ru50 ran feature list for pre-study

13
Name Brief Description F RAS Re RAN147 RRC Connection Setup Redirection RU50 RU50 RAN1668 RU50 RU50 RAN1905 DC-HSUPA RU50EP1 RU50 RAN2179 Dual Band HSDPA 42 Mbps RU50 RU50 RAN2199 BTS Event Triggered Symptom Data Collection RU50 RU50 RAN2211 Multi-Cell HSDPA RU50EP1 RU50 RAN2242 Basic routing in BTS unassigned RU50 RAN2243 Performance Monitoring Based on ETH Service OAM RU50 RU50 RAN2251 Automatic mcRNC Resource Optimization RU50EP1 RU50 RAN2264 Smart LTE Handover RU50 RU50 RAN2512 RNC Resiliency for RNC2600 RU50 RU50 RAN2554 Self Healing for M-Plane Connectivity RU50 RU50 RAN2555 Configurable Ranges for User Throughput Counters RU50EP1 RU50 RAN2574 SIB11 Capability Check RU50 RU40 RAN2671 Upgrading of mcBSC to mcRNC RU50EP1 RU50 RAN2674 Traffica IP Reports for Data Volume and Bandwidth RU50EP1 RU50 RAN2680 RU50EP1 RU50 RAN2693 Statistics Collection Optimization RU50 RU50 RAN2704 3GPP Rel8 CBS ETWS Support RU50 RU40 w Planned RU Release (18.07.13) HSUPA Compressed Mode for LTE and Inter-frequency Handover SW fallback possibility in case of failed mcRNC SW upgrade/update

Upload: aaron-perkins

Post on 17-Jul-2016

145 views

Category:

Documents


26 download

DESCRIPTION

RU50

TRANSCRIPT

Page 1: RU50 RAN Feature List for Pre-study

Name Brief Description F RAS ReRAN147 RRC Connection Setup Redirection RU50 RU50

RAN1668 RU50 RU50

RAN1905 DC-HSUPA RU50EP1 RU50

RAN2179 Dual Band HSDPA 42 Mbps RU50 RU50

RAN2199 BTS Event Triggered Symptom Data Collection RU50 RU50

RAN2211 Multi-Cell HSDPA RU50EP1 RU50

RAN2242 Basic routing in BTS unassigned RU50RAN2243 Performance Monitoring Based on ETH Service OAM RU50 RU50

RAN2251 Automatic mcRNC Resource Optimization RU50EP1 RU50

RAN2264 Smart LTE Handover RU50 RU50

RAN2512 RNC Resiliency for RNC2600 RU50 RU50

RAN2554 Self Healing for M-Plane Connectivity RU50 RU50RAN2555 Configurable Ranges for User Throughput Counters RU50EP1 RU50

RAN2574 SIB11 Capability Check RU50 RU40RAN2671 Upgrading of mcBSC to mcRNC RU50EP1 RU50RAN2674 Traffica IP Reports for Data Volume and Bandwidth RU50EP1 RU50RAN2680 RU50EP1 RU50

RAN2693 Statistics Collection Optimization RU50 RU50RAN2704 3GPP Rel8 CBS ETWS Support RU50 RU40

w Planned RU Release(18.07.13)

HSUPA Compressed Mode for LTE and Inter-frequency Handover

SW fallback possibility in case of failed mcRNC SW upgrade/update

Page 2: RU50 RAN Feature List for Pre-study

RAN2709 System Upgrade to RU50 RU50 RU50

RAN2710 BTS Platform Testability Improvements RU50 RU50

RAN2732 Flexi System Module extension, FSM3 + FSM2 RU50EP1 RU50

RAN2846 mcRNC HW diagnostics and supervision enhancement RU50EP1 RU50

RAN2881 WCDMA and GSM Layer Priorities RU50 RU50

RAN2951 BASE - Phase 1 RU50 RU50RAN2955 mcRNC EM extension RU50 RU50EP1 RU50RAN2959 mcRNC step 7 support RU50EP1 RU50RAN2963 Data Session Profiling RU50 RU50RAN2966 mcRNC Octeon -card's blackbox RU50EP1 RU50RAN2969 mcRNC add-in card overload detection RU50EP1 RU50RAN2975 RNC196/450 support in RU50 RU50 RU50RAN2980 Measurement based LTE Layering RU50 RU50RAN2982 RU50 RU50

RAN3000 mcRNC4.0 configurations, capacity and performance RU50EP1 RU50

RAN3017 Additional 6 WCDMA cell activation RU50

Traffica Interface to RNC through Megamon/Data Collector

Page 3: RU50 RAN Feature List for Pre-study
Page 4: RU50 RAN Feature List for Pre-study

w Planned Visibility Category Pre-study AuthorRU50

Public Radio Resource Management LukaszRU50

Public Radio Resource Management LukaszRU50

Public Radio Resource Management LukaszRU50

Public Radio Resource Management LukaszRU50

Public Operability LukaszRU50

Public Telecom LukaszRU50 Public Transmission & Transport OssiRU50

Public Transmission & Transport OssiRU50

Public RNC Solution YinRU50

Public Radio Resource Management YinRU50 Public RNC Solution by Lukasz S.RU50 Public Operability PiotrRU50

Public Performance Monitoring YinRU50 Public Radio Resource Management YinRU50 Public RNC SolutionRU50 Public Performance Monitoring YinRU50

Internal RNC Solution YinRU50 Internal RNC Solution YinRU50 Public Radio Resource Management Yin

Page 5: RU50 RAN Feature List for Pre-study

RU50Internal Operability Yin

RU50

Internal Operability PiotrRU50

Internal BTS Solution PiotrRU50

Internal Operability YinRU50

Public Radio Resource Management YinRU50 Internal BTS Solution PiotrRU50 Public Operability PiotrRU50 Public RNC Solution PiotrRU50 Public Radio Resource Management PiotrRU50 Internal RNC Solution PiotrRU50 Internal RNC Solution PiotrRU50 Internal RNC Solution PiotrRU50 Public Radio Resource Management Yin and LukaszRU50

Public Operability PiotrRU50

Internal RNC Solution Piotr-

Public BTS Solution Luka

Page 6: RU50 RAN Feature List for Pre-study
Page 7: RU50 RAN Feature List for Pre-study

Pre-study Analysis

low

low

low

low

low

low

None

High

Lowleft from RU40, US exist Low

No impact to CM. Draft EFS available in DOORsNo Impact to CM. EFS phase 1 is approved in DOORs

No Impact to CM. EFS is approved in DOORs Noneleft from RU40, US exist Low

RAN147 was postponed from RU40 with EFS in Approved State. EFS was updated and approved for RU50. There are 19 new and 3 modified parameters related to RAN147 - impact to CM. Licensed feature (RNC/mcRNC on/off license).

CFAM document exists and is approved. Some old SFS has already exist in DOOR’s WCDMA_RAN/Feature_Team_Modules/RU30) No special requirement for NetAct CM. Licensed feature (RNC/mcRNC on/off license). There are 2 new and 4 modified parameters of RAN1668. Modification of parameters is connected with description modification - very low affect to CM.

CFAM document exists and is approved. No special requirement for NetAct CM. There are 2 new and 4 modified parameters related to RAN1905 - impact to CMLicensed feature (RNC/mcRNC on/off license).

CFAM (v. 1.4) and EFS (v. 1.7) documents exists in DOORs tool. RAN2179 is not at the RU50 list in WCDMA RAN & MGW Features website. RAN2179 is licensed feature (RNC/mcRNC long-term on/off license). There are 5 new and 3 modified parameters in PDDB. New parameters can be seen in PDDB: RNC RN7.0, version 2.0, id 3274 as a "proposal".

CFAM (v. 2.7) and EFS phase 1 (v. 2.0) are approved in DOORS tool. Ther is 1 new parameter under MRBTS (WN9.0) related to RAN2199. - low affect to CM.

CFAM and EFS available in DOORs. There are 2 new WCEL parameters and a few modified parameters of other objects which are related to RAN2211 - impact to CM.

EFS Phase 1 is Approved in DOORs. No impact to CM at this point.

New MO ADJE is added. Adjacency from WCDMA to LTE shall be supported.

Draft EFS available in DOORs. Licensed feature. New parameters introduced

Page 8: RU50 RAN Feature List for Pre-study

None

None

lowNo Impact to CM. EFS is approved in DOORs None

low

New MO: FMCL Middle

??

System Upgrade. EFS of phase 1 is approved in DOORsNo special requirement for NetAct CM

No Impact to CM. EFS is approved in DOORs

EFS approved in DOORs. Impact to CM: new and modified parameters

EFS approved in DOORs. Impact to CM: new and modified parameters

There is some information about RAN3017 feature in Focalpoint and Accept360. CFAM and EFS schedule is being planned.

Page 9: RU50 RAN Feature List for Pre-study
Page 10: RU50 RAN Feature List for Pre-study

System programSystem Program Manager Turunen, Jouni (NSN - FI/Espoo) JoTuProgram Support Manager Takolander, Pirjo Riitta (NSN - FI/Espoo)PiriProgram Quality Manager Sumathi RajavannianSystem Specification Program Manager Patronen, Petri (NSN - FI/Oulu)

BTSWBTS9.0 Program Manager Zhuxiang, LinWBTS Specification SPO Maow, AljiWBTS Tcom Technical Manager Ye, Zhizeng (NSN - CN/Hangzhou) NateWBTS BTS solutions Technical Manager Latomaa, Juha (NSN - FI/Oulu)WBTS Operability TM Polak, Andrzej (NSN - PL/Wroclaw); Guo, Lei (NSN - CN/Hangzhou); Vaaraniemi, Asko (NSN - CN/Hangzhou)WBTS Transport Technical Manager Alappat, Jerry (NSN - IN/Bangalore)

RNCRN8 Program ManagerRNC Specification SPO Vaara, Tomi (NSN - FI/Espoo)IPA Program Manager Palo, Matti (NSN - FI/Espoo)ADA Program Manager

OMSOMS Program Manager Jussi KinnunenOMS Specificaiton Manager Virtanen, Marko J. (NSN - FI/Tampere)

NetActNetAct Program Manager Darcy Xu

SyVeSyVe RU50 Program Manager

Tang, Jie 1. (NSN - CN/Hangzhou)T&T Lv, Xiaohui (NSN - CN/Hangzhou)O&M Wu, Yong 1. (NSN - CN/Hangzhou)

CuDoCuDo contact Sirpa Vellonen-Myllylä

Network Engineering

RRM/Telecom

Page 11: RU50 RAN Feature List for Pre-study

Polak, Andrzej (NSN - PL/Wroclaw); Guo, Lei (NSN - CN/Hangzhou); Vaaraniemi, Asko (NSN - CN/Hangzhou)

Page 12: RU50 RAN Feature List for Pre-study

Reference

RU50 Pre-study folder

Date Version Name

4/2/2013 1 Yin Yu

6/12/2013 2 Yin Yu

7/8/2013 3 Yin Yu

7/18/2013 4 Yin Yu

7/22/2013 5 Yin Yu

Accept360

RU50 Content and Specification Status excel

RU50 Specification Site

https://sharenet-ims.inside.nokiasiemensnetworks.com/Open/498203098

Page 13: RU50 RAN Feature List for Pre-study

Change

Features list are updated according to Accept360

Features are assigned for pre-study in 3G specification team

RU50 Content and Specification Status excel

https://sharenet-ims.inside.nokiasiemensnetworks.com/Open/498203098

Excel created. Copied frrom RU50 Content excel from column A to BQ only.NetAct Configuration information are added from BS column.

Update the feature list of RU50, RU release in column C (based on today's Accept 360). RAN3017 is added to RU50

Removed RAN1908, RAN1910 and RAN1913 as those are moved to RU40MNT, so supported is needed in OSS_FC_011197. (USs are moved to that one)