M1 Are we improving our quality?
Incomplete Stories Stories targeted for current iteration that are still incomplete M1 What is behind?
Iteration Health Visualization based on various statistics that can be used to interpret the health of the current iteration filtered by timelines
M1 Are we green, yellow, orange?
Release Status Chart (List) Number of open and closed stories for a release M1 Are we green, yellow, orange?
Scope Added Work added to the current iteration scope after iteration start M1 Why are we behind?
Scope Removed Work removed from the current iteration scope after iteration start
M1 Why are we behind?
Team Dependencies List of open work items blocked by another team’s open work items
M1M5
What is at risk?
Team Velocity Number of story points completed in each iteration M1M5
How well did we do?
17
Additional SAFe Reports (in progress)
Report Description SAFe Metric Answers the question…
Release Predictability Trend report that shows Program velocity by Team over time
M5 Are we improving our ability to deliver? Which teams are still struggling? Where are our bottlenecks?
Program Increment (PI) Burndown
Story Points burn down by Sprints in the PI M4 Are we behind ?How much are we behind?
Feature Progress Based on # of stories completed vs remaining for Feature
M4 Are we green, yellow, red?
Velocity planned/actual As measure of Story Points rolled up to Feature M5 How well did we do?
Number of Business Features planned/delivered/accepted by customer
M5 Are we improving our value delivery?
Number of Architecture Features
M5 Measure of risk/instability
Program Self-Assessment M3 Where can we improve as a program?
Team Self-Assessment M2 Where can we improve as a team?
18
What do I do next?o Visit the SAFe Landing Page: bit.ly/
ibmsafesupport Examine the self-assessments and provide feedback Review the SAFe solution details document (coming soon!) Watch the YouTube videos and various recorded webinars
o Download RTC V6.0 RC1 and try out the new template Provide feedback via jazz.net (Forum, Work Items)
If you are interested in being a formal reference for our SAFe solution, please let us know!
19