s-energy en 2017 01 en 2017_01.pdf · 2019. 10. 29. · solar energy generation authorizer (kepco)...

12

Upload: others

Post on 21-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back
Page 2: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back
Page 3: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

02

Name

Establishment

No. of employees

Subsidiaries

Branches

S-Energy Co., Ltd.

12th of January 2001

472

S-Power / S-Fuelcell

[S-Energy America Inc.] Irvine, U.S.A.[S-Energy Japan Co., Ltd. ] Tokyo, Japan[S-Services Inc. ] Irvine, U.S.A. [S-Services Co., Ltd. ] Tokyo, Japan

FY 2015

Page 4: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

O&MProject Business Fuel cell SystemLease & Power Supply Module Supply

· Inspection, Maintenance· Monitoring system· Renovaiton

· Standard Module· BIPV Module· Specialized Module

· Fuel cell for buildings· Investment, Consulting, Assessment etc.· Korea’s Top Solar Lease Company, expanding its reach into the world

· EPC· Project Development· O&M

S-Energy S-Power S-Fuelcell

Page 5: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

Based on our experience over the past 20 years, S-Energy’s PV module has proven to be reliable and durable through production and supply of standard module, BIPV module and specialized module.

PV Module Supply

Standard module

BIPV module

Specialized PV module

Optimized desert PV module

Aquatic module enhanced for water resistance

Lightest frameless type glass to glass PV module

04

EL TEST, Enhanced PID, ARC GlassLong-term reliability

Higher endurance than the IEC standardDurability

Linear warranty/ Max. annual power decline up ot 0.7%Sustainability

Desert PV Module Floating PV Module

70% market share of BIPV in Korea

Obtained the nation’s first BIPV G2G type module certification from Renewable Energy Center

Page 6: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

At S-Energy, a team of experts competent in engineering, finance and legal review conductsprojects.

Project Business

05

Operation & Maintenance

O&M· 24hr monitoring· Immediate and reliable response· Full insurance coverage

Project Development

EPCFinancing Consulting

· Financial modeling· Incentive/Tax equity funding· Project acquisition

· Project assessment· Evaluating power system· Environmental assessment· Business analysis

Competitive components

· PV module· Inverter· Racking system· SCADA· Bankable sourcing

Procurement

· Project engineering· Civil engineering· Electrical engineering· Supervisory services

Well-organized local partners

Construction

EPC

Page 7: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

Guarantee ROI through project financing and equity investment for small commercial power supply and residential solar leases.

Lease & Power Supply

Investment in PV power plantsImprove the value of a PV power plant by buying the shares, operating the plant, and making a profit via resale.

Financial advisory and consultingAdvise business models with risk hedging for optimal ROI and coordinate investors for stable financial support.

Project feasibility assessment

06

Solar Energy Generation Authorizer(KEPCO)

① Consume PV generated power first (100kWh/month)

② Reverse excess power back to KEPCO (200kWh/month) * It’s not a commercial power supply business for using power generation.

③ Use main power from KEPCO again if extra power needed after reverse power transmission to KEPCO (150kWh/month)

Solar lease

This project provides power companies, wishing to purchase small-sized power plants with an installment payment program for solar power system and power plant construction costs. Power companies pay the down payment first and the balance by monthly installment, and thereby do not have the burden of initial investment.

Authorizer Customer S-Power &Developer

Power generation earnings

Sales of power supply

- Down payment- Pay the balance by monthly installment

- Solar plant construction- Site, licensing, administration- Provide financial program

Installment project of 99kW solar package

Save over 20% on your utility bill without the initial investment by leasing home PV systems, only a monthly lease fee is required.

Lease project of solar powered houses

Analyze and evaluate various factors affecting project cash flow for business feasibility.

Page 8: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

PVsyst Licensed to S-Energy (Korea, Republic Of)

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0

1

2

3

4

5

6

Nor

mal

ized

Ene

rgy

[kW

h/kW

p/da

y]

Normalized productions (per installed kWp): Nominal power 98.8 kWp

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0.0

0.2

0.4

0.6

0.8

1.0

Perf

orm

ance

Rat

io P

R

Performance Ratio PR

PR : Performance Ratio (Yf / Yr) : 0.814

Yf : Produced useful energy (inverter output)Ls : System Loss (inverter, ...)Lc : Collection Loss (PV-array losses)

3.49 kWh/kWp/day0.25 kWh/kWp/day0.55 kWh/kWp/day

SPMC(Solar Performance Management Center) provides high quality advisory services and optimized maintenance services.

The service is to ensure the performance of client's PV assets by identifying potential issues before they directly impact on power production.

S-Power acts on your behalf, providing you optional services such as the best power-performance guarantee, insurance, accounting and security services. All for your convenience.

Monitoring Inspection & Maintenance

Guarantee

The operation and management service experts at S-Power provide the best satisfaction to customers through power plant integrated management system.

O&M(Operations & Maintenance)

Grid-Connected System: Main results

07

Page 9: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

Configurations of fuel cell system

Fuel cell models

We provide optimal solutions in PEM fuel cell applications based on the best technology and diverse experiences.

Fuel cell systems provide both electricity and thermal energy, with a total efficiency (electrical efficiency + thermal efficiency) of over 85%

Fuel cell system

NG Series HG Series

1. A fuel processor is a reactor that transforms city gas into hydrogen-rich gas.2. A stack generates energy(electricity and heat) through the reaction of hydrogen and oxygen (in the air).3. A power conditioning system converts a direct current to an alternating current.

08

DC AC

City gas Fuel processor 1

(Reformer)Stack 2

Heat exchangerHeat

Heat storage tank Heat

ElectricityPower conditioning system 3

(Inverter)

:::

:

M o d e lF u e l sP o w e r

Efficiency

ecogener NG seriesLNG/LPG1~5kW (electricity)1.5~7kW (heat)over 85%

:::

:

M o d e lF u e l sP o w e r

Efficiency

ecogener HG seriesH21~10kW (electricity)1.5~15kW (heat)over 85%

Page 10: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back
Page 11: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

10

Contact Information

S-FuelcellS-Fuelcell Co., LtdFl3, U2O Korea Building, 546, Dunchon-daero, Jungwon-gu, Seongnam, Gyeonggi, 13230, Republic of KOREAT E L +82-70-4613-4900

F A X +82-70-4613-4999

E - m a i l [email protected]

S-EnergyS-Energy Co., LtdFl3, MiraeAsset Tower, 20, Pangyoyeok-ro 241 beon-gil, Bundang-gu, Seongnam, Gyeonggi, 13494, Republic of KOREAT E L +82-70-4339-7100

F A X +82-70-4339-7199

E - m a i l [email protected]

S-Energy 1st factory328 Techno-2-ro, Yuseong-gu, Daejeon, Republic of KOREA

T E L +82-42-933-7715

F A X +82-42-933-7718

S-Energy 2nd Factory260 Gapcheon-ro, Yuseong-gu, Daejeon, Republic of KOREA

T E L +82-42-717-7100

F A X +82-42-717-7199

SEAI America, Inc. d.b.a. S-Energy America

20 Corporate Park, Suite 190, Irvine, CA 92606, U.S.A.

T E L +1-949-281-7897

F A X +1-949-281-7893

E - m a i l [email protected]

S-Energy Japan Co., Ltd.1-6-9, Kojimachi, Chiyoda-ku, Tokyo, DIK Kojimachi building 3F-A, JapanT E L +81-949-281-7897

F A X +81-949-281-7893

E - m a i l [email protected]

S-Power Co., LtdFl3, MiraeAsset Tower, 20, Pangyoyeok-ro 241 beon-gil, Bundang-gu, Seongnam, Gyeonggi, 13494, Republic of KOREA

T E L +82-70-4339-7100

F A X +82-70-4339-7199

E - m a i l [email protected]

S-Services, Inc.20 Corporate Park, Suite 190, Irvine, CA 92606, U.S.A.

T E L +1-949-281-7897

F A X +1-949-281-7893

E - m a i l [email protected]

S-Services Japan1-6-9, Kojimachi, Chiyoda-ku, Tokyo, DIK Kojimachi building 3F-A, JapanT E L +81-3-6261-3759

F A X +81-3-6261-3769

E - m a i l [email protected]

S-Power

Page 12: S-Energy en 2017 01 EN 2017_01.pdf · 2019. 10. 29. · Solar Energy Generation Authorizer (KEPCO) ① Consume PV generated power first (100kWh/month) ② Reverse excess power back

S-Energy Co., Ltd. www.s-energy.com/en

H E A D O F F I C EC O N T A C T

Fl3, MiraeAsset Tower, 20, Pangyoyeok-ro 241 beon-gil Bundang-gu, Seongnam, Gyeonggi-do, 13494, Republic of KOREATel. +82-70-4339-7100 Fax. +82-70-4339-7199 E-mail. [email protected]

||