rrrl efw facility belvedere - home | · pdf filerrrl efw facility belvedere analyst visit john...
TRANSCRIPT
RRRL EfW Facility Belvedere
Analyst visit
John Russell, Project Manager
1 July 2010
‘Choosing Costain’
John Russell, Project Manager
‘Choosing Costain’ 2
EfW pedigree
SELCHP 1993 £14 million
‘Choosing Costain’ 3
RRRL energy from waste plant
• Delivery of the largest energy from waste facility in the UK
• Opportunity to gain further Waste Sector experience from SELCHP, London
• Fits with our expertise
• Large growth market in power / waste
Developing our waste strategy in the UK market -
£460 million project with proven technology
‘Choosing Costain’ 4
Delivering our customer needs
• Key Issues facing RRRL Facility
– Need for step change in waste management services to meet:
– London Waste Strategy Targets
– EU Landfill Directive targets (by 2010, 2013 & 2020)
– Increase cost of landfill due to landfill tax costs and
Landfill Allowance Trading Scheme (LATS)
• Riverside Resource Recovery Ltd
- Company set up by Cory Environmental Ltd
- RRRL contracted to WRRL to dispose of waste
- VonRoll Environmental Ltd preferred EPC contractor
- Costain preferred D&B contractor 21 December 2007
‘Choosing Costain’ 5
Timetable
Front end consulting
Preferred Bidder Dec 2007 Tender fixed to 30 July 2008
Memorandum of Agreement & side letters 1-5
Rebased for Contract Commercial Closure
30 July 2008 Costain offer with options
Construction
Construction period July 2008 to May 2011
Advanced works underwritten from January to July 2011 to maintain
design continuity & pre-construction activities
July 2008 access to site
Main works complete December 2010
‘Choosing Costain’ 6
Complex energy from waste engineering facility
‘Choosing Costain’ 7
Design and construction – our scope
‘Choosing Costain’ 8
Landscaping - scope
‘Choosing Costain’ 9
Project layout – consultancy role
1. Compliance to
planning conditions
(50 No)
2. Ecological
requirements
3. Environmental
compliance
4. Test piles for land
and marine piles
5. Pre-construction
activities
6. Site set up for
whole project
‘Choosing Costain’ 10
Construction deliverables
Key milestones
Start 1 July 2008
Handover to Von Roll Inova in line with agreed programme
Hot commissioning October 2010
Take over & testing April 2011
‘Choosing Costain’ 11
Belvedere progress – October 2008
Jetty works progressing and erection of first of three tower cranes
‘Choosing Costain’ 12
Belvedere progress – December 2008
Trial slipforming completed & lessons learnt
‘Choosing Costain’ 13
Belvedere progress – end May 2009
Stack slip formed
‘Choosing Costain’ 14
Belvedere progress – December 2009
Process equipment installation- Steelwork and cladding progressing
‘Choosing Costain’ 15
Belvedere progress – April 2010
Jetty fender installation complete – External drainage commences – BS4 roof steelwork and roof cladding
‘Choosing Costain’ 16
Health, Safety Environment
• Considerate Constructors Scheme
• 2010 National Bronze Award Winner
RoSPA Gold Award Winner 2010
Safety Briefing
‘Choosing Costain’ 18
Safety briefing: Analyst visit 1 July 2010
Aim: -
• To brief you on the route we will be taking around the site.
• Bring to your attention any significant on site hazards.
‘Choosing Costain’ 19
Route
• Split up into 2 groups.
– Group 1 - John Russell
– Group 2 – Andy Mooney
– Depart 2-3 minutes between groups.
– Photograph on the Jetty
‘Choosing Costain’
External Pedestrian Routes
‘Choosing Costain’
Undulating Surfaces
External Pedestrian Routes
‘Choosing Costain’
Trip Hazards
Internal Pedestrian Routes
‘Choosing Costain’
Lifting Operations
‘Choosing Costain’
Overhead Working
‘Choosing Costain’
Working Over Water
‘Choosing Costain’
Working at Height
‘Choosing Costain’
Traffic
‘Choosing Costain’
Staircases
‘Choosing Costain’
MOBILE PHONES
Do not use your mobile
phones on site.
‘Choosing Costain’
Emergency Procedure:
• In the event of any emergency you will hear bells and/or air horns
sounding across the site.
• Follow directions from your group guides to the Assembly Point and
wait further instruction.
‘Choosing Costain’
Any Questions?