Safe roads, Reliable journeys, Informed travellers
PPP IN HIGHWAYS WORKSHOP
WASHINGTON – 3 APRIL 2006
RECENT DEVELOPMENTS IN PRIVATELY- FINANCED HIGHWAY PROJECTS IN THE UK
by
ALEC BRIGGSSENIOR PROJECT LEADER, HIGHWAYS AGENCY
Safe roads, Reliable journeys, Informed travellers
THE ROLE OF THE HIGHWAYS AGENCY
An Executive Agency of the Department for Transport
Responsible for operating, maintaining and improving the strategic
road network in England
In conjunction with the Highways Agency’s ‘Customer First’ initiative,
its primary aims are to provide:
●S
afe
Ro
ads
●R
elia
ble
Jo
urn
eys
●R
eal-
Tim
e In
form
atio
n f
or
Tra
vell
ers
Safe roads, Reliable journeys, Informed travellers
England’s Strategic Road Network
Comprises 8,000 km / 5000 miles of motorways and trunk roads
Asset valued at £72bn
Carries a third of all traffic and two-thirds of freight traffic
Over 170 bn vehicle-kilometres per annum
Safe roads, Reliable journeys, Informed travellers
Categorisation of Major Improvement Projects in TPI (October 2005)
Typ
e MW
TR
W J B
To
tal
No. £
(bn)
No. £
(bn)
No. £
(bn)
No. £
(bn)
No. £
(bn)
EC
I
21 2.7
18 1.7
17 0.7
15 1.0
71 6.1
DB
FO
7 3.4 1 0.1 0 0 0 0 8 3.5
D&
B
3 0.5 9 0.3 5 0.1
17 0.6
34 1.5
Tot
al
31 6.5
28 2.1
22 0.8
32 1.7
113
11.1
Ke
y:
MW
= M
oto
rwa
y W
ide
nin
g
TR
W =
Tru
nk
Ro
ad
Wid
en
ing
J
= J
un
cti
on
Im
pro
ve
me
nts
B
= B
yp
as
se
s
Safe roads, Reliable journeys, Informed travellers
Speeding-up Delivery
Safe roads, Reliable journeys, Informed travellers
Tranche 1 Works Payment ContractCost Mechanism Award
●A69 Newcastle to Carlisle £9.4m Shadow tolls Jan 1996
●A1(M) Alconbury to Peterborough £128m Shadow tolls Feb 1996
●A417/A419 Swindon to Gloucester £49m Shadow tolls Feb 1996
●M1-A1 Motorway Link, Leeds £214m Shadow tolls Mar 1996
Tranche 1A
●A50/A564 Stoke to Derby Link £20.6m Shadow tolls May 1996
●A30/A35 Exeter to Bere Regis £75.7m Shadow tolls July 1996
●M40 junctions 1-15 £37.1m Shadow tolls Oct 1996
●A168/A19 Dishforth to Tyne Tunnel £29.4m Shadow tolls Oct 1996
Tranche 2●A13 Thames Gateway, London £146m Lane availability Apr
2000(Transferred to T f L in July 2000)
●A1 Darrington to Dishforth £245m Congestion Feb 2003
●A249 Stockbury to Sheerness £100m Congestion Feb 2004
DB
FO
PR
OJ
EC
TS
AW
AR
DE
D T
O D
AT
E
Safe roads, Reliable journeys, Informed travellers
D2D DBFO ContractOverall Organogram
Secretary of StateHighways Agency
Department's Agent(BCL / PFC)
Department's Representative(Highways Agency)
DBFO Company(RMS)
Contractor (RMG)(AMEC, A. McAlpine, Dragados, KBR)
Designer(Mouchel-Parkman)
Design sub-consultants(KBR, Carl Bro)
Operation and Maintenance(A. McAlpine)
Funders(Shareholders)
(Bond Finance)(Bank Loans)
DBFO Agreement(inc. Direct Agreement)
Finance Company
ConstructionContract
O & M Contract
Design Contract
TY
PIC
AL
CO
NT
RA
CT
UA
L A
RR
AN
GE
ME
NT
S
To
tal N
o. o
f co
ntr
acts
: 16
0
Safe roads, Reliable journeys, Informed travellers
Development of Payment Mechanisms in DBFO Projects
Tranches 1 & 1A
shadow tolls
safety payments
lane closurecharges
congestionpayments
safetyperformance
availability
safetyperformance
A13 D2D & A249
Fu
ture
M25
Lo
nd
on
Orb
ital
lik
ely
to
be
avai
lab
ilit
y-b
ased
mec
han
ismCO
NG
ES
TIO
N M
AN
AG
EM
EN
T P
AY
ME
NT
ME
CH
AN
ISM
Safe roads, Reliable journeys, Informed travellers
Project includes:
2 TPI Schemes:
● A1(M) Ferrybridge to Hook Moor
● A1(M) Wetherby to Walshford
and
new
or
up
gra
ded
M
oto
rway
C
om
mu
nic
atio
ns
Fac
ilit
ies
thro
ug
ho
ut A1
Da
rrin
gto
n t
o D
ish
fort
h D
BF
O P
roje
ct
Wo
rks
cost
: £2
45m
Co
nce
ssio
n p
erio
d:
33 y
ears
Safe roads, Reliable journeys, Informed travellers
Congestion Management Payment Mechanism – D2D Contract
Comprises 2 separate key elements based on:
(a) Active management of traffic congestion(i.e. minimising congestion)
(b) Active management of traffic safety(i.e. minimising Personal Injury Accidents (PIAs))
Safe roads, Reliable journeys, Informed travellers
Allocation of payment amounts and measurement of traffic
● Whole Project Road divided into 50 NO 2 KM LONG CARRIAGEWAY SECTIONS (25 NB
and 25 SB)
● GROSS ANNUAL PAYMENT (as tendered) allocated to whole project road to give
amounts for EACH HOUR on EACH CARRIAGEWAY SECTION pro-rata previous hourly
traffic flows
● VEHICLE SPEEDS and VOLUMES measured AUTOMATICALLY using a MONITORING
SYSTEM based on inductive loop detectors (in carriageway surfacing)
(a) Active Congestion Management
Safe roads, Reliable journeys, Informed travellers
Mo
nit
ori
ng
Sys
tem
Ou
t-s
tati
on
Eq
uip
men
t•
Ind
uct
ive
loo
ps
& G
R M
arks
man
660
co
un
ters
•C
CT
V c
amer
as f
or
veri
fica
tio
n
•D
edic
ated
fib
re o
pti
c ca
ble
s fo
r si
gn
al t
ran
smis
sio
n
Safe roads, Reliable journeys, Informed travellers
Minimum Condition Criteria must be met before any payment made
Co
ng
esti
on
Man
ag
eme
nt
Pa
yme
nts
Safe roads, Reliable journeys, Informed travellers
(b) Active Safety Adjustment
Criteria for Safety Payments or Deductions
Cap
Benchmark
+PIAs
£ Deduction
£ Bonus
C B A B C
-PIAs
Cap
Zo
ne
A –
no
ad
just
men
ts
Zo
ne
B –
en
han
ced
ad
just
men
ts
Zo
ne
C –
sta
nd
ard
en
han
cem
ents
-8 -2 2 8
Safe roads, Reliable journeys, Informed travellers
Time
% of Full Payments
100
80
35
10
Pt U North Part
Pt U South Part
Total completion
Construction Period
Stepped-Up Construction Period Payments
No
te:
Du
rin
g
con
stru
ctio
n
per
iod
, la
ne
clo
sure
ch
arg
es
also
ap
ply
Safe roads, Reliable journeys, Informed travellers
CURRENT STANDARDS FOR OPERATION AND MAINTENANCE
• DBFO Co obliged to automatically adopt revised or new
standards
• Only exception – Step Change (remote unforeseeable
change affecting whole motorway and trunk road network)
• Not applicable to design and construction (standards fixed)
Safe roads, Reliable journeys, Informed travellers
SOME LESSONS LEARNT FROM DBFO PROCUREMENT
Schemes with large new-build elements more viable (more risk)
Need to reduce tendering costs
Need to reduce tendering / negotiation period
Need for well-resourced DBFO companies
Need to streamline contractual procedures
Safe roads, Reliable journeys, Informed travellers
Motorway Widening Schemes:
● M25 London Orbital – circa £1.5bn
● M1 J21 - J30 – circa £2bn
● M6 J11A - J19 – circa £2bn (possible
toll road)
M1
M25
M6
FUTURE PRIVATELY-FINANCED / DBFO PROJECTS
Safe roads, Reliable journeys, Informed travellers
M2
5 L
on
do
n
Orb
ita
l
M1
M25
M6
Safe roads, Reliable journeys, Informed travellers
Thank YouThank You
HO
LM
FIE
LD
IN
TE
RC
HA
NG
E(A
1(M
)/M
62
Ju
nc
tio
n)