RTA Project Delivery Status Detail Data Report as of August 31, 2016 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Marana Tangerine Rd: I10 to La Canada Dr 01_a ST021 86.06 Under Construction Segment 1: Dove Mountain to Thornydale Roadway Segments Segment 2: Tangerine Rd.: Thornydale to La Canada Roadway Segments Segment 3: I10 to Dove Mountain Roadway Segments Tangerine+Twin Peaks/Dove Mountain Blvd Intersection Improvement Tangerine+Camino De Oeste Intersection Improvement Tangerine+Thornydale Intersection Improvement Tangerine+La Cholla Intersection Improvement Tangerine+I10 Frontage Rd. Intersection Improvement Tangerine Rd. @ Twin Peaks EB Bus Pullout Bus Pullout Twin Peaks @ Linda Vista SB Bus Pullout (transferred to 561 00) Bus Pullout Twin Peaks @ Linda Vista SB Bus Pullout (transferred to 561.00) Bus Pullout Tangerine Rd.: Dove Mountain to La Canada (5 mile) Tangerine MultiUse Path Pathway Tangerine Rd.: I10 to Dove Mountain (5 mile), Tangerine MultiUse Path Pathway Tangerine Rd.: Dove Mountain to La Canada Tangerine On Street Bikelanes Bikeway Tangerine Rd.: I10 to Dove Mountain (5 Mile) Tangerine On Street Bikelanes Bikeway Tangerine Rd.: Dove Mountain to La Canada Tangerine Sidewalk Sidewalk Tangerine Rd.: I10 to Dove Mountain (5 mile) Tangerine Sidewalk Sidewalk Oro Valley Tangerine Rd: Shannon to La Canada 01_b 15.03 Under Construction Segment 3: Tangerine Rd.: La Canada to Shannon Roadway Segments Marana Camino de Manana / Dove Mtn Extn. 02__ ST004 200152 561 Complete Camino De Manana Roadway Segments Twin Peaks Rd./Dove Mountain Blvd. (formerly Camino De Manana) + Tangerine Intersection Improvement Camino De Manana + Oasis Intersection Improvement Camino De Manana + Twin Peaks/Camino De Manana Intersection Improvement Tangerine Rd. @ Twin Peaks SB Bus Pullout Bus Pullout Twin Peaks @ Linda Vista NB Bus Pullout Camino De Manana Bikeways Bikeway Camino De Manana Sidewalks Sidewalk Marana Twin Peaks Rd / Linda Vista Blvd TI 03_a 200144 758 Complete Twin Peaks, Silverbell to I10 Roadway Segments Twin Peaks+I10 East Frontage Rd. Intersection Improvement Twin Peaks+Linda Vista Blvd Intersection Improvement 03_b Twin Peaks+Tiffany Loop Intersection Improvement Twin Peaks+I10 West Frontage Rd. Intersection Improvement Marana Twin Peaks Bridge / Roadway 03_b 76.01 Complete Twin Peaks Bridge/Roadway Roadway Segments Twin Peaks Bridge/Roadway: Grade Separated RR Crossing Bridge Deficiency T i P k Bik Bik Twin Peaks Bikeway Bikeway Twin Peaks Sidewalk Sidewalk Pima County La Cholla Blvd: Overton to Magee 04_a 4RTLTM 90.06 Complete La Cholla Blvd., Tangerine to Magee Rd. DCR DCR Study La Cholla Blvd: Overton to Magee Roadway Segments La Cholla/Overton Intersection Improvement La Cholla/Overton Bikeway Bikeway La Cholla/Overton Sidewalks Sidewalk Oro Valley La Cholla Blvd. Tangerine to Overton 04_b 87.03 In Design La Cholla Blvd. Tangerine to Overton Roadway Segments La Cholla Blvd. Tangerine to Overton Bikelanes Bikeway La Cholla Blvd. Tangerine to Overton Sidewalk Sidewalk Tucson Silverbell Rd: Grant to Ina 05__ 56.06 Under Construction Silverbell Rd.: Grant Rd. to Ina Rd. DCR (Design Concept Report) DCR Study Segment 1 = Grant to Goret Roadway Roadway Segments 9/19/2016 2:36:28 PM 1 1 of 60

Upload: others

Post on 25-Apr-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Marana Tangerine Rd: I‐10 to La Canada Dr  01_a ST021 86.06 Under ConstructionSegment 1: Dove Mountain to Thornydale Roadway SegmentsSegment 2: Tangerine Rd.: Thornydale to La Canada Roadway SegmentsSegment 3: I‐10 to Dove Mountain Roadway SegmentsTangerine+Twin Peaks/Dove Mountain Blvd Intersection ImprovementTangerine+Camino De Oeste Intersection ImprovementTangerine+Thornydale Intersection ImprovementTangerine+La Cholla Intersection ImprovementTangerine+I‐10 Frontage Rd. Intersection ImprovementTangerine Rd. @ Twin Peaks EB Bus Pullout Bus PulloutTwin Peaks @ Linda Vista SB Bus Pull‐out (transferred to 561 00) Bus PulloutTwin Peaks @ Linda Vista SB Bus Pull‐out (transferred to 561.00) Bus PulloutTangerine Rd.: Dove Mountain to La Canada (5 mile) Tangerine Multi‐Use Path PathwayTangerine Rd.: I‐10 to Dove Mountain (5 mile), Tangerine Multi‐Use Path PathwayTangerine Rd.: Dove Mountain to La Canada Tangerine On Street Bikelanes BikewayTangerine Rd.: I‐10 to Dove Mountain (5 Mile) Tangerine On Street Bikelanes BikewayTangerine Rd.: Dove Mountain to La Canada Tangerine Sidewalk SidewalkTangerine Rd.: I‐10 to Dove Mountain (5 mile) Tangerine Sidewalk Sidewalk

Oro Valley Tangerine Rd: Shannon to La Canada 01_b             15.03 Under Construction

Segment 3: Tangerine Rd.: La Canada to Shannon Roadway Segments

Marana Camino de Manana / Dove Mtn Extn.     02__ ST004  2001‐52 561 Complete

Camino De Manana Roadway SegmentsTwin Peaks Rd./Dove Mountain Blvd. (formerly Camino De Manana) + Tangerine Intersection ImprovementCamino De Manana + Oasis Intersection ImprovementCamino De Manana + Twin Peaks/Camino De Manana Intersection ImprovementTangerine Rd. @ Twin Peaks SB Bus Pullout Bus PulloutTwin Peaks @ Linda Vista NB Bus PulloutCamino De Manana Bikeways BikewayCamino De Manana Sidewalks Sidewalk

Marana Twin Peaks Rd / Linda Vista Blvd TI 03_a            2001‐44 758 CompleteTwin Peaks, Silverbell to I‐10 Roadway SegmentsTwin Peaks+I‐10 East Frontage Rd. Intersection ImprovementTwin Peaks+Linda Vista Blvd Intersection Improvement

03_b              Twin Peaks+Tiffany Loop Intersection ImprovementTwin Peaks+I‐10 West Frontage Rd. Intersection Improvement

Marana Twin Peaks Bridge / Roadway 03_b               76.01 CompleteTwin Peaks Bridge/Roadway Roadway SegmentsTwin Peaks Bridge/Roadway: Grade Separated RR Crossing Bridge DeficiencyT i P k Bik BikTwin Peaks Bikeway BikewayTwin Peaks Sidewalk Sidewalk

Pima County La Cholla Blvd: Overton to Magee            04_a 4RTLTM 90.06 CompleteLa Cholla Blvd., Tangerine to Magee Rd. DCR DCR StudyLa Cholla Blvd: Overton to Magee Roadway SegmentsLa Cholla/Overton Intersection ImprovementLa Cholla/Overton Bikeway BikewayLa Cholla/Overton Sidewalks Sidewalk

Oro Valley La Cholla Blvd. ‐ Tangerine to Overton 04_b 87.03 In Design

La Cholla Blvd. ‐ Tangerine to Overton Roadway SegmentsLa Cholla Blvd. ‐ Tangerine to Overton Bikelanes BikewayLa Cholla Blvd. ‐ Tangerine to Overton Sidewalk Sidewalk

Tucson Silverbell Rd: Grant to Ina                          05__ 56.06 Under ConstructionSilverbell Rd.: Grant Rd. to Ina Rd. DCR (Design Concept Report) DCR StudySegment 1 = Grant to Goret Roadway Roadway Segments

 9/19/2016 2:36:28 PM  1 1 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Segment 2 = Goret to Cmo. Del Cerro Roadway Roadway SegmentsSegment 3 = Cmo Del Cerro to Ina Road Roadway Roadway SegmentsSegment 1 Bikeways BikewaySegment 2 Bikeways BikewaySegment 3 Bikeways BikewaySegment 1 Sidewalks SidewalkSegment 2 Sidewalks SidewalkSegment 3 Sidewalks Sidewalk

ADOT I‐10: Ina TI                                                 06__ 3.02 In DesignI‐10: Ina TI (Reconstruct TI and construct RR Overpass) Roadway Segments

Pima County Magee Rd: Mona Lisa to La Canada 07 a 4RTMLI 115 06 CompletePima County Magee Rd: Mona Lisa to La Canada         07_a 4RTMLI 115.06 CompleteMagee Rd: Mona Lisa to La Canada Roadway SegmentsLa Cholla + Magee Rd Intersection ImprovementMagee Rd + Mona Lisa       Intersection ImprovementCortaro Farms @ Ranch Escondido HAWK Pedestrian Crossing HAWKMagee Rd: Mona Lisa to La Canada Bikeway BikewayMagee Rd: Mona Lisa to La Canada Sidewalk Sidewalk

Pima County Magee Rd. ‐ Thornydale to Mona Lisa     07_b 4MCFTL  152 Complete

Magee Rd. :Thornydale to Mona Lisa Roadway SegmentsMagee Rd. + Shannon Northbound Intersection ImprovementMagee Rd. + Shannon Southbound Intersection ImprovementMagee Rd. + Thornydale Intersection ImprovementClub + Magee Rd. Intersection ImprovementMagee Rd: Mona Lisa to La Canada Bikeway BikewayMagee Rd: Mona Lisa to La Canada Sidewalk Sidewalk

Pima County Sunset Rd. ‐ Silverbell to I‐10                08__ 4RTSUN 35.05 Under Construction09_a                     Sunset, Silverbell to I‐10 Roadway Segments

Sunset, I‐10 to River Roadway SegmentsADOT I‐10: Ruthrauff TI                   09_a                      5.12 In Design

I‐10: Ruthrauff TI ‐ Phase 1 Roadway Segments

Pima CountyLa Cholla Blvd: Ruthrauff Rd to River Rd

10__ 789 Complete

La Cholla: Ruthrauff to River Road Segment Roadway SegmentsLa Cholla + Curtis Intersection Improvements Intersection ImprovementLa Cholla + Ruthrauff Intersection Improvements Intersection ImprovementLa Cholla Bus Pullout #1 La Cholla + Ruthrauff Bus PulloutLa Cholla Bus Pullout #2 La Cholla + River Deleted ‐ Paid by RTA 36ak Bus PulloutLa Cholla Bus Pullout #3 Bus PulloutL Ch ll B P ll t #4 B P ll tLa Cholla Bus Pullout #4 Bus PulloutLa Cholla Bus Pullout #5 Bus PulloutLa Cholla Bus Pullout #6 Bus PulloutLa Cholla: Ruthrauff to River Bikeway BikewayLa Cholla: Ruthrauff to River Sidewalks Sidewalk

Pima County La Canada Dr. #1 ‐ River to Ina                 11_a 4LCRRI 150 CompleteLa Canada ‐ River to Ina: River>Calle Concordia Roadway SegmentsLa Canada ‐ River to Ina: River>Calle Concordia Bikeway BikewayLa Canada ‐ River to Ina: River>Calle Concordia Sidewalk Sidewalk

Pima CountyLa Canada Dr. #6 ‐ Ina to Calle Concordia                   

11_b 4RTCCI 35.06 Complete

La Canada Dr.: Ina to Calle Concordia Roadway SegmentsLa Canada+ Hardy Intersection Improvement Intersection ImprovementLa Canada + Magee Intersection Improvement Intersection ImprovementLa Canada + Ina Intersection Improvement Intersection ImprovementLa Canada + Orange Grove Intersection Improvement Intersection Improvement

 9/19/2016 2:36:28 PM  1 2 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

La Canada + Calle Concordia Intersection Improvement Intersection ImprovementLa Canada + Sunset Intersection Improvement Intersection ImprovementLa Canada Dr.: Ina to Calle Concordia Bikeway BikewayLa Canada Dr.: Ina to Calle Concordia Sidewalks Sidewalk

Pima County Magee Rd. ‐ La Canada to Oracle             12__ 592 CompleteMagee Rd.: La Canada to Oracle Roadway Roadway SegmentsIntersection @ Magee + Northern Intersection Improvement Intersection ImprovementIntersection @ Magee + Oracle Intersection Improvement

Pima County 1st Ave: Orange Grove Rd to Ina Rd 13__ 82.06 Not Started1st Ave: Orange Grove Rd to Ina Rd Roadway Segments

Tucson 1st Ave: Grant to River 14 81 06 Under ConstructionTucson 1st Ave: Grant to River                               14__ 81.06 Under Construction1st Ave: Grant to River Widen to 6 lanes Roadway Segments

TucsonGrant Rd: RR Underpass Reconstruction

15__ 84.06 Not Started

UPRR Underpass Expansion at Grant Road Roadway Segments

TucsonUPRR Underpass Expansion at Grant Road

15_a 11.15 In Design

UPRR Underpass Expansion at Grant Road Roadway SegmentsTucson Downtown Links: Broadway to I‐10 16_a S30N 81.04 In Design

Phase I= 8th Street Drainage Roadway SegmentsDowntown Links: High School Wash Improvements Roadway SegmentsPhase II= St Mary's: I‐10 to Church Ave. Roadway SegmentsPhase III=6th Street to Broadway Blvd Roadway SegmentsSt Mary's + Granada Intersection Improvement Intersection ImprovementDowntown Links + Broadway Intersection Improvement Intersection ImprovementDowntown Links + 6th Avenue Intersection Improvement Intersection ImprovementDowntown Links + 6th Street Intersection Improvement Intersection ImprovementDowntown Links + Stone Intersection Improvement Intersection ImprovementDowntown Links + Church Intersection Improvement Intersection ImprovementDavis Bilingual Elementary HAWK Pedestrian Crossing HAWKBus Pullout Granada WB Bus PulloutDowntown Links: I‐10 to Broadway Blvd. Bikeways BikewayDowntown Links: I‐10 to Broadway Blvd. Sidewalks Sidewalk

TucsonBroadway Blvd. ‐ Euclid to Country Club                     

17__ 22.05 In Design

Broadway Blvd.: Euclid Ave. to Country Club Rd. Roadway SegmentsTucson Grant Rd: Oracle Rd to Swan Rd 18__ 55.06 In Design

Phase I Intersection Improvement Grant Rd + Oracle Rd. (includes roadway West at 9th and East to 15th) Intersection ImprovementPhase II  15th Ave West of Stone Ave. to Santa Rita East of Park Ave. Roadway SegmentsPh III Al W t V i Pl W t f S Rd & Ph IV D d Bl d (P l V d ) t Al W R d S tPhase III: Alvernon Way to Venice Place, West of Swan Rd & Phase IV: Dodge Blvd. (Palo Verde) to Alvernon Way Roadway SegmentsPhase V: Santa Rita East of Park Ave. to Tucson Blvd & Phase VI Tucson Blvd. to Pal Verde West of Dodge Roadway SegmentsGrant Rd. + Oracle HAWK ILT East HAWKGrant Rd. + Oracle HAWK ILT West HAWKGrant Rd. + Oracle Rd Bus Pullout North Bus PulloutGrant Rd. + Oracle Rd Bus Pullout South Bus PulloutGrant Rd. + Oracle Rd Bus Pullout East Bus PulloutOracle Rd. to Swan Rd. Bikeways Phase I BikewayOracle Rd. to Swan Rd. Bikeways Phase II BikewayOracle Rd. to Swan Rd. Bikeways Phase III & IV BikewayOracle Rd. to Swan Rd. Bikeways Phase V & VI BikewayOracle Rd. to Swan Rd. Sidewalks Phase I SidewalkOracle Rd. to Swan Rd. Sidewalks Phase II SidewalkOracle Rd. to Swan Rd. Sidewalks Phase III & IV SidewalkOracle Rd. to Swan Rd. Sidewalks Phase V & VI Sidewalk

Tucson 22nd Street: I‐10 to Tucson Blvd.             19_a SR5A 131 In Design

 9/19/2016 2:36:28 PM  1 3 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

22nd. Street ‐ 3rd Segment Kino Parkway to I‐10 (1st segment overpass listed as interseciton) Roadway Segments22nd. Street: 2nd Segment Kino Parkway to Tucson Blvd. Roadway Segments22nd. Street + Kino Parkway Intersection Improvement Kino Parkway Overpass at 22nd St. Intersection ImprovementBus Pullout Eastbound 22nd. Street + Kino Parkway Intersection Improvement Kino Parkway Bus PulloutBus Pullout Westbound 22nd. Street + Kino Parkway Intersection Improvement Kino Parkway Bus Pullout

Tucson Barraza Aviation Pkwy Extension             20__ 87.06 Not StartedBarraza Aviation Pkwy Extension Roadway Segments

Pima CountyValencia Rd: Ajo Way to Mountain Eagle Dr

21_a 113.06 Transferred

Valencia Rd.: Ajo to Mark Value Analysis VA StudyPima County Valencia Rd: Ajo to Wade 21 b 114 06 In DesignPima County Valencia Rd: Ajo to Wade  21_b 114.06 In Design

Valencia Ajo Way to Mountain Eagle Dr. Wade Roadway SegmentsValencia Rd.: Ajo to Wade: Valencia + Camino Verde Intersection Improvement

Pima County Valencia Rd. ‐ Wade to Mark                    21_c 4RTVMW 58.06 CompleteValencia Rd.: Ajo to Mark DCR DCR StudyValencia Rd.: Wade to Mark Roadway SegmentsValencia Rd.: Wade to Mark: Valencia + Mark Intersection ImprovementValencia Rd.: Wade to Mark: Valencia + Wade Intersection ImprovementValencia Rd.: Wade to Mark: Valencia + San Ignacio Baumea Intersection ImprovementValencia Rd.: Wade to Mark: Valencia + South Camino Verde Intersection Improvement

Tucson Irvington Rd: West of I‐19                         22__ 77.06 Not StartedIrvington Rd: West of I‐19 Roadway Segments

Tucson Valencia Rd: I‐19 to Alvernon                   23__ 60.06 Not StartedValencia Rd: I‐19 to Alvernon Roadway Segments

Pima County Valencia Rd.: Alvernon to Kolb                 24__ 4VAKDP 61.06 Under ConstructionAlvernon to Wilmot Roadway Segment Roadway SegmentsWilmot to Kolb Roadway Segment Roadway SegmentsValencia + I‐10 Eastbound Intersection ImprovementValencia + Benson Highway Intersection ImprovementValencia + Littletown Rd. Intersection Improvement Valencia + I‐10 Westbound Intersection ImprovementValencia (Eastbound) + Kolb Rd. Intersection ImprovementValencia + Wilmot Intersection ImprovementValencia Rd.+ Desert View High School Intersection Improvement

Tucson Valencia Rd: Kolb Rd to Houghton Rd 25__ 59.06 Not Started

Valencia Rd: Kolb Rd to Houghton Rd Roadway Segments

TucsonKolb Rd.: Connection to Sabino Canyon                       

26__ 76.06 Under Construction

K lb E t i t S bi C R d S tKolb, Extension to Sabino Canyon Roadway SegmentsKolb Rd.: Kolb + Tanque Verde Intersection Improvement Intersection ImprovementKolb Road Bikeways Bikeway

Pima CountyTanque Verde Rd: Catalina Hwy to Houghton Rd

27__ 170 Complete

Tanque Verde Rd.: Catalina Hwy to Houghton Rd Roadway SegmentsTanque Verde Rd. + Houghton Rd Intersection Improvement Intersection ImprovementTanque Verde Rd.: Catalina Hwy to Houghton Rd Bikeway BikewayTanque Verde Rd.: Catalina Hwy to Houghton Rd Sidewalk Sidewalk

TucsonSpeedway Blvd: Camino Seco to Houghton

28__ 57.06 Complete

Speedway: Camino Seco to Houghton Road Segment Roadway SegmentsSpeedway + Camino Seco Intersection Improvement Intersection ImprovementSpeedway + Harrison Intersection Improvement Intersection ImprovementSpeedway + Houghton Intersection Improvement Intersection ImprovementSpeedway at Igo HAWK Pedestrian Crossing HAWK

 9/19/2016 2:36:28 PM  1 4 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Speedway at Schrader Lane HAWK Pedestrian Crossing HAWKSpeedway Bus Pull‐out #1 Speedway + Camino Seco Bus PulloutSpeedway Bus Pull‐out #2 Speedway + Harrison Bus PulloutSpeedway Bus Pull‐out #3 Speedway + Harrison Bus PulloutSpeedway Bikeway BikewaySpeedway Sidewalk Sidewalk

TucsonBroadway Blvd: Camino Seco to Houghton

29__ 36 In Design

Broadway Blvd: Camino Seco to Houghton Roadway Segments

Tucson 22nd St: Camino Seco to Houghton Rd 30__ 32 Not Started

22nd St: Camino Seco to Houghton Rd Roadway Segments

Tucson Harrison Rd. ‐ Irvington to Golf Links       31__ 38 Not Started

Harrison Rd. ‐ Irvington to Golf Links Roadway Segments

Pima CountyHoughton Rd. ‐ Golf Links to Tanque Verde                   

32_a       SR1_ 23.02 Dropped

Houghton Rd. ‐ Golf Links to Tanque Verde Roadway Segments

TucsonHoughton Rd. ‐ Old Spanish Trail to Tanque Verde            

32_b SR 58.07 Complete

Houghton Rd. ‐ Old Spanish Trail to Tanque Verde DCR Only DCR Study

TucsonHoughton Rd: Valencia to Old Spanish Trail DCR          

32_c 59.07 Complete

Houghton Roadway: Valencia to Old Spanish Trail DCR DCR StudyTucson Houghton Rd.: I‐10 to Valencia                 32_d 60.07 Complete

Houghton Roadway: I‐10 to Valencia DCR only for road widening DCR Study

Tucson Houghton Road: UPRR Bridge to I‐10      32_e 108.09 In Design

Houghton: UPRR Bridge to I‐10 Roadway SegmentsTucson Houghton Rd. @ UPRR                               32_f SR1D 61.07 In Design

Reconstruct and widen RR bridge Bridge Deficiency

TucsonHoughton Rd:Irvington to Valencia, Intersect Imp Old Vail Rd

32_g SR1E 17.12 Complete

Houghton Roadway: Segment 3 Irvington to Valencia Roadway SegmentsHoughton Roadway: Segment 1 Old Spanish Trl to Golf Links Roadway SegmentsHoughton Roadway: Segment 4 Irvington to I‐10 Roadway SegmentsHoughton Roadway + Drexel Intersection ImprovementHoughton Roadway + Mary Ann Cleveland Intersection ImprovementHoughton Roadway + Poor Man Intersection ImprovementH h R d V l i I t ti I tHoughton Roadway + Valencia Intersection ImprovementHoughton Roadway + Irvington Intersection ImprovementHoughton Roadway: Houghton Greenway 500 ft North of Irvington to 1000 ft south of Valencia GreenwayHoughton Roadway: Greenway along Eastside, I‐10 to 1000 ft South of Valencia GreenwayHoughton Roadway: Greenway along Eastside, 500 ft North of Irvington to 22nd St GreenwayHoughton Roadway: Greenway along Eastside, Broadway to Tanque Verde GreenwayHoughton Roadway: Bus Pull‐out 500ft North of E. Irvington Rd. Bus PulloutHoughton Roadway: Bikeway BikewayHoughton Roadway: Sidewalk Sidewalk

TucsonHoughton Rd: Broadway to 22nd, Intersection Improv @Broadway

32_h SR1F 18.12 Complete

Houghton: Broadway to 22nd Street Road Segment Roadway SegmentsHoughton Roadway + Broadway (plus roadway taper) Intersection ImprovementHoughton + Broadway Intersection Bikelanes BikewayHoughton Roadway + Broadway sidewalks SidewalkHoughton Roadway: Greenway along Eastside: Broadway to 22nd Street Greenway

 9/19/2016 2:36:28 PM  1 5 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

TucsonHoughton: Valencia to Mary Ann Cleveland Way

32_i 46.14 Not Started

Houghton: Valencia to Mary Ann Cleveland Way Roadway SegmentsHoughton: Valencia to Mary Ann Cleveland Way Bikelanes Bikeway

Tucson Houghton Road: 22nd to Irvington 32_j 16.15 In DesignHoughton Road, widen from 22nd to Irvington Roadway Segments

Tucson Houghton Rd. ‐ I‐10 to Golf Links             32aa SR1 1.06 TransferredHoughton Rd. ‐ Golf Links to Tanque Verde                    Roadway Segments

Pima County Wilmot North of Sahuarita Rd 33__ 4RTWNS 78.06 Under ConstructionWilmot North of Sahuarita Rd. Roadway SegmentsWilmot North of Sahuarita Rd : Wilmot + Sahuarita Intersection ImprovementWilmot North of Sahuarita Rd.: Wilmot + Sahuarita Intersection Improvement

Sahuarita Sahuarita Road: I‐19 to Country Club 34_a 6.04 Complete

Sahuarita Roadway: Segment 1= I‐19 to La Vilita Roadway SegmentsRoadway Segment 4= Azatlan> CC Rd Segment Nogales Hwy to Country Club Roadway SegmentsRoadway Segment 2= (I19) Rancho Sahuarita>La Villita Roadway SegmentsRoadway Segment 3=La Villita to Azatlan Ave. Roadway SegmentsSahuarita Roadway + La Villita Intersection Improvement Intersection ImprovementSahuarita Roadway + Ranch Sahuarita Intersection Improvement Intersection ImprovementSahuarita Roadway + Nogales Hwy Intersection Improvement Intersection ImprovementSahuarita Road + Country Club Intersection Improvement Intersection ImprovementSahuarita Roadway: Pedestrian crossing at Underpass (In front of Town Hall) Pedestrian CrossingSahuarita Roadway: Bikelanes La Villita> CC Rd Segment 3‐4: La Villita to Azatlan Ave. BikewaySidewalks: La Villita> CC Rd Segment 3‐4: La Villita to Azatlan Ave. SidewalkSahuarita Roadway: La Villita to Country Club Wildlife Crossings Wildlife Linkages

Pima County I‐19: NB Frontage Rd ‐ Part 2 35__ 110.01 CompleteI‐19 Frontage Road: Canoa Ranch to Continental Rd. Roadway SegmentsI‐19 Frontage Road: I‐19 + Conoa Intersection ImprovementI‐19 Frontage Road: I‐19 + Continental Intersection ImprovementI‐19 Frontage Road: Canoa Ranch to Continental Rd. Bikelanes Bikeway

Tucson Grant / Craycroft Intersection 36_a SN01 1.07 CompleteGrant/Craycroft Intersection ImprovementGrant/Craycroft: Bus Pull‐out #1 Bus PulloutGrant/Craycroft: Bus Pull‐out #2 Bus PulloutGrant/Craycroft: Bus Pull‐out #3 Bus PulloutAlamo Wash Bridge (Grant/Craycroft Intersection) Railroad Safety

Tucson Golf Links/Wilmot Intersection                 36_b SN02 2.07 CompleteGolf Links/Wilmot Intersection ImprovementBus Pull‐out #1: Golf Links/Wilmot Bus PulloutB P ll t #2 G lf Li k /Wil t B P ll tBus Pull‐out #2: Golf Links/Wilmot Bus PulloutBus Pull‐out #3: Golf Links/Wilmot Bus Pullout

Tucson Ft Lowell/Campbell Intersection              36_c SN03 3.07 CompleteFt. Lowell/Campbell Intersection ImprovementBus Pull‐out Ft. Lowell/Campbell Bus PulloutBus Pull‐out Ft. Lowell/Campbell Bus PulloutBus Pull‐out Ft. Lowell/Campbell Bus PulloutBus Pull‐out Ft. Lowell/Campbell Bus Pullout

Tucson Starr Pass/Mission Rd Intersection          36_d SN04              4.07 CompleteStarr Pass/Mission Intersection Improvement

Tucson Wilmot/Park Place Intersection                36_e 5.07 CompleteWilmot/Park Place Intersection Improvement

Tucson Starr Pass/La Cholla Intersection              36_f 6.07 CompleteStarr Pass/La Cholla Intersection Improvement

Tucson 6th Ave / Euclid Ave Signal Upgrade 36_g SG02 7.07 CompleteSixth/Euclid Intersection Improvement

 9/19/2016 2:36:28 PM  1 6 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Tucson Country Club/Pima Signal Upgrade          36_h SG04 8.07 CompleteCountry Club/Pima Intersection Improvement

Tucson Nogales/Drexel Signal Upgrade                36_i SG05 9.07 CompleteNogales/Drexel Intersection Improvement

Tucson Stone/Glenn Signal Upgrade                     36_j SG03        10.07 CompleteStone/Glenn Intersection Improvement

Tucson Old Vail/Valencia Signal                             36_k 11.07 CompleteOld Vail/Valencia Intersection Improvement

Tucson Rita/Old Vail Traffic Signal                         36_l 12.07 CompleteRita/Old Vail Intersection Improvement

South Tucson South Tucson Intersections 36 m 13 07 CompleteSouth Tucson South Tucson Intersections                       36_m               13.07 CompleteSouth Tucson Intersection #1:  29th St / 10th Ave Intersection ImprovementSouth Tucson Intersection #2:  29th St / 4th ave Intersection ImprovementSouth Tucson Intersection #3:  29th St / 6th Ave Intersection ImprovementSouth Tucson Intersection #4:  36th St / 4th Ave Intersection ImprovementSouth Tucson Intersection #5:  36th St / 6th Ave Intersection ImprovementSouth Tucson Intersection #6:  39th St / 6th Ave Intersection Improvement

Sahuarita Alpha Ave/Duval Mine Intersection         36_n 14.07 CompleteAlpha Ave./Duval Mine Intersection Improvement

Sahuarita Duval Mine/La Canada Intersection        36_o             15.07 CompleteDuval Mine/La Canada Intersection Improvement

Oro Valley Lambert Ln/La Cholla Intersection           36_p             16.07 CompleteLambert Lane/La Cholla Intersection Improvement

Pima County La Cholla/Overton Intersection                36_q 17.07 CompleteLa Cholla/Overton Intersection Improvement

Pima County Benson Hwy/Valencia Intersection          36_r 18.07 CompleteValencia/Benson Hwy  Intersection Improvement

Pima County Valencia/Wilmot Intersection                   36_s 19.07 CompleteValencia/Wilmot Intersection Improvement

Pima CountyTanque Verde/Soldier Trail Intersection                     

36_t             20.07 Complete

Tanque Verde/Soldier Trail Intersection ImprovementPima County Ina Rd / Wade Rd Intersection  36_u 21.07 Complete

Ina + Wade Intersection ImprovementMarana Silverbell/Ina Intersection                         36_v 22.07 Complete

Silverbell/Ina Intersection ImprovementTohono O'odham Mission/Valencia Intersection                  36_w 23.07 Dropped

Mission/Valencia Intersection Improvement

Pima CountyHoughton Rd./Sahuarita Rd. I t ti

36_x 38.07 CompleteyIntersection                     

_ p

Houghton/Sahuarita Intersection Improvement

Oro ValleyGlover/La Cholla Safety Improvement & School Crossing       

36_y 157.07 Complete

Glover/La Cholla Intersection Improvement

RTAKolb and Valencia intersection reconstruction               

36_z 158.07 In Design

Valencia/Kolb Intersection Improvement

MaranaSilverbell/Coachline Intersection Improvements              

36aa 159.07 Complete

Silverbell/Coachline Intersection Improvement

TucsonCamino Seco/Wrightstown Intersection Improvements           

36ab 45.08 Complete

Camino Seco/Wrightstown Intersection Improvement

Pima CountyFlowing Wells Rd. and Wetmore Intersection Improvements     

36ac 6.08 Complete

 9/19/2016 2:36:28 PM  1 7 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Flowing Wells + Wetmore Intersection Improvement

SahuaritaPima Mine Rd./Rancho Sahuarita Blvd. Traffic Signal         

36ad 92.08 Complete

Pima Mine Rd./Rancho Sahuarita Blvd. Traffic Signal          Intersection ImprovementTucson Oracle and Auto Mall Design                    36ae 59.08 Dropped

Oracle and Auto Mall Design                                  Intersection Improvement

Pima CountyAlvernon Way and Valencia Rd. Intersection Improvements     

36af 4RTAWV 8.08 Complete

Valencia/Alvernon Way Intersection ImprovementValencia Rd./Alvernon Bus Pull‐out Bus Pullout

Tucson Grant and Rosemont Design and Build   36ag 56.08 Dropped

Grant and Rosemont Design and Build                          Intersection Improvement

Pima CountyCampbell Ave./Skyline shoulder widening, left turn bay      

36ah 4RTCAS            10.08 Complete

Campbell/Skyline Intersection Improvement

Pima CountyPalo Verde Rd. and Michigan St./Coach Dr.                   

36ai 15.08 Complete

Palo Verde/Michigan & Coach Intersection ImprovementTucson Detection cameras                                      36aj 57.08 Complete

Detection Cameras, Intersection #01: 22nd St / Harrison Rd Intersection ImprovementDetection Cameras, Intersection #02: 22nd / Kolb Intersection ImprovementDetection Cameras, Intersection #03: 22nd / Park Ave Intersection ImprovementDetection Cameras, Intersection #04: 22nd / Wilmot Rd Intersection ImprovementDetection Cameras, Intersection #05: Ajo Way / 12th  Ave Intersection ImprovementDetection Cameras, Intersection #06: Ajo Way / 6th Ave Intersection ImprovementDetection Cameras, Intersection #07: Ajo Way / Park Ave Intersection ImprovementDetection Cameras, Intersection #08: Broadway Blvd / Chantilly Dr Intersection ImprovementDetection Cameras, Intersection #09: Broadway Blvd / Craycroft Rd Intersection ImprovementDetection Cameras, Intersection #10: Broadway Blvd / Kolb Rd Intersection ImprovementDetection Cameras, Intersection #11: Broadway Blvd / Wilmot Intersection ImprovementDetection Cameras, Intersection #12: Campbell Ave / River Rd Intersection ImprovementDetection Cameras, Intersection #13: Fort Lowell / Stone Ave Intersection ImprovementDetection Cameras, Intersection #14: Golf Links / Harrison Intersection ImprovementDetection Cameras, Intersection #15: Golf Links / Pantano Rd Intersection ImprovementDetection Cameras, Intersection #16: Grant Rd / 1st Ave Intersection ImprovementDetection Cameras, Intersection #17: Grant Rd / Campbell Ave Intersection ImprovementDetection Cameras, Intersection #18: Grant Rd / Rosemont Blvd Intersection ImprovementDetection Cameras, Intersection #19: Irvington Rd / Midvale Park Rd Intersection ImprovementD t ti C I t ti #20 K lb Rd / S d Bld I t ti I tDetection Cameras, Intersection #20: Kolb Rd / Speedway Bld Intersection ImprovementDetection Cameras, Intersection #21: Prince Rd / Mountain Ave Intersection ImprovementDetection Cameras, Intersection #22: Rita Rd / Houghton Rd Intersection ImprovementDetection Cameras, Intersection #23: River Rd / 1st Ave Intersection ImprovementDetection Cameras, Intersection #24: Speedway Blvd / Alvernon Way Intersection ImprovementDetection Cameras, Intersection #25: Speedway Blvd / Campbell Intersection ImprovementDetection Cameras, Intersection #26: Speedway Blvd / Cherry Ave Intersection ImprovementDetection Cameras, Intersection #27: Speedway Blvd / Euclid Ave Intersection ImprovementDetection Cameras, Intersection #28: Speedway Blvd / Mountain Ave Intersection ImprovementDetection Cameras, Intersection #29: Speedway Blvd / Park Ave Intersection ImprovementDetection Cameras, Intersection #30: Speedway Blvd / Tucson Blvd Intersection ImprovementDetection Cameras, Intersection #31: Speedway Blvd / Wilmot Rd Intersection ImprovementDetection Cameras, Intersection #32: Swan Rd / Camp Lowell Dr Intersection ImprovementDetection Cameras, Intersection #33: Tanque Verde / Sabino Canyon Intersection ImprovementDetection Cameras, Intersection #34: Valencia Rd / 12th Ave Intersection Improvement

36ak             Detection Cameras, Intersection #35: Valencia Rd / Nexus Dr Intersection Improvement

 9/19/2016 2:36:28 PM  1 8 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Detection Cameras, Intersection #36: Wilmot Rd / Park Place Dr. Intersection Improvement

Pima CountyLa Cholla Blvd./River Rd. Intersection Improvements         

36ak              20.08 Complete

La Cholla + River Intersection ImprovementLa Cholla + River: Bus Pull‐out Bus Pullout

TucsonTanque Verde and Pima Intersection Improvements             

36al 47.08 Complete

Tanque Verde/Pima Intersection Improvement

Pima CountyCamino Verde and Valencia Rd. Intersection Improvements     

36am 4.08 Complete

Camino Verde/Valencia Intersection ImprovementCamino Verde/Valencia Intersection ImprovementTucson Wilmot and Nicaragua Traffic Signal        36an 46.08 Dropped

Wilmot/Nicaragua (design only) Intersection Improvement

Pima CountyMona Lisa Rd. at Orange Grove Intersection Improvements     

36ao 11.08 Complete

Mona Lisa + Orange Grove Intersection Improvement

Pima CountyIna Rd. and Oracle Rd. Intersection Improvement             

36ap 4RTIRO             19.08 Complete

Ina + Oracle Intersection ImprovementPima County Alvernon/Los Reales Traffic Signal           36aq 152.08 Complete

Alvernon/Los Reales Intersection Improvement

Pima CountyContinental Rd and Camino del Sol Traffic Circle            

36ar 16.08 Complete

Continental/Camino del Sol Intersection Improvement

Tucson6th St/Highland Intersection 

36at SN06 163 08 CompleteTucsonImprovements                   

36at SN06 163.08 Complete

6th/Highland Intersection Improvement

MaranaTangerine and Thornydale Intersection Improvement           

36au ST 171.08 Complete

Tangerine + Thornydale Intersection ImprovementTucson Prince Rd / Runway Dr Traffic Signal   36av 31.09 Transferred

Prince/Runway Dr Traffic Signal Intersection ImprovementMarana Cortaro Rd. Widening and Striping          36aw 32.09 Complete

Silverbell/Cortaro Intersection Improvement

Sahuarita Old Nogales Highway & Nogales Hwy 36ax 19.05 Complete

Old Nogales Highway & Nogales Hwy                            Intersection Improvement

RTARegional Intersection MUTCD Compliance Program              

36ay 99.09 Not Started

R i l I i MUTCD C li P I t ti I tRegional Intersection MUTCD Compliance Program               Intersection Improvement

Pima CountyNogales/Old Nogales Intersection Improvement                

36az 4OTNHS               100.09 Complete

Nogales/Old Nogales Intersection Improvement                 Intersection Improvement

TucsonGolf Links/Kolb Rd. Intersection Improvement                

36ba 4.01 Complete

Golf Links/Kolb Rd. Intersection Improvement Intersection ImprovementGolf Links/Kolb Rd. Intersection Bus Pullout #1 Bus PulloutGolf Links/Kolb Rd. Intersection Bus Pullout #2 Bus PulloutGolf Links/Kolb Rd. Intersection Bus Pullout #3 Bus Pullout

Pima CountyKolb Rd.: Ventana Canyon and Mt. Shadows                    

36bb 101.09 Complete

Kolb Rd.: Ventana Canyon and Mt. Shadows                     Intersection Improvement

Pima CountyCardinal/Valencia Road Intersection Improvements            

36bc 4RTVLS           102.09 Complete

Cardinal/Valencia Road Intersection Improvements             Intersection Improvement

 9/19/2016 2:36:28 PM  1 9 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Tucson Rita Rd: I‐10 to UPRR 36bd SR9A 71.09 CompleteRita Rd: I‐10 to UPRR Intersection ImprovementRita Rd: I‐10 to UPRR ‐ Rail Improvement Railroad SafetyRita Rd: I‐10 to UPRR Sidewalk Sidewalk

Tucson Harrison/Irvington Signalization               36be 104.09 CompleteHarrison/Irvington Signalization                             Intersection Improvement

ADOTI‐10 Interchange Signals Connection into ITOC System        

36bf 105.09 Transferred

I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #1  Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #2 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #3 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #3 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #4 Intersection ImprovementI‐10 Interchange Signals Connection into ITOC System: Sub‐Project #5 Intersection Improvement

ADOT Ajo Signal Interconnect                            36bg 106.09 TransferredAjo Signal Interconnect                            Intersection Improvement

ADOT Regional Traffic Signal Data to ITOC        36bh 107.09 TransferredRegional Traffic Signal Data to ITOC                         Intersection Improvement

Oro Valley Count Down Pedestrian Heads                 36bi 109.09 CompletePedestrian Countdown Head: N. First Ave / Palisades Intersection ImprovementPedestrian Countdown Head: La Canada / W Naranja Dr Intersection ImprovementPedestrian Countdown Head: La Canada W Lambert Intersection ImprovementPedestrian Countdown Head: La Cholla Blvd / Glover Rd Intersection ImprovementPedestrian Countdown Head: La Cholla Blvd + Tangerine Intersection ImprovementPedestrian Countdown Head: First Ave / Lambert Intersection ImprovementPedestrian Countdown Head: First Ave / E Naranja Intersection ImprovementPedestrian Countdown Head: La Cholla Dr. / W Lambert Intersection ImprovementPedestrian Countdown Head: Northern / Magee Intersection ImprovementPedestrian Countdown Head: Innovation Park / Rancho Vistoso Intersection ImprovementPedestrian Countdown Head: First Ave + Tangerine Intersection ImprovementPedestrian Countdown Head: Innovation Park + Tangerine Intersection ImprovementPedestrian Countdown Head: La Cholla Blvd / W Naranja Dr Intersection ImprovementPedestrian Countdown Head: First Ave Intersection ImprovementPedestrian Countdown Head: La Canada + Tangerine Intersection Improvement

Tucson Speedway/6th Avenue Signal Upgrade   36bj SG10 110.09 Complete

Speedway/6th Avenue Signal Upgrade                           Intersection ImprovementTucson Left Turn Phasing Installations  36bk             112.09 Complete

Valencia + Rita Rd. Intersection ImprovementSpeedway + Park Ave Intersection ImprovementS d M t i Intersection ImprovementSpeedway + Mountain Intersection ImprovementSpeedway + Cherry Intersection Improvement

Tucson2009 City of Tucson Intersection Improvements

36bl SN09 13.09 Complete

Wilmot / Nicaragua Dr Intersection ImprovementSt. Mary's + Silverbell Intersection Improvement Intersection ImprovementTanque Verde / Pima Street Intersection ImprovementOracle + Auto Mall Intersection ImprovementGrant/Rosemont Intersection Improvement

SahuaritaPima Mine Rd./Nogales Highway Traffic Signal                

36bm 73.09 Complete

#N/A Complete 40_t                    40_t                      91.08 Transferred Pima Mine Rd/Nogales Hwy Traffic Signal Intersection Improvement

Pima Mine Rd./Nogales Highway Traffic Signal Signal Technology Upgrades

TucsonStone Avenue Gateway: Speedway to Drachman                  

36bn 30 Under Construction

 9/19/2016 2:36:28 PM  1 10 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Stone Avenue Gateway: Speedway to Drachman Intersection ImprovementBus Pull‐out Stone Speedway NB Bus PulloutBus Pull‐out Stone Drachman SB Bus PulloutBikelane Bikeway

Pima County Colossal Cave Rd UPRR Success Drive      36bo 4rtccs           94.12 Under Construction

Colossal Cave Rd UPRR Success Drive                          Intersection Improvement

SahuaritaLa Villita/Rancho Sahuarita Intersection                    

36bp 97.12 Complete

La Villita/Rancho Sahuarita Intersection                     Intersection ImprovementTucson Kolb/UA Tech Park Signal 36bq SG12 95 12 CompleteTucson Kolb/UA Tech Park Signal                          36bq SG12 95.12 Complete

Kolb/UA Tech Park Signal                                     Intersection Improvement

Oro ValleyRancho Vistoso Blvd at Vistoso Highlands Signal             

36br              96.12 Complete

Rancho Vistoso Blvd at Vistoso Highlands Signal              Intersection Improvement

MaranaIna and Thornydale: EB/WB right turn lane widening

36bs ST043 93.12 Complete

Ina Rd. + Thornydale: EB/WB right turn lane widening Intersection Improvement

Pima CountyOrange Grove Rd./Silverbell Rd. Intersection                

36bt                      18.08 Dropped

Orange Grove Rd./Silverbell Rd. Intersection                 Intersection Improvement

RTAElderly and Pedestrian Safety Improvements                  

37__ 63.06 Dropped

Various Pedestrian Crossings Pedestrian CrossingTucson Euclid/2nd St HAWK                                   37_a 24.07 Dropped

HAWK ‐ 6th Avenue/14th Street (formerly Euclid/2nd.) HAWK

TucsonHAWK ‐ Stone / Cushing (formerly at Euclid / 5th), TIP 25.07

37_b         156.07 Complete

HAWK ‐ Stone/Cushing (formerlyEuclid/5th. TIP 25.07) HAWKTucson Santa Clara/Drexel HAWK                         37_c 26.07 Complete

HAWK ‐ Santa Clara/Drexel HAWK

Pima CountyFennimore Ave / Tanque Verde Rd HAWK  

37_d 27.07 Complete

HAWK ‐ Camino Fennimore/Tanque Verde HAWK

Pima CountyCamino La Zorrela/Orange Grove HAWK                         

37_e 28.07 Complete

HAWK ‐ Camino La Zorella/Orange Grove HAWKPascua Yaqui Hohokam HAWK                                         37_f 29.07 Complete

HAWK ‐ Hohokam HAWKS X i Eld l /P d S f

Tohono O'odhamSan Xavier Elderly/Ped Safety Improvements                  

37_g 30.07 Complete

San Xavier Elderly/Pedestrian Master Plan SidewalkTucson HAWK  Broadway / Sarnoff Dr. 37_h 63.07 Complete

HAWK ‐ Broadway / Sarnoff Dr HAWKTucson HAWK  Euclid / Lester 37_i 64.07 Complete

HAWK‐  Euclid / Lester  HAWK

Pima County Agua Caliente ‐ Safe Routes to School     37_j 4SRSAC 162.07 Complete

Agua Caliente Safe Routes to School:Limberlost Rd.: Melpomene Way to Agua Caliente School SidewalkAgua Caliente Safe Routes to School:Melpomene Way:Fort Lowell Rd. to Catalina Hwy SidewalkAgua Caliente Safe Routes to School:Melpomene Way:Limberlost Rd. to Camino Miramonte Sidewalk

Tucson ADA Improvements: Various Locations 37_k 163.07 Complete

ADA Improvements: Sub‐Project #01 ‐ 12th Ave / Michigan Dr ADAADA Improvements: Sub‐Project #02 ‐ 12th Ave: 38th St to 44th St ADA

 9/19/2016 2:36:28 PM  1 11 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

ADA Improvements: Sub‐Project #03 ‐ 5th St / Alvernon Way ADAADA Improvements: Sub‐Project #04 ‐ 6th Ave: I‐10 to 19th St ADAADA Improvements: Sub‐Project #05 ‐ 6th Ave: President St to Michigan Dr ADAADA Improvements: Sub‐Project #06 ‐ 6th St / Stone Ave ADAADA Improvements: Sub‐Project #07 ‐ Broadway Blvd: Kolb Rd to Pantano Rd ADAADA Improvements: Sub‐Project #08 ‐ Broadway Blvd: Park Ave to Campbell Ave ADAADA Improvements: Sub‐Project #09 ‐ Broadway: Campbell Ave to Craycroft Rd ADAADA Improvements: Sub‐Project #10 ‐ Campbell: Grant Rd to Elm St ADAADA Improvements: Sub‐Project #11 ‐ Escalante Rd: Kolb Rd to Pantano Rd ADAADA Improvements: Sub‐Project #12 ‐ Euclid Ave: Speedway Blvd to Broadway Blvd ADAADA Improvements: Sub‐Project #13 ‐ Fort Lowell Rd / Fontana Ave ADAADA Improvements: Sub‐Project #13 ‐ Fort Lowell Rd / Fontana Ave ADAADA Improvements: Sub‐Project #14 ‐ Glenn St: Swan Rd to Craycroft Rd ADAADA Improvements: Sub‐Project #15 ‐ Golf Links Rd: Pantano Rd to Bonanza Ave ADAADA Improvements: Sub‐Project #16 ‐ Grant Rd: Country Club Rd to Alvernon Way ADAADA Improvements: Sub‐Project #17 ‐ Grant Rd: Country Club Rd to Columbus Blvd ADAADA Improvements: Sub‐Project #18 ‐ Harrison Rd: Old Spanish Tr to Golf Links Rd ADAADA Improvements: Sub‐Project #19 ‐ Kino Pkwy: Aviation Pkwy to Benson Hwy ADAADA Improvements: Sub‐Project #20 ‐ Mountain Ave: Grant Rd to Fort Lowell Rd ADAADA Improvements: Sub‐Project #21 ‐ Palo Verde Rd: Glenn St to Grant Rd ADAADA Improvements: Sub‐Project #22 ‐ Pantano Rd: Escalante Rd to Golf Links Rd ADAADA Improvements: Sub‐Project #23 ‐ Pantano Rd: Escalante Rd to Irvington Rd ADAADA Improvements: Sub‐Project #24 ‐ Pantano Rd: Speedway Blvd to Wrightstown Rd ADAADA Improvements: Sub‐Project #25 ‐ Park Ave: Irvington Rd to Valencia Rd ADAADA Improvements: Sub‐Project #26 ‐ Pima St: Craycroft Rd to Wilmot Rd ADAADA Improvements: Sub‐Project #27 ‐ Pima St: Swan Rd to Craycroft Rd ADAADA Improvements: Sub‐Project #28 ‐ Silverbell Rd: Speedway Blvd to St Mary's Rd ADAADA Improvements: Sub‐Project #29 ‐ Speedway Blvd: Rosemont Blvd to Kolb Rd ADAADA Improvements: Sub‐Project #30 ‐ St. Mary's: I‐10 to Silverbell Rd ADAADA Improvements: Sub‐Project #31 ‐ Stella Rd: Kolb Rd to Pantano Rd ADAADA Improvements: Sub‐Project #32 ‐ Swan Rd: Rillito River to 22nd St ADAADA Improvements: Sub‐Project #33 ‐ Tucson Blvd: Irvington Rd to Valencia Rd ADAADA Improvements: Sub‐Project #34 ‐ Wetmore Rd: Oracle Rd to 1st Ave ADAADA Improvements: Sub‐Project #35 ‐ Wilmot Rd: Broadway Blvd to Golf Links Rd ADAADA Improvements: Sub‐Project #36 ‐ 1st Ave & Ft Lowell Rd ADAADA Improvements: Sub‐Project #37 ‐ 5th St & Craycroft Rd ADAADA Improvements: Sub‐Project #38 ‐ 6th St & 3rd Ave ADAADA Improvements: Sub‐Project #39 ‐ 12th Ave and Nebraska St ADAADA Improvements: Sub‐Project #40 ‐ 22nd St & Craycroft Rd ADAADA Improvements: Sub‐Project #41 ‐ Ajo Way & Park Ave ADAADA I t S b P j t #42 Al W & 22 d St ADAADA Improvements: Sub‐Project #42 ‐ Alvernon Way & 22nd St ADAADA Improvements: Sub‐Project #43 ‐ Alvernon Way & Broadway Blvd ADAADA Improvements: Sub‐Project #44 ‐ Alvernon Way & Fort Lowell ADAADA Improvements: Sub‐Project #45 ‐ Alvernon Way and Hayne Street ADAADA Improvements: Sub‐Project #46 ‐ Broadway Blvd & Camino Seco ADAADA Improvements: Sub‐Project #47 ‐ Broadway Blvd & Swan Rd (SE) ADAADA Improvements: Sub‐Project #48 ‐ Broadway Blvd & Swan Rd (NW) ADAADA Improvements: Sub‐Project #49 ‐ Campbell Ave & Speedway Blvd ADAADA Improvements: Sub‐Project #50 ‐ Craycroft & Speedway ADAADA Improvements: Sub‐Project #51 ‐ Ft Lowell Rd & 1st Ave ADAADA Improvements: Sub‐Project #52 ‐ Grant Rd & Alvernon Way ADAADA Improvements: Sub‐Project #53 ‐ Pantano Rd and Speedway ADAADA Improvements: Sub‐Project #54 ‐ Prince Rd & Campbell  Ave ADAADA Improvements: Sub‐Project #55 ‐ Prince Rd & Oracle  Rd (NW) ADAADA Improvements: Sub‐Project #56 ‐ Prince Rd & Oracle Rd (SE) ADAADA Improvements: Sub‐Project #57 ‐ Prince Rd & 1st Ave ADA

 9/19/2016 2:36:28 PM  1 12 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

ADA Improvements: Sub‐Project #58 ‐ Prince Rd & Stone Rd (SE) ADAADA Improvements: Sub‐Project #59 ‐ Prince Rd & Stone Rd (SW) ADAADA Improvements: Sub‐Project #60 ‐ Speedway Blvd & 6th Ave ADAADA Improvements: Sub‐Project #61 ‐ Speedway Blvd & Craycroft ADAADA Improvements: Sub‐Project #62 ‐ Speedway Blvd & Euclid Ave ADAADA Improvements: Sub‐Project #63 ‐ Speedway Blvd & Rook Ave ADAADA Improvements: Sub‐Project #64 ‐ Speedway Blvd: Stone ‐ Euclid ADAADA Improvements: Sub‐Project #65 ‐ St Mary's Rd & I‐10 ADAADA Improvements: Sub‐Project #66 ‐ St Mary's Rd at Furr's Cafeteria (SW Bonita Ave) ADAADA Improvements: Sub‐Project #67 ‐ Stone Ave & Blacklidge Dr ADA

37 m ADA Improvements: Sub‐Project #68 ‐ Speedway Blvd: Stone Ave ADA37_m         ADA Improvements: Sub‐Project #68 ‐ Speedway Blvd: Stone Ave ADAADA Improvements: Sub‐Project #69 ‐ Speedway Wilmot ADA

Tucson Sam Hughes Elementary SRTS                  37_m          21.08 CompleteSam Hughes Elementary SRTS: Sub‐Project #1 ‐ 3rd St: Country Club Rd ‐ Campbell Ave SidewalkSam Hughes Elementary SRTS: Sub‐Project #2 ‐ 4th St: Country Club Rd ‐ Campbell Ave SidewalkSam Hughes Elementary SRTS: Sub‐Project #3 ‐ Norton Ave: 1st St ‐ 6th St SidewalkSam Hughes Elementary SRTS: Sub‐Project #4 ‐ Wilson Ave: 1st St ‐ 6th St Sidewalk

Tucson 17th/Swan HAWK                                       37_n 117.08 Dropped17th/Swan HAWK                                               HAWK

Pima County West Curtis Rd at N. Shannon                   37_o 4RTHCS              13.08 CompleteHAWK ‐ Curtis + Shannon HAWK

Pima CountyValencia Rd Street Lighting and Sidewalk                   

37_p 4RTVLS 2.08 Complete

Valencia Street Lighting / Sidewalk Camino De La Tierra to Cardinal Sidewalk+LightingValencia Street Lighting / Sidewalk Westover to Cardinal Sidewalk+Lighting

SahuaritaGreat Expectations School Flasher Assembly                  

37_q 89.08 Complete

Great Expectations School Flasher Pedestrian CrossingTucson Wrightstown/Fountain Park HAWK         37_r 118.08 Dropped

Wrightstown/Fountain Park HAWK                               HAWK

South TucsonHAWK 31st St. and 6th Ave. Pedestrian Crossing

37_s 63.08 Complete

HAWK ‐ 6th/31st HAWK

South TucsonHAWK 34th St. and 6th Ave. Pedestrian Crossing

37_t 64.08 Complete

HAWK ‐ 6th/34th HAWKTucson Euclid Ave / 9th Ave HAWK 37_u 32.08 Dropped

Euclid/9th Ave HAWK                                          HAWK

Pascua YaquiHealth Center to Senior Center Sid lk P j t

37 v 150.08 CompleteqSidewalk Project             

_ p

37_w             Health Center to Senior Center Sidewalk ‐ Camino Benem: Calle Torim to Senior Center SidewalkHealth Center to Senior Center Sidewalk ‐ PYT Health Center to Senior Center Sidewalk

Oro ValleyLa Cholla Pedestrian Improvements (SRTS)                    

37_w              151.08 Transferred

La Cholla School Walking Path Pathway

Pima CountyHomer Davis School Bike/Ped Enhancement                     

37_x 4HDBPE           30.06 Complete

Homer Davis Safe Routes to School SidewalkTucson Pedestrian HAWK Crossings    37_y SH08            155.08 Complete

HAWK ‐ 12th/Alvord HAWKHAWK ‐ 3rd/Swan HAWKHAWK ‐ Camino Seco/Kenyon HAWKHAWK ‐ Country Club/Silver HAWKHAWK ‐ Drexel/Del Moral HAWKHAWK ‐ Drexel/Liberty HAWK

 9/19/2016 2:36:28 PM  1 13 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

HAWK ‐ Escalante/Prudence HAWKHAWK ‐ Esmond/Rita (Desert Sky 1) HAWKHAWK ‐ Euclid/9th HAWKHAWK ‐ Flower/Alvernon HAWKHAWK ‐ Grande/St. Clair HAWKHAWK ‐ La Paloma Academy PELICAN ; Golf Links / E. Lakeside Pkwy HAWKHAWK ‐ North Sahuara Ave/East Pima Street HAWKHAWK ‐ Old Spanish Trail/29th HAWKHAWK ‐ Old Spanish Trail/Kenyon HAWKHAWK ‐ Rita/Via Del Tiembre HAWKHAWK ‐ Starr Pass/Santa Cruz HAWKHAWK ‐ Starr Pass/Santa Cruz HAWKHAWK ‐ Swan/17th HAWKHAWK ‐ Wilson/6th HAWKHAWK ‐ Wrightstown/Fountain Park HAWK

Tucson 2nd Ave/Speedway Pedestrian Refuge   37_z 162.08 Complete

2nd/Speedway Pedestrian Refuge Pedestrian Refuge

Pima CountyFruchthendler Elementary School Walking Paths               

37aa 37.07 Complete

Fruchtendler School Walking Paths Sidewalk

Pima CountyPicture Rocks & Desert Winds Safe Routes to School          

37ab 4PRDWE           71.07 Complete

Picture Rocks Safe Routes to Schools: Rudasill Rd: Avra Rd to Chaparral Rd Sidewalk37ac         Picture Rocks Safe Routes to Schools: Rudasill Rd: Chaparral Rd to Sanders Rd Sidewalk

Picture Rocks Safe Routes to Schools: Sanders Rd: Rudasill Rd to Sunset Dr Sidewalk

Tucson HAWK beacon at 6th Ave and 14th St.    37ac          155.07 Complete

HAWK beacon at 6th Ave and 14th St.                          HAWKPima County Camino de Oeste Sidewalk                        37ad             5.1 Transferred

Camino de Oeste Sidewalk Sidewalk

Pima CountyContinental School Safe Routes to School                    

37ae 4CEMSR             31.06 Complete

37af             Shared Use Path ‐ White House Canyon Rd. Madera Reserve Rd PathwayBikelines ‐ Whitehouse Canyon Rd. Continental Rd Bikeway

Tucson 18th St / Main Ave Pedestrian Refuge  37af              7.1 Complete

Main/18th Pedestrian Refuge                                  Pedestrian Refuge

Pima CountyManzanita Elementary Safe Routes to School                  

37ag 8.1 Complete

M i El S f R S h l S f R t t S h lManzanita Elementary Safe Routes to School                   Safe Routes to SchoolPima County Camino del Sol Pedestrian Ramps            37ah 9.1 Transferred

Camino del Sol Pedestrian Ramps                              RampsTucson Broadway/Old Spanish Trail Pelican        37ai 10.1 Complete

Broadway/Old Spanish Trail Pelican                           Signal PelicanTucson Oaktree/Drexel Pedestrian Refuge          37aj            11.1 Complete

Oaktree/Drexel Pedestrian Refuge                             Pedestrian RefugeTucson School HAWK Signals ‐ Package I              37ak      SH19        12.1 Complete

School HAWK Signals Package I: 22nd Street / Magnolia HAWKSchool HAWK Signals Package I: Stone Ave / King HAWKSchool HAWK Signals Package I: Park Ave / 33rd St HAWK

37al             School HAWK Signals Package I: Campbell Ave / Bantam HAWKSchool HAWK Signals Package I: La Cholla Blvd / Merlin HAWK

Tucson Speedway/10th HAWK                               37al             13.1 CompleteSpeedway/10th HAWK                                           HAWK

 9/19/2016 2:36:28 PM  1 14 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Tucson22nd St/Lakeshore HAWK  and La Cholla/Ocelot HAWK     

37am             14.1 Complete

37an             22nd St/Lakeshore HAWK HAWKLa Cholla/Ocelot HAWK HAWK

Tucson Speedway/Arcadia HAWK                         37an             15.1 CompleteSpeedway/Arcadia HAWK                                        HAWK

South Tucson 26th St and 10th Ave HAWK   37ao 16.1 In Design26th and 10th HAWK   HAWK

South Tucson ADA Upgrades       37ap 17.1 Not StartedADA Upgrades       ADA

Sidewalk and Safe Routes to SchoolPima County

Sidewalk and Safe Routes to School Package 2

37aq             12.11 Complete

Sidewalk and SRTS Package 2: Laguna Elementary SRTS‐ Shannon Rd: Curtis to Diamond SidewalkSidewalk and SRTS Package 2: Camino Del Sol, Placita de la Cotonia to Canoa Rd SidewalkSidewalk and SRTS Package 2: Centennial/Flowing Wells Jr H. (Wetmore:La Cholla‐Romero Sidewalk

37ar            Camino De Oeste: Valencia to Tetakusim Rd. Sidewalk and SRTS SidewalkSidewalk and SRTS Package 2: Manzanita Elem. SRTS; La Encantada to Manzanita (Design) Sidewalk

South Tucson4th Avenue Street Lighting Improvements ‐ City of South Tuc.

37ar             6.12 Complete

4th Avenue Street Lighting Improvements ‐ City of South Tuc. Street Lighting

Tohono O'odhamSan Xavier: Little Nogales Mission Gateway Path

37as 91.09 In Design

San Xavier: Little Nogales Mission Gateway Path PathwayTucson 22nd/Avenida Sirio HAWK                         37at SH26 68.12 Complete

22nd/Avenida Sirio HAWK HAWKTucson Campbell/Ninth HAWK                              37au SH27 65.12 Under Construction

Campbell/Ninth HAWK HAWKTucson Craycroft/Ft. Lowell Park HAWK               37av SH28 66.12 Under Construction

Craycroft/Ft. Lowell Park HAWK                               HAWKTucson Grant/Sahuara Bike HAWK            37aw SH29 67.12 Under Construction

Grant/North Sahuara Ave Bike HAWK HAWKPima County Palo Verde HAWKs                                      37ax 4RTPAM 71.12 Complete

Palo Verde @ Alvord HAWKPalo Verde @ Milton HAWK

Pima County Summerhaven Sidewalk                             37ay 4SUMSW 70.12 CompleteSummerhaven Sidewalk                                         Sidewalk

Tucson La Cholla / Ocelot HAWK                           37az                      23.12 TransferredLa Cholla / Ocelot HAWK                                      HAWK

Tucson Desert Sky 1 HAWK                                     37ba                      34.08 DroppedD t Sk 1 HAWK HAWKDesert Sky 1 HAWK                                            HAWK

Pima County Mary Ann Cleveland at Kush HAWK         37bb 4TAMAC 87.12 Under ConstructionMary Ann Cleveland at Kush HAWK HAWK

Pima CountyLaguna Elementary School Pedestrian Enhancement Project     

37bc 4LEMSI               40.05 Transferred

Laguna Elementary School Pedestrian Enhancement Project. Shannon Rd. adjacent to Flowing Wells District Park Pedestrian EnhancementTucson Nogales and Olive HAWK Crossing 37be 27.15 Complete

HAWK

Pima County Bus Pullout Projects, Valencia Corridor   38_a 151.07 Complete

Bus Pullouts, Valencia Corridor: 01 Valencia Rd + Caballo Rd EB Bus PulloutBus Pullouts, Valencia Corridor: 02 Valencia Rd + Caballo Rd WB Bus PulloutBus Pullouts, Valencia Corridor: 03 Valencia Rd + Camino de la Tierra EB Bus PulloutBus Pullouts, Valencia Corridor: 04 Valencia Rd + Camino de la Tierra WB Bus PulloutBus Pullouts, Valencia Corridor: 05 Valencia Rd + Camino de Oeste EB Bus PulloutBus Pullouts, Valencia Corridor: 06 Valencia Rd + Camino de Oeste WB Bus Pullout

 9/19/2016 2:36:28 PM  1 15 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Bus Pullouts, Valencia Corridor: 07 Valencia Rd + Mark Rd EB Bus PulloutBus Pullouts, Valencia Corridor: 08 Valencia Rd + Mark Rd WB Bus PulloutBus Pullouts, Valencia Corridor: 09 Valencia Rd + Sorrell Ln EB Bus PulloutBus Pullouts, Valencia Corridor: 10 Valencia Rd + Sorrell Ln WB Bus Pullout

Tucson Bus Pullout Projects, Package 1                38_b 152.07 CompleteTucson Bus Pullout Pkg 01: 01 Broadway Blvd + Alvernon Way Bus PulloutTucson Bus Pullout Pkg 01: 02 Country Club Rd + Kleindale Rd NB Bus PulloutTucson Bus Pullout Pkg 01: 03 Country Club Rd + Kleindale Rd SB Bus PulloutTucson Bus Pullout Pkg 01: 04 Glenn St + Oracle Rd NB Bus PulloutTucson Bus Pullout Pkg 01: 05 Grant Rd + Alvernon Way Bus PulloutTucson Bus Pullout Pkg 01: 06 Irvington Rd + Campbell Ave Bus PulloutTucson Bus Pullout Pkg 01: 06 Irvington Rd + Campbell Ave Bus PulloutTucson Bus Pullout Pkg 01: 07 Irvington Rd + Campbell Ave Bus Pullout

Tucson Bus Pullout Projects, Package 2                38_c 153.07 CompleteTucson Bus Pullout Pkg 02: 01 Ajo Way + Park Ave Bus PulloutTucson Bus Pullout Pkg 02: 02 Grant Rd + Oracle Rd Bus PulloutTucson Bus Pullout Pkg 02: 03 Speedway Blvd + 6th Ave Bus PulloutTucson Bus Pullout Pkg 02: 04 Stone Ave + Yavapai Rd Bus Pullout

Tucson Bus Pullout Projects, Package 3                38_d 154.07 CompleteTucson Bus Pullout Pkg 03: 01 Broadway Blvd + Country Club Rd Bus PulloutTucson Bus Pullout Pkg 03: 02 Fort Lowell Rd + Dodge Blvd Bus PulloutTucson Bus Pullout Pkg 03: 03 Irvington Rd + Park Ave Bus PulloutTucson Bus Pullout Pkg 03: 04 Los Reales Rd + Nogales Hwy Bus Pullout

OWP‐TDOT ADA Accessible Bus Stop                            38_e 76.08 CompleteADA Accessible Stop @Ina/Oracle Bus Pullout

Pima CountyPalo Verde Corridor Transit 

38 f 4RTPVC 126 08 CompletePima CountyImprovements                    

38_f 4RTPVC 126.08 Complete

Palo Verde Corridor ‐ Palo Verde Rd. / Ajo Way NB Bus PulloutPalo Verde Corridor ‐ Palo Verde Rd. / Ajo Way SB Bus PulloutPalo Verde Corridor ‐ Palo Verde Rd. / Benson Hwy NB Bus Pullout

Tucson Bus Pullout Projects, Package 4                38_g 165.08 CompleteBus Pullouts Package 4: Subproject 1 ‐ Sixth St + Euclid Ave NB Bus PulloutBus Pullouts Package 4: Subproject 2 ‐ Sixth St + Highland Ave WB Bus PulloutBus Pullouts Package 4: Subproject 3 ‐ Sixth St + Campbell Ave WB Bus PulloutBus Pullouts Package 4: Subproject 4 ‐ Grant Rd + Silverbell Rd EB Bus Pullout

38_h             Bus Pullouts Package 4: Subproject 5 ‐ Fifth St + Alvernon Way SB Bus PulloutBus Pullouts Package 4: Subproject 6 ‐ 22nd St + Country Club Rd SB Bus Pullout

Sahuarita Sahuarita Town Hall Park‐and‐Ride         38_h             97.08 CompleteSahuarita Park & Ride Transit Facility: Park & Ride

Tucson Bus Pullout Package 5 38_i 69.09 CompleteB P ll t P k 5 S b j t1 29th St / C ft Rd EB Bus PulloutBus Pullouts Package 5: Subproject1: 29th St / Craycroft Rd EB Bus PulloutBus Pullouts Package 5: Subproject2: Congress St WB / Avenida Del Convento WB (El Rio Neighborhood Health Ctr) Bus Pullout

38_j             Bus Pullouts Package 5: Subproject3: Craycroft Rd / 29th St NB Bus PulloutBus Pullouts Package 5: Subproject4: Flowing Wells Rd / Roger Rd SB Bus Pullout

RTA  Bus Pullout Packages #6 ‐ #15                 38_j             79.09 Under ConstructionRTA Bus Pullout pkg 06: Alvernon Way / Ft Lowell Rd SB Bus PulloutRTA Bus Pullout Pkg 06: Alvernon Way / Glenn St NB Bus PulloutRTA Bus Pullout Pkg 06: Alvernon Way / Glenn St SB Bus PulloutRTA Bus Pullout pkg 06: Alvernon Way / Pima St NB Bus PulloutRTA Bus Pullout pkg 06: Alvernon Way / Pima St SB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Ft Lowell Rd NB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Ft Lowell Rd SB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Prince Rd SB Bus PulloutRTA Bus Pullout pkg 07: 1st Ave / Roger Rd SB Bus PulloutRTA Bus Pullout pkg 07: Ft Lowell / 1st Ave EB Bus PulloutRTA Bus Pullout pkg 08: 22nd St / Country Club Rd WB Bus Pullout

 9/19/2016 2:36:28 PM  1 16 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

RTA Bus Pullout pkg 08: 29th St / Columbus Blvd EB Bus PulloutRTA Bus Pullout pkg 08: St. Mary's  Rd / Silverbell Rd EB Bus PulloutRTA Bus Pullout pkg 08: Wilmot Rd / Broadway Blvd SB Bus PulloutRTA Bus Pullout pkg 09: Alvernon Way / 22nd St SB Bus PulloutRTA Bus Pullout pkg 09: Alvernon Way / 29th St NB Bus PulloutRTA Bus Pullout pkg 09: Alvernon Way / 32nd St SB Bus PulloutRTA Bus Pullout pkg 10: Campbell Ave / Adams St SB Bus PulloutRTA Bus Pullout pkg 10: Campbell Ave / Prince Rd SB Bus PulloutRTA Bus Pullout pkg 10: Ft. Lowell Rd / Alvernon Way WB Bus PulloutRTA Bus Pullout Pkg 11: Oracle Rd + Glenn St SB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd EB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd  EB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd NB Bus PulloutRTA Bus Pullout pkg 11: Oracle Rd + Prince Rd SB Bus PulloutRTA Bus Pullout pkg 12: 12th Ave / Nebraska St NB Bus PulloutRTA Bus Pullout pkg 12: 12th Ave / Valencia Rd NB Bus PulloutRTA Bus Pullout pkg 12: 6th Ave / Veterans Blvd NB Bus PulloutRTA Bus Pullout pkg 12: Park Ave / Irvington Rd NB Bus PulloutRTA Bus Pullout pkg 12: Valencia Rd / San Fernando Rd EB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Euclid Ave EB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Swan Rd EB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Swan Rd WB Bus PulloutRTA Bus Pullout pkg 13: Speedway Blvd / Wilmot Rd EB Bus PulloutRTA Bus Pullout pkg 13: Swan Rd / Speedway Blvd SB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 26th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 29th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 29th St SB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 36th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 39th St NB Bus PulloutRTA Bus Pullout pkg 14: 6th Ave / 39th St SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / C. Adobes Dr  NB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / C. Adobes Dr SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Cresta Loma NB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Cresta Loma SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Las Lomitas NB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Las Lomitas SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Lavery Ln SB Bus PulloutRTA Bus Pullout pkg 15: Oracle Rd / Rudasill Rd SB Bus PulloutRTA Bus Pullout pkg 13: Harrison / 22nd SB Bus Pullout

Marana Northern Marana Bus Stop                       38_k 71.1 CompleteM Ci i C t P ll t #1 Ci i C t Bus PulloutMarana Civic Center Pull‐outs: #1 Civic Center Bus PulloutMarana Civic Center Pull‐outs: #2 Civic Center Bus PulloutMarana Civic Center Pull‐outs: #3 Grier Rd/Sandario Rd. Bus Pullout

RTA Bus Pullouts: Packages 16 ‐ 19 38_l 51.14 In DesignRTA Bus Pullout Packages #16 Project #01 Stone Ave./ Prince Rd.  NB Bus PulloutRTA Bus Pullout Packages #16 Project #02 Bus PulloutRTA Bus Pullout Packages #16 Project #03 Bus PulloutRTA Bus Pullout Packages #16 Project #04 Bus PulloutRTA Bus Pullout Packages #16 Project #05 Bus PulloutRTA Bus Pullout Packages #16 Project #06 Bus PulloutRTA Bus Pullout Packages #16 Project #07 Bus PulloutRTA Bus Pullout Packages #17 Project #01 Bus PulloutRTA Bus Pullout Packages #17 Project #02 Bus PulloutRTA Bus Pullout Packages #17 Project #03 Bus PulloutRTA Bus Pullout Packages #17 Project #04 Bus PulloutRTA Bus Pullout Packages #17 Project #05 Bus Pullout

 9/19/2016 2:36:28 PM  1 17 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

RTA Bus Pullout Packages #17 Project #06 Bus PulloutRTA Bus Pullout Packages #17 Project #07 Bus PulloutRTA Bus Pullout Packages #17 Project #08 Prince / First NB Bus PulloutRTA Bus Pullout Packages #18 Project #01 Bus PulloutRTA Bus Pullout Packages #18 Project #02 Bus PulloutRTA Bus Pullout Packages #18 Project #03 Bus PulloutRTA Bus Pullout Packages #18 Project #04 Bus PulloutRTA Bus Pullout Packages #18 Project #05 Bus PulloutRTA Bus Pullout Packages #18 Project #06 Speedway / Tucson Blvd WB Bus PulloutRTA Bus Pullout Packages #19 Project #01 Bus PulloutRTA Bus Pullout Packages #19 Project #02 Bus PulloutRTA Bus Pullout Packages #19 Project #02 Bus PulloutRTA Bus Pullout Packages #19 Project #03 Bus PulloutRTA Bus Pullout Packages #19 Project #04 Bus PulloutRTA Bus Pullout Packages #19 Project #05 Bus PulloutRTA Bus Pullout Packages #19 Project #06 Bus PulloutRTA Bus Pullout Packages #19 Project #07 Bus Pullout

Pima CountyMadera Canyon Rd. @Florida Canyon Wash (8302)               

39_a SB406 01C 867 Dropped

Madera Canyon Rd @ Florida Canyon Wash Railroad Safety

Pima CountyMadera Canyon Rd. @Medium Wash (8301)                       

39_b SB405 01C 151 Dropped

Madera Canyon Rd @ Medium Wash Railroad SafetyTucson Downtown Rail Safety Project                  39_c         44.08 Not Started

Downtown Rail Safety Project Study Railroad SafetySahuarita Pima Mine Rd. Bridge Replacement        39_d 87.08 Under Construction

Pima Mine Rd @ Santa Cruz River Bridge DeficiencyPima County Sabino Canyon Rd. Bridge                         39_e             33.09 Complete

Sabino Canyon Rd Bridge ‐ Rehabilitation Bridge Deficiency

TucsonSpeedway Blvd.: RR Underpass Reconstruction                 

39_f S190 85.06 In Design

Speedway/Union Pacific Railroad Underpass Railroad SafetySahuarita La Canada ‐ El Toro Rd. Rail Crossing  39_g 34.09 Complete

La Canada ‐ El Toro Rd Rail Crossing Railroad SafetyTohono O'odham San Xavier Rd Pedestrian Bridge              39_h 35.09 Dropped

San Xavier Rd Pedestrian Bridge Bridge Deficiency

Pima CountyMarsh Station Road Bridge at Cienega Wash                   

39_i 113.09 Complete

Marsh Station Road Bridge at Cienega Wash                    Bridge Deficiency

Pima CountyColossal Cave Road UPRR Success Dr., R th ff UPRR i

39 j 4RTCCS          1.1 Under ConstructionyRuthrauff UPRR crossing

_j

39_k             Colossal Cave Road UPRR Success Dr.                          Railroad SafetyRuthrauff UPRR                                               Railroad Safety

Oro ValleyRancho Vistoso Blvd Big Wash Bridge Barrier walls

39_k              2.1 Complete

Rancho Vistoso Blvd Big Wash Bridge Barrier walls            Bridge DeficiencyTucson UPRR Nogales Branch Rail Safety             39_l          3.1 Complete

UPRR Nogales Branch Rail Safety                              Railroad SafetyPima County Ruthrauff UPRR                                           39_m 4.1 Transferred

Ruthrauff UPRR                                               Railroad SafetyPima County Golder Ranch Rd Bridge 39_n 72.1 Complete

Golder Ranch Rd Bridge ‐ Rehabilitation Bridge DeficiencyPima County Elephant Head Road Bridge Repair  39_o 4RTEHB 8.15 Complete

Elephant Head Road, over the Santa Cruz River Bridge Deficiency

TucsonGolf Links‐Aviation Shared Use Path Bridge Deck Replacement

39_p 15.15 Not Started

 9/19/2016 2:36:28 PM  1 18 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Golf Links‐Aviation Shared Use Path Bridge deck rehabRTA Signalization Technology                           40__ 67.06 Complete

Signalization Technology: 29th St / 4th Ave  Signal Technology UpgradesSignalization Technology: 29th St / 6th Ave Signal Technology UpgradesSignalization Technology: 29th St / 10th Ave Signal Technology UpgradesSignalization Technology: 36th St / 4th Ave Signal Technology UpgradesSignalization Technology: 36th St / 6th Ave Signal Technology UpgradesSignalization Technology: 39th St / 6th Ave Signal Technology Upgrades

Tucson UPS/LED (20 intersections)                        40_a 31.07 CompleteUPS/LED Intersection #01: Ajo Way / 3rd Ave Signal Technology UpgradesUPS/LED Intersection #02: Ajo Way / 6th Ave Signal Technology UpgradesUPS/LED Intersection #02: Ajo Way / 6th Ave Signal Technology UpgradesUPS/LED Intersection #03: Ajo Way / Park Ave Signal Technology UpgradesUPS/LED Intersection #04: Alvernon Way / Elm St Signal Technology UpgradesUPS/LED Intersection #05: Alvernon Way / 5th St Signal Technology UpgradesUPS/LED Intersection #06: Campbell Ave / Elm St Signal Technology UpgradesUPS/LED Intersection #07: Campbell Ave / 3rd Ave Signal Technology UpgradesUPS/LED Intersection #08: Irvington Rd / 6th Ave Signal Technology UpgradesUPS/LED Intersection #09: Nogales Hwy / Bilby Rd Signal Technology UpgradesUPS/LED Intersection #10: Nogales Hwy / Drexel Rd Signal Technology UpgradesUPS/LED Intersection #11: Nogales Hwy / Valencia  Rd Signal Technology UpgradesUPS/LED Intersection #12: Speedway Blvd / Alvernon Way Signal Technology UpgradesUPS/LED Intersection #13: Speedway Blvd / Campbell Ave Signal Technology UpgradesUPS/LED Intersection #14: Speedway Blvd / Cherry Ave Signal Technology UpgradesUPS/LED Intersection #15: Speedway Blvd / Country Club Rd Signal Technology UpgradesUPS/LED Intersection #16: Speedway Blvd / Euclid Ave  Signal Technology UpgradesUPS/LED Intersection #17: Speedway Blvd / Mountain Ave Signal Technology UpgradesUPS/LED Intersection #18: Speedway Blvd / Park Ave Signal Technology UpgradesUPS/LED Intersection #19: Speedway Blvd / Tucson Blvd Signal Technology UpgradesUPS/LED Intersection #20: Valencia Rd / 12th Ave Signal Technology UpgradesUPS/LED Intersection #21: Valencia Rd / 6th Ave Signal Technology UpgradesUPS/LED Intersection #22: Valencia Rd / Calle Santa Cruz Signal Technology UpgradesUPS/LED Intersection #23: Valencia Rd / Campbell Ave Signal Technology UpgradesUPS/LED Intersection #24: Valencia Rd / I‐19 Signal Technology UpgradesUPS/LED Intersection #25: Valencia Rd / Santa Clara Ave Signal Technology UpgradesUPS/LED Intersection #26: Valencia Rd / Tucson Blvd Signal Technology UpgradesUPS/LED Intersection #27:  Signal Technology UpgradesUPS/LED Intersection #28:  Signal Technology UpgradesUPS/LED Intersection #29:  Signal Technology UpgradesUPS/LED Intersection #30:  Signal Technology Upgrades

T P d T it P i it 40 b 32 07 C l tTucson �Pre‐emp on and Transit Priority             40_b 32.07 CompletePre‐emption & Transit Priorty Signal Technology Upgrades

Tucson U of A Atlas Center                                     40_c SC03 33.07 CompleteU of A Atlas Study Signal Technology Upgrades

Pima County Ina Rd Corridor Signal Timing                    40_d 4RTICS 110.07 CompleteIna Road Signal Coordination  Signal Technology Upgrades

Tucson Regional Traffic Signal Central System    40_e             111.07 Under Construction

Regional Traffic Signal Central System Signal Technology Upgrades

Pima CountyTraffic Signal Wireless Communication System                

40_f 112.07 Complete

Traffic Signal Wireless Communication System Signal Technology UpgradesSouth Tucson Speed Alert Monitor Signs 40_g 113.07 Not Started

Speed Alert Monitor Systems  Signal Technology UpgradesSouth Tucson 27th St 6th Emergency Signal                   40_h 114.07 Complete

27th Street & 6th Avenue Emergency Signal Signal Technology Upgrades

 9/19/2016 2:36:28 PM  1 19 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Pima County Traffic Signal Battery Backup System      40_i 115.07 Complete

o   RTA – Traffic Signal Battery Backup System – Pima County Signal Technology UpgradesOWP‐PAG Regional Traffic Signal Services                 40_j 116.07 Under Construction

o   RTA – Traffic Signal Services (2008) – Pima Association of Governments/RTA Signal Technology Upgradeso   RTA – Traffic Signal Services (2009) – Pima Association of Governments/RTA Signal Technology Upgradeso   RTA – Traffic Signal Services (2010) – Pima Association of Governments/RTA Signal Technology Upgrades

Tucson Fire Station 17 Flasher                               40_k 172.08 CompleteFire Station 17 Flasher Signal Technology Upgrades

South Tucson UPS ‐ City of South Tucson                        40_l 169.08 Complete#N/A Complete 40 x#N/A Complete 40_x                    

40_x                      177.08 Not Started UPS ‐ South Tucson Signals Signal Technology UpgradesTown‐wide Signal Technology Upgrade Signal Technology Upgrades

Marana Marana Wireless Signal Upgrades            40_m 93.09 CompleteMarana Wireless Signal Upgrades: N/S Thornydale Rd. & E/W Cortaro Rd. Signal Technology Upgrades

Oro Valley Wireless Signal Link                                    40_n 94.09 CompleteWireless Signal Link: First Ave Signal Technology UpgradesWireless Signal Link: La Canada / Tangerine Rd Signal Technology UpgradesWireless Signal Link: La Canada / W Lambert Signal Technology UpgradesWireless Signal Link: La Canada / W Naranja Drive Signal Technology UpgradesWireless Signal Link: La Cholla / Tangerine Signal Technology UpgradesWireless Signal Link: La Cholla Blvd / Glover Rd Signal Technology UpgradesWireless Signal Link: Lambert / First Ave Signal Technology UpgradesWireless Signal Link: N First / E Naranja Signal Technology UpgradesWireless Signal Link: N First Ave / Palisades Signal Technology UpgradesWireless Signal Link: N La Cholla Dr. / W Lambert Signal Technology UpgradesWireless Signal Link: Northern / Magee Signal Technology UpgradesWireless Signal Link: Rancho Vistoso Blvd / Innovation Park Signal Technology UpgradesWireless Signal Link: Tangerine / First Ave Signal Technology Upgrades

40_o             Wireless Signal Link: Tangerine / Innovation Park Signal Technology UpgradesWireless Signal Link: W Naranja Drive / N La Cholla Blvd Signal Technology Upgrades

SahuaritaWireless signal & controller/equipment upgrades

40_o              95.09 Under Construction

RTA – Traffic Signal Wireless Communications Systems ‐ Pima County Signal Technology Upgrades

Tucson Real Time Signal Timing & Traffic Info 40_q SC04 98.09 Under Construction

Real Time Signal Timing & Traffic Info Signal Technology Upgrades

TucsonRegional Traffic Signal Operations Program

40_r 490V 34.06 Under Construction

R i l T ffi Si l O ti P Signal Technolog UpgradesRegional Traffic Signal Operations Program Signal Technology UpgradesTucson Regional Traffic Operations Center 40_s                      43.05 Not Started

Regional Traffic Operations Center Signal Technology Upgrades

SahuaritaTown‐wide GPS Clock and Yellow LED Retrofit                 

40_u                      174.08 Not Started

Signal Technology Improvement Signal Technology UpgradesOro Valley Signal Synchronization ‐ Oro Valley         40_v 175.08 Transferred

Various Locations Signal Technology UpgradesOro Valley UPS ‐ Oro Valley                                          40_w                      176.08 Transferred

UPS ‐ Oro Valley Signals Signal Technology UpgradesTucson Transit Priority ‐ FY 2009                           40_y                      179.08 Dropped

Transit Priority ‐ FY 2009 Signal Technology Upgrade Signal Technology Upgrades

SahuaritaUPS‐ Sahuarita. 3 Intersections along Nogales HWY           

40ak 90.08 Complete

UPS ‐ Sahuarita Signals ‐ Intersection#1 Signal Technology UpgradesUPS ‐ Sahuarita Signals ‐ Intersection#2 Signal Technology Upgrades

 9/19/2016 2:36:28 PM  1 20 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

UPS ‐ Sahuarita Signals ‐ Intersection#3 Signal Technology UpgradesTucson NTCIP Communications                             40al 41.08 Complete

NTCIP Communications Signal Technology Upgrades

Tucson Regional Transportation Data Network 40am 40am             39.08 Under Construction

Regional Transportation Data Network Signal Technology Upgrades

Sahuarita Speed Monitor Station ‐ Nogales Hwy    40an 94.08 Complete

Nogales Highway Speed Monitor Station Signal Technology UpgradesOro Valley UPS ‐ Town of Oro Valley                           40ao 121.08 Complete

UPS / Wireless Signal Upgrade : First Ave / Main Signal Technology UpgradesUPS / Wireless Signal Upgrade : First Ave / Main Signal Technology UpgradesUPS / Wireless Signal Upgrade : Northern / Magee Signal Technology UpgradesUPS / Wireless Signal Upgrade : Tangerine / First Ave Signal Technology UpgradesUPS / Wireless Signal Upgrade : Tangerine Rd / Innovation Park Signal Technology Upgrades

40ap          UPS / Wireless Signal Upgrade : Tangerine Rd / La Cholla Signal Technology UpgradesUPS / Wireless Signal Upgrade : First Ave / Main Signal Technology Upgrades

Tucson RTDN Mesh Network Expansion               40ap           178.08 CompleteRTDN Mesh Network Expansion Signal Technology Upgrades

ADOT SR 77: Signalization Upgrade 40aq 34.13 Under ConstructionSR77 Signalization Upgrade: Project 01: Ajo Signal Interconnect Signal Technology UpgradesSR77 Signalization Upgrade: Project 02: Regional Traffic Signal Data to ITOC Signal Technology UpgradesSR77 Signalization Upgrade: Project 03: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #1 Signal Technology UpgradesSR77 Signalization Upgrade: Project 04: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #2 Signal Technology UpgradesSR77 Signalization Upgrade: Project 05: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #3 Signal Technology UpgradesSR77 Signalization Upgrade: Project 06: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #4 Signal Technology UpgradesSR77 Signalization Upgrade: Project 07: I‐10 Interchange Signals Connection into ITOC System: Sub‐Project #5 Signal Technology UpgradesSR77 Signalization Upgrade: Project 08: Signal Technology UpgradesSR77 Signalization Upgrade: Project 09: Signal Technology UpgradesSR77 Signalization Upgrade: Project 10: Signal Technology UpgradesSR77 Signalization Upgrade: Project 11: Signal Technology UpgradesSR77 Signalization Upgrade: Project 12: Signal Technology UpgradesSR77 Signalization Upgrade: Project 13: Signal Technology UpgradesSR77 Signalization Upgrade: Project 14: Signal Technology UpgradesSR77 Signalization Upgrade: Project 15: Signal Technology Upgrades

Tucson Sidewalks Package 1                                   41_a 34.07 CompleteSidewalks Package 1 ‐ location #1 22nd St: Wilmot RD ‐ Kolb SidewalkSidewalks Package 1 ‐ location #2 Alvernon Way: Broadway Blvd. ‐ 22nd St SidewalkSidewalks Package 1 ‐ location #3 Broadway Blvd: Country Club Rd ‐ Randolph Way   SidewalkSidewalks Package 1 ‐ location #4 Grant Rd: Dragoon Ave ‐ I‐10 SidewalkSid lk P k 1 l ti #5 S Rd 22 d St 29th St SidewalkSidewalks Package 1 ‐ location #5 Swan Rd: 22nd St ‐ 29th St SidewalkSidewalks Package 1 ‐ location #6 Wetmore Rd: Oracle Rd ‐ Stone Ave SidewalkSidewalks Package 1 ‐ location #7 Broadway: Wilmot Rd ‐ Kolb Rd Sidewalk

Tucson Sidewalks Package 2                                   41_b 35.07 CompleteLocation #1 22nd St: Alvernon Way to Swan Rd SidewalkLocation #2 Broadway Blvd: Alvernon Way to Swan Rd SidewalkLocation #3 Craycroft Rd: Broadway to 22nd Street SidewalkLocation #4 Mission Rd: Ajo Way to Irvington Rd SidewalkLocation #5 Tanque Verde Rd: Kolb Rd to Sabino Canyon Sidewalk

Pima County Kolb Rd Bike Lane Project                          41_c 36.07 CompleteKolb Road Bike Lane Project Bikeway

Tucson Campbell Ave Revitalization 41_d                      32.06 CompleteNew sidewalks, streetscape and bus bays Sidewalk

TucsonEl Paso & Southwestern Greenway: Kino to University

41_l SP01 83.07 In Design

El Paso & Southwestern Greenway: Kino to University Pathway

 9/19/2016 2:36:28 PM  1 21 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Pima County Freeman Rd Bike Lanes                              41_m             84.07 TransferredFreeman Rd  From Broadway  To Old Spanish Trail Bikeway

Pima County Orange Grove Bike Lanes                           41_n 85.07 TransferredOrange Grove  From Oracle Rd  To Camino la Zorrela Bikeway

Pima County Escalante Bike Lanes                                   41_o             86.07 TransferredEscalante Rd From Houghton To Old Spanish Trail Bikeway

Pima County Valencia Bike Lanes                                    41_p 87.07 TransferredValencia: From Craycroft  To Wilmot  BikewayValencia Road Bike Lane Gap Closure Bikeway

Pima County Valencia Bike Lanes ‐ Wilmot to Kolb      41_q 88.07 Transferred

Valencia: Wilmot To Kolb Bikeway

Pima CountyValencia Bike Lanes ‐ Alvernon to Craycroft                 

41_r 89.07 Transferred

Valencia From Alvernon To Craycroft BikewayPima County Mission Rd Bike Lanes                                41_s 90.07 Dropped

Mission Road  From San Xavier Rd  To Drexel BikewayPima County Tanque Verde Bike Lanes                          41_t 91.07 Transferred

Tanque Verde  From Powderhorn  To Camino Fennimore BikewayPima County Continental Rd Bike Lanes                         41_u 92.07 Transferred

Continental Rd  From Camino Del Sol  To La Canada BikewayTucson Park Ave Bike Lanes                                    41_v 93.07 Transferred

8) Park Ave Bike Lanes: Benson to Ajo BikewayTucson 6th Ave Bike Lanes                                      41_w 94.07 Transferred

2) 6th Ave Bike Lanes: South Tucson to Irvington Bikeway

Tucson6th Ave Bike Lanes South Tucson to 19th St                  

41_x 95.07 Transferred

1) 6th Ave: South Tucson to 19th St. BikewayTucson Alvernon Bike Lanes                                   41_y 96.07 Transferred

3) Alvernon: Speedway to Broadway Bikeway

Tucson Alvernon Bike Lanes ‐ Ajo to Valencia     41_z 97.07 Transferred

4) Alvernon: Ajo to Valencia Bikeway

Tucson Campbell Bike lanes ‐ Glenn to Grant      41aa            49B1 98.07 Transferred

5) Campbell Ave:Glenn to Grant Bikeway

TucsonCampbell Bike Lanes ‐ Elm to Speedway                       

41ab 99.07 Transferred

6) Campbell Ave: Elm to Speedway BikewayT P t Bik L 41 100 07 T f dTucson Pantano Bike Lanes                                    41ac 100.07 Transferred

7) Pantano: Speedway to Broadway BikewayTucson Park Ave Bike Lanes #2                              41ad 101.07 Transferred

9) Park: Ajo to Irvington BikewayTucson Speedway Bike Lanes                                 41ae 102.07 Transferred

10) Speedway: Alvernon to Rosemont Bikeway

TucsonRTA Bicycle Lane Restriping Package #1                      

41af 49B1 142.07 Complete

6th Ave  From So. Tucson city limits  To Irvington  Bikeway6th Ave. From N of 19th St  To South Tucson northern city limits BikewayAlvernon  From Speedway  To Broadway BikewayAlvernon From Ajo Way  To Valencia BikewayCampbell  From Elm  To Speedway BikewayCampbell  From Glenn  To Grant BikewayPantano Road  From Speedway To Broadway BikewayPark  From Ajo To Irvington Bikeway

 9/19/2016 2:36:28 PM  1 22 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Park  From Benson  To Ajo BikewaySpeedway  From Alvernon  To Rosemont Bikeway

TucsonRTA ADA Accessibility Projects, Package 1                   

41ag 143.07 Complete

Sidewalks Package 3: location #1 29th St.: Euclid To Railroad tracks ramps SidewalkSidewalks Package 3: location #2 6th Ave: Speedway  To Broadway ramps SidewalkSidewalks Package 3: location #3 Drachman: Stone  To 6th Ave ramps SidewalkSidewalks Package 3: location #4 Golf Links: Craycroft To Wilmot ramps SidewalkSidewalks Package 3: location #5 Grande: Drachman To Speedway ramps SidewalkSidewalks Package 3: location #6 Speedway: Stone To Euclid ramps SidewalkSidewalks Package 3: location #7 6th Ave: Drachman to Speedway SidewalkSidewalks Package 3: location #7 6th Ave: Drachman to Speedway Sidewalk

Pima CountyBike Pkg1 Paved Shoulder, Restriping/Gap Closure

41ah 144.07 Complete

Continental Rd: Camino Del Sol  To La Canada BikewayEscalante Rd: Houghton To Old Spanish Trail BikewayFreeman Rd: Broadway  To Old Spanish Trail BikewayKolb Road Bike Lane Project North of Valencia to Voyager Rd. BikewayOrange Grove Rd: Oracle Rd  To Shadow Bluffs BikewayOrange Grove Rd: Shadow Bluffs to Camino la Zorrela BikewayTanque Verde: Powderhorn  To Camino Fennimore BikewayValencia: Alvernon To Craycroft BikewayValencia: Craycroft  To Wilmot BikewayValencia: Wilmot To Kolb BikewayMission Road: San Xavier Rd To Drexel Bikeway

Pima County RTA Sidewalk Package 1                             41ai 145.07 CompleteSidewalk Pkg 1: Continental Road From La Canada To PCC entrance SidewalkSidewalk Pkg 1: Flowing Wells From River To Roger SidewalkSidewalk Pkg 1: Oracle Road From Orange Grove To River Sidewalk

SahuaritaOld Nogales Highway Bike Lane Project                       

41aj 161.07 Complete

Old Nogales Highway Bike Lanes BikewayPima County Bike Lane Package 2                                   41ak 75.08 Complete

PC Bike Lane Pkg 2 (Bear Canyon SRTS/ Shared use path): Bear Canyon: Indian Bend to 1200 ft N of Tanque Verde BikewayPC Bike Lane Pkg 2: Country Club: Irvington to Valencia BikewayPC Bike Lane Pkg 2: Valencia Rd: Westover to Mission BikewayPC Bike Lane Pkg 2: Valencia Rd: 500 ft west of Camino de la Tierra to Cardinal BikewayPC Bike Lane Pkg 2: Alvernon Way: Golf Links to Ajo BikewayPC Bike Lane Pkg 2: Bear Canyon: Snyder Rd to Tanque Verde Bikeway

Pima County Colossal Cave Road Bike Lanes                 41al 119.08 TransferredC l l C R d Bik L Ci Hi h S h l t Pi t l Hill Rd BikewayColossal Cave Road Bike Lanes: Cienega High School to Pistol Hill Rd. BikewayColossal Cave Bike Lane Construction Bikeway

Tucson Bike Lane Package II (Design)          41am 49B2 120.08 CompleteCOT Bike Lane Pkg 2: Design Only (Construction in 39.09 RTA41be) Bikeway

Sahuarita Santo Tomas Sidewalk Project                  41an 84.08 CompleteSanto Tomas Sidewalk & Street Lighting Sidewalk

TucsonArroyo Chico Urban Greenway: Reid Park Segment              

41ao 37.08 Complete

Arroyo Chico Urban Greenway: Reid Park Segment Greenway

TucsonChurch/Franklin Island Modification for Bikes               

41at 161.08 Complete

Church/Franklin Island Modification SidewalkOro Valley La Cholla Bike Improvements                    41au 156.08 Complete

La Cholla Bike Improvement : La Cholla Blvd: Tangerine Rd to Lambert Ln BikewayLa Cholla multi use path: La Cholla Blvd: Glover Rd to Naranja Dr Pathway

 9/19/2016 2:36:28 PM  1 23 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Pima CountyPantano River Park Supplemental Funding                     

41av PPANTP 154.08 Complete

Pantano River Park PathwayPantano River Park Bikeway

South Tucson 36th St.                                                     41aw 189 Complete36th St.  Greenway Pathway

TucsonSidewalk Improvements ‐ Tucson FY 2009                      

41ay 173.08 Complete

Sidewalks FY 2009 Project#1: Country Club Rd: Broadway Blvd to 22nd St SidewalkSidewalks FY 2009 Project#2: Craycroft Rd: Glenn St to Speedway Blvd SidewalkSidewalks FY 2009 Project#3: Grant Rd: Swan Rd to Wilmot Rd SidewalkSidewalks FY 2009 Project#3: Grant Rd: Swan Rd to Wilmot Rd SidewalkSidewalks FY 2009 Project#4: Stone Ave: Grant Rd to Drachman St Sidewalk

Pima CountyCentennial Elem. & Flowing Wells JrH ‐  Safe Routes to School

41az 4SRCEN 16.09 Complete

Cenntennial Elementary Sidewalks SidewalkSahuarita Camino de las Quintas Sidewalk               41ba           36.09 Complete

Camino de Las Quintas Sidewalk Sidewalk

TucsonTransportation Enhancement Pre‐design                       

41bb 37.09 Complete

Pre‐Design for TEA Projects SidewalkTucson 4th Ave. Bike Blvd.                                      41bc 38.09 Complete

4th Avenue Bike Boulevard BikewayADOT SR 77: River to Suffolk 41bd 50.14 In Design

HAWK Bus PulloutTucson Bike Lane Package II (Construction) 41be 49B2 39.09 Complete

COT Bike Lane Pkg 2: Sub‐Project #01 22nd: Camino Seco to Harrion Rd BikewayCOT Bike Lane Pkg 2: Sub‐Project #02 Ajo Way through I‐10 Interchange BikewayCOT Bike Lane Pkg 2: Sub‐Project #03 Ajo Way: 16th Ave to 6th Ave BikewayCOT Bike Lane Pkg 2: Sub‐Project #04 Ajo Way: Santa Cruz River Bridge to 16th Ave BikewayCOT Bike Lane Pkg 2: Sub‐Project #05 Alvernon Way: 22nd St to 29th St BikewayCOT Bike Lane Pkg 2: Sub‐Project #06 Alvernon Way: Broadway Blvd to 22nd St Bikeway

41bf            COT Bike Lane Pkg 2: Sub‐Project #07 Valencia Rd: Calle Santa Cruz to 12th Ave BikewayCOT Bike Lane Pkg 2: Sub‐Project #08 Wrightstown Rd: Tanque Verde Rd to Harrison Rd Bikeway

TucsonSidewalk Package II ‐ Construction ‐ City of Tucson 2010    

41bf             40.09 Transferred

Sidewalk Package II ‐ Construction ‐ City of Tucson 2010 Sidewalk

TucsonIronwood Hills Drive Sidewalks (Design)                     

41bg 41.09 Dropped

Ironwood Hills Drive Sidewalks SidewalkJ li W h G /P t Ri

Pima CountyJulian Wash Greenway/Pantano River Park R/W Acquisition     

41bh             42.09 Under Construction

Julian Wash Greenway Sidewalk

TucsonArmory Park/Santa Rita Park Enhancement Project             

41bi SL556 01C 41.05 Complete

Armory Park/Santa Rita Park TEA Sidewalk

South Tucson36th St: 4th Ave to RR Bike Lane/Greenway

41bj 89.01 In Design

36th St. 4th Ave ‐ RR BikewayTucson Bike Lane Package III   41bl 49B3 19.1 Under Construction

Bike Lane Package 3 BikewayPima County Flowing Wells Bike Lanes                           41bn            21.1 Transferred

Flowing Wells Bikelanes Flowing Wells Road along the Rillito Bridge BikewayTucson Ft. Lowell Sidewalk                                     41bo           22.1 Complete

Ft. Lowell Sidewalk Sidewalk

 9/19/2016 2:36:28 PM  1 24 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Pima CountyColossal Cave/Mary Ann Cleveland Way Bike Lanes

41bq 24.1 Transferred

Kush Canyon Lane to Cienega High School BikewayPima County Abrego Bike Lanes                                      41bt 27.1 Transferred

Abrego Bike Lanes BikewayPascua Yaqui Head Start Sidewalks                                  41bx             31.1 Complete

Head Start Sidewalks: Construct Calle Tetakusim: Tuivit to Camino Benem SidewalkHead Start Sidewalks: Construct Camino Potam: Just North of W Tetakusim ‐ Calle Torim Sidewalk

OWP‐TDOT Hughes Access/Alvernon Bike Lane         41by 32.1 TransferredHughes Access/Alvernon Bike Lane Bikeway

Oro Valley Calle Concordia Bike Lane 41ca 34 1 CompleteOro Valley Calle Concordia Bike Lane                         41ca             34.1 CompleteCalle Concordia Bike Lane Calle Buena Vista to Calle Loma Linda Bikeway

Sahuarita La Villita Bike Lane                                      41cb             35.1 CompleteLa Villita Bike Lane Bikeway

Tucson University/3rd Street Bike Boulevard      41cc SP05 96.09 Under Construction

University/3rd Street Bike Boulevard BikewayTucson Liberty Bike Blvd Design                             41cd SP04 111.09 In Design

Liberty Bike Blvd Design Bikeway

TucsonGlenn St: Columbus to Country Club Pedestrian Path        

41ce S01H           87.09 In Design

Glenn St: Columbus to Country Club Pedestrian Path Shared Use Pathways

Oro ValleyCanada del Oro Shared Use‐Path Final Phase                  

41cf            88.09 Complete

Canada del Oro Shared Use‐Path Final Phase Shared Use PathwaysPima County Bike Lane Package 3 41cg 4TEHBL    11.11 Under Construction

PC Bike Pkg 3: Abrego Dr: E Duval to Calle Herboso BikewayPC Bike Pkg 3: Camino De Oeste: Valencia to Tetakusim Rd BikewayPC Bike Pkg 3: Camino Loma Alta: Rancho Del Lago Pky to Colossal Cave BikewayPC Bike Pkg 3: Colossal Cave Rd: Cienega HS to Pistol Hill Rd BikewayPC Bike Pkg 3: Harrison Rd: E Wasatch to Sabino HS (N of Snyder) BikewayPC Bike Pkg 3: Pantano River, Speedway to 5th St BikewayPC Bike Pkg 3: Rillito River: Country Club Rd to Hacienda Del Sol BikewayPC Bike Pkg 3: Rillito River: Cmo de La Tierra, South Bank of Rillito River to CDO Wash BikewayPC Bike Pkg 3: ROW Purchase:Various Locations on Rillto for Shared Use Path PathwayPC Bike Pkg 3: Marking Installation on various Bike lanes/Shared Use Path BikewayFlowing Wells Bikelanes Flowing Wells Road along the Rillito Bridge Bikeway

Tohono O'odham San Xavier Rd: Little Nogales to I‐19        41ci 79.1 In DesignConstruct Multi‐use pathway Little Nogales Rd and the Pedestrian Bridge Pathway

O V ll R h Vi t Sid lk 41 j 79 12 C l tOro Valley Rancho Vistoso Sidewalk                           41cj            79.12 CompleteRancho Vistoso Sidewalk: Vistoso to Highland Dr. Sidewalk

Pima CountyPantano Pathway: Broadway to Kenyon                         

41ck PPBDWY   81.12 Complete

Pantano Pathway: Broadway to Kenyon 12 Foot SUP and 8 foot dg path Shared Use Pathways

Pima CountyManzanita Elementary Safe Routes to School, Phase 2         

41cl 4RTMES 80.12 Complete

Manzanita Elementary Safe Routes to School Sidewalk

SahuaritaBike/Pedestrian Neighborhood Path Program

41cm 72.12 Complete

Bike/Pedestrian Neighborhood Path Program SidewalkPima County El Paso Southwest ROW acquisition        41cn 82.12 In Design

El Paso Southwest ROW acquisition                            Shared Use Pathways

TucsonCopper St: Oracle to Swan Bike Boulevard

41co SP10 77.12 In Design

Design/Construct bike blvd improvements Bikeway

 9/19/2016 2:36:28 PM  1 25 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Tucson5th St. Bike Boulevard: 7th Avenue to University

41cp SP11 83.12 Complete

HAWK at 5th & Euclid HAWK5th St: 7th to University Bike Boulevard Bikeway

TucsonTreat Ave: Rillito River to Barraza‐Aviation Bike Boulevard

41cq SP12           78.12 Under Construction

Treat Ave at Broadway Blvd HAWK HAWKTreat Ave: Rillito River to Barraza‐Aviation Bike Boulevard Bikeway

TucsonArroyo Chico Greenway: Country Club to Treat                

41cr SP09             76.12 In Design

Arroyo Chico Urban Greenway: GreenwayArroyo Chico Urban Greenway: Greenway

MaranaSandario Road: Moore to Grier Sidewalk/Path

41cs CP011 75.12 Complete

Sandario Road: Moore to Grier Sidewalk/Path PathwaySandario Road: Moore to Grier Sidewalk/Path Sidewalk

Marana Ina Road Sidewalk                                       41ct 74.12 CompleteIna Rd. Sidewalk: South Side of Ina from Thornydale to Meredith Sidewalk

MaranaEl Rio Park to Avra Valley Road Shared Use Path             

41cu    PK013 73.12 In Design

El Rio Park to Avra Valley Rd Shared Use Path Pathway

TucsonLiberty Ave Bicycle Blvd and Safe Routes to School

41cv                      83.1 In Design

Liberty Ave Bicycle Blvd and Safe Routes to School Bikeway

Pima CountySummit View Elementary School Safe Routes to School         

41cw                      89.12 Under Construction

Summit View Elementary School Safe Routes to School: East Summit Street from Old Nogales Hwy to Epperson Lane Shared Use Pathways

MaranaWildlife Connectivity Study Rattlesnake Pass‐Twin Peaks

42_a 146.07 Complete

Rattlesnake Pass‐Twin Peaks Wildlife Study Wildlife Linkages

Pima CountyWildlife Movement through Culvert ‐ Wildlife Study

42_b 150.07 Complete

Wildlife Movement through Culvert Study Wildlife LinkagesPima County Wildlife Fencing Study 42_c RTAWLDLFE 127.08 Complete

Wildlife Fencing Study Wildlife Linkages

Marana Camino de Manana Wildlife Crossings    42_d 181.08 Complete

Camino de Manana Wildlife Crossings Wildlife LinkagesMarana RTA Wildlife Linkage Identification 42_e 68.09 Complete

42_f             La Cholla Wildlife Linkages Study Wildlife LinkagesT i Wildlif Li k S d Wildlif Li kTangerine Wildlife Linkages Study Wildlife Linkages

TucsonHoughton Rd: I‐10 to Speedway Wildlife Design Study

42_f              82.09 Transferred

Houghton Rd: I‐10 to Speedway Wildlife Design Study‐Bat Box Wildlife Linkages

SahuaritaSahuarita Rd: La Villita to Country Club Wildlife Crossings

42_g           83.09 Complete

42_h              Sahuarita Rd: I19 to La Villita  Wildlife Crossings Wildlife LinkagesSahuarita Rd: La Villita to Country Club Wildlife Crossings Wildlife Linkages

SahuaritaSahuarita Rd: La Villita to Country Club Wildlife Monitoring

42_h               84.09 Study Underway

Sahuarita Rd: La Villita to Country Club Wildlife Monitoring Wildlife LinkagesSahuarita Wildlife Assessment                                42_i          85.09 Study Underway

Wildlife Assessment                                Wildlife LinkagesADOT SR 77: Wildlife Crossing Structures 42_j 86.09 Under Construction

SR 77: Wildlife Crossing Structures Wildlife LinkagesSR 77: Wildlife Monitoring Wildlife Linkages

 9/19/2016 2:36:28 PM  1 26 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

AZ Game & FishWildlife Connectivity Assessment in Pima County             

42_k 74.1 Complete

Wildlife Connectivity Assessment in Pima County              Wildlife Linkages

ADOTSR 86:Kitt Peak Linkage Wildlife Crossing Retrofit Phase 1

42_l 25.11 Complete

SR 86:Kitt Peak Linkage Wildlife Crossing Retrofit Phase 1: State Route 86 ‐ Mile posts 130‐136 (Construct 2 crossings)  Wildlife Linkages

Tohono O'odhamSR 86: Kitt Peak Linkage Wildlife Crossing Retrofit Phase 2

42_m 20.12 Not Started

SR 86:Kitt Peak Linkage Wildlife Crossing Retrofit Phase 2 Wildlife LinkagesMarana Ina Rd Bridge Bat Boxes 42_n 64.12 Complete

Ina Road Bridge Bat Boxes Wildlife LinkagesIna Road Bridge Bat Boxes                                    Wildlife LinkagesADOT SR 86: Kitt Peak Rd Segment 42_o                      105.03 Transferred

SR 86: Kitt Peak Rd. Segment              Wildlife LinkagesADOT SR 86 Wildlife Movement Study 42_p                      182.08 Complete

SR 86 Wildlife Movement Study                                Wildlife Linkages

TucsonHoughton Rd UPRR Bridge Bat Roost Mitigation

42_q 19.13 In Design

Houghton Rd UPRR Bridge Bat Roost Mitigation Construction Wildlife LinkagesHoughton Rd UPRR Bridge Bat Roost Mitigation Study Wildlife Linkages

RTASR 77: Wildlife Crossing off highway fencing

42_r 1.14 In Design

SR 77: Wildlife Crossing off highway fencing Wildlife Linkages

Marana Tangerine Corridor: Wildlife Linkages 42_s ST 12.15 In Design

Wildlife Linkages: Twin Peaks Rd to La Cañada Dr Wildlife LinkagesgMainstreet Small Business Assistance                          43__               69.06 Under Construction

MAP Mainstreet Assistance Program Small Business Assistance

Tucson TransitSun Tran ‐ Weekday Evening Service Expansion                

44__ 70.06 Complete

Route 01 Weekday Extended ServiceRoute 04 Weekday Extended ServiceRoute 08 Weekday Extended ServiceRoute 16 Weekday Extended ServiceRoute 03 Weekday Extended ServiceRoute 06 Weekday Extended ServiceRoute 07 Weekday Extended ServiceRoute 09 Weekday Extended ServiceRoute 11 Weekday Extended ServiceRoute 29 Weekday Extended ServiceR 10 W kd E t d d S iRoute 10 Weekday Extended ServiceRoute 15 Weekday Extended ServiceRoute 17 Weekday Extended ServiceRoute 19 Weekday Extended ServiceRoute 22 Weekday Extended ServiceRoute 34 Weekday Extended ServiceRoute 02 Weekday Extended ServiceRoute 21 Weekday Extended ServiceRoute 27 Weekday Extended ServiceRoute 23 Weekday Extended ServiceRoute 26 Weekday Extended Service

Tucson Transit Sun Tran ‐ Weekend Service Expansion  45__ 94.06 Complete

Route 08 Broadway Weekend Bus Service ExpansionRoute 37 Pantano Weekend Bus Service ExpansionRoute 04 Speedway Weekend Bus Service Expansion

 9/19/2016 2:36:28 PM  1 27 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Route 03 6th Street/Wilmot Weekend Bus Service ExpansionRoute 07 22nd Street Weekend Bus Service ExpansionRoute 16 Oracle/12th Weekend Bus Service ExpansionRoute 11 Alvernon Weekend Bus Service ExpansionRoute 06 Park/1st Weekend Bus Service ExpansionRoute 09 Grant Weekend Bus Service ExpansionRoute 01 Glenn/Swan Weekend Bus Service ExpansionRoute 10 Flowing Wells Weekend Bus Service ExpansionRoute 15 Campbell Weekend Bus Service ExpansionRoute 17 Golf Links/Country Club Weekend Bus Service ExpansionRoute 19 Stone Weekend Bus Service ExpansionRoute 19 Stone Weekend Bus Service ExpansionRoute 22 Grande Weekend Bus Service ExpansionRoute 34 Craycroft Weekend Bus Service ExpansionRoute 02 Cherrybell Weekend Bus Service ExpansionRoute 21 Silverbell Weekend Bus Service ExpansionRoute 27 Cardinal Weekend Bus Service ExpansionRoute 23 Mission Weekend Bus Service ExpansionRoute 26 Benson Hwy Weekend Bus Service ExpansionRoute 29 Valencia Weekend Bus Service ExpansionRoute 20 West Grant Weekend Bus Service Expansion

RTASun Tran ‐ Frequency and Area Expansion                     

46_a 93.06 Complete

Bus Frequency (PLUGS) FY 07, 08, 09 Bus Frequency and ExpansionBus Frequency (PLUGS) FY 07, 08, 09 Bus Frequency and Expansion

Tucson Transit Bus Replacements                                       46_b 471 CompleteNew Buses ‐ Local Match (participation in purchasing 140+ buses) Bus Frequency and Expansion

Tucson TransitAdministrative & Maintenance Facility ‐ Phase 2             

46_c 51.05 Transferred

Sun Tran Bus Storage & Maint. Facility Phase I Warehouse Transit FacilitySun Tran Bus Storage & Maint. Facility Phase II Admin Bldg Transit FacilityPrince/Runway Dr Traffic Signal Intersection Improvement

RTATransit Regional Fare System and Rebranding

46_d 128.08 Complete

Rebranding  Bus Frequency and ExpansionSeemless Regional Fare System‐Fare Boxes Bus Frequency and Expansion

South Tucson South Tucson Transit ‐ Operations           46_e 76.09 CompleteSouth Tucson Transit Operations Bus Frequency and Expansion

Tucson Transit Administrative & Maintenance Facility   46_f 72.03 Complete

S T B St & M i t F ilit Ph I W h Transit FacilitSun Tran Bus Storage & Maint. Facility Phase I Warehouse Transit FacilitySun Tran Bus Storage & Maint. Facility Phase II Admin Bldg Transit FacilityAdministrative & Maintenance Facility: Prince Rd/Runway Dr Traffic Signal Intersection Improvement

Tucson Transit Bus Expansion                                              46_g 21.11 CompleteBus Expansion Citywide ‐ Purchase new buses Bus Frequency and Expansion

Tucson Transit South Tucson Transit Services                  46_j                      43.12 Not StartedBus Frequency and Expansion

Tucson Transit Oro Valley Transit Support                        46_k                      62.01 TransferredOro Valley Transit Support: Purchase 2 Vans, 1/24/01 ‐ Added  by FY01 amendment #5. Bus Purchase

Tucson TransitSun Tran Expansion Bus Purchases FY07 Carryover             

46_m                      121.07 Transferred

Casino del Sol Bus Purchase Bus Frequency and ExpansionTucson Transit Sun Van/Paratransit Expansion                47__ 71.06 Complete

SunVan/Paratransit Expansion  Special Needs Transit

Tucson TransitVan Tran Paratransit Service Expansion                      

47_a 96.06 Dropped

 9/19/2016 2:36:28 PM  1 28 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

VAN TRAN service (paratransit) Special Needs TransitTucson Transit Sun Van Expansion Vans                            47_b 29.03 Transferred

Sun Van Expansion Vans Special Needs TransitOro Valley Coyote Run Service Expansion                  47_c 98.06 Dropped

Expand service within Oro Valley Special Needs TransitPCOA Volunteer Transit                                        47_d 75.06 Complete

Special Needs Transit for Elderly & Disabled Special Needs TransitTucson Transit Paratransit Service Area Expansion         47_g                      78.09 Transferred#N/A Transferred 47_h                    

Oro ValleyNew Freedom (Urban) ‐ Transit Services Coordinator

47_h                      132.08 DroppedServices Coordinator          

Oro Valley Transit Services Coordinator Special Needs Transit

RTA RTA Special Needs Transit Expansion      47_i 97.06 Complete

RTA Special Needs Transit Expansion Special Needs TransitMarana Marana Circulator Service                         48_a 99.06 Transferred

Marana Circulator Service 2: Route 410 Anway/TRICO Neighborhood Circulator Bus SystemsMarana Circulator Service 1: Route 411 Neighborhood Circulator Bus Systems

Oro Valley Oro Valley Circulator Service                    48_b 100.06 DroppedOro Valley Circulator Service:Route 401 N. Oracle/Catalina Neighborhood Circulator Bus SystemsOro Valley Dial‐A‐Ride Neighborhood Circulator Bus Systems

SahuaritaGreen Valley/Sahuarita Circulator Service                   

48_c 101.06 Transferred

Route 421 Green Valley/Sahuarita Circulator Service  Neighborhood Circulator Bus SystemsRoute 430 Tucson Estateshuarita Circulator Service  Neighborhood Circulator Bus Systems

RTA Ajo Circulator Service                                 48_d 102.06 CompleteAjo Circulator Service Neighborhood Circulator Bus SystemsAjo Dial‐A‐Ride Neighborhood Circulator Bus Systems

RTA Sun Shuttle Expanded Transit Services    48_e 42.1 Complete

Sun Shuttle Expanded Transit Services: Route  Neighborhood Circulator Bus SystemsSun Shuttle Expanded Transit Services: Route 413 Marana I‐10 Neighborhood Circulator Bus SystemsOro Valley Circulator Service:Route 401 N. Oracle/Catalina Neighborhood Circulator Bus SystemsSun Shuttle Expanded Transit Services: Route 401 Oro Valley N. Oracle/Catalina Neighborhood Circulator Bus SystemsSun Shuttle Expanded Transit Services: Route 411 Marana Cortaro/Silverbell Neighborhood Circulator Bus Systems

MaranaJob Access Reverse Commute (Urban) ‐ Marana Commuter Express

48_f 131.08 Complete

Job Access Reverse Commute (Urban) ‐ Marana Commuter Express Neighborhood Circulator Bus Systems

Tucson Transit Sun Tran ‐ Express Service Expansion      49_a 95.06 Complete

Sun Tran ‐ Express Service Expansion                         Express Service ExpansionTucson Transit Sun Tran Expansion Buses ‐ P49               49_b 109.08 Dropped

Sun Tran Expansion Buses ‐ P49                               Express Service ExpansionPima County Pima County Rural Transit Service           49_c 103.06 Complete

Ajo‐Tucson Expansion to 5 days/week Express Service Expansion

Tucson TransitLaos Transit Center Sun Shuttle Pull Out

49_d MRC5 23.14 Complete

Laos Transit Center Sun Shuttle Pull Out Express Service ExpansionTucson Transit Downtown/University Streetcar               50__ 73.06 Complete

50_a Downtown Streetcar StreetcarDowntown Streetcar ‐ Maintenance Facility Streetcar Maintenance Facility

Tucson Transit Modern Streetcar FY07 Carryover           50_a   123.07 DroppedModern Streetcar carryover Streetcar Operations

Tucson Transit Streetcar Operations 50_b 40.13 Under Construction

 9/19/2016 2:36:28 PM  1 29 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type

Streetcar OperationsPascua Yaqui Casino del Sol Park‐and‐Ride                    51_b 105.06 Complete

Casino del Sol Park‐and‐Ride                                 Transit FacilityMarana Marana Park‐and‐Ride                               51_c 106.06 Not Started

Marana Park and Ride Transit FacilityOro Valley Oro Valley Park‐and‐Ride                          51_d 107.06 Complete

Oro Valley Park & Ride Riverfront Park Lot Transit FacilityOro Valley Rancho Vistoso Park & Ride Transit Facility: Park & RideOV Bus Pullout: Innovation Park Dr / Vistoso Commerce Loop SB Bus PulloutOV Bus Pullout: Lambert Ln / Calle Mira Mesa EB (@ Riverfront P&R) Bus PulloutOV Bus Pullout: Lambert Ln / Calle Mira Mesa WB (@ Riverfront P&R) Bus PulloutOV Bus Pullout: Lambert Ln / Calle Mira Mesa WB (@ Riverfront P&R) Bus PulloutOV Bus Pullout: Rancho Vistoso Blvd / Vistoso Commerce Loop Rd WB Bus PulloutOV Bus Pullout: Rancho Vistoso Park & Ride Bus Pullout

Tucson Transit Houghton / Broadway Park‐and‐Ride 51_e 108.06 Complete

Houghton/Broadway Transit FacilityOld Vail temporary Lot Transit Facility

Tucson Transit Rita Ranch Park‐and‐Ride                          51_f 109.06 CompleteRita Ranch/Old Vail Park‐and‐Ride Transit Facility

RTA Sun Shuttle Base Transit Services             70__ 72.06 CompleteMarana: Route 410 Anway/TRICO Bus Frequency and Expansion

Bus Frequency and Expansion

 9/19/2016 2:36:28 PM  1 30 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Under ConstructionUnder ConstructionIn DesignUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionDroppedTransferredTransferredUnder ConstructionIn DesignUnder ConstructionIn DesignUnder ConstructionIn Design

Under Construction

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteComplete

CompleteCompleteC l tCompleteComplete

CompleteCompleteCompleteCompleteComplete

In DesignIn DesignIn Design

CompleteUnder Construction

 9/19/2016 2:36:28 PM  1 31 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

In DesignNot StartedUnder ConstructionIn DesignNot StartedUnder ConstructionIn DesignUnder Construction

In Design

CompleteCompleteDroppedCompleteCompleteComplete

CompleteCompleteCompleteDroppedDroppedCompleteComplete

Under ConstructionUnder Construction

In Design

CompleteCompleteCompleteCompleteDroppedCompleteC l tCompleteCompleteCompleteCompleteComplete

CompleteCompleteComplete

CompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 32 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

DroppedDroppedCompleteComplete

CompleteCompleteComplete

Not Started

Not Started

Not Started

In Design

CompleteCompleteCompleteIn DesignCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

In Design

CompleteIn DesignI D iIn DesignIn DesignCompleteCompleteCompleteCompleteCompleteCompleteIn DesignIn DesignNot StartedCompleteIn DesignIn DesignNot Started

 9/19/2016 2:36:28 PM  1 33 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

In DesignIn DesignCompleteCompleteComplete

Not Started

Transferred

In DesignIn Design

CompleteCompleteDroppedCompleteCompleteComplete

Not Started

Not Started

CompleteIn DesignCompleteCompleteCompleteCompleteIn DesignCompleteComplete

Not Started

U d C t tiUnder ConstructionCompleteComplete

CompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 34 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteCompleteCompleteComplete

In Design

Not Started

Not Started

Dropped

Complete

Complete

Complete

In Design

In Design

CompleteCompleteCompleteCompleteCompleteCompleteC l tCompleteCompleteCompleteNot StartedNot StartedNot StartedCompleteCompleteComplete

CompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 35 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

In DesignIn Design

Not Started

Transferred

In DesignIn DesignIn Design

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteComplete

CompleteCompleteC l tCompleteComplete

CompleteCompleteCompleteCompleteComplete

Complete

Complete

Complete

Complete

 9/19/2016 2:36:28 PM  1 36 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Complete

Complete

Complete

Complete

Complete

CompleteCompleteCompleteCompleteCompleteComplete

Complete

Complete

Complete

Complete

Complete

Complete

Complete

Complete

Complete

Dropped

Complete

Complete

In Design

Complete

Complete

 9/19/2016 2:36:28 PM  1 37 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Complete

Complete

Dropped

CompleteComplete

Dropped

Complete

Complete

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteC l tCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 38 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Complete

CompleteComplete

Dropped

CompleteComplete

Dropped

Complete

Complete

Complete

Complete

Complete

Complete

Transferred

Complete

Complete

N t St t dNot Started

Complete

CompleteCompleteCompleteComplete

Complete

Complete

 9/19/2016 2:36:28 PM  1 39 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteComplete

Complete

TransferredTransferredTransferredTransferredTransferredTransferred

Transferred

Transferred

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

Complete

CompleteCompleteCompleteCompleteComplete

CompleteDroppedCompleteCompleteComplete

CompleteTransferred

 9/19/2016 2:36:28 PM  1 40 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Under ConstructionUnder ConstructionUnder ConstructionUnder Construction

In Design

Complete

Complete

Complete

Complete

Dropped

Dropped

Dropped

Complete

Complete

Complete

Complete

Complete

Complete

Complete

Complete

CompleteCompleteComplete

CompleteComplete

 9/19/2016 2:36:28 PM  1 41 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 42 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteComplete

Dropped

Complete

CompleteComplete

Complete

Dropped

Complete

Complete

Dropped

CompleteComplete

Transferred

Complete

CompleteCompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 43 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteDroppedCompleteCompleteCompleteCompleteComplete

Complete

Complete

CompleteCompleteComplete

Complete

Transferred

CompleteComplete

Complete

T f dTransferred

Dropped

Complete

Complete

CompleteCompleteCompleteCompleteComplete

Complete

 9/19/2016 2:36:28 PM  1 44 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteComplete

Complete

In Design

Not Started

CompleteCompleteCompleteNot StartedTransferred

Complete

In Design

Complete

Under Construction

Under Construction

Complete

CompleteComplete

Complete

Transferred

DroppedDropped

Under Construction

Transferred

Under Construction

CompleteCompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 45 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteComplete

CompleteCompleteCompleteComplete

Complete

CompleteCompleteComplete

CompleteCompleteCompleteCompleteCompleteComplete

Complete

CompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteCompleteCompleteIn DesignCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 46 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteUnder ConstructionUnder ConstructionUnder ConstructionCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteOn HoldOn HoldIn DesignIn DesignIn DesignOn HoldIn DesignOn HoldOn HoldDroppedOn HoldTransferredOn HoldOn HoldOn HoldComplete

CompleteCompleteCompleteDropped

In DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn Design

 9/19/2016 2:36:28 PM  1 47 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

In DesignIn DesignDroppedIn DesignIn DesignIn DesignIn DesignIn DesignDroppedIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn DesignIn Design

Dropped

Dropped

Not Started

Under Construction

Complete

In Design

Complete

Dropped

Complete

Under ConstructionComplete

Complete

Complete

Transferred

Complete

Complete

 9/19/2016 2:36:28 PM  1 48 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Not Started

CompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

Complete

Complete

Complete

Under Construction

Complete

Not Started

Complete

 9/19/2016 2:36:28 PM  1 49 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Complete

Under ConstructionUnder ConstructionUnder Construction

Complete

CompleteNot Started

Complete

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

Under Construction

Under Construction

Under Constr ctionUnder Construction

Not Started

Not Started

Transferred

Transferred

Dropped

CompleteComplete

 9/19/2016 2:36:28 PM  1 50 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Complete

Complete

Under Construction

Complete

CompleteCompleteCompleteCompleteCompleteCompleteComplete

Complete

Under ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder ConstructionUnder Construction

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteComplete

Complete

Complete

In Design

 9/19/2016 2:36:28 PM  1 51 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Dropped

Transferred

Dropped

DroppedDropped

Dropped

Dropped

Dropped

Dropped

Transferred

Transferred

Transferred

Transferred

Transferred

Transferred

Transferred

Transferred

Transferred

Transferred

Transferred

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 52 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteComplete

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteOn Hold

CompleteCompleteComplete

Complete

CompleteCompleteCompleteCompleteCompleteComplete

TransferredTransferredDropped

Complete

Complete

Complete

Complete

CompleteComplete

 9/19/2016 2:36:28 PM  1 53 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteComplete

Complete

CompleteCompleteCompleteCompleteComplete

Transferred

Complete

Complete

Complete

In Design

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

Transferred

Dropped

Under Construction

Complete

In Design

Under Construction

Transferred

Complete

 9/19/2016 2:36:28 PM  1 54 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Transferred

Dropped

CompleteComplete

Dropped

Complete

Complete

Under Construction

In Design

In Design

Complete

CompleteOn HoldCompleteCompleteCompleteUnder ConstructionCompleteIn DesignCompleteUnder ConstructionComplete

In Design

Complete

Complete

Complete

Complete

In Design

In Design

 9/19/2016 2:36:28 PM  1 55 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteComplete

CompleteUnder Construction

In DesignIn Design

CompleteComplete

Complete

In Design

Transferred

Under Construction

Complete

Complete

Complete

Complete

CompleteC l tComplete

Transferred

CompleteComplete

Study Underway

Study Underway

Under ConstructionStudy Underway

 9/19/2016 2:36:28 PM  1 56 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Complete

Complete

In Design

CompleteComplete

Dropped

Complete

In DesignComplete

In Design

In Designg

Under Construction

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteC l tCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteCompleteComplete

 9/19/2016 2:36:28 PM  1 57 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteComplete

Complete

TransferredTransferredTransferred

CompleteComplete

Complete

CompleteCompleteCompleteComplete

Complete

Not Started

Transferred

Transferred

Complete

 9/19/2016 2:36:28 PM  1 58 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Dropped

Transferred

Dropped

Complete

Dropped

Complete

TransferredTransferred

TransferredTransferred

TransferredTransferred

CompleteTransferred

CompleteCompleteCompleteCompleteComplete

Complete

Complete

Dropped

Complete

Complete

CompleteComplete

Dropped

 9/19/2016 2:36:28 PM  1 59 of 60

RTA Project Delivery Status Detail Data Report as of August 31, 2016Sub‐Project Status

Under Construction

Complete

Not Started

CompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

CompleteComplete

Complete

CompleteComplete