RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Marana Tangerine Rd: I‐10 to La Canada Dr 01_a ST021 86.06 Under ConstructionSegment 1: Dove Mountain to Thornydale Roadway SegmentsSegment 2: Tangerine Rd.: Thornydale to La Canada Roadway SegmentsSegment 3: I‐10 to Dove Mountain Roadway SegmentsTangerine+Twin Peaks/Dove Mountain Blvd Intersection ImprovementTangerine+Camino De Oeste Intersection ImprovementTangerine+Thornydale Intersection ImprovementTangerine+La Cholla Intersection ImprovementTangerine+I‐10 Frontage Rd. Intersection ImprovementTangerine Rd. @ Twin Peaks EB Bus Pullout Bus PulloutTwin Peaks @ Linda Vista SB Bus Pull‐out (transferred to 561 00) Bus PulloutTwin Peaks @ Linda Vista SB Bus Pull‐out (transferred to 561.00) Bus PulloutTangerine Rd.: Dove Mountain to La Canada (5 mile) Tangerine Multi‐Use Path PathwayTangerine Rd.: I‐10 to Dove Mountain (5 mile), Tangerine Multi‐Use Path PathwayTangerine Rd.: Dove Mountain to La Canada Tangerine On Street Bikelanes BikewayTangerine Rd.: I‐10 to Dove Mountain (5 Mile) Tangerine On Street Bikelanes BikewayTangerine Rd.: Dove Mountain to La Canada Tangerine Sidewalk SidewalkTangerine Rd.: I‐10 to Dove Mountain (5 mile) Tangerine Sidewalk Sidewalk
Oro Valley Tangerine Rd: Shannon to La Canada 01_b 15.03 Under Construction
Segment 3: Tangerine Rd.: La Canada to Shannon Roadway Segments
Marana Camino de Manana / Dove Mtn Extn. 02__ ST004 2001‐52 561 Complete
Camino De Manana Roadway SegmentsTwin Peaks Rd./Dove Mountain Blvd. (formerly Camino De Manana) + Tangerine Intersection ImprovementCamino De Manana + Oasis Intersection ImprovementCamino De Manana + Twin Peaks/Camino De Manana Intersection ImprovementTangerine Rd. @ Twin Peaks SB Bus Pullout Bus PulloutTwin Peaks @ Linda Vista NB Bus PulloutCamino De Manana Bikeways BikewayCamino De Manana Sidewalks Sidewalk
Marana Twin Peaks Rd / Linda Vista Blvd TI 03_a 2001‐44 758 CompleteTwin Peaks, Silverbell to I‐10 Roadway SegmentsTwin Peaks+I‐10 East Frontage Rd. Intersection ImprovementTwin Peaks+Linda Vista Blvd Intersection Improvement
03_b Twin Peaks+Tiffany Loop Intersection ImprovementTwin Peaks+I‐10 West Frontage Rd. Intersection Improvement
Marana Twin Peaks Bridge / Roadway 03_b 76.01 CompleteTwin Peaks Bridge/Roadway Roadway SegmentsTwin Peaks Bridge/Roadway: Grade Separated RR Crossing Bridge DeficiencyT i P k Bik BikTwin Peaks Bikeway BikewayTwin Peaks Sidewalk Sidewalk
Pima County La Cholla Blvd: Overton to Magee 04_a 4RTLTM 90.06 CompleteLa Cholla Blvd., Tangerine to Magee Rd. DCR DCR StudyLa Cholla Blvd: Overton to Magee Roadway SegmentsLa Cholla/Overton Intersection ImprovementLa Cholla/Overton Bikeway BikewayLa Cholla/Overton Sidewalks Sidewalk
Oro Valley La Cholla Blvd. ‐ Tangerine to Overton 04_b 87.03 In Design
La Cholla Blvd. ‐ Tangerine to Overton Roadway SegmentsLa Cholla Blvd. ‐ Tangerine to Overton Bikelanes BikewayLa Cholla Blvd. ‐ Tangerine to Overton Sidewalk Sidewalk
Tucson Silverbell Rd: Grant to Ina 05__ 56.06 Under ConstructionSilverbell Rd.: Grant Rd. to Ina Rd. DCR (Design Concept Report) DCR StudySegment 1 = Grant to Goret Roadway Roadway Segments
9/19/2016 2:36:28 PM 1 1 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Segment 2 = Goret to Cmo. Del Cerro Roadway Roadway SegmentsSegment 3 = Cmo Del Cerro to Ina Road Roadway Roadway SegmentsSegment 1 Bikeways BikewaySegment 2 Bikeways BikewaySegment 3 Bikeways BikewaySegment 1 Sidewalks SidewalkSegment 2 Sidewalks SidewalkSegment 3 Sidewalks Sidewalk
ADOT I‐10: Ina TI 06__ 3.02 In DesignI‐10: Ina TI (Reconstruct TI and construct RR Overpass) Roadway Segments
Pima County Magee Rd: Mona Lisa to La Canada 07 a 4RTMLI 115 06 CompletePima County Magee Rd: Mona Lisa to La Canada 07_a 4RTMLI 115.06 CompleteMagee Rd: Mona Lisa to La Canada Roadway SegmentsLa Cholla + Magee Rd Intersection ImprovementMagee Rd + Mona Lisa Intersection ImprovementCortaro Farms @ Ranch Escondido HAWK Pedestrian Crossing HAWKMagee Rd: Mona Lisa to La Canada Bikeway BikewayMagee Rd: Mona Lisa to La Canada Sidewalk Sidewalk
Pima County Magee Rd. ‐ Thornydale to Mona Lisa 07_b 4MCFTL 152 Complete
Magee Rd. :Thornydale to Mona Lisa Roadway SegmentsMagee Rd. + Shannon Northbound Intersection ImprovementMagee Rd. + Shannon Southbound Intersection ImprovementMagee Rd. + Thornydale Intersection ImprovementClub + Magee Rd. Intersection ImprovementMagee Rd: Mona Lisa to La Canada Bikeway BikewayMagee Rd: Mona Lisa to La Canada Sidewalk Sidewalk
Pima County Sunset Rd. ‐ Silverbell to I‐10 08__ 4RTSUN 35.05 Under Construction09_a Sunset, Silverbell to I‐10 Roadway Segments
Sunset, I‐10 to River Roadway SegmentsADOT I‐10: Ruthrauff TI 09_a 5.12 In Design
I‐10: Ruthrauff TI ‐ Phase 1 Roadway Segments
Pima CountyLa Cholla Blvd: Ruthrauff Rd to River Rd
10__ 789 Complete
La Cholla: Ruthrauff to River Road Segment Roadway SegmentsLa Cholla + Curtis Intersection Improvements Intersection ImprovementLa Cholla + Ruthrauff Intersection Improvements Intersection ImprovementLa Cholla Bus Pullout #1 La Cholla + Ruthrauff Bus PulloutLa Cholla Bus Pullout #2 La Cholla + River Deleted ‐ Paid by RTA 36ak Bus PulloutLa Cholla Bus Pullout #3 Bus PulloutL Ch ll B P ll t #4 B P ll tLa Cholla Bus Pullout #4 Bus PulloutLa Cholla Bus Pullout #5 Bus PulloutLa Cholla Bus Pullout #6 Bus PulloutLa Cholla: Ruthrauff to River Bikeway BikewayLa Cholla: Ruthrauff to River Sidewalks Sidewalk
Pima County La Canada Dr. #1 ‐ River to Ina 11_a 4LCRRI 150 CompleteLa Canada ‐ River to Ina: River>Calle Concordia Roadway SegmentsLa Canada ‐ River to Ina: River>Calle Concordia Bikeway BikewayLa Canada ‐ River to Ina: River>Calle Concordia Sidewalk Sidewalk
Pima CountyLa Canada Dr. #6 ‐ Ina to Calle Concordia
11_b 4RTCCI 35.06 Complete
La Canada Dr.: Ina to Calle Concordia Roadway SegmentsLa Canada+ Hardy Intersection Improvement Intersection ImprovementLa Canada + Magee Intersection Improvement Intersection ImprovementLa Canada + Ina Intersection Improvement Intersection ImprovementLa Canada + Orange Grove Intersection Improvement Intersection Improvement
9/19/2016 2:36:28 PM 1 2 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
La Canada + Calle Concordia Intersection Improvement Intersection ImprovementLa Canada + Sunset Intersection Improvement Intersection ImprovementLa Canada Dr.: Ina to Calle Concordia Bikeway BikewayLa Canada Dr.: Ina to Calle Concordia Sidewalks Sidewalk
Pima County Magee Rd. ‐ La Canada to Oracle 12__ 592 CompleteMagee Rd.: La Canada to Oracle Roadway Roadway SegmentsIntersection @ Magee + Northern Intersection Improvement Intersection ImprovementIntersection @ Magee + Oracle Intersection Improvement
Pima County 1st Ave: Orange Grove Rd to Ina Rd 13__ 82.06 Not Started1st Ave: Orange Grove Rd to Ina Rd Roadway Segments
Tucson 1st Ave: Grant to River 14 81 06 Under ConstructionTucson 1st Ave: Grant to River 14__ 81.06 Under Construction1st Ave: Grant to River Widen to 6 lanes Roadway Segments
TucsonGrant Rd: RR Underpass Reconstruction
15__ 84.06 Not Started
UPRR Underpass Expansion at Grant Road Roadway Segments
TucsonUPRR Underpass Expansion at Grant Road
15_a 11.15 In Design
UPRR Underpass Expansion at Grant Road Roadway SegmentsTucson Downtown Links: Broadway to I‐10 16_a S30N 81.04 In Design
Phase I= 8th Street Drainage Roadway SegmentsDowntown Links: High School Wash Improvements Roadway SegmentsPhase II= St Mary's: I‐10 to Church Ave. Roadway SegmentsPhase III=6th Street to Broadway Blvd Roadway SegmentsSt Mary's + Granada Intersection Improvement Intersection ImprovementDowntown Links + Broadway Intersection Improvement Intersection ImprovementDowntown Links + 6th Avenue Intersection Improvement Intersection ImprovementDowntown Links + 6th Street Intersection Improvement Intersection ImprovementDowntown Links + Stone Intersection Improvement Intersection ImprovementDowntown Links + Church Intersection Improvement Intersection ImprovementDavis Bilingual Elementary HAWK Pedestrian Crossing HAWKBus Pullout Granada WB Bus PulloutDowntown Links: I‐10 to Broadway Blvd. Bikeways BikewayDowntown Links: I‐10 to Broadway Blvd. Sidewalks Sidewalk
TucsonBroadway Blvd. ‐ Euclid to Country Club
17__ 22.05 In Design
Broadway Blvd.: Euclid Ave. to Country Club Rd. Roadway SegmentsTucson Grant Rd: Oracle Rd to Swan Rd 18__ 55.06 In Design
Phase I Intersection Improvement Grant Rd + Oracle Rd. (includes roadway West at 9th and East to 15th) Intersection ImprovementPhase II 15th Ave West of Stone Ave. to Santa Rita East of Park Ave. Roadway SegmentsPh III Al W t V i Pl W t f S Rd & Ph IV D d Bl d (P l V d ) t Al W R d S tPhase III: Alvernon Way to Venice Place, West of Swan Rd & Phase IV: Dodge Blvd. (Palo Verde) to Alvernon Way Roadway SegmentsPhase V: Santa Rita East of Park Ave. to Tucson Blvd & Phase VI Tucson Blvd. to Pal Verde West of Dodge Roadway SegmentsGrant Rd. + Oracle HAWK ILT East HAWKGrant Rd. + Oracle HAWK ILT West HAWKGrant Rd. + Oracle Rd Bus Pullout North Bus PulloutGrant Rd. + Oracle Rd Bus Pullout South Bus PulloutGrant Rd. + Oracle Rd Bus Pullout East Bus PulloutOracle Rd. to Swan Rd. Bikeways Phase I BikewayOracle Rd. to Swan Rd. Bikeways Phase II BikewayOracle Rd. to Swan Rd. Bikeways Phase III & IV BikewayOracle Rd. to Swan Rd. Bikeways Phase V & VI BikewayOracle Rd. to Swan Rd. Sidewalks Phase I SidewalkOracle Rd. to Swan Rd. Sidewalks Phase II SidewalkOracle Rd. to Swan Rd. Sidewalks Phase III & IV SidewalkOracle Rd. to Swan Rd. Sidewalks Phase V & VI Sidewalk
Tucson 22nd Street: I‐10 to Tucson Blvd. 19_a SR5A 131 In Design
9/19/2016 2:36:28 PM 1 3 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
22nd. Street ‐ 3rd Segment Kino Parkway to I‐10 (1st segment overpass listed as interseciton) Roadway Segments22nd. Street: 2nd Segment Kino Parkway to Tucson Blvd. Roadway Segments22nd. Street + Kino Parkway Intersection Improvement Kino Parkway Overpass at 22nd St. Intersection ImprovementBus Pullout Eastbound 22nd. Street + Kino Parkway Intersection Improvement Kino Parkway Bus PulloutBus Pullout Westbound 22nd. Street + Kino Parkway Intersection Improvement Kino Parkway Bus Pullout
Tucson Barraza Aviation Pkwy Extension 20__ 87.06 Not StartedBarraza Aviation Pkwy Extension Roadway Segments
Pima CountyValencia Rd: Ajo Way to Mountain Eagle Dr
21_a 113.06 Transferred
Valencia Rd.: Ajo to Mark Value Analysis VA StudyPima County Valencia Rd: Ajo to Wade 21 b 114 06 In DesignPima County Valencia Rd: Ajo to Wade 21_b 114.06 In Design
Valencia Ajo Way to Mountain Eagle Dr. Wade Roadway SegmentsValencia Rd.: Ajo to Wade: Valencia + Camino Verde Intersection Improvement
Pima County Valencia Rd. ‐ Wade to Mark 21_c 4RTVMW 58.06 CompleteValencia Rd.: Ajo to Mark DCR DCR StudyValencia Rd.: Wade to Mark Roadway SegmentsValencia Rd.: Wade to Mark: Valencia + Mark Intersection ImprovementValencia Rd.: Wade to Mark: Valencia + Wade Intersection ImprovementValencia Rd.: Wade to Mark: Valencia + San Ignacio Baumea Intersection ImprovementValencia Rd.: Wade to Mark: Valencia + South Camino Verde Intersection Improvement
Tucson Irvington Rd: West of I‐19 22__ 77.06 Not StartedIrvington Rd: West of I‐19 Roadway Segments
Tucson Valencia Rd: I‐19 to Alvernon 23__ 60.06 Not StartedValencia Rd: I‐19 to Alvernon Roadway Segments
Pima County Valencia Rd.: Alvernon to Kolb 24__ 4VAKDP 61.06 Under ConstructionAlvernon to Wilmot Roadway Segment Roadway SegmentsWilmot to Kolb Roadway Segment Roadway SegmentsValencia + I‐10 Eastbound Intersection ImprovementValencia + Benson Highway Intersection ImprovementValencia + Littletown Rd. Intersection Improvement Valencia + I‐10 Westbound Intersection ImprovementValencia (Eastbound) + Kolb Rd. Intersection ImprovementValencia + Wilmot Intersection ImprovementValencia Rd.+ Desert View High School Intersection Improvement
Tucson Valencia Rd: Kolb Rd to Houghton Rd 25__ 59.06 Not Started
Valencia Rd: Kolb Rd to Houghton Rd Roadway Segments
TucsonKolb Rd.: Connection to Sabino Canyon
26__ 76.06 Under Construction
K lb E t i t S bi C R d S tKolb, Extension to Sabino Canyon Roadway SegmentsKolb Rd.: Kolb + Tanque Verde Intersection Improvement Intersection ImprovementKolb Road Bikeways Bikeway
Pima CountyTanque Verde Rd: Catalina Hwy to Houghton Rd
27__ 170 Complete
Tanque Verde Rd.: Catalina Hwy to Houghton Rd Roadway SegmentsTanque Verde Rd. + Houghton Rd Intersection Improvement Intersection ImprovementTanque Verde Rd.: Catalina Hwy to Houghton Rd Bikeway BikewayTanque Verde Rd.: Catalina Hwy to Houghton Rd Sidewalk Sidewalk
TucsonSpeedway Blvd: Camino Seco to Houghton
28__ 57.06 Complete
Speedway: Camino Seco to Houghton Road Segment Roadway SegmentsSpeedway + Camino Seco Intersection Improvement Intersection ImprovementSpeedway + Harrison Intersection Improvement Intersection ImprovementSpeedway + Houghton Intersection Improvement Intersection ImprovementSpeedway at Igo HAWK Pedestrian Crossing HAWK
9/19/2016 2:36:28 PM 1 4 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Speedway at Schrader Lane HAWK Pedestrian Crossing HAWKSpeedway Bus Pull‐out #1 Speedway + Camino Seco Bus PulloutSpeedway Bus Pull‐out #2 Speedway + Harrison Bus PulloutSpeedway Bus Pull‐out #3 Speedway + Harrison Bus PulloutSpeedway Bikeway BikewaySpeedway Sidewalk Sidewalk
TucsonBroadway Blvd: Camino Seco to Houghton
29__ 36 In Design
Broadway Blvd: Camino Seco to Houghton Roadway Segments
Tucson 22nd St: Camino Seco to Houghton Rd 30__ 32 Not Started
22nd St: Camino Seco to Houghton Rd Roadway Segments
Tucson Harrison Rd. ‐ Irvington to Golf Links 31__ 38 Not Started
Harrison Rd. ‐ Irvington to Golf Links Roadway Segments
Pima CountyHoughton Rd. ‐ Golf Links to Tanque Verde
32_a SR1_ 23.02 Dropped
Houghton Rd. ‐ Golf Links to Tanque Verde Roadway Segments
TucsonHoughton Rd. ‐ Old Spanish Trail to Tanque Verde
32_b SR 58.07 Complete
Houghton Rd. ‐ Old Spanish Trail to Tanque Verde DCR Only DCR Study
TucsonHoughton Rd: Valencia to Old Spanish Trail DCR
32_c 59.07 Complete
Houghton Roadway: Valencia to Old Spanish Trail DCR DCR StudyTucson Houghton Rd.: I‐10 to Valencia 32_d 60.07 Complete
Houghton Roadway: I‐10 to Valencia DCR only for road widening DCR Study
Tucson Houghton Road: UPRR Bridge to I‐10 32_e 108.09 In Design
Houghton: UPRR Bridge to I‐10 Roadway SegmentsTucson Houghton Rd. @ UPRR 32_f SR1D 61.07 In Design
Reconstruct and widen RR bridge Bridge Deficiency
TucsonHoughton Rd:Irvington to Valencia, Intersect Imp Old Vail Rd
32_g SR1E 17.12 Complete
Houghton Roadway: Segment 3 Irvington to Valencia Roadway SegmentsHoughton Roadway: Segment 1 Old Spanish Trl to Golf Links Roadway SegmentsHoughton Roadway: Segment 4 Irvington to I‐10 Roadway SegmentsHoughton Roadway + Drexel Intersection ImprovementHoughton Roadway + Mary Ann Cleveland Intersection ImprovementHoughton Roadway + Poor Man Intersection ImprovementH h R d V l i I t ti I tHoughton Roadway + Valencia Intersection ImprovementHoughton Roadway + Irvington Intersection ImprovementHoughton Roadway: Houghton Greenway 500 ft North of Irvington to 1000 ft south of Valencia GreenwayHoughton Roadway: Greenway along Eastside, I‐10 to 1000 ft South of Valencia GreenwayHoughton Roadway: Greenway along Eastside, 500 ft North of Irvington to 22nd St GreenwayHoughton Roadway: Greenway along Eastside, Broadway to Tanque Verde GreenwayHoughton Roadway: Bus Pull‐out 500ft North of E. Irvington Rd. Bus PulloutHoughton Roadway: Bikeway BikewayHoughton Roadway: Sidewalk Sidewalk
TucsonHoughton Rd: Broadway to 22nd, Intersection Improv @Broadway
32_h SR1F 18.12 Complete
Houghton: Broadway to 22nd Street Road Segment Roadway SegmentsHoughton Roadway + Broadway (plus roadway taper) Intersection ImprovementHoughton + Broadway Intersection Bikelanes BikewayHoughton Roadway + Broadway sidewalks SidewalkHoughton Roadway: Greenway along Eastside: Broadway to 22nd Street Greenway
9/19/2016 2:36:28 PM 1 5 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
TucsonHoughton: Valencia to Mary Ann Cleveland Way
32_i 46.14 Not Started
Houghton: Valencia to Mary Ann Cleveland Way Roadway SegmentsHoughton: Valencia to Mary Ann Cleveland Way Bikelanes Bikeway
Tucson Houghton Road: 22nd to Irvington 32_j 16.15 In DesignHoughton Road, widen from 22nd to Irvington Roadway Segments
Tucson Houghton Rd. ‐ I‐10 to Golf Links 32aa SR1 1.06 TransferredHoughton Rd. ‐ Golf Links to Tanque Verde Roadway Segments
Pima County Wilmot North of Sahuarita Rd 33__ 4RTWNS 78.06 Under ConstructionWilmot North of Sahuarita Rd. Roadway SegmentsWilmot North of Sahuarita Rd : Wilmot + Sahuarita Intersection ImprovementWilmot North of Sahuarita Rd.: Wilmot + Sahuarita Intersection Improvement
Sahuarita Sahuarita Road: I‐19 to Country Club 34_a 6.04 Complete
Sahuarita Roadway: Segment 1= I‐19 to La Vilita Roadway SegmentsRoadway Segment 4= Azatlan> CC Rd Segment Nogales Hwy to Country Club Roadway SegmentsRoadway Segment 2= (I19) Rancho Sahuarita>La Villita Roadway SegmentsRoadway Segment 3=La Villita to Azatlan Ave. Roadway SegmentsSahuarita Roadway + La Villita Intersection Improvement Intersection ImprovementSahuarita Roadway + Ranch Sahuarita Intersection Improvement Intersection ImprovementSahuarita Roadway + Nogales Hwy Intersection Improvement Intersection ImprovementSahuarita Road + Country Club Intersection Improvement Intersection ImprovementSahuarita Roadway: Pedestrian crossing at Underpass (In front of Town Hall) Pedestrian CrossingSahuarita Roadway: Bikelanes La Villita> CC Rd Segment 3‐4: La Villita to Azatlan Ave. BikewaySidewalks: La Villita> CC Rd Segment 3‐4: La Villita to Azatlan Ave. SidewalkSahuarita Roadway: La Villita to Country Club Wildlife Crossings Wildlife Linkages
Pima County I‐19: NB Frontage Rd ‐ Part 2 35__ 110.01 CompleteI‐19 Frontage Road: Canoa Ranch to Continental Rd. Roadway SegmentsI‐19 Frontage Road: I‐19 + Conoa Intersection ImprovementI‐19 Frontage Road: I‐19 + Continental Intersection ImprovementI‐19 Frontage Road: Canoa Ranch to Continental Rd. Bikelanes Bikeway
Tucson Grant / Craycroft Intersection 36_a SN01 1.07 CompleteGrant/Craycroft Intersection ImprovementGrant/Craycroft: Bus Pull‐out #1 Bus PulloutGrant/Craycroft: Bus Pull‐out #2 Bus PulloutGrant/Craycroft: Bus Pull‐out #3 Bus PulloutAlamo Wash Bridge (Grant/Craycroft Intersection) Railroad Safety
Tucson Golf Links/Wilmot Intersection 36_b SN02 2.07 CompleteGolf Links/Wilmot Intersection ImprovementBus Pull‐out #1: Golf Links/Wilmot Bus PulloutB P ll t #2 G lf Li k /Wil t B P ll tBus Pull‐out #2: Golf Links/Wilmot Bus PulloutBus Pull‐out #3: Golf Links/Wilmot Bus Pullout
Tucson Ft Lowell/Campbell Intersection 36_c SN03 3.07 CompleteFt. Lowell/Campbell Intersection ImprovementBus Pull‐out Ft. Lowell/Campbell Bus PulloutBus Pull‐out Ft. Lowell/Campbell Bus PulloutBus Pull‐out Ft. Lowell/Campbell Bus PulloutBus Pull‐out Ft. Lowell/Campbell Bus Pullout
Tucson Starr Pass/Mission Rd Intersection 36_d SN04 4.07 CompleteStarr Pass/Mission Intersection Improvement
Tucson Wilmot/Park Place Intersection 36_e 5.07 CompleteWilmot/Park Place Intersection Improvement
Tucson Starr Pass/La Cholla Intersection 36_f 6.07 CompleteStarr Pass/La Cholla Intersection Improvement
Tucson 6th Ave / Euclid Ave Signal Upgrade 36_g SG02 7.07 CompleteSixth/Euclid Intersection Improvement
9/19/2016 2:36:28 PM 1 6 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Tucson Country Club/Pima Signal Upgrade 36_h SG04 8.07 CompleteCountry Club/Pima Intersection Improvement
Tucson Nogales/Drexel Signal Upgrade 36_i SG05 9.07 CompleteNogales/Drexel Intersection Improvement
Tucson Stone/Glenn Signal Upgrade 36_j SG03 10.07 CompleteStone/Glenn Intersection Improvement
Tucson Old Vail/Valencia Signal 36_k 11.07 CompleteOld Vail/Valencia Intersection Improvement
Tucson Rita/Old Vail Traffic Signal 36_l 12.07 CompleteRita/Old Vail Intersection Improvement
South Tucson South Tucson Intersections 36 m 13 07 CompleteSouth Tucson South Tucson Intersections 36_m 13.07 CompleteSouth Tucson Intersection #1: 29th St / 10th Ave Intersection ImprovementSouth Tucson Intersection #2: 29th St / 4th ave Intersection ImprovementSouth Tucson Intersection #3: 29th St / 6th Ave Intersection ImprovementSouth Tucson Intersection #4: 36th St / 4th Ave Intersection ImprovementSouth Tucson Intersection #5: 36th St / 6th Ave Intersection ImprovementSouth Tucson Intersection #6: 39th St / 6th Ave Intersection Improvement
Sahuarita Alpha Ave/Duval Mine Intersection 36_n 14.07 CompleteAlpha Ave./Duval Mine Intersection Improvement
Sahuarita Duval Mine/La Canada Intersection 36_o 15.07 CompleteDuval Mine/La Canada Intersection Improvement
Oro Valley Lambert Ln/La Cholla Intersection 36_p 16.07 CompleteLambert Lane/La Cholla Intersection Improvement
Pima County La Cholla/Overton Intersection 36_q 17.07 CompleteLa Cholla/Overton Intersection Improvement
Pima County Benson Hwy/Valencia Intersection 36_r 18.07 CompleteValencia/Benson Hwy Intersection Improvement
Pima County Valencia/Wilmot Intersection 36_s 19.07 CompleteValencia/Wilmot Intersection Improvement
Pima CountyTanque Verde/Soldier Trail Intersection
36_t 20.07 Complete
Tanque Verde/Soldier Trail Intersection ImprovementPima County Ina Rd / Wade Rd Intersection 36_u 21.07 Complete
Ina + Wade Intersection ImprovementMarana Silverbell/Ina Intersection 36_v 22.07 Complete
Silverbell/Ina Intersection ImprovementTohono O'odham Mission/Valencia Intersection 36_w 23.07 Dropped
Mission/Valencia Intersection Improvement
Pima CountyHoughton Rd./Sahuarita Rd. I t ti
36_x 38.07 CompleteyIntersection
_ p
Houghton/Sahuarita Intersection Improvement
Oro ValleyGlover/La Cholla Safety Improvement & School Crossing
36_y 157.07 Complete
Glover/La Cholla Intersection Improvement
RTAKolb and Valencia intersection reconstruction
36_z 158.07 In Design
Valencia/Kolb Intersection Improvement
MaranaSilverbell/Coachline Intersection Improvements
36aa 159.07 Complete
Silverbell/Coachline Intersection Improvement
TucsonCamino Seco/Wrightstown Intersection Improvements
36ab 45.08 Complete
Camino Seco/Wrightstown Intersection Improvement
Pima CountyFlowing Wells Rd. and Wetmore Intersection Improvements
36ac 6.08 Complete
9/19/2016 2:36:28 PM 1 7 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Flowing Wells + Wetmore Intersection Improvement
SahuaritaPima Mine Rd./Rancho Sahuarita Blvd. Traffic Signal
36ad 92.08 Complete
Pima Mine Rd./Rancho Sahuarita Blvd. Traffic Signal Intersection ImprovementTucson Oracle and Auto Mall Design 36ae 59.08 Dropped
Oracle and Auto Mall Design Intersection Improvement
Pima CountyAlvernon Way and Valencia Rd. Intersection Improvements
36af 4RTAWV 8.08 Complete
Valencia/Alvernon Way Intersection ImprovementValencia Rd./Alvernon Bus Pull‐out Bus Pullout
Tucson Grant and Rosemont Design and Build 36ag 56.08 Dropped
Grant and Rosemont Design and Build Intersection Improvement
Pima CountyCampbell Ave./Skyline shoulder widening, left turn bay
36ah 4RTCAS 10.08 Complete
Campbell/Skyline Intersection Improvement
Pima CountyPalo Verde Rd. and Michigan St./Coach Dr.
36ai 15.08 Complete
Palo Verde/Michigan & Coach Intersection ImprovementTucson Detection cameras 36aj 57.08 Complete
Detection Cameras, Intersection #01: 22nd St / Harrison Rd Intersection ImprovementDetection Cameras, Intersection #02: 22nd / Kolb Intersection ImprovementDetection Cameras, Intersection #03: 22nd / Park Ave Intersection ImprovementDetection Cameras, Intersection #04: 22nd / Wilmot Rd Intersection ImprovementDetection Cameras, Intersection #05: Ajo Way / 12th Ave Intersection ImprovementDetection Cameras, Intersection #06: Ajo Way / 6th Ave Intersection ImprovementDetection Cameras, Intersection #07: Ajo Way / Park Ave Intersection ImprovementDetection Cameras, Intersection #08: Broadway Blvd / Chantilly Dr Intersection ImprovementDetection Cameras, Intersection #09: Broadway Blvd / Craycroft Rd Intersection ImprovementDetection Cameras, Intersection #10: Broadway Blvd / Kolb Rd Intersection ImprovementDetection Cameras, Intersection #11: Broadway Blvd / Wilmot Intersection ImprovementDetection Cameras, Intersection #12: Campbell Ave / River Rd Intersection ImprovementDetection Cameras, Intersection #13: Fort Lowell / Stone Ave Intersection ImprovementDetection Cameras, Intersection #14: Golf Links / Harrison Intersection ImprovementDetection Cameras, Intersection #15: Golf Links / Pantano Rd Intersection ImprovementDetection Cameras, Intersection #16: Grant Rd / 1st Ave Intersection ImprovementDetection Cameras, Intersection #17: Grant Rd / Campbell Ave Intersection ImprovementDetection Cameras, Intersection #18: Grant Rd / Rosemont Blvd Intersection ImprovementDetection Cameras, Intersection #19: Irvington Rd / Midvale Park Rd Intersection ImprovementD t ti C I t ti #20 K lb Rd / S d Bld I t ti I tDetection Cameras, Intersection #20: Kolb Rd / Speedway Bld Intersection ImprovementDetection Cameras, Intersection #21: Prince Rd / Mountain Ave Intersection ImprovementDetection Cameras, Intersection #22: Rita Rd / Houghton Rd Intersection ImprovementDetection Cameras, Intersection #23: River Rd / 1st Ave Intersection ImprovementDetection Cameras, Intersection #24: Speedway Blvd / Alvernon Way Intersection ImprovementDetection Cameras, Intersection #25: Speedway Blvd / Campbell Intersection ImprovementDetection Cameras, Intersection #26: Speedway Blvd / Cherry Ave Intersection ImprovementDetection Cameras, Intersection #27: Speedway Blvd / Euclid Ave Intersection ImprovementDetection Cameras, Intersection #28: Speedway Blvd / Mountain Ave Intersection ImprovementDetection Cameras, Intersection #29: Speedway Blvd / Park Ave Intersection ImprovementDetection Cameras, Intersection #30: Speedway Blvd / Tucson Blvd Intersection ImprovementDetection Cameras, Intersection #31: Speedway Blvd / Wilmot Rd Intersection ImprovementDetection Cameras, Intersection #32: Swan Rd / Camp Lowell Dr Intersection ImprovementDetection Cameras, Intersection #33: Tanque Verde / Sabino Canyon Intersection ImprovementDetection Cameras, Intersection #34: Valencia Rd / 12th Ave Intersection Improvement
36ak Detection Cameras, Intersection #35: Valencia Rd / Nexus Dr Intersection Improvement
9/19/2016 2:36:28 PM 1 8 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Detection Cameras, Intersection #36: Wilmot Rd / Park Place Dr. Intersection Improvement
Pima CountyLa Cholla Blvd./River Rd. Intersection Improvements
36ak 20.08 Complete
La Cholla + River Intersection ImprovementLa Cholla + River: Bus Pull‐out Bus Pullout
TucsonTanque Verde and Pima Intersection Improvements
36al 47.08 Complete
Tanque Verde/Pima Intersection Improvement
Pima CountyCamino Verde and Valencia Rd. Intersection Improvements
36am 4.08 Complete
Camino Verde/Valencia Intersection ImprovementCamino Verde/Valencia Intersection ImprovementTucson Wilmot and Nicaragua Traffic Signal 36an 46.08 Dropped
Wilmot/Nicaragua (design only) Intersection Improvement
Pima CountyMona Lisa Rd. at Orange Grove Intersection Improvements
36ao 11.08 Complete
Mona Lisa + Orange Grove Intersection Improvement
Pima CountyIna Rd. and Oracle Rd. Intersection Improvement
36ap 4RTIRO 19.08 Complete
Ina + Oracle Intersection ImprovementPima County Alvernon/Los Reales Traffic Signal 36aq 152.08 Complete
Alvernon/Los Reales Intersection Improvement
Pima CountyContinental Rd and Camino del Sol Traffic Circle
36ar 16.08 Complete
Continental/Camino del Sol Intersection Improvement
Tucson6th St/Highland Intersection
36at SN06 163 08 CompleteTucsonImprovements
36at SN06 163.08 Complete
6th/Highland Intersection Improvement
MaranaTangerine and Thornydale Intersection Improvement
36au ST 171.08 Complete
Tangerine + Thornydale Intersection ImprovementTucson Prince Rd / Runway Dr Traffic Signal 36av 31.09 Transferred
Prince/Runway Dr Traffic Signal Intersection ImprovementMarana Cortaro Rd. Widening and Striping 36aw 32.09 Complete
Silverbell/Cortaro Intersection Improvement
Sahuarita Old Nogales Highway & Nogales Hwy 36ax 19.05 Complete
Old Nogales Highway & Nogales Hwy Intersection Improvement
RTARegional Intersection MUTCD Compliance Program
36ay 99.09 Not Started
R i l I i MUTCD C li P I t ti I tRegional Intersection MUTCD Compliance Program Intersection Improvement
Pima CountyNogales/Old Nogales Intersection Improvement
36az 4OTNHS 100.09 Complete
Nogales/Old Nogales Intersection Improvement Intersection Improvement
TucsonGolf Links/Kolb Rd. Intersection Improvement
36ba 4.01 Complete
Golf Links/Kolb Rd. Intersection Improvement Intersection ImprovementGolf Links/Kolb Rd. Intersection Bus Pullout #1 Bus PulloutGolf Links/Kolb Rd. Intersection Bus Pullout #2 Bus PulloutGolf Links/Kolb Rd. Intersection Bus Pullout #3 Bus Pullout
Pima CountyKolb Rd.: Ventana Canyon and Mt. Shadows
36bb 101.09 Complete
Kolb Rd.: Ventana Canyon and Mt. Shadows Intersection Improvement
Pima CountyCardinal/Valencia Road Intersection Improvements
36bc 4RTVLS 102.09 Complete
Cardinal/Valencia Road Intersection Improvements Intersection Improvement
9/19/2016 2:36:28 PM 1 9 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Tucson Rita Rd: I‐10 to UPRR 36bd SR9A 71.09 CompleteRita Rd: I‐10 to UPRR Intersection ImprovementRita Rd: I‐10 to UPRR ‐ Rail Improvement Railroad SafetyRita Rd: I‐10 to UPRR Sidewalk Sidewalk
Tucson Harrison/Irvington Signalization 36be 104.09 CompleteHarrison/Irvington Signalization Intersection Improvement
ADOTI‐10 Interchange Signals Connection into ITOC System
36bf 105.09 Transferred
I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #1 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #2 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #3 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #3 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #4 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #5 Intersection Improvement
ADOT Ajo Signal Interconnect 36bg 106.09 TransferredAjo Signal Interconnect Intersection Improvement
ADOT Regional Traffic Signal Data to ITOC 36bh 107.09 TransferredRegional Traffic Signal Data to ITOC Intersection Improvement
Oro Valley Count Down Pedestrian Heads 36bi 109.09 CompletePedestrian Countdown Head: N. First Ave / Palisades Intersection ImprovementPedestrian Countdown Head: La Canada / W Naranja Dr Intersection ImprovementPedestrian Countdown Head: La Canada W Lambert Intersection ImprovementPedestrian Countdown Head: La Cholla Blvd / Glover Rd Intersection ImprovementPedestrian Countdown Head: La Cholla Blvd + Tangerine Intersection ImprovementPedestrian Countdown Head: First Ave / Lambert Intersection ImprovementPedestrian Countdown Head: First Ave / E Naranja Intersection ImprovementPedestrian Countdown Head: La Cholla Dr. / W Lambert Intersection ImprovementPedestrian Countdown Head: Northern / Magee Intersection ImprovementPedestrian Countdown Head: Innovation Park / Rancho Vistoso Intersection ImprovementPedestrian Countdown Head: First Ave + Tangerine Intersection ImprovementPedestrian Countdown Head: Innovation Park + Tangerine Intersection ImprovementPedestrian Countdown Head: La Cholla Blvd / W Naranja Dr Intersection ImprovementPedestrian Countdown Head: First Ave Intersection ImprovementPedestrian Countdown Head: La Canada + Tangerine Intersection Improvement
Tucson Speedway/6th Avenue Signal Upgrade 36bj SG10 110.09 Complete
Speedway/6th Avenue Signal Upgrade Intersection ImprovementTucson Left Turn Phasing Installations 36bk 112.09 Complete
Valencia + Rita Rd. Intersection ImprovementSpeedway + Park Ave Intersection ImprovementS d M t i Intersection ImprovementSpeedway + Mountain Intersection ImprovementSpeedway + Cherry Intersection Improvement
Tucson2009 City of Tucson Intersection Improvements
36bl SN09 13.09 Complete
Wilmot / Nicaragua Dr Intersection ImprovementSt. Mary's + Silverbell Intersection Improvement Intersection ImprovementTanque Verde / Pima Street Intersection ImprovementOracle + Auto Mall Intersection ImprovementGrant/Rosemont Intersection Improvement
SahuaritaPima Mine Rd./Nogales Highway Traffic Signal
36bm 73.09 Complete
#N/A Complete 40_t 40_t 91.08 Transferred Pima Mine Rd/Nogales Hwy Traffic Signal Intersection Improvement
Pima Mine Rd./Nogales Highway Traffic Signal Signal Technology Upgrades
TucsonStone Avenue Gateway: Speedway to Drachman
36bn 30 Under Construction
9/19/2016 2:36:28 PM 1 10 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Stone Avenue Gateway: Speedway to Drachman Intersection ImprovementBus Pull‐out Stone Speedway NB Bus PulloutBus Pull‐out Stone Drachman SB Bus PulloutBikelane Bikeway
Pima County Colossal Cave Rd UPRR Success Drive 36bo 4rtccs 94.12 Under Construction
Colossal Cave Rd UPRR Success Drive Intersection Improvement
SahuaritaLa Villita/Rancho Sahuarita Intersection
36bp 97.12 Complete
La Villita/Rancho Sahuarita Intersection Intersection ImprovementTucson Kolb/UA Tech Park Signal 36bq SG12 95 12 CompleteTucson Kolb/UA Tech Park Signal 36bq SG12 95.12 Complete
Kolb/UA Tech Park Signal Intersection Improvement
Oro ValleyRancho Vistoso Blvd at Vistoso Highlands Signal
36br 96.12 Complete
Rancho Vistoso Blvd at Vistoso Highlands Signal Intersection Improvement
MaranaIna and Thornydale: EB/WB right turn lane widening
36bs ST043 93.12 Complete
Ina Rd. + Thornydale: EB/WB right turn lane widening Intersection Improvement
Pima CountyOrange Grove Rd./Silverbell Rd. Intersection
36bt 18.08 Dropped
Orange Grove Rd./Silverbell Rd. Intersection Intersection Improvement
RTAElderly and Pedestrian Safety Improvements
37__ 63.06 Dropped
Various Pedestrian Crossings Pedestrian CrossingTucson Euclid/2nd St HAWK 37_a 24.07 Dropped
HAWK ‐ 6th Avenue/14th Street (formerly Euclid/2nd.) HAWK
TucsonHAWK ‐ Stone / Cushing (formerly at Euclid / 5th), TIP 25.07
37_b 156.07 Complete
HAWK ‐ Stone/Cushing (formerlyEuclid/5th. TIP 25.07) HAWKTucson Santa Clara/Drexel HAWK 37_c 26.07 Complete
HAWK ‐ Santa Clara/Drexel HAWK
Pima CountyFennimore Ave / Tanque Verde Rd HAWK
37_d 27.07 Complete
HAWK ‐ Camino Fennimore/Tanque Verde HAWK
Pima CountyCamino La Zorrela/Orange Grove HAWK
37_e 28.07 Complete
HAWK ‐ Camino La Zorella/Orange Grove HAWKPascua Yaqui Hohokam HAWK 37_f 29.07 Complete
HAWK ‐ Hohokam HAWKS X i Eld l /P d S f
Tohono O'odhamSan Xavier Elderly/Ped Safety Improvements
37_g 30.07 Complete
San Xavier Elderly/Pedestrian Master Plan SidewalkTucson HAWK Broadway / Sarnoff Dr. 37_h 63.07 Complete
HAWK ‐ Broadway / Sarnoff Dr HAWKTucson HAWK Euclid / Lester 37_i 64.07 Complete
HAWK‐ Euclid / Lester HAWK
Pima County Agua Caliente ‐ Safe Routes to School 37_j 4SRSAC 162.07 Complete
Agua Caliente Safe Routes to School:Limberlost Rd.: Melpomene Way to Agua Caliente School SidewalkAgua Caliente Safe Routes to School:Melpomene Way:Fort Lowell Rd. to Catalina Hwy SidewalkAgua Caliente Safe Routes to School:Melpomene Way:Limberlost Rd. to Camino Miramonte Sidewalk
Tucson ADA Improvements: Various Locations 37_k 163.07 Complete
ADA Improvements: Sub‐Project #01 ‐ 12th Ave / Michigan Dr ADAADA Improvements: Sub‐Project #02 ‐ 12th Ave: 38th St to 44th St ADA
9/19/2016 2:36:28 PM 1 11 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
ADA Improvements: Sub‐Project #03 ‐ 5th St / Alvernon Way ADAADA Improvements: Sub‐Project #04 ‐ 6th Ave: I‐10 to 19th St ADAADA Improvements: Sub‐Project #05 ‐ 6th Ave: President St to Michigan Dr ADAADA Improvements: Sub‐Project #06 ‐ 6th St / Stone Ave ADAADA Improvements: Sub‐Project #07 ‐ Broadway Blvd: Kolb Rd to Pantano Rd ADAADA Improvements: Sub‐Project #08 ‐ Broadway Blvd: Park Ave to Campbell Ave ADAADA Improvements: Sub‐Project #09 ‐ Broadway: Campbell Ave to Craycroft Rd ADAADA Improvements: Sub‐Project #10 ‐ Campbell: Grant Rd to Elm St ADAADA Improvements: Sub‐Project #11 ‐ Escalante Rd: Kolb Rd to Pantano Rd ADAADA Improvements: Sub‐Project #12 ‐ Euclid Ave: Speedway Blvd to Broadway Blvd ADAADA Improvements: Sub‐Project #13 ‐ Fort Lowell Rd / Fontana Ave ADAADA Improvements: Sub‐Project #13 ‐ Fort Lowell Rd / Fontana Ave ADAADA Improvements: Sub‐Project #14 ‐ Glenn St: Swan Rd to Craycroft Rd ADAADA Improvements: Sub‐Project #15 ‐ Golf Links Rd: Pantano Rd to Bonanza Ave ADAADA Improvements: Sub‐Project #16 ‐ Grant Rd: Country Club Rd to Alvernon Way ADAADA Improvements: Sub‐Project #17 ‐ Grant Rd: Country Club Rd to Columbus Blvd ADAADA Improvements: Sub‐Project #18 ‐ Harrison Rd: Old Spanish Tr to Golf Links Rd ADAADA Improvements: Sub‐Project #19 ‐ Kino Pkwy: Aviation Pkwy to Benson Hwy ADAADA Improvements: Sub‐Project #20 ‐ Mountain Ave: Grant Rd to Fort Lowell Rd ADAADA Improvements: Sub‐Project #21 ‐ Palo Verde Rd: Glenn St to Grant Rd ADAADA Improvements: Sub‐Project #22 ‐ Pantano Rd: Escalante Rd to Golf Links Rd ADAADA Improvements: Sub‐Project #23 ‐ Pantano Rd: Escalante Rd to Irvington Rd ADAADA Improvements: Sub‐Project #24 ‐ Pantano Rd: Speedway Blvd to Wrightstown Rd ADAADA Improvements: Sub‐Project #25 ‐ Park Ave: Irvington Rd to Valencia Rd ADAADA Improvements: Sub‐Project #26 ‐ Pima St: Craycroft Rd to Wilmot Rd ADAADA Improvements: Sub‐Project #27 ‐ Pima St: Swan Rd to Craycroft Rd ADAADA Improvements: Sub‐Project #28 ‐ Silverbell Rd: Speedway Blvd to St Mary's Rd ADAADA Improvements: Sub‐Project #29 ‐ Speedway Blvd: Rosemont Blvd to Kolb Rd ADAADA Improvements: Sub‐Project #30 ‐ St. Mary's: I‐10 to Silverbell Rd ADAADA Improvements: Sub‐Project #31 ‐ Stella Rd: Kolb Rd to Pantano Rd ADAADA Improvements: Sub‐Project #32 ‐ Swan Rd: Rillito River to 22nd St ADAADA Improvements: Sub‐Project #33 ‐ Tucson Blvd: Irvington Rd to Valencia Rd ADAADA Improvements: Sub‐Project #34 ‐ Wetmore Rd: Oracle Rd to 1st Ave ADAADA Improvements: Sub‐Project #35 ‐ Wilmot Rd: Broadway Blvd to Golf Links Rd ADAADA Improvements: Sub‐Project #36 ‐ 1st Ave & Ft Lowell Rd ADAADA Improvements: Sub‐Project #37 ‐ 5th St & Craycroft Rd ADAADA Improvements: Sub‐Project #38 ‐ 6th St & 3rd Ave ADAADA Improvements: Sub‐Project #39 ‐ 12th Ave and Nebraska St ADAADA Improvements: Sub‐Project #40 ‐ 22nd St & Craycroft Rd ADAADA Improvements: Sub‐Project #41 ‐ Ajo Way & Park Ave ADAADA I t S b P j t #42 Al W & 22 d St ADAADA Improvements: Sub‐Project #42 ‐ Alvernon Way & 22nd St ADAADA Improvements: Sub‐Project #43 ‐ Alvernon Way & Broadway Blvd ADAADA Improvements: Sub‐Project #44 ‐ Alvernon Way & Fort Lowell ADAADA Improvements: Sub‐Project #45 ‐ Alvernon Way and Hayne Street ADAADA Improvements: Sub‐Project #46 ‐ Broadway Blvd & Camino Seco ADAADA Improvements: Sub‐Project #47 ‐ Broadway Blvd & Swan Rd (SE) ADAADA Improvements: Sub‐Project #48 ‐ Broadway Blvd & Swan Rd (NW) ADAADA Improvements: Sub‐Project #49 ‐ Campbell Ave & Speedway Blvd ADAADA Improvements: Sub‐Project #50 ‐ Craycroft & Speedway ADAADA Improvements: Sub‐Project #51 ‐ Ft Lowell Rd & 1st Ave ADAADA Improvements: Sub‐Project #52 ‐ Grant Rd & Alvernon Way ADAADA Improvements: Sub‐Project #53 ‐ Pantano Rd and Speedway ADAADA Improvements: Sub‐Project #54 ‐ Prince Rd & Campbell Ave ADAADA Improvements: Sub‐Project #55 ‐ Prince Rd & Oracle Rd (NW) ADAADA Improvements: Sub‐Project #56 ‐ Prince Rd & Oracle Rd (SE) ADAADA Improvements: Sub‐Project #57 ‐ Prince Rd & 1st Ave ADA
9/19/2016 2:36:28 PM 1 12 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
ADA Improvements: Sub‐Project #58 ‐ Prince Rd & Stone Rd (SE) ADAADA Improvements: Sub‐Project #59 ‐ Prince Rd & Stone Rd (SW) ADAADA Improvements: Sub‐Project #60 ‐ Speedway Blvd & 6th Ave ADAADA Improvements: Sub‐Project #61 ‐ Speedway Blvd & Craycroft ADAADA Improvements: Sub‐Project #62 ‐ Speedway Blvd & Euclid Ave ADAADA Improvements: Sub‐Project #63 ‐ Speedway Blvd & Rook Ave ADAADA Improvements: Sub‐Project #64 ‐ Speedway Blvd: Stone ‐ Euclid ADAADA Improvements: Sub‐Project #65 ‐ St Mary's Rd & I‐10 ADAADA Improvements: Sub‐Project #66 ‐ St Mary's Rd at Furr's Cafeteria (SW Bonita Ave) ADAADA Improvements: Sub‐Project #67 ‐ Stone Ave & Blacklidge Dr ADA
37 m ADA Improvements: Sub‐Project #68 ‐ Speedway Blvd: Stone Ave ADA37_m ADA Improvements: Sub‐Project #68 ‐ Speedway Blvd: Stone Ave ADAADA Improvements: Sub‐Project #69 ‐ Speedway Wilmot ADA
Tucson Sam Hughes Elementary SRTS 37_m 21.08 CompleteSam Hughes Elementary SRTS: Sub‐Project #1 ‐ 3rd St: Country Club Rd ‐ Campbell Ave SidewalkSam Hughes Elementary SRTS: Sub‐Project #2 ‐ 4th St: Country Club Rd ‐ Campbell Ave SidewalkSam Hughes Elementary SRTS: Sub‐Project #3 ‐ Norton Ave: 1st St ‐ 6th St SidewalkSam Hughes Elementary SRTS: Sub‐Project #4 ‐ Wilson Ave: 1st St ‐ 6th St Sidewalk
Tucson 17th/Swan HAWK 37_n 117.08 Dropped17th/Swan HAWK HAWK
Pima County West Curtis Rd at N. Shannon 37_o 4RTHCS 13.08 CompleteHAWK ‐ Curtis + Shannon HAWK
Pima CountyValencia Rd Street Lighting and Sidewalk
37_p 4RTVLS 2.08 Complete
Valencia Street Lighting / Sidewalk Camino De La Tierra to Cardinal Sidewalk+LightingValencia Street Lighting / Sidewalk Westover to Cardinal Sidewalk+Lighting
SahuaritaGreat Expectations School Flasher Assembly
37_q 89.08 Complete
Great Expectations School Flasher Pedestrian CrossingTucson Wrightstown/Fountain Park HAWK 37_r 118.08 Dropped
Wrightstown/Fountain Park HAWK HAWK
South TucsonHAWK 31st St. and 6th Ave. Pedestrian Crossing
37_s 63.08 Complete
HAWK ‐ 6th/31st HAWK
South TucsonHAWK 34th St. and 6th Ave. Pedestrian Crossing
37_t 64.08 Complete
HAWK ‐ 6th/34th HAWKTucson Euclid Ave / 9th Ave HAWK 37_u 32.08 Dropped
Euclid/9th Ave HAWK HAWK
Pascua YaquiHealth Center to Senior Center Sid lk P j t
37 v 150.08 CompleteqSidewalk Project
_ p
37_w Health Center to Senior Center Sidewalk ‐ Camino Benem: Calle Torim to Senior Center SidewalkHealth Center to Senior Center Sidewalk ‐ PYT Health Center to Senior Center Sidewalk
Oro ValleyLa Cholla Pedestrian Improvements (SRTS)
37_w 151.08 Transferred
La Cholla School Walking Path Pathway
Pima CountyHomer Davis School Bike/Ped Enhancement
37_x 4HDBPE 30.06 Complete
Homer Davis Safe Routes to School SidewalkTucson Pedestrian HAWK Crossings 37_y SH08 155.08 Complete
HAWK ‐ 12th/Alvord HAWKHAWK ‐ 3rd/Swan HAWKHAWK ‐ Camino Seco/Kenyon HAWKHAWK ‐ Country Club/Silver HAWKHAWK ‐ Drexel/Del Moral HAWKHAWK ‐ Drexel/Liberty HAWK
9/19/2016 2:36:28 PM 1 13 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
HAWK ‐ Escalante/Prudence HAWKHAWK ‐ Esmond/Rita (Desert Sky 1) HAWKHAWK ‐ Euclid/9th HAWKHAWK ‐ Flower/Alvernon HAWKHAWK ‐ Grande/St. Clair HAWKHAWK ‐ La Paloma Academy PELICAN ; Golf Links / E. Lakeside Pkwy HAWKHAWK ‐ North Sahuara Ave/East Pima Street HAWKHAWK ‐ Old Spanish Trail/29th HAWKHAWK ‐ Old Spanish Trail/Kenyon HAWKHAWK ‐ Rita/Via Del Tiembre HAWKHAWK ‐ Starr Pass/Santa Cruz HAWKHAWK ‐ Starr Pass/Santa Cruz HAWKHAWK ‐ Swan/17th HAWKHAWK ‐ Wilson/6th HAWKHAWK ‐ Wrightstown/Fountain Park HAWK
Tucson 2nd Ave/Speedway Pedestrian Refuge 37_z 162.08 Complete
2nd/Speedway Pedestrian Refuge Pedestrian Refuge
Pima CountyFruchthendler Elementary School Walking Paths
37aa 37.07 Complete
Fruchtendler School Walking Paths Sidewalk
Pima CountyPicture Rocks & Desert Winds Safe Routes to School
37ab 4PRDWE 71.07 Complete
Picture Rocks Safe Routes to Schools: Rudasill Rd: Avra Rd to Chaparral Rd Sidewalk37ac Picture Rocks Safe Routes to Schools: Rudasill Rd: Chaparral Rd to Sanders Rd Sidewalk
Picture Rocks Safe Routes to Schools: Sanders Rd: Rudasill Rd to Sunset Dr Sidewalk
Tucson HAWK beacon at 6th Ave and 14th St. 37ac 155.07 Complete
HAWK beacon at 6th Ave and 14th St. HAWKPima County Camino de Oeste Sidewalk 37ad 5.1 Transferred
Camino de Oeste Sidewalk Sidewalk
Pima CountyContinental School Safe Routes to School
37ae 4CEMSR 31.06 Complete
37af Shared Use Path ‐ White House Canyon Rd. Madera Reserve Rd PathwayBikelines ‐ Whitehouse Canyon Rd. Continental Rd Bikeway
Tucson 18th St / Main Ave Pedestrian Refuge 37af 7.1 Complete
Main/18th Pedestrian Refuge Pedestrian Refuge
Pima CountyManzanita Elementary Safe Routes to School
37ag 8.1 Complete
M i El S f R S h l S f R t t S h lManzanita Elementary Safe Routes to School Safe Routes to SchoolPima County Camino del Sol Pedestrian Ramps 37ah 9.1 Transferred
Camino del Sol Pedestrian Ramps RampsTucson Broadway/Old Spanish Trail Pelican 37ai 10.1 Complete
Broadway/Old Spanish Trail Pelican Signal PelicanTucson Oaktree/Drexel Pedestrian Refuge 37aj 11.1 Complete
Oaktree/Drexel Pedestrian Refuge Pedestrian RefugeTucson School HAWK Signals ‐ Package I 37ak SH19 12.1 Complete
School HAWK Signals Package I: 22nd Street / Magnolia HAWKSchool HAWK Signals Package I: Stone Ave / King HAWKSchool HAWK Signals Package I: Park Ave / 33rd St HAWK
37al School HAWK Signals Package I: Campbell Ave / Bantam HAWKSchool HAWK Signals Package I: La Cholla Blvd / Merlin HAWK
Tucson Speedway/10th HAWK 37al 13.1 CompleteSpeedway/10th HAWK HAWK
9/19/2016 2:36:28 PM 1 14 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Tucson22nd St/Lakeshore HAWK and La Cholla/Ocelot HAWK
37am 14.1 Complete
37an 22nd St/Lakeshore HAWK HAWKLa Cholla/Ocelot HAWK HAWK
Tucson Speedway/Arcadia HAWK 37an 15.1 CompleteSpeedway/Arcadia HAWK HAWK
South Tucson 26th St and 10th Ave HAWK 37ao 16.1 In Design26th and 10th HAWK HAWK
South Tucson ADA Upgrades 37ap 17.1 Not StartedADA Upgrades ADA
Sidewalk and Safe Routes to SchoolPima County
Sidewalk and Safe Routes to School Package 2
37aq 12.11 Complete
Sidewalk and SRTS Package 2: Laguna Elementary SRTS‐ Shannon Rd: Curtis to Diamond SidewalkSidewalk and SRTS Package 2: Camino Del Sol, Placita de la Cotonia to Canoa Rd SidewalkSidewalk and SRTS Package 2: Centennial/Flowing Wells Jr H. (Wetmore:La Cholla‐Romero Sidewalk
37ar Camino De Oeste: Valencia to Tetakusim Rd. Sidewalk and SRTS SidewalkSidewalk and SRTS Package 2: Manzanita Elem. SRTS; La Encantada to Manzanita (Design) Sidewalk
South Tucson4th Avenue Street Lighting Improvements ‐ City of South Tuc.
37ar 6.12 Complete
4th Avenue Street Lighting Improvements ‐ City of South Tuc. Street Lighting
Tohono O'odhamSan Xavier: Little Nogales Mission Gateway Path
37as 91.09 In Design
San Xavier: Little Nogales Mission Gateway Path PathwayTucson 22nd/Avenida Sirio HAWK 37at SH26 68.12 Complete
22nd/Avenida Sirio HAWK HAWKTucson Campbell/Ninth HAWK 37au SH27 65.12 Under Construction
Campbell/Ninth HAWK HAWKTucson Craycroft/Ft. Lowell Park HAWK 37av SH28 66.12 Under Construction
Craycroft/Ft. Lowell Park HAWK HAWKTucson Grant/Sahuara Bike HAWK 37aw SH29 67.12 Under Construction
Grant/North Sahuara Ave Bike HAWK HAWKPima County Palo Verde HAWKs 37ax 4RTPAM 71.12 Complete
Palo Verde @ Alvord HAWKPalo Verde @ Milton HAWK
Pima County Summerhaven Sidewalk 37ay 4SUMSW 70.12 CompleteSummerhaven Sidewalk Sidewalk
Tucson La Cholla / Ocelot HAWK 37az 23.12 TransferredLa Cholla / Ocelot HAWK HAWK
Tucson Desert Sky 1 HAWK 37ba 34.08 DroppedD t Sk 1 HAWK HAWKDesert Sky 1 HAWK HAWK
Pima County Mary Ann Cleveland at Kush HAWK 37bb 4TAMAC 87.12 Under ConstructionMary Ann Cleveland at Kush HAWK HAWK
Pima CountyLaguna Elementary School Pedestrian Enhancement Project
37bc 4LEMSI 40.05 Transferred
Laguna Elementary School Pedestrian Enhancement Project. Shannon Rd. adjacent to Flowing Wells District Park Pedestrian EnhancementTucson Nogales and Olive HAWK Crossing 37be 27.15 Complete
HAWK
Pima County Bus Pullout Projects, Valencia Corridor 38_a 151.07 Complete
Bus Pullouts, Valencia Corridor: 01 Valencia Rd + Caballo Rd EB Bus PulloutBus Pullouts, Valencia Corridor: 02 Valencia Rd + Caballo Rd WB Bus PulloutBus Pullouts, Valencia Corridor: 03 Valencia Rd + Camino de la Tierra EB Bus PulloutBus Pullouts, Valencia Corridor: 04 Valencia Rd + Camino de la Tierra WB Bus PulloutBus Pullouts, Valencia Corridor: 05 Valencia Rd + Camino de Oeste EB Bus PulloutBus Pullouts, Valencia Corridor: 06 Valencia Rd + Camino de Oeste WB Bus Pullout
9/19/2016 2:36:28 PM 1 15 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Bus Pullouts, Valencia Corridor: 07 Valencia Rd + Mark Rd EB Bus PulloutBus Pullouts, Valencia Corridor: 08 Valencia Rd + Mark Rd WB Bus PulloutBus Pullouts, Valencia Corridor: 09 Valencia Rd + Sorrell Ln EB Bus PulloutBus Pullouts, Valencia Corridor: 10 Valencia Rd + Sorrell Ln WB Bus Pullout
Tucson Bus Pullout Projects, Package 1 38_b 152.07 CompleteTucson Bus Pullout Pkg 01: 01 Broadway Blvd + Alvernon Way Bus PulloutTucson Bus Pullout Pkg 01: 02 Country Club Rd + Kleindale Rd NB Bus PulloutTucson Bus Pullout Pkg 01: 03 Country Club Rd + Kleindale Rd SB Bus PulloutTucson Bus Pullout Pkg 01: 04 Glenn St + Oracle Rd NB Bus PulloutTucson Bus Pullout Pkg 01: 05 Grant Rd + Alvernon Way Bus PulloutTucson Bus Pullout Pkg 01: 06 Irvington Rd + Campbell Ave Bus PulloutTucson Bus Pullout Pkg 01: 06 Irvington Rd + Campbell Ave Bus PulloutTucson Bus Pullout Pkg 01: 07 Irvington Rd + Campbell Ave Bus Pullout
Tucson Bus Pullout Projects, Package 2 38_c 153.07 CompleteTucson Bus Pullout Pkg 02: 01 Ajo Way + Park Ave Bus PulloutTucson Bus Pullout Pkg 02: 02 Grant Rd + Oracle Rd Bus PulloutTucson Bus Pullout Pkg 02: 03 Speedway Blvd + 6th Ave Bus PulloutTucson Bus Pullout Pkg 02: 04 Stone Ave + Yavapai Rd Bus Pullout
Tucson Bus Pullout Projects, Package 3 38_d 154.07 CompleteTucson Bus Pullout Pkg 03: 01 Broadway Blvd + Country Club Rd Bus PulloutTucson Bus Pullout Pkg 03: 02 Fort Lowell Rd + Dodge Blvd Bus PulloutTucson Bus Pullout Pkg 03: 03 Irvington Rd + Park Ave Bus PulloutTucson Bus Pullout Pkg 03: 04 Los Reales Rd + Nogales Hwy Bus Pullout
OWP‐TDOT ADA Accessible Bus Stop 38_e 76.08 CompleteADA Accessible Stop @Ina/Oracle Bus Pullout
Pima CountyPalo Verde Corridor Transit
38 f 4RTPVC 126 08 CompletePima CountyImprovements
38_f 4RTPVC 126.08 Complete
Palo Verde Corridor ‐ Palo Verde Rd. / Ajo Way NB Bus PulloutPalo Verde Corridor ‐ Palo Verde Rd. / Ajo Way SB Bus PulloutPalo Verde Corridor ‐ Palo Verde Rd. / Benson Hwy NB Bus Pullout
Tucson Bus Pullout Projects, Package 4 38_g 165.08 CompleteBus Pullouts Package 4: Subproject 1 ‐ Sixth St + Euclid Ave NB Bus PulloutBus Pullouts Package 4: Subproject 2 ‐ Sixth St + Highland Ave WB Bus PulloutBus Pullouts Package 4: Subproject 3 ‐ Sixth St + Campbell Ave WB Bus PulloutBus Pullouts Package 4: Subproject 4 ‐ Grant Rd + Silverbell Rd EB Bus Pullout
38_h Bus Pullouts Package 4: Subproject 5 ‐ Fifth St + Alvernon Way SB Bus PulloutBus Pullouts Package 4: Subproject 6 ‐ 22nd St + Country Club Rd SB Bus Pullout
Sahuarita Sahuarita Town Hall Park‐and‐Ride 38_h 97.08 CompleteSahuarita Park & Ride Transit Facility: Park & Ride
Tucson Bus Pullout Package 5 38_i 69.09 CompleteB P ll t P k 5 S b j t1 29th St / C ft Rd EB Bus PulloutBus Pullouts Package 5: Subproject1: 29th St / Craycroft Rd EB Bus PulloutBus Pullouts Package 5: Subproject2: Congress St WB / Avenida Del Convento WB (El Rio Neighborhood Health Ctr) Bus Pullout
38_j Bus Pullouts Package 5: Subproject3: Craycroft Rd / 29th St NB Bus PulloutBus Pullouts Package 5: Subproject4: Flowing Wells Rd / Roger Rd SB Bus Pullout
RTA Bus Pullout Packages #6 ‐ #15 38_j 79.09 Under ConstructionRTA Bus Pullout pkg 06: Alvernon Way / Ft Lowell Rd SB Bus PulloutRTA Bus Pullout Pkg 06: Alvernon Way / Glenn St NB Bus PulloutRTA Bus Pullout Pkg 06: Alvernon Way / Glenn St SB Bus PulloutRTA Bus Pullout pkg 06: Alvernon Way / Pima St NB Bus PulloutRTA Bus Pullout pkg 06: Alvernon Way / Pima St SB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Ft Lowell Rd NB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Ft Lowell Rd SB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Prince Rd SB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Roger Rd SB Bus PulloutRTA Bus Pullout pkg 07: Ft Lowell / 1st Ave EB Bus PulloutRTA Bus Pullout pkg 08: 22nd St / Country Club Rd WB Bus Pullout
9/19/2016 2:36:28 PM 1 16 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
RTA Bus Pullout pkg 08: 29th St / Columbus Blvd EB Bus PulloutRTA Bus Pullout pkg 08: St. Mary's Rd / Silverbell Rd EB Bus PulloutRTA Bus Pullout pkg 08: Wilmot Rd / Broadway Blvd SB Bus PulloutRTA Bus Pullout pkg 09: Alvernon Way / 22nd St SB Bus PulloutRTA Bus Pullout pkg 09: Alvernon Way / 29th St NB Bus PulloutRTA Bus Pullout pkg 09: Alvernon Way / 32nd St SB Bus PulloutRTA Bus Pullout pkg 10: Campbell Ave / Adams St SB Bus PulloutRTA Bus Pullout pkg 10: Campbell Ave / Prince Rd SB Bus PulloutRTA Bus Pullout pkg 10: Ft. Lowell Rd / Alvernon Way WB Bus PulloutRTA Bus Pullout Pkg 11: Oracle Rd + Glenn St SB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd EB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd EB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd NB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd SB Bus PulloutRTA Bus Pullout pkg 12: 12th Ave / Nebraska St NB Bus PulloutRTA Bus Pullout pkg 12: 12th Ave / Valencia Rd NB Bus PulloutRTA Bus Pullout pkg 12: 6th Ave / Veterans Blvd NB Bus PulloutRTA Bus Pullout pkg 12: Park Ave / Irvington Rd NB Bus PulloutRTA Bus Pullout pkg 12: Valencia Rd / San Fernando Rd EB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Euclid Ave EB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Swan Rd EB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Swan Rd WB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Wilmot Rd EB Bus PulloutRTA Bus Pullout pkg 13: Swan Rd / Speedway Blvd SB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 26th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 29th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 29th St SB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 36th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 39th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 39th St SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / C. Adobes Dr NB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / C. Adobes Dr SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Cresta Loma NB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Cresta Loma SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Las Lomitas NB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Las Lomitas SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Lavery Ln SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Rudasill Rd SB Bus PulloutRTA Bus Pullout pkg 13: Harrison / 22nd SB Bus Pullout
Marana Northern Marana Bus Stop 38_k 71.1 CompleteM Ci i C t P ll t #1 Ci i C t Bus PulloutMarana Civic Center Pull‐outs: #1 Civic Center Bus PulloutMarana Civic Center Pull‐outs: #2 Civic Center Bus PulloutMarana Civic Center Pull‐outs: #3 Grier Rd/Sandario Rd. Bus Pullout
RTA Bus Pullouts: Packages 16 ‐ 19 38_l 51.14 In DesignRTA Bus Pullout Packages #16 Project #01 Stone Ave./ Prince Rd. NB Bus PulloutRTA Bus Pullout Packages #16 Project #02 Bus PulloutRTA Bus Pullout Packages #16 Project #03 Bus PulloutRTA Bus Pullout Packages #16 Project #04 Bus PulloutRTA Bus Pullout Packages #16 Project #05 Bus PulloutRTA Bus Pullout Packages #16 Project #06 Bus PulloutRTA Bus Pullout Packages #16 Project #07 Bus PulloutRTA Bus Pullout Packages #17 Project #01 Bus PulloutRTA Bus Pullout Packages #17 Project #02 Bus PulloutRTA Bus Pullout Packages #17 Project #03 Bus PulloutRTA Bus Pullout Packages #17 Project #04 Bus PulloutRTA Bus Pullout Packages #17 Project #05 Bus Pullout
9/19/2016 2:36:28 PM 1 17 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
RTA Bus Pullout Packages #17 Project #06 Bus PulloutRTA Bus Pullout Packages #17 Project #07 Bus PulloutRTA Bus Pullout Packages #17 Project #08 Prince / First NB Bus PulloutRTA Bus Pullout Packages #18 Project #01 Bus PulloutRTA Bus Pullout Packages #18 Project #02 Bus PulloutRTA Bus Pullout Packages #18 Project #03 Bus PulloutRTA Bus Pullout Packages #18 Project #04 Bus PulloutRTA Bus Pullout Packages #18 Project #05 Bus PulloutRTA Bus Pullout Packages #18 Project #06 Speedway / Tucson Blvd WB Bus PulloutRTA Bus Pullout Packages #19 Project #01 Bus PulloutRTA Bus Pullout Packages #19 Project #02 Bus PulloutRTA Bus Pullout Packages #19 Project #02 Bus PulloutRTA Bus Pullout Packages #19 Project #03 Bus PulloutRTA Bus Pullout Packages #19 Project #04 Bus PulloutRTA Bus Pullout Packages #19 Project #05 Bus PulloutRTA Bus Pullout Packages #19 Project #06 Bus PulloutRTA Bus Pullout Packages #19 Project #07 Bus Pullout
Pima CountyMadera Canyon Rd. @Florida Canyon Wash (8302)
39_a SB406 01C 867 Dropped
Madera Canyon Rd @ Florida Canyon Wash Railroad Safety
Pima CountyMadera Canyon Rd. @Medium Wash (8301)
39_b SB405 01C 151 Dropped
Madera Canyon Rd @ Medium Wash Railroad SafetyTucson Downtown Rail Safety Project 39_c 44.08 Not Started
Downtown Rail Safety Project Study Railroad SafetySahuarita Pima Mine Rd. Bridge Replacement 39_d 87.08 Under Construction
Pima Mine Rd @ Santa Cruz River Bridge DeficiencyPima County Sabino Canyon Rd. Bridge 39_e 33.09 Complete
Sabino Canyon Rd Bridge ‐ Rehabilitation Bridge Deficiency
TucsonSpeedway Blvd.: RR Underpass Reconstruction
39_f S190 85.06 In Design
Speedway/Union Pacific Railroad Underpass Railroad SafetySahuarita La Canada ‐ El Toro Rd. Rail Crossing 39_g 34.09 Complete
La Canada ‐ El Toro Rd Rail Crossing Railroad SafetyTohono O'odham San Xavier Rd Pedestrian Bridge 39_h 35.09 Dropped
San Xavier Rd Pedestrian Bridge Bridge Deficiency
Pima CountyMarsh Station Road Bridge at Cienega Wash
39_i 113.09 Complete
Marsh Station Road Bridge at Cienega Wash Bridge Deficiency
Pima CountyColossal Cave Road UPRR Success Dr., R th ff UPRR i
39 j 4RTCCS 1.1 Under ConstructionyRuthrauff UPRR crossing
_j
39_k Colossal Cave Road UPRR Success Dr. Railroad SafetyRuthrauff UPRR Railroad Safety
Oro ValleyRancho Vistoso Blvd Big Wash Bridge Barrier walls
39_k 2.1 Complete
Rancho Vistoso Blvd Big Wash Bridge Barrier walls Bridge DeficiencyTucson UPRR Nogales Branch Rail Safety 39_l 3.1 Complete
UPRR Nogales Branch Rail Safety Railroad SafetyPima County Ruthrauff UPRR 39_m 4.1 Transferred
Ruthrauff UPRR Railroad SafetyPima County Golder Ranch Rd Bridge 39_n 72.1 Complete
Golder Ranch Rd Bridge ‐ Rehabilitation Bridge DeficiencyPima County Elephant Head Road Bridge Repair 39_o 4RTEHB 8.15 Complete
Elephant Head Road, over the Santa Cruz River Bridge Deficiency
TucsonGolf Links‐Aviation Shared Use Path Bridge Deck Replacement
39_p 15.15 Not Started
9/19/2016 2:36:28 PM 1 18 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Golf Links‐Aviation Shared Use Path Bridge deck rehabRTA Signalization Technology 40__ 67.06 Complete
Signalization Technology: 29th St / 4th Ave Signal Technology UpgradesSignalization Technology: 29th St / 6th Ave Signal Technology UpgradesSignalization Technology: 29th St / 10th Ave Signal Technology UpgradesSignalization Technology: 36th St / 4th Ave Signal Technology UpgradesSignalization Technology: 36th St / 6th Ave Signal Technology UpgradesSignalization Technology: 39th St / 6th Ave Signal Technology Upgrades
Tucson UPS/LED (20 intersections) 40_a 31.07 CompleteUPS/LED Intersection #01: Ajo Way / 3rd Ave Signal Technology UpgradesUPS/LED Intersection #02: Ajo Way / 6th Ave Signal Technology UpgradesUPS/LED Intersection #02: Ajo Way / 6th Ave Signal Technology UpgradesUPS/LED Intersection #03: Ajo Way / Park Ave Signal Technology UpgradesUPS/LED Intersection #04: Alvernon Way / Elm St Signal Technology UpgradesUPS/LED Intersection #05: Alvernon Way / 5th St Signal Technology UpgradesUPS/LED Intersection #06: Campbell Ave / Elm St Signal Technology UpgradesUPS/LED Intersection #07: Campbell Ave / 3rd Ave Signal Technology UpgradesUPS/LED Intersection #08: Irvington Rd / 6th Ave Signal Technology UpgradesUPS/LED Intersection #09: Nogales Hwy / Bilby Rd Signal Technology UpgradesUPS/LED Intersection #10: Nogales Hwy / Drexel Rd Signal Technology UpgradesUPS/LED Intersection #11: Nogales Hwy / Valencia Rd Signal Technology UpgradesUPS/LED Intersection #12: Speedway Blvd / Alvernon Way Signal Technology UpgradesUPS/LED Intersection #13: Speedway Blvd / Campbell Ave Signal Technology UpgradesUPS/LED Intersection #14: Speedway Blvd / Cherry Ave Signal Technology UpgradesUPS/LED Intersection #15: Speedway Blvd / Country Club Rd Signal Technology UpgradesUPS/LED Intersection #16: Speedway Blvd / Euclid Ave Signal Technology UpgradesUPS/LED Intersection #17: Speedway Blvd / Mountain Ave Signal Technology UpgradesUPS/LED Intersection #18: Speedway Blvd / Park Ave Signal Technology UpgradesUPS/LED Intersection #19: Speedway Blvd / Tucson Blvd Signal Technology UpgradesUPS/LED Intersection #20: Valencia Rd / 12th Ave Signal Technology UpgradesUPS/LED Intersection #21: Valencia Rd / 6th Ave Signal Technology UpgradesUPS/LED Intersection #22: Valencia Rd / Calle Santa Cruz Signal Technology UpgradesUPS/LED Intersection #23: Valencia Rd / Campbell Ave Signal Technology UpgradesUPS/LED Intersection #24: Valencia Rd / I‐19 Signal Technology UpgradesUPS/LED Intersection #25: Valencia Rd / Santa Clara Ave Signal Technology UpgradesUPS/LED Intersection #26: Valencia Rd / Tucson Blvd Signal Technology UpgradesUPS/LED Intersection #27: Signal Technology UpgradesUPS/LED Intersection #28: Signal Technology UpgradesUPS/LED Intersection #29: Signal Technology UpgradesUPS/LED Intersection #30: Signal Technology Upgrades
T P d T it P i it 40 b 32 07 C l tTucson �Pre‐emp on and Transit Priority 40_b 32.07 CompletePre‐emption & Transit Priorty Signal Technology Upgrades
Tucson U of A Atlas Center 40_c SC03 33.07 CompleteU of A Atlas Study Signal Technology Upgrades
Pima County Ina Rd Corridor Signal Timing 40_d 4RTICS 110.07 CompleteIna Road Signal Coordination Signal Technology Upgrades
Tucson Regional Traffic Signal Central System 40_e 111.07 Under Construction
Regional Traffic Signal Central System Signal Technology Upgrades
Pima CountyTraffic Signal Wireless Communication System
40_f 112.07 Complete
Traffic Signal Wireless Communication System Signal Technology UpgradesSouth Tucson Speed Alert Monitor Signs 40_g 113.07 Not Started
Speed Alert Monitor Systems Signal Technology UpgradesSouth Tucson 27th St 6th Emergency Signal 40_h 114.07 Complete
27th Street & 6th Avenue Emergency Signal Signal Technology Upgrades
9/19/2016 2:36:28 PM 1 19 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Pima County Traffic Signal Battery Backup System 40_i 115.07 Complete
o RTA – Traffic Signal Battery Backup System – Pima County Signal Technology UpgradesOWP‐PAG Regional Traffic Signal Services 40_j 116.07 Under Construction
o RTA – Traffic Signal Services (2008) – Pima Association of Governments/RTA Signal Technology Upgradeso RTA – Traffic Signal Services (2009) – Pima Association of Governments/RTA Signal Technology Upgradeso RTA – Traffic Signal Services (2010) – Pima Association of Governments/RTA Signal Technology Upgrades
Tucson Fire Station 17 Flasher 40_k 172.08 CompleteFire Station 17 Flasher Signal Technology Upgrades
South Tucson UPS ‐ City of South Tucson 40_l 169.08 Complete#N/A Complete 40 x#N/A Complete 40_x
40_x 177.08 Not Started UPS ‐ South Tucson Signals Signal Technology UpgradesTown‐wide Signal Technology Upgrade Signal Technology Upgrades
Marana Marana Wireless Signal Upgrades 40_m 93.09 CompleteMarana Wireless Signal Upgrades: N/S Thornydale Rd. & E/W Cortaro Rd. Signal Technology Upgrades
Oro Valley Wireless Signal Link 40_n 94.09 CompleteWireless Signal Link: First Ave Signal Technology UpgradesWireless Signal Link: La Canada / Tangerine Rd Signal Technology UpgradesWireless Signal Link: La Canada / W Lambert Signal Technology UpgradesWireless Signal Link: La Canada / W Naranja Drive Signal Technology UpgradesWireless Signal Link: La Cholla / Tangerine Signal Technology UpgradesWireless Signal Link: La Cholla Blvd / Glover Rd Signal Technology UpgradesWireless Signal Link: Lambert / First Ave Signal Technology UpgradesWireless Signal Link: N First / E Naranja Signal Technology UpgradesWireless Signal Link: N First Ave / Palisades Signal Technology UpgradesWireless Signal Link: N La Cholla Dr. / W Lambert Signal Technology UpgradesWireless Signal Link: Northern / Magee Signal Technology UpgradesWireless Signal Link: Rancho Vistoso Blvd / Innovation Park Signal Technology UpgradesWireless Signal Link: Tangerine / First Ave Signal Technology Upgrades
40_o Wireless Signal Link: Tangerine / Innovation Park Signal Technology UpgradesWireless Signal Link: W Naranja Drive / N La Cholla Blvd Signal Technology Upgrades
SahuaritaWireless signal & controller/equipment upgrades
40_o 95.09 Under Construction
RTA – Traffic Signal Wireless Communications Systems ‐ Pima County Signal Technology Upgrades
Tucson Real Time Signal Timing & Traffic Info 40_q SC04 98.09 Under Construction
Real Time Signal Timing & Traffic Info Signal Technology Upgrades
TucsonRegional Traffic Signal Operations Program
40_r 490V 34.06 Under Construction
R i l T ffi Si l O ti P Signal Technolog UpgradesRegional Traffic Signal Operations Program Signal Technology UpgradesTucson Regional Traffic Operations Center 40_s 43.05 Not Started
Regional Traffic Operations Center Signal Technology Upgrades
SahuaritaTown‐wide GPS Clock and Yellow LED Retrofit
40_u 174.08 Not Started
Signal Technology Improvement Signal Technology UpgradesOro Valley Signal Synchronization ‐ Oro Valley 40_v 175.08 Transferred
Various Locations Signal Technology UpgradesOro Valley UPS ‐ Oro Valley 40_w 176.08 Transferred
UPS ‐ Oro Valley Signals Signal Technology UpgradesTucson Transit Priority ‐ FY 2009 40_y 179.08 Dropped
Transit Priority ‐ FY 2009 Signal Technology Upgrade Signal Technology Upgrades
SahuaritaUPS‐ Sahuarita. 3 Intersections along Nogales HWY
40ak 90.08 Complete
UPS ‐ Sahuarita Signals ‐ Intersection#1 Signal Technology UpgradesUPS ‐ Sahuarita Signals ‐ Intersection#2 Signal Technology Upgrades
9/19/2016 2:36:28 PM 1 20 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
UPS ‐ Sahuarita Signals ‐ Intersection#3 Signal Technology UpgradesTucson NTCIP Communications 40al 41.08 Complete
NTCIP Communications Signal Technology Upgrades
Tucson Regional Transportation Data Network 40am 40am 39.08 Under Construction
Regional Transportation Data Network Signal Technology Upgrades
Sahuarita Speed Monitor Station ‐ Nogales Hwy 40an 94.08 Complete
Nogales Highway Speed Monitor Station Signal Technology UpgradesOro Valley UPS ‐ Town of Oro Valley 40ao 121.08 Complete
UPS / Wireless Signal Upgrade : First Ave / Main Signal Technology UpgradesUPS / Wireless Signal Upgrade : First Ave / Main Signal Technology UpgradesUPS / Wireless Signal Upgrade : Northern / Magee Signal Technology UpgradesUPS / Wireless Signal Upgrade : Tangerine / First Ave Signal Technology UpgradesUPS / Wireless Signal Upgrade : Tangerine Rd / Innovation Park Signal Technology Upgrades
40ap UPS / Wireless Signal Upgrade : Tangerine Rd / La Cholla Signal Technology UpgradesUPS / Wireless Signal Upgrade : First Ave / Main Signal Technology Upgrades
Tucson RTDN Mesh Network Expansion 40ap 178.08 CompleteRTDN Mesh Network Expansion Signal Technology Upgrades
ADOT SR 77: Signalization Upgrade 40aq 34.13 Under ConstructionSR77 Signalization Upgrade: Project 01: Ajo Signal Interconnect Signal Technology UpgradesSR77 Signalization Upgrade: Project 02: Regional Traffic Signal Data to ITOC Signal Technology UpgradesSR77 Signalization Upgrade: Project 03: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #1 Signal Technology UpgradesSR77 Signalization Upgrade: Project 04: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #2 Signal Technology UpgradesSR77 Signalization Upgrade: Project 05: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #3 Signal Technology UpgradesSR77 Signalization Upgrade: Project 06: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #4 Signal Technology UpgradesSR77 Signalization Upgrade: Project 07: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #5 Signal Technology UpgradesSR77 Signalization Upgrade: Project 08: Signal Technology UpgradesSR77 Signalization Upgrade: Project 09: Signal Technology UpgradesSR77 Signalization Upgrade: Project 10: Signal Technology UpgradesSR77 Signalization Upgrade: Project 11: Signal Technology UpgradesSR77 Signalization Upgrade: Project 12: Signal Technology UpgradesSR77 Signalization Upgrade: Project 13: Signal Technology UpgradesSR77 Signalization Upgrade: Project 14: Signal Technology UpgradesSR77 Signalization Upgrade: Project 15: Signal Technology Upgrades
Tucson Sidewalks Package 1 41_a 34.07 CompleteSidewalks Package 1 ‐ location #1 22nd St: Wilmot RD ‐ Kolb SidewalkSidewalks Package 1 ‐ location #2 Alvernon Way: Broadway Blvd. ‐ 22nd St SidewalkSidewalks Package 1 ‐ location #3 Broadway Blvd: Country Club Rd ‐ Randolph Way SidewalkSidewalks Package 1 ‐ location #4 Grant Rd: Dragoon Ave ‐ I‐10 SidewalkSid lk P k 1 l ti #5 S Rd 22 d St 29th St SidewalkSidewalks Package 1 ‐ location #5 Swan Rd: 22nd St ‐ 29th St SidewalkSidewalks Package 1 ‐ location #6 Wetmore Rd: Oracle Rd ‐ Stone Ave SidewalkSidewalks Package 1 ‐ location #7 Broadway: Wilmot Rd ‐ Kolb Rd Sidewalk
Tucson Sidewalks Package 2 41_b 35.07 CompleteLocation #1 22nd St: Alvernon Way to Swan Rd SidewalkLocation #2 Broadway Blvd: Alvernon Way to Swan Rd SidewalkLocation #3 Craycroft Rd: Broadway to 22nd Street SidewalkLocation #4 Mission Rd: Ajo Way to Irvington Rd SidewalkLocation #5 Tanque Verde Rd: Kolb Rd to Sabino Canyon Sidewalk
Pima County Kolb Rd Bike Lane Project 41_c 36.07 CompleteKolb Road Bike Lane Project Bikeway
Tucson Campbell Ave Revitalization 41_d 32.06 CompleteNew sidewalks, streetscape and bus bays Sidewalk
TucsonEl Paso & Southwestern Greenway: Kino to University
41_l SP01 83.07 In Design
El Paso & Southwestern Greenway: Kino to University Pathway
9/19/2016 2:36:28 PM 1 21 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Pima County Freeman Rd Bike Lanes 41_m 84.07 TransferredFreeman Rd From Broadway To Old Spanish Trail Bikeway
Pima County Orange Grove Bike Lanes 41_n 85.07 TransferredOrange Grove From Oracle Rd To Camino la Zorrela Bikeway
Pima County Escalante Bike Lanes 41_o 86.07 TransferredEscalante Rd From Houghton To Old Spanish Trail Bikeway
Pima County Valencia Bike Lanes 41_p 87.07 TransferredValencia: From Craycroft To Wilmot BikewayValencia Road Bike Lane Gap Closure Bikeway
Pima County Valencia Bike Lanes ‐ Wilmot to Kolb 41_q 88.07 Transferred
Valencia: Wilmot To Kolb Bikeway
Pima CountyValencia Bike Lanes ‐ Alvernon to Craycroft
41_r 89.07 Transferred
Valencia From Alvernon To Craycroft BikewayPima County Mission Rd Bike Lanes 41_s 90.07 Dropped
Mission Road From San Xavier Rd To Drexel BikewayPima County Tanque Verde Bike Lanes 41_t 91.07 Transferred
Tanque Verde From Powderhorn To Camino Fennimore BikewayPima County Continental Rd Bike Lanes 41_u 92.07 Transferred
Continental Rd From Camino Del Sol To La Canada BikewayTucson Park Ave Bike Lanes 41_v 93.07 Transferred
8) Park Ave Bike Lanes: Benson to Ajo BikewayTucson 6th Ave Bike Lanes 41_w 94.07 Transferred
2) 6th Ave Bike Lanes: South Tucson to Irvington Bikeway
Tucson6th Ave Bike Lanes South Tucson to 19th St
41_x 95.07 Transferred
1) 6th Ave: South Tucson to 19th St. BikewayTucson Alvernon Bike Lanes 41_y 96.07 Transferred
3) Alvernon: Speedway to Broadway Bikeway
Tucson Alvernon Bike Lanes ‐ Ajo to Valencia 41_z 97.07 Transferred
4) Alvernon: Ajo to Valencia Bikeway
Tucson Campbell Bike lanes ‐ Glenn to Grant 41aa 49B1 98.07 Transferred
5) Campbell Ave:Glenn to Grant Bikeway
TucsonCampbell Bike Lanes ‐ Elm to Speedway
41ab 99.07 Transferred
6) Campbell Ave: Elm to Speedway BikewayT P t Bik L 41 100 07 T f dTucson Pantano Bike Lanes 41ac 100.07 Transferred
7) Pantano: Speedway to Broadway BikewayTucson Park Ave Bike Lanes #2 41ad 101.07 Transferred
9) Park: Ajo to Irvington BikewayTucson Speedway Bike Lanes 41ae 102.07 Transferred
10) Speedway: Alvernon to Rosemont Bikeway
TucsonRTA Bicycle Lane Restriping Package #1
41af 49B1 142.07 Complete
6th Ave From So. Tucson city limits To Irvington Bikeway6th Ave. From N of 19th St To South Tucson northern city limits BikewayAlvernon From Speedway To Broadway BikewayAlvernon From Ajo Way To Valencia BikewayCampbell From Elm To Speedway BikewayCampbell From Glenn To Grant BikewayPantano Road From Speedway To Broadway BikewayPark From Ajo To Irvington Bikeway
9/19/2016 2:36:28 PM 1 22 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Park From Benson To Ajo BikewaySpeedway From Alvernon To Rosemont Bikeway
TucsonRTA ADA Accessibility Projects, Package 1
41ag 143.07 Complete
Sidewalks Package 3: location #1 29th St.: Euclid To Railroad tracks ramps SidewalkSidewalks Package 3: location #2 6th Ave: Speedway To Broadway ramps SidewalkSidewalks Package 3: location #3 Drachman: Stone To 6th Ave ramps SidewalkSidewalks Package 3: location #4 Golf Links: Craycroft To Wilmot ramps SidewalkSidewalks Package 3: location #5 Grande: Drachman To Speedway ramps SidewalkSidewalks Package 3: location #6 Speedway: Stone To Euclid ramps SidewalkSidewalks Package 3: location #7 6th Ave: Drachman to Speedway SidewalkSidewalks Package 3: location #7 6th Ave: Drachman to Speedway Sidewalk
Pima CountyBike Pkg1 Paved Shoulder, Restriping/Gap Closure
41ah 144.07 Complete
Continental Rd: Camino Del Sol To La Canada BikewayEscalante Rd: Houghton To Old Spanish Trail BikewayFreeman Rd: Broadway To Old Spanish Trail BikewayKolb Road Bike Lane Project North of Valencia to Voyager Rd. BikewayOrange Grove Rd: Oracle Rd To Shadow Bluffs BikewayOrange Grove Rd: Shadow Bluffs to Camino la Zorrela BikewayTanque Verde: Powderhorn To Camino Fennimore BikewayValencia: Alvernon To Craycroft BikewayValencia: Craycroft To Wilmot BikewayValencia: Wilmot To Kolb BikewayMission Road: San Xavier Rd To Drexel Bikeway
Pima County RTA Sidewalk Package 1 41ai 145.07 CompleteSidewalk Pkg 1: Continental Road From La Canada To PCC entrance SidewalkSidewalk Pkg 1: Flowing Wells From River To Roger SidewalkSidewalk Pkg 1: Oracle Road From Orange Grove To River Sidewalk
SahuaritaOld Nogales Highway Bike Lane Project
41aj 161.07 Complete
Old Nogales Highway Bike Lanes BikewayPima County Bike Lane Package 2 41ak 75.08 Complete
PC Bike Lane Pkg 2 (Bear Canyon SRTS/ Shared use path): Bear Canyon: Indian Bend to 1200 ft N of Tanque Verde BikewayPC Bike Lane Pkg 2: Country Club: Irvington to Valencia BikewayPC Bike Lane Pkg 2: Valencia Rd: Westover to Mission BikewayPC Bike Lane Pkg 2: Valencia Rd: 500 ft west of Camino de la Tierra to Cardinal BikewayPC Bike Lane Pkg 2: Alvernon Way: Golf Links to Ajo BikewayPC Bike Lane Pkg 2: Bear Canyon: Snyder Rd to Tanque Verde Bikeway
Pima County Colossal Cave Road Bike Lanes 41al 119.08 TransferredC l l C R d Bik L Ci Hi h S h l t Pi t l Hill Rd BikewayColossal Cave Road Bike Lanes: Cienega High School to Pistol Hill Rd. BikewayColossal Cave Bike Lane Construction Bikeway
Tucson Bike Lane Package II (Design) 41am 49B2 120.08 CompleteCOT Bike Lane Pkg 2: Design Only (Construction in 39.09 RTA41be) Bikeway
Sahuarita Santo Tomas Sidewalk Project 41an 84.08 CompleteSanto Tomas Sidewalk & Street Lighting Sidewalk
TucsonArroyo Chico Urban Greenway: Reid Park Segment
41ao 37.08 Complete
Arroyo Chico Urban Greenway: Reid Park Segment Greenway
TucsonChurch/Franklin Island Modification for Bikes
41at 161.08 Complete
Church/Franklin Island Modification SidewalkOro Valley La Cholla Bike Improvements 41au 156.08 Complete
La Cholla Bike Improvement : La Cholla Blvd: Tangerine Rd to Lambert Ln BikewayLa Cholla multi use path: La Cholla Blvd: Glover Rd to Naranja Dr Pathway
9/19/2016 2:36:28 PM 1 23 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Pima CountyPantano River Park Supplemental Funding
41av PPANTP 154.08 Complete
Pantano River Park PathwayPantano River Park Bikeway
South Tucson 36th St. 41aw 189 Complete36th St. Greenway Pathway
TucsonSidewalk Improvements ‐ Tucson FY 2009
41ay 173.08 Complete
Sidewalks FY 2009 Project#1: Country Club Rd: Broadway Blvd to 22nd St SidewalkSidewalks FY 2009 Project#2: Craycroft Rd: Glenn St to Speedway Blvd SidewalkSidewalks FY 2009 Project#3: Grant Rd: Swan Rd to Wilmot Rd SidewalkSidewalks FY 2009 Project#3: Grant Rd: Swan Rd to Wilmot Rd SidewalkSidewalks FY 2009 Project#4: Stone Ave: Grant Rd to Drachman St Sidewalk
Pima CountyCentennial Elem. & Flowing Wells JrH ‐ Safe Routes to School
41az 4SRCEN 16.09 Complete
Cenntennial Elementary Sidewalks SidewalkSahuarita Camino de las Quintas Sidewalk 41ba 36.09 Complete
Camino de Las Quintas Sidewalk Sidewalk
TucsonTransportation Enhancement Pre‐design
41bb 37.09 Complete
Pre‐Design for TEA Projects SidewalkTucson 4th Ave. Bike Blvd. 41bc 38.09 Complete
4th Avenue Bike Boulevard BikewayADOT SR 77: River to Suffolk 41bd 50.14 In Design
HAWK Bus PulloutTucson Bike Lane Package II (Construction) 41be 49B2 39.09 Complete
COT Bike Lane Pkg 2: Sub‐Project #01 22nd: Camino Seco to Harrion Rd BikewayCOT Bike Lane Pkg 2: Sub‐Project #02 Ajo Way through I‐10 Interchange BikewayCOT Bike Lane Pkg 2: Sub‐Project #03 Ajo Way: 16th Ave to 6th Ave BikewayCOT Bike Lane Pkg 2: Sub‐Project #04 Ajo Way: Santa Cruz River Bridge to 16th Ave BikewayCOT Bike Lane Pkg 2: Sub‐Project #05 Alvernon Way: 22nd St to 29th St BikewayCOT Bike Lane Pkg 2: Sub‐Project #06 Alvernon Way: Broadway Blvd to 22nd St Bikeway
41bf COT Bike Lane Pkg 2: Sub‐Project #07 Valencia Rd: Calle Santa Cruz to 12th Ave BikewayCOT Bike Lane Pkg 2: Sub‐Project #08 Wrightstown Rd: Tanque Verde Rd to Harrison Rd Bikeway
TucsonSidewalk Package II ‐ Construction ‐ City of Tucson 2010
41bf 40.09 Transferred
Sidewalk Package II ‐ Construction ‐ City of Tucson 2010 Sidewalk
TucsonIronwood Hills Drive Sidewalks (Design)
41bg 41.09 Dropped
Ironwood Hills Drive Sidewalks SidewalkJ li W h G /P t Ri
Pima CountyJulian Wash Greenway/Pantano River Park R/W Acquisition
41bh 42.09 Under Construction
Julian Wash Greenway Sidewalk
TucsonArmory Park/Santa Rita Park Enhancement Project
41bi SL556 01C 41.05 Complete
Armory Park/Santa Rita Park TEA Sidewalk
South Tucson36th St: 4th Ave to RR Bike Lane/Greenway
41bj 89.01 In Design
36th St. 4th Ave ‐ RR BikewayTucson Bike Lane Package III 41bl 49B3 19.1 Under Construction
Bike Lane Package 3 BikewayPima County Flowing Wells Bike Lanes 41bn 21.1 Transferred
Flowing Wells Bikelanes Flowing Wells Road along the Rillito Bridge BikewayTucson Ft. Lowell Sidewalk 41bo 22.1 Complete
Ft. Lowell Sidewalk Sidewalk
9/19/2016 2:36:28 PM 1 24 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Pima CountyColossal Cave/Mary Ann Cleveland Way Bike Lanes
41bq 24.1 Transferred
Kush Canyon Lane to Cienega High School BikewayPima County Abrego Bike Lanes 41bt 27.1 Transferred
Abrego Bike Lanes BikewayPascua Yaqui Head Start Sidewalks 41bx 31.1 Complete
Head Start Sidewalks: Construct Calle Tetakusim: Tuivit to Camino Benem SidewalkHead Start Sidewalks: Construct Camino Potam: Just North of W Tetakusim ‐ Calle Torim Sidewalk
OWP‐TDOT Hughes Access/Alvernon Bike Lane 41by 32.1 TransferredHughes Access/Alvernon Bike Lane Bikeway
Oro Valley Calle Concordia Bike Lane 41ca 34 1 CompleteOro Valley Calle Concordia Bike Lane 41ca 34.1 CompleteCalle Concordia Bike Lane Calle Buena Vista to Calle Loma Linda Bikeway
Sahuarita La Villita Bike Lane 41cb 35.1 CompleteLa Villita Bike Lane Bikeway
Tucson University/3rd Street Bike Boulevard 41cc SP05 96.09 Under Construction
University/3rd Street Bike Boulevard BikewayTucson Liberty Bike Blvd Design 41cd SP04 111.09 In Design
Liberty Bike Blvd Design Bikeway
TucsonGlenn St: Columbus to Country Club Pedestrian Path
41ce S01H 87.09 In Design
Glenn St: Columbus to Country Club Pedestrian Path Shared Use Pathways
Oro ValleyCanada del Oro Shared Use‐Path Final Phase
41cf 88.09 Complete
Canada del Oro Shared Use‐Path Final Phase Shared Use PathwaysPima County Bike Lane Package 3 41cg 4TEHBL 11.11 Under Construction
PC Bike Pkg 3: Abrego Dr: E Duval to Calle Herboso BikewayPC Bike Pkg 3: Camino De Oeste: Valencia to Tetakusim Rd BikewayPC Bike Pkg 3: Camino Loma Alta: Rancho Del Lago Pky to Colossal Cave BikewayPC Bike Pkg 3: Colossal Cave Rd: Cienega HS to Pistol Hill Rd BikewayPC Bike Pkg 3: Harrison Rd: E Wasatch to Sabino HS (N of Snyder) BikewayPC Bike Pkg 3: Pantano River, Speedway to 5th St BikewayPC Bike Pkg 3: Rillito River: Country Club Rd to Hacienda Del Sol BikewayPC Bike Pkg 3: Rillito River: Cmo de La Tierra, South Bank of Rillito River to CDO Wash BikewayPC Bike Pkg 3: ROW Purchase:Various Locations on Rillto for Shared Use Path PathwayPC Bike Pkg 3: Marking Installation on various Bike lanes/Shared Use Path BikewayFlowing Wells Bikelanes Flowing Wells Road along the Rillito Bridge Bikeway
Tohono O'odham San Xavier Rd: Little Nogales to I‐19 41ci 79.1 In DesignConstruct Multi‐use pathway Little Nogales Rd and the Pedestrian Bridge Pathway
O V ll R h Vi t Sid lk 41 j 79 12 C l tOro Valley Rancho Vistoso Sidewalk 41cj 79.12 CompleteRancho Vistoso Sidewalk: Vistoso to Highland Dr. Sidewalk
Pima CountyPantano Pathway: Broadway to Kenyon
41ck PPBDWY 81.12 Complete
Pantano Pathway: Broadway to Kenyon 12 Foot SUP and 8 foot dg path Shared Use Pathways
Pima CountyManzanita Elementary Safe Routes to School, Phase 2
41cl 4RTMES 80.12 Complete
Manzanita Elementary Safe Routes to School Sidewalk
SahuaritaBike/Pedestrian Neighborhood Path Program
41cm 72.12 Complete
Bike/Pedestrian Neighborhood Path Program SidewalkPima County El Paso Southwest ROW acquisition 41cn 82.12 In Design
El Paso Southwest ROW acquisition Shared Use Pathways
TucsonCopper St: Oracle to Swan Bike Boulevard
41co SP10 77.12 In Design
Design/Construct bike blvd improvements Bikeway
9/19/2016 2:36:28 PM 1 25 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Tucson5th St. Bike Boulevard: 7th Avenue to University
41cp SP11 83.12 Complete
HAWK at 5th & Euclid HAWK5th St: 7th to University Bike Boulevard Bikeway
TucsonTreat Ave: Rillito River to Barraza‐Aviation Bike Boulevard
41cq SP12 78.12 Under Construction
Treat Ave at Broadway Blvd HAWK HAWKTreat Ave: Rillito River to Barraza‐Aviation Bike Boulevard Bikeway
TucsonArroyo Chico Greenway: Country Club to Treat
41cr SP09 76.12 In Design
Arroyo Chico Urban Greenway: GreenwayArroyo Chico Urban Greenway: Greenway
MaranaSandario Road: Moore to Grier Sidewalk/Path
41cs CP011 75.12 Complete
Sandario Road: Moore to Grier Sidewalk/Path PathwaySandario Road: Moore to Grier Sidewalk/Path Sidewalk
Marana Ina Road Sidewalk 41ct 74.12 CompleteIna Rd. Sidewalk: South Side of Ina from Thornydale to Meredith Sidewalk
MaranaEl Rio Park to Avra Valley Road Shared Use Path
41cu PK013 73.12 In Design
El Rio Park to Avra Valley Rd Shared Use Path Pathway
TucsonLiberty Ave Bicycle Blvd and Safe Routes to School
41cv 83.1 In Design
Liberty Ave Bicycle Blvd and Safe Routes to School Bikeway
Pima CountySummit View Elementary School Safe Routes to School
41cw 89.12 Under Construction
Summit View Elementary School Safe Routes to School: East Summit Street from Old Nogales Hwy to Epperson Lane Shared Use Pathways
MaranaWildlife Connectivity Study Rattlesnake Pass‐Twin Peaks
42_a 146.07 Complete
Rattlesnake Pass‐Twin Peaks Wildlife Study Wildlife Linkages
Pima CountyWildlife Movement through Culvert ‐ Wildlife Study
42_b 150.07 Complete
Wildlife Movement through Culvert Study Wildlife LinkagesPima County Wildlife Fencing Study 42_c RTAWLDLFE 127.08 Complete
Wildlife Fencing Study Wildlife Linkages
Marana Camino de Manana Wildlife Crossings 42_d 181.08 Complete
Camino de Manana Wildlife Crossings Wildlife LinkagesMarana RTA Wildlife Linkage Identification 42_e 68.09 Complete
42_f La Cholla Wildlife Linkages Study Wildlife LinkagesT i Wildlif Li k S d Wildlif Li kTangerine Wildlife Linkages Study Wildlife Linkages
TucsonHoughton Rd: I‐10 to Speedway Wildlife Design Study
42_f 82.09 Transferred
Houghton Rd: I‐10 to Speedway Wildlife Design Study‐Bat Box Wildlife Linkages
SahuaritaSahuarita Rd: La Villita to Country Club Wildlife Crossings
42_g 83.09 Complete
42_h Sahuarita Rd: I19 to La Villita Wildlife Crossings Wildlife LinkagesSahuarita Rd: La Villita to Country Club Wildlife Crossings Wildlife Linkages
SahuaritaSahuarita Rd: La Villita to Country Club Wildlife Monitoring
42_h 84.09 Study Underway
Sahuarita Rd: La Villita to Country Club Wildlife Monitoring Wildlife LinkagesSahuarita Wildlife Assessment 42_i 85.09 Study Underway
Wildlife Assessment Wildlife LinkagesADOT SR 77: Wildlife Crossing Structures 42_j 86.09 Under Construction
SR 77: Wildlife Crossing Structures Wildlife LinkagesSR 77: Wildlife Monitoring Wildlife Linkages
9/19/2016 2:36:28 PM 1 26 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
AZ Game & FishWildlife Connectivity Assessment in Pima County
42_k 74.1 Complete
Wildlife Connectivity Assessment in Pima County Wildlife Linkages
ADOTSR 86:Kitt Peak Linkage Wildlife Crossing Retrofit Phase 1
42_l 25.11 Complete
SR 86:Kitt Peak Linkage Wildlife Crossing Retrofit Phase 1: State Route 86 ‐ Mile posts 130‐136 (Construct 2 crossings) Wildlife Linkages
Tohono O'odhamSR 86: Kitt Peak Linkage Wildlife Crossing Retrofit Phase 2
42_m 20.12 Not Started
SR 86:Kitt Peak Linkage Wildlife Crossing Retrofit Phase 2 Wildlife LinkagesMarana Ina Rd Bridge Bat Boxes 42_n 64.12 Complete
Ina Road Bridge Bat Boxes Wildlife LinkagesIna Road Bridge Bat Boxes Wildlife LinkagesADOT SR 86: Kitt Peak Rd Segment 42_o 105.03 Transferred
SR 86: Kitt Peak Rd. Segment Wildlife LinkagesADOT SR 86 Wildlife Movement Study 42_p 182.08 Complete
SR 86 Wildlife Movement Study Wildlife Linkages
TucsonHoughton Rd UPRR Bridge Bat Roost Mitigation
42_q 19.13 In Design
Houghton Rd UPRR Bridge Bat Roost Mitigation Construction Wildlife LinkagesHoughton Rd UPRR Bridge Bat Roost Mitigation Study Wildlife Linkages
RTASR 77: Wildlife Crossing off highway fencing
42_r 1.14 In Design
SR 77: Wildlife Crossing off highway fencing Wildlife Linkages
Marana Tangerine Corridor: Wildlife Linkages 42_s ST 12.15 In Design
Wildlife Linkages: Twin Peaks Rd to La Cañada Dr Wildlife LinkagesgMainstreet Small Business Assistance 43__ 69.06 Under Construction
MAP Mainstreet Assistance Program Small Business Assistance
Tucson TransitSun Tran ‐ Weekday Evening Service Expansion
44__ 70.06 Complete
Route 01 Weekday Extended ServiceRoute 04 Weekday Extended ServiceRoute 08 Weekday Extended ServiceRoute 16 Weekday Extended ServiceRoute 03 Weekday Extended ServiceRoute 06 Weekday Extended ServiceRoute 07 Weekday Extended ServiceRoute 09 Weekday Extended ServiceRoute 11 Weekday Extended ServiceRoute 29 Weekday Extended ServiceR 10 W kd E t d d S iRoute 10 Weekday Extended ServiceRoute 15 Weekday Extended ServiceRoute 17 Weekday Extended ServiceRoute 19 Weekday Extended ServiceRoute 22 Weekday Extended ServiceRoute 34 Weekday Extended ServiceRoute 02 Weekday Extended ServiceRoute 21 Weekday Extended ServiceRoute 27 Weekday Extended ServiceRoute 23 Weekday Extended ServiceRoute 26 Weekday Extended Service
Tucson Transit Sun Tran ‐ Weekend Service Expansion 45__ 94.06 Complete
Route 08 Broadway Weekend Bus Service ExpansionRoute 37 Pantano Weekend Bus Service ExpansionRoute 04 Speedway Weekend Bus Service Expansion
9/19/2016 2:36:28 PM 1 27 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Route 03 6th Street/Wilmot Weekend Bus Service ExpansionRoute 07 22nd Street Weekend Bus Service ExpansionRoute 16 Oracle/12th Weekend Bus Service ExpansionRoute 11 Alvernon Weekend Bus Service ExpansionRoute 06 Park/1st Weekend Bus Service ExpansionRoute 09 Grant Weekend Bus Service ExpansionRoute 01 Glenn/Swan Weekend Bus Service ExpansionRoute 10 Flowing Wells Weekend Bus Service ExpansionRoute 15 Campbell Weekend Bus Service ExpansionRoute 17 Golf Links/Country Club Weekend Bus Service ExpansionRoute 19 Stone Weekend Bus Service ExpansionRoute 19 Stone Weekend Bus Service ExpansionRoute 22 Grande Weekend Bus Service ExpansionRoute 34 Craycroft Weekend Bus Service ExpansionRoute 02 Cherrybell Weekend Bus Service ExpansionRoute 21 Silverbell Weekend Bus Service ExpansionRoute 27 Cardinal Weekend Bus Service ExpansionRoute 23 Mission Weekend Bus Service ExpansionRoute 26 Benson Hwy Weekend Bus Service ExpansionRoute 29 Valencia Weekend Bus Service ExpansionRoute 20 West Grant Weekend Bus Service Expansion
RTASun Tran ‐ Frequency and Area Expansion
46_a 93.06 Complete
Bus Frequency (PLUGS) FY 07, 08, 09 Bus Frequency and ExpansionBus Frequency (PLUGS) FY 07, 08, 09 Bus Frequency and Expansion
Tucson Transit Bus Replacements 46_b 471 CompleteNew Buses ‐ Local Match (participation in purchasing 140+ buses) Bus Frequency and Expansion
Tucson TransitAdministrative & Maintenance Facility ‐ Phase 2
46_c 51.05 Transferred
Sun Tran Bus Storage & Maint. Facility Phase I Warehouse Transit FacilitySun Tran Bus Storage & Maint. Facility Phase II Admin Bldg Transit FacilityPrince/Runway Dr Traffic Signal Intersection Improvement
RTATransit Regional Fare System and Rebranding
46_d 128.08 Complete
Rebranding Bus Frequency and ExpansionSeemless Regional Fare System‐Fare Boxes Bus Frequency and Expansion
South Tucson South Tucson Transit ‐ Operations 46_e 76.09 CompleteSouth Tucson Transit Operations Bus Frequency and Expansion
Tucson Transit Administrative & Maintenance Facility 46_f 72.03 Complete
S T B St & M i t F ilit Ph I W h Transit FacilitSun Tran Bus Storage & Maint. Facility Phase I Warehouse Transit FacilitySun Tran Bus Storage & Maint. Facility Phase II Admin Bldg Transit FacilityAdministrative & Maintenance Facility: Prince Rd/Runway Dr Traffic Signal Intersection Improvement
Tucson Transit Bus Expansion 46_g 21.11 CompleteBus Expansion Citywide ‐ Purchase new buses Bus Frequency and Expansion
Tucson Transit South Tucson Transit Services 46_j 43.12 Not StartedBus Frequency and Expansion
Tucson Transit Oro Valley Transit Support 46_k 62.01 TransferredOro Valley Transit Support: Purchase 2 Vans, 1/24/01 ‐ Added by FY01 amendment #5. Bus Purchase
Tucson TransitSun Tran Expansion Bus Purchases FY07 Carryover
46_m 121.07 Transferred
Casino del Sol Bus Purchase Bus Frequency and ExpansionTucson Transit Sun Van/Paratransit Expansion 47__ 71.06 Complete
SunVan/Paratransit Expansion Special Needs Transit
Tucson TransitVan Tran Paratransit Service Expansion
47_a 96.06 Dropped
9/19/2016 2:36:28 PM 1 28 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
VAN TRAN service (paratransit) Special Needs TransitTucson Transit Sun Van Expansion Vans 47_b 29.03 Transferred
Sun Van Expansion Vans Special Needs TransitOro Valley Coyote Run Service Expansion 47_c 98.06 Dropped
Expand service within Oro Valley Special Needs TransitPCOA Volunteer Transit 47_d 75.06 Complete
Special Needs Transit for Elderly & Disabled Special Needs TransitTucson Transit Paratransit Service Area Expansion 47_g 78.09 Transferred#N/A Transferred 47_h
Oro ValleyNew Freedom (Urban) ‐ Transit Services Coordinator
47_h 132.08 DroppedServices Coordinator
Oro Valley Transit Services Coordinator Special Needs Transit
RTA RTA Special Needs Transit Expansion 47_i 97.06 Complete
RTA Special Needs Transit Expansion Special Needs TransitMarana Marana Circulator Service 48_a 99.06 Transferred
Marana Circulator Service 2: Route 410 Anway/TRICO Neighborhood Circulator Bus SystemsMarana Circulator Service 1: Route 411 Neighborhood Circulator Bus Systems
Oro Valley Oro Valley Circulator Service 48_b 100.06 DroppedOro Valley Circulator Service:Route 401 N. Oracle/Catalina Neighborhood Circulator Bus SystemsOro Valley Dial‐A‐Ride Neighborhood Circulator Bus Systems
SahuaritaGreen Valley/Sahuarita Circulator Service
48_c 101.06 Transferred
Route 421 Green Valley/Sahuarita Circulator Service Neighborhood Circulator Bus SystemsRoute 430 Tucson Estateshuarita Circulator Service Neighborhood Circulator Bus Systems
RTA Ajo Circulator Service 48_d 102.06 CompleteAjo Circulator Service Neighborhood Circulator Bus SystemsAjo Dial‐A‐Ride Neighborhood Circulator Bus Systems
RTA Sun Shuttle Expanded Transit Services 48_e 42.1 Complete
Sun Shuttle Expanded Transit Services: Route Neighborhood Circulator Bus SystemsSun Shuttle Expanded Transit Services: Route 413 Marana I‐10 Neighborhood Circulator Bus SystemsOro Valley Circulator Service:Route 401 N. Oracle/Catalina Neighborhood Circulator Bus SystemsSun Shuttle Expanded Transit Services: Route 401 Oro Valley N. Oracle/Catalina Neighborhood Circulator Bus SystemsSun Shuttle Expanded Transit Services: Route 411 Marana Cortaro/Silverbell Neighborhood Circulator Bus Systems
MaranaJob Access Reverse Commute (Urban) ‐ Marana Commuter Express
48_f 131.08 Complete
Job Access Reverse Commute (Urban) ‐ Marana Commuter Express Neighborhood Circulator Bus Systems
Tucson Transit Sun Tran ‐ Express Service Expansion 49_a 95.06 Complete
Sun Tran ‐ Express Service Expansion Express Service ExpansionTucson Transit Sun Tran Expansion Buses ‐ P49 49_b 109.08 Dropped
Sun Tran Expansion Buses ‐ P49 Express Service ExpansionPima County Pima County Rural Transit Service 49_c 103.06 Complete
Ajo‐Tucson Expansion to 5 days/week Express Service Expansion
Tucson TransitLaos Transit Center Sun Shuttle Pull Out
49_d MRC5 23.14 Complete
Laos Transit Center Sun Shuttle Pull Out Express Service ExpansionTucson Transit Downtown/University Streetcar 50__ 73.06 Complete
50_a Downtown Streetcar StreetcarDowntown Streetcar ‐ Maintenance Facility Streetcar Maintenance Facility
Tucson Transit Modern Streetcar FY07 Carryover 50_a 123.07 DroppedModern Streetcar carryover Streetcar Operations
Tucson Transit Streetcar Operations 50_b 40.13 Under Construction
9/19/2016 2:36:28 PM 1 29 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type
Streetcar OperationsPascua Yaqui Casino del Sol Park‐and‐Ride 51_b 105.06 Complete
Casino del Sol Park‐and‐Ride Transit FacilityMarana Marana Park‐and‐Ride 51_c 106.06 Not Started
Marana Park and Ride Transit FacilityOro Valley Oro Valley Park‐and‐Ride 51_d 107.06 Complete
Oro Valley Park & Ride Riverfront Park Lot Transit FacilityOro Valley Rancho Vistoso Park & Ride Transit Facility: Park & RideOV Bus Pullout: Innovation Park Dr / Vistoso Commerce Loop SB Bus PulloutOV Bus Pullout: Lambert Ln / Calle Mira Mesa EB (@ Riverfront P&R) Bus PulloutOV Bus Pullout: Lambert Ln / Calle Mira Mesa WB (@ Riverfront P&R) Bus PulloutOV Bus Pullout: Lambert Ln / Calle Mira Mesa WB (@ Riverfront P&R) Bus PulloutOV Bus Pullout: Rancho Vistoso Blvd / Vistoso Commerce Loop Rd WB Bus PulloutOV Bus Pullout: Rancho Vistoso Park & Ride Bus Pullout
Tucson Transit Houghton / Broadway Park‐and‐Ride 51_e 108.06 Complete
Houghton/Broadway Transit FacilityOld Vail temporary Lot Transit Facility
Tucson Transit Rita Ranch Park‐and‐Ride 51_f 109.06 CompleteRita Ranch/Old Vail Park‐and‐Ride Transit Facility
RTA Sun Shuttle Base Transit Services 70__ 72.06 CompleteMarana: Route 410 Anway/TRICO Bus Frequency and Expansion
Bus Frequency and Expansion
9/19/2016 2:36:28 PM 1 30 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Under ConstructionUnder ConstructionIn DesignUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionDroppedTransferredTransferredUnder ConstructionIn DesignUnder ConstructionIn DesignUnder ConstructionIn Design
Under Construction
CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteComplete
CompleteCompleteC l tCompleteComplete
CompleteCompleteCompleteCompleteComplete
In DesignIn DesignIn Design
CompleteUnder Construction
9/19/2016 2:36:28 PM 1 31 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
In DesignNot StartedUnder ConstructionIn DesignNot StartedUnder ConstructionIn DesignUnder Construction
In Design
CompleteCompleteDroppedCompleteCompleteComplete
CompleteCompleteCompleteDroppedDroppedCompleteComplete
Under ConstructionUnder Construction
In Design
CompleteCompleteCompleteCompleteDroppedCompleteC l tCompleteCompleteCompleteCompleteComplete
CompleteCompleteComplete
CompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 32 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
DroppedDroppedCompleteComplete
CompleteCompleteComplete
Not Started
Not Started
Not Started
In Design
CompleteCompleteCompleteIn DesignCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
In Design
CompleteIn DesignI D iIn DesignIn DesignCompleteCompleteCompleteCompleteCompleteCompleteIn DesignIn DesignNot StartedCompleteIn DesignIn DesignNot Started
9/19/2016 2:36:28 PM 1 33 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
In DesignIn DesignCompleteCompleteComplete
Not Started
Transferred
In DesignIn Design
CompleteCompleteDroppedCompleteCompleteComplete
Not Started
Not Started
CompleteIn DesignCompleteCompleteCompleteCompleteIn DesignCompleteComplete
Not Started
U d C t tiUnder ConstructionCompleteComplete
CompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 34 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteCompleteCompleteComplete
In Design
Not Started
Not Started
Dropped
Complete
Complete
Complete
In Design
In Design
CompleteCompleteCompleteCompleteCompleteCompleteC l tCompleteCompleteCompleteNot StartedNot StartedNot StartedCompleteCompleteComplete
CompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 35 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
In DesignIn Design
Not Started
Transferred
In DesignIn DesignIn Design
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteComplete
CompleteCompleteC l tCompleteComplete
CompleteCompleteCompleteCompleteComplete
Complete
Complete
Complete
Complete
9/19/2016 2:36:28 PM 1 36 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Complete
Complete
Complete
Complete
Complete
CompleteCompleteCompleteCompleteCompleteComplete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Dropped
Complete
Complete
In Design
Complete
Complete
9/19/2016 2:36:28 PM 1 37 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Complete
Complete
Dropped
CompleteComplete
Dropped
Complete
Complete
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteC l tCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 38 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Complete
CompleteComplete
Dropped
CompleteComplete
Dropped
Complete
Complete
Complete
Complete
Complete
Complete
Transferred
Complete
Complete
N t St t dNot Started
Complete
CompleteCompleteCompleteComplete
Complete
Complete
9/19/2016 2:36:28 PM 1 39 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteComplete
Complete
TransferredTransferredTransferredTransferredTransferredTransferred
Transferred
Transferred
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
Complete
CompleteCompleteCompleteCompleteComplete
CompleteDroppedCompleteCompleteComplete
CompleteTransferred
9/19/2016 2:36:28 PM 1 40 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Under ConstructionUnder ConstructionUnder ConstructionUnder Construction
In Design
Complete
Complete
Complete
Complete
Dropped
Dropped
Dropped
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
CompleteCompleteComplete
CompleteComplete
9/19/2016 2:36:28 PM 1 41 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 42 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteComplete
Dropped
Complete
CompleteComplete
Complete
Dropped
Complete
Complete
Dropped
CompleteComplete
Transferred
Complete
CompleteCompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 43 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteDroppedCompleteCompleteCompleteCompleteComplete
Complete
Complete
CompleteCompleteComplete
Complete
Transferred
CompleteComplete
Complete
T f dTransferred
Dropped
Complete
Complete
CompleteCompleteCompleteCompleteComplete
Complete
9/19/2016 2:36:28 PM 1 44 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteComplete
Complete
In Design
Not Started
CompleteCompleteCompleteNot StartedTransferred
Complete
In Design
Complete
Under Construction
Under Construction
Complete
CompleteComplete
Complete
Transferred
DroppedDropped
Under Construction
Transferred
Under Construction
CompleteCompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 45 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteComplete
CompleteCompleteCompleteComplete
Complete
CompleteCompleteComplete
CompleteCompleteCompleteCompleteCompleteComplete
Complete
CompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteCompleteCompleteIn DesignCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 46 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteUnder ConstructionUnder ConstructionUnder ConstructionCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteOn HoldOn HoldIn DesignIn DesignIn DesignOn HoldIn DesignOn HoldOn HoldDroppedOn HoldTransferredOn HoldOn HoldOn HoldComplete
CompleteCompleteCompleteDropped
In DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn Design
9/19/2016 2:36:28 PM 1 47 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
In DesignIn DesignDroppedIn DesignIn DesignIn DesignIn DesignIn DesignDroppedIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn Design
Dropped
Dropped
Not Started
Under Construction
Complete
In Design
Complete
Dropped
Complete
Under ConstructionComplete
Complete
Complete
Transferred
Complete
Complete
9/19/2016 2:36:28 PM 1 48 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Not Started
CompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
Complete
Complete
Complete
Under Construction
Complete
Not Started
Complete
9/19/2016 2:36:28 PM 1 49 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Complete
Under ConstructionUnder ConstructionUnder Construction
Complete
CompleteNot Started
Complete
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
Under Construction
Under Construction
Under Constr ctionUnder Construction
Not Started
Not Started
Transferred
Transferred
Dropped
CompleteComplete
9/19/2016 2:36:28 PM 1 50 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Complete
Complete
Under Construction
Complete
CompleteCompleteCompleteCompleteCompleteCompleteComplete
Complete
Under ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder Construction
CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteComplete
Complete
Complete
In Design
9/19/2016 2:36:28 PM 1 51 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Dropped
Transferred
Dropped
DroppedDropped
Dropped
Dropped
Dropped
Dropped
Transferred
Transferred
Transferred
Transferred
Transferred
Transferred
Transferred
Transferred
Transferred
Transferred
Transferred
CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
9/19/2016 2:36:28 PM 1 52 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteComplete
CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteOn Hold
CompleteCompleteComplete
Complete
CompleteCompleteCompleteCompleteCompleteComplete
TransferredTransferredDropped
Complete
Complete
Complete
Complete
CompleteComplete
9/19/2016 2:36:28 PM 1 53 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteComplete
Complete
CompleteCompleteCompleteCompleteComplete
Transferred
Complete
Complete
Complete
In Design
CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
Transferred
Dropped
Under Construction
Complete
In Design
Under Construction
Transferred
Complete
9/19/2016 2:36:28 PM 1 54 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Transferred
Dropped
CompleteComplete
Dropped
Complete
Complete
Under Construction
In Design
In Design
Complete
CompleteOn HoldCompleteCompleteCompleteUnder ConstructionCompleteIn DesignCompleteUnder ConstructionComplete
In Design
Complete
Complete
Complete
Complete
In Design
In Design
9/19/2016 2:36:28 PM 1 55 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteComplete
CompleteUnder Construction
In DesignIn Design
CompleteComplete
Complete
In Design
Transferred
Under Construction
Complete
Complete
Complete
Complete
CompleteC l tComplete
Transferred
CompleteComplete
Study Underway
Study Underway
Under ConstructionStudy Underway
9/19/2016 2:36:28 PM 1 56 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Complete
Complete
In Design
CompleteComplete
Dropped
Complete
In DesignComplete
In Design
In Designg
Under Construction
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteC l tCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteCompleteComplete
9/19/2016 2:36:28 PM 1 57 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete
CompleteComplete
Complete
TransferredTransferredTransferred
CompleteComplete
Complete
CompleteCompleteCompleteComplete
Complete
Not Started
Transferred
Transferred
Complete
9/19/2016 2:36:28 PM 1 58 of 60
RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status
Dropped
Transferred
Dropped
Complete
Dropped
Complete
TransferredTransferred
TransferredTransferred
TransferredTransferred
CompleteTransferred
CompleteCompleteCompleteCompleteComplete
Complete
Complete
Dropped
Complete
Complete
CompleteComplete
Dropped