Buttai Quarry Community Consultation meeting and site visit – 15 November

2018

Page 2: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview Issues arising from previous meetings; Year To Date summary of operations; Overview of operations:

Dust; Noise; Flora and fauna management; Blast management; Rehabilitation; Incidents / complaints;

Planned activities for 2019;

Page 3: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Issues from previous meetings SRL to set up Dropbox for storing quarry

documents;

RF to email consents;

LR to upload EMP;

Council to provide a property ownership map of land adjoining the quarry;

Page 4: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Changes to Annual Report: Change list to just have addresses and not names;

Drone photo to be annotated as a base map for time lapse imagery of quarry activities;

RF to extend invitation to Ward councillors;

Daily truck movement figures for November 2017 to be provided to CCC to double check truck numbers per day comply and reflect the numbers in the Annual Report. Summary shown overleaf;

Page 5: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

November 2017 sales and truck movements

Page 6: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure
Page 7: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Quarrying continuing in Lot 76 in a north / west direction following the consented extraction area;

Quarry operation continues to involve the manufacture and sale of various road base products;

Progressive rehabilitation on “bench 3” and north west boundary;

2018 Year To Date summary of operations

Page 8: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

A total of 11 blasts have been conducted so far in 2018;

Nil complaints received;

The Department of Industry has undertaken 2 inspections so far in 2018;

Rubicon (previously TREES) consultants conducted 1 environmental inspection & 2 internal environmental audits have been carried out;

Spectrum Acoustics have conducted 3 noise monitoring sessions;

Page 9: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

DustAssessed against NSW EPA Criteria (4mg/L)

with a number of results over the criteria at Buttai Barn as shown overleaf (containing insects and vegetation);

Buttai Barn #2 results are fully compliant;

Overview of operations

Page 10: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Dust monitoring results

January – October 2018

Date / Site D1 - Tetratheca D2 - Norma D3 - Buttai Barn D4 - Bishop D5- Buttai Barn 2

Dec-17 into Jan-18 1.1 3.5 1.9 0.8 0.7

Jan-18 0.8 0.8 2 0.4 0.9

Feb-18 0.5 0.9 9.7 0.8 3.8

Mar-18 1.2 1.6 13.3 5 3.2

Apr-18 0.4 0.9 1.3 1.7 1

May-18 0.7 0.9 11.3 1.8 1

Jun-18 0.2 0.7 16.6 3.3 2

Jul-18 1 1 4.2 0.8 0.9

Aug-18 1.3 1 2.5 1.5 0.8

Sep-18 0.5 0.8 3.5 1 0.7

Oct-18 0.4 0.7 15 1.9 1.4

Page 11: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Noise Noise monitoring undertaken by Spectrum

Acoustics who have conducted 3 monitoring sessions in accordance with the noise management plan;

The results obtained were within the specified limits as shown in the tables overleaf;

Overview of operations

Page 12: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Noise

Page 13: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Flora and FaunaOngoing weed eradication continues on site

regularly;

Including regular weed spraying and vegetation control in selected areas;

Boundary clearing for fire hazard reduction occurs as required;

Overview of operations

Page 14: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations Blast Management11 blasts have been conducted in 2018 with

all 11 blasts being under allowable limits;

Page 15: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations RehabilitationAn additional 50 trees were planted on Bench

3 in May 2018 to improve the overall vegetative cover;

Bench planting 3 is progressing well considering the recent dry conditions;

Maintenance of the planting along the Western extraction boundary on Lot 76 continues;

Page 16: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Rehabilitation

Progress shot - Buttai Quarry Bench 3 planting (October 2018)

Page 17: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (October 2018)

Page 18: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (October 2018)

Page 19: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 2 planting (October 2018)

Page 20: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 2 planting (October 2018)

Page 21: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations Incidents / complaintsNil;

Page 22: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

Page 23: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Planned activities for 2019

Further extraction of material;

Continuation of dust monitoring;

Maintenance of recent rehabilitation work completed;

Update on Recycling proposal: Umwelt are still working on the relevant studies

associated with the recycling facility;

Page 24: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

We hope to have information to present to the CCC shortly with Umwelt representatives in attendance;

This will require an extraordinary CCC meeting to be confirmed shortly;

Page 25: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

ANY QUESTIONS?

THANK YOU

Page 26: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Community Consultation Meeting

15th March 2018

Reporting period: 1st January 2017 to 31st December 2017

Page 27: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview� Issues arising from previous meetings;

� Summary of operations for the reporting period;

� Overview of operations:� Dust;

� Noise;

� Flora and Fauna management;

� Blast Management;

� Rehabilitation;

� Incidents / Complaints;

� Planned activities for 2018;

Page 28: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Issues from previous meetings

� Updated electronic and hard copies of the EMP will be provided to the CCC;

� Daracon to confirm if the most current Conditions of Consent (CoC) can be uploaded to the website;

� Unresolved issues will remain live in Meeting Agendas until resolved;

Page 29: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Council to provide a property ownership map of land adjoining the quarry to confirm the ownership of the access roads to the quarry;

� Daracon to confirm if the Crown has offered them a portion of Ridge Road to purchase;

Page 30: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Daracon to arrange a drone photo of the quarry for the next meeting. Drone survey to include aerial, benches, contours and rehabilitation areas;

� Signed off site inspection action list to be included in the annual report;

� Better clarify the relevant dates on the forms in the AEMR;

Page 31: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Summary of operations for the

reporting period� Quarrying continuing in Lot 76;

� Quarry operations continues to involve the

manufacture and sale of various road base

products to the local industry and government

sector;

Page 32: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� A total of 12 blasts were conducted during the

reporting period;

� One complaint received for dust from a blast;

� The Department of Primary Industries undertook

no inspections during the reporting period

� 1 informal EPA site visit occurred;

� 3 Internal Environmental Audits were completed

� 1 Rubicon (formerly T.R.E.E.S) external

Environmental Audit conducted;

Page 33: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Dust

� Assessed against NSW EPA Criteria (4mg/L)

with all results under the specified criteria

except for “Buttai Barn” in May 2017;

�Buttai Barn #2 for May 2017 was well below

4mg/L;

Overview of operations

Page 34: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Dust monitoring results D1 -

TetrathecaD2 - Norma D3 - Buttai Barn D4 - Bishop

D5 - Buttai Barn #2

Dec 16 into Jan 17

1.2 3.0 2.5 0.7 0.5

Jan 1.1 0.9 2.3 0.7 1.5

Feb 1.2 3.5 1.5 0.7 1.8

Mar 1.1 1.0 1.5 1.7 2.3

Apr 0.3 0.4 1.0 1.1 0.3

May 0.4 0.5 5.9 1.9 0.9

Jun 0.3 1.9 2.0 0.5 1.8

Jul 0.5 0.5 2.9 0.9 0.4

Aug 1.0 0.7 1.3 2.2 1.1

Sep 0.8 1.3 1.4 1.1 0.9

Oct 0.8 0.7 1.2 0.9 1.5

Nov 1.0 2.0 1.2 1.0 2.0

Dec 0.8 2.0 1.2 0.8 1.6

Average 0.8 1.4 2.0 1.1 1.3

Page 35: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Noise

� Noise monitoring is undertaken by Spectrum

Acoustics who have conducted 4 monitoring

sessions during 2017. This is in accordance

with the noise management plan;

�The results obtained were within the specified

limits;

Overview of operations

Page 36: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� NoiseLocation Time dB(A)) Wind Speed and Diection Identified Noise Sources

28-Feb-

17

1 9:10 am 41 2.5 m/s S Birds (40), excavator (32), traffic (27), BQ (<20)

2 9:31 am 43 2.5 m/s SBirds & insects (43), excavator (27), traffic (25),

BQ (<20)

3 9:54 am 40 2.6 m/s S Birds & insects (40), traffic (28), BQ (<20)

12-

May-17

1 2:01 pm 44 <1 m/s SE Birds (43), traffic (34), BQ inaudible

2 2:34 am 39 <1 m/s SSE Traffic (37), birds (33), BQ inaudible

3 3:02 am 46 <1 m/s SSE Car (46), Birds (35), BQ (<27)

30-

Aug-17

1 12:01 pm 36 1.5 m/s S Birds (36), traffic (25), BQ (<20)

2 12:22 am 33 1.5 m/s S Birds (33), BQ inaudible

3 12:42 am 32 1.5 m/s S Birds (30), frogs (25), BQ (25), traffic (20)

24-

Nov-17

1 3:15 pm 40 2.5 m/s SE Traffic (38), birds (36), BQ inaudible

2 3:45 pm 41 2.5 m/s EBirds & insects (39), traffic (37), BQ

inaudible

3 4:10 pm 43 1.5 m/s SEBirds & insects (42), plane (35), BQ barely

audible(<25)

Page 37: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Flora and Fauna

�The quarry footprint and extent of clearing

changed marginally from previous operational

years;

�The relevant “tree clearing protocol” was

utilised which revealed that there was no

impact on the local fauna;

Overview of operations

Page 38: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations � Blast Management

�12 blasts were conducted during the reporting

period with all being within the allowable

limits;

�No specific blasting complaints were received

during the reporting period;

Page 39: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Blast Management monitoring resultsNorma Brookes Lings Rd Buttai Barn

Date Time Blast #PPV

mm/s

O/pressure

dBL

PPV

mm/s

O/pressure

dBLPPV mm/s

O/pressure

dBL

25/01/2017 13:05 P_058 0.45 111.3 0.94 92.4 No trigger No trigger

14/02/2017 14:52 P_059 0.6 106.3 No trigger No trigger 0.53 101.8

21/03/2017 12:55 P_060 0.87 106.5 0.5 102.8 No trigger No trigger

10/04/2017 2:53 P_061 0.61 103.4 0.87 107.2 No trigger No trigger

10/05/2017 12:54 P_062 0.9 104.6 0.66 108.1 0.53 95.5

23/05/2017 9:14 P_063 0.41 104.9 0.93 106.1 0.59 98.1

22/06/2017 14.31 P_064 0.69 111 0.83 108.4 No trigger No trigger

19/07/2017 14.03 P_065 0.52 106.1 0.97 109.7 0.87 104.7

27/07/2017 13.13 P_066 0.62 101.1 0.63 102.6 No trigger No trigger

18/08/2017 11.28 P_067 0.88 106.4 1.09 111.5 0.83 109.3

15/09/2017 13.18 P_068No

triggerNo trigger No trigger No trigger No trigger No trigger

1/12/2017 14.26 P_069 0.57 109.2 0.65 107.3 0.66 103.9

Page 40: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations � Rehabilitation

�Maintenance of the rehabilitation of Bench 3

continued during 2017 despite the difficult

weather conditions encountered during the

last half of the year;

�Shaping and seeding of a portion of the

eastern extraction boundary in Lot 76 was

completed;

Page 41: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Rehabilitation

Progress shot - Buttai Quarry Bench 3 planting (March 2017)

Page 42: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (September 2017)

Rehabilitation continued

Page 43: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Rehabilitation continued

Buttai Quarry South Eastern side of Lot 76 rehabilitation (December 2017)

Page 44: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

� Incidents / complaints� One complaint received for dust from a blast;

Page 45: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Quarry sales floor (March 2017)

Overview of operations

Page 46: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

Drone image (February 2018)

Page 47: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

Drone image (February 2018)

Page 48: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

Page 49: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Planned activities for 2018

� Further extraction of material;

� Continuation of dust monitoring;

� Maintenance of rehabilitation work completed;

� Buttai “Recycling Proposal” ongoing – current

status explained;

Page 50: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

ANY QUESTIONS?

THANK YOU

Page 51: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Buttai Quarry Community Consultation Meeting - 31 August 2017

Page 52: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview Issues arising from previous meetings; Year To Date summary of operations; Overview of operations:

Dust; Noise; Flora and fauna management; Blast management; Rehabilitation; Rubicon (formerly TREES) reports; Incidents / complaints;

Planned activities for 2018;

Page 53: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Issues from previous meetings Buttai Quarry s96 modification; Daracon Annual report; Proposed recycling facility; Bushfire reduction; Lings Rd access and rubbish;

Page 54: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

2017 Year To Date summary of operations Quarrying continuing in Lot 76 in a north / west

direction following the consented extraction area;

Quarry operation continues to involve the manufacture and sale of various road base products;

Progressive rehabilitation on “bench 3”, north west boundary and south east bund;

Page 55: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

A total of 10 blasts have been conducted; One complaint received – 18/08/17; The Department of Industry has undertaken 1

inspection; Rubicon (previously TREES) consultants

conducted 1 environmental inspection & 1 internal environmental audit has been carried out;

Spectrum Acoustics have conducted 2 noise monitoring sessions;

Page 56: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Dust Assessed against NSW EPA Criteria (4mg/L)

with all but one result under the criteria - that being Buttai Barn in June 2017 which recorded a value of 5.9mg/L (containing insects and vegetation);

Overview of operations

Page 57: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Dust monitoring results January – August 2017

Date / Site D1 - Tetratheca D2 - Norma D3 - Buttai Barn D4 - Bishop D5- Buttai Barn 2

Jan-17 1.2 3 2.5 0.7 0.5

Feb-17 1.1 0.9 2.3 0.7 1.5

Mar-17 1.2 3.5 1.5 0.7 1.8

Apr-17 1.1 1 1.5 1.7 2.3

May-17 0.3 0.4 1 1.1 0.3

Jun-17 0.4 0.5 5.9 1.9 0.9

Jul-17 0.3 1.9 2 0.5 1.8

Aug-17 0.5 0.5 2.9 0.9 0.4

Page 58: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Noise Noise monitoring undertaken by Spectrum

Acoustics who have conducted 2 monitoring sessions in accordance with the noise management plan;

The results obtained were within the specified limits;

Overview of operations

Page 59: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Noise

Page 60: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Flora and FaunaMinor tree clearing has been completed as

necessary for pit progression and in accordance with Quarry Management Plan;

Ongoing weed eradication continues on site regularly;

Overview of operations

Page 61: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations Blast Management

10 blasts have been conducted in 2017 with all 10 blasts being under allowable limits;

Page 62: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations Rehabilitation

Bench planting 3 is progressing well;Planting & seeding the Western extraction

boundary in Lot 76 continues;Shaping and seeding of finished surfaces

continues along the eastern boundary;

Page 63: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Rehabilitation

Progress shot - Buttai Quarry Bench 3 planting (August 2017)

Page 64: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (August 2017)

Page 65: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (August 2017)

Page 66: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations Incidents / complaints

One complaint has been received in the 2017 period – Dust on 18/08/17;

Page 67: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

Page 68: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Planned activities for 2018

Further extraction of material; Continuation of dust monitoring; Maintenance of recent rehabilitation work

completed; Update on Recycling proposal:

Documentation was submitted in February 2017 to request Secretary’s Environmental Assessment Requirements (SEARs). Copies to be supplied;

Page 69: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

NSW Planning and Environment responded in April supplying SEARs and associated documentation. Copies to be supplied;

Information has been distributed to various consultants for review and they are currently pricing this work;

Once we receive and have reviewed the pricing, the working team will be nominated;

Draft reports will then be compiled. It is expected that this will occur late 2017 / early 2018;

Page 70: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Next key consultation with CCC will then be when the draft documents have been prepared. This will allow community feedback and discussion;

This could occur in next year’s CCC meeting or if the timing doesn’t suit that, then Daracon will organise a separate meeting for such;

Page 71: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

ANY QUESTIONS?

THANK YOU

Page 72: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Community Consultation Meeting 11 August 2016

Page 73: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview � Issues arising from previous meetings � Year To Date summary of operations � Overview of operations

� Dust � Noise � Flora and Fauna management � Blast Management � Rehabilitation � TREES Reports � Incidents / Complaints

� Planned activities for 2016

Page 74: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Issues from previous meetings � Buttai Quarry consent � Dissemination of information – Minutes � Blasting notifications � Trial of new dust monitor location � Dumping of rubbish � Daracon Annual report � Report of wild dogs

Page 75: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

2016 Year To Date summary of operations � Quarrying continuing in Lot 76 � Quarry operations has involved the manufacture

and sale of various road base products

Page 76: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� A total of 5 blasts have been conducted. � No complaints have been received � The Department of Primary Industries have

undertaken 2 inspections � TREES consultants conducted 1 environmental

inspection & 1 Internal Inspection has been carried out

� Spectrum Acoustics have conducted 2 noise monitoring sessions

Page 77: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Dust � Assessed against NSW EPA Criteria (4mg/L)

most results were under the criterion with the exceptions of: �Buttai Barn in July which recorded a value

of 87.8mg/L (a significant quantity of bird droppings present)

Overview of operations

Page 78: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Dust monitoring results January – July 2016

Date / Site Tetratheca Norma Buttai Barn Bishop Buttai Barn 2

Jan-16 0.1 0.9 1.8 1.4 0.2

Feb-16 0.5 1 1.3 2.2 0.6

Mar-16 0.2 1.4 0.5 1.4 0.6

Apr-16 0.6 1.5 0.4 0.7 0.4

May-16 0.7 3.4 3.2 1.6 0.9

Jun-16 0.5 2 2.7 0.8 1.1

Jul-16 0.4 1 87.8 1.2 1.6

Page 79: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Noise � Noise monitoring was undertaken by

Spectrum Acoustics who have conducted 2 monitoring sessions in accordance with the noise management plan

�The results obtained were within the specified limits

Overview of operations

Page 80: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Noise

Page 81: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Flora and Fauna �No clearing has been undertaken �Lantana eradication has continued on the

western side of Lot 75

Overview of operations

Page 82: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations � Blast Management �5 blasts have been conducted in 2016 with all

5 blasts being under allowable limits �No complaints were received during 2016 in

relation to a blast

Page 83: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations � Rehabilitation �Rehabilitation of Bench 3 involving the

planting of tube stock was carried out in May 2016

�Planting & seeding of a portion of the western extraction boundary in Lot 76 was carried out

Page 84: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

� Rehabilitation

Progress shot - Buttai Quarry Bench 3 planting (April 2016)

Page 85: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (April 2016)

Page 86: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Progress shot - Buttai Quarry Bench 3 planting (August 2016)

Page 87: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Western Extraction Boundary Lot 76 seeding and planting (August 2016)

Page 88: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations � Incidents / complaints �No complaints were received in the 2016

period

Page 89: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Overview of operations

Page 90: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

Planned activities for 2016

� Further extraction of material � Continuation of dust monitoring � Maintenance of recent rehabilitation work

completed

Page 91: &RQVXOWDWLRQ PHHWLQJ DQG VLWH YLVLW ± 1RYHPEHU and Quarries Docu… · Blast Management monitoring results Norma Brookes Lings Rd Buttai Barn Date Time Blast # PPV mm/s O/pressure

ANY QUESTIONS?

THANK YOU