rpt of work - ontario...2. work filed three, four or five years after completion is claimed at 5g"vb...
TRANSCRIPT
-
52A10NW0008 2.15791 TARTAN LAKE 010
2. 15? 9 l
REPORT OF WORK 1994
During the summer of 1994 a continuation of stripping and washing away of overburden was carried out. Nore amethyst veins were uncovered and sampled. Colour varied from clear quartz to purple crystals, however, there was iron oxide on the surface of many pieces making them difficult to clean.
Drilling and blasting of the showing revealled the prescence of disseminated pyrite approximately 2* - 3* wide bordering the amethyst occurrence. Assays revealed no gold present.
Blasting to a depth of 5* - 6* indicated the amethyst veins to be cleaner and crystals of better quality. Some samples were taken to the Department of Mines in Thunder Bay and interest was encouraging, so continued work is planned for 1995.
Authour of report W.(Bill) Richardson Prospector
-
STATEMENT OF COST 1994
Water pump Briggs and Stratton 5 Hp.
Rental Fee S39.007day
Hose: SlO.OO/day for each 25 m.
Total cost per day S100.00
Total 19 days 51900.00
Gas and oil
Manual labour @ SISO.OO/day (46 days)
S380.00
S6900.00
Transportation: 3/4 ton truck
80 KB return @ S0.307km
46 trips 51104.00
Total S10284.00
-
•-- y
59' 58'5i
CA/R/A^
-
v* j- - \~? f "*I*3S
^rwjdiV-is jo t/avb'
T
o ol
rf^
Y
0S:•fcr •v"
D.T V-r ".i.0
I^F-
l *U j
..l*, r -ji Or (r- ——j^Jfe f- - --^. --li -.l:i.Ol.J.!:i: .....
[L^-J-U;,; l j : :J:r : r -- -..:— r:.!:.; .. :.;
o \ . . - ,.fV:
; 1.i::,:,;:,A:::Jv.v, •::::..::::::rl :.-|::.Vi;..... ........J ;. ,.j ^
flp.
' : : : - : r
::::;:-..l ::i'::1"!':'
^Ti.i;:\?..:.^:lh;:-Hv: :-Jp^\L.vJl
-*-!-:i
tH: . . . \ .^'Jj ^k ^ k-•**o5-fc
\
lit,
3 l vvt OWOj/Si'
-
'"SJl:
-
\
-
REPORT OF WORK BY D. ARSENAU^T
MINING LANDS BRANCH
Work on claim * 1183530
RECEIVED
MAR l 7 1995
In the fall of 1993 aa amethyst showing was discovered on what is now claim * 1183530. During the summer of 1994 manual stripping and washing was carried out. The amethyst occurrence was on the face of a granite ledge approximately 4'-5* high and 20' in length. The crystals ranged in size from 1/4" to 1.4" across and varied in colour from white to deep purple. The deep coloured crystals were beyond reach at the bottom of the ledge. Removal of overburden at the bottom of the ledge will have to be done to extr.ict any amethyst. Overburden on top of the ledge was removed to locate any parallel veins. Mowever the heavy layer of sand and the presence of numerous tree stumps made it difficult to do this by manual labour. It was decided to wait until the summer of 1995 and bring in mechanical equipment to further explore this showing. The amethyst vein was traced to the northeast along a ravine for approximately 200 metres. Crystals ranged from 1/4" to 3/4" and were deep purple in colour. These showings were also on the face of ledges. These ledges will require extensive removal of overburden to determine the width of the vein or veins. The loose boulders that are believed to have fallen off the face of these ledges contain massive amethyst crystals. Work in 1995 will hopefully determine the .narket quality of the this showing.
Drilling and blasting was done on the showing and will be documented on an application for submission for assessment work credit for W. Richardson at a later date.
-
v
*)
*5iJ ^
Nx
*.
? U
js.1
^'K
^•\"
"-t
'"
-
Ministry atNorthern Dovoloprnontand Mines
Ontario
Report of Work Conducted After Recording Claim f
MlnJnQ ActParmal Information cotected on this form is obtained under the authority of the M
lA — — **-i nil n H *im* JH ItA Jtf^*f^^*t b* MtA DMM^NM^M! ftA^MAJ^^V KUff^bM* l ••kJ^M ftdk*n common snowo oe oireciea n nw riuniKWi Manager. Miimig LOTOS, MWI Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.
Instructions: - Ptease type or print and submit in duplicate.- Refer to the Mining Act and Regulations for req^
Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
900
ded HoUer(s) O.
G, AtCHAR^r_^^_^___
CtartNo.
Tetophone No.fi. HIT 13 p***?
MMnp DlvWofig/iy
raNpMrM MorQPtanNo.
From: To: J ,9T
Work Performed (Check One Work Group Only)WorkGroup Type
Geotechnical Survey
Physical Work. Including DriOing W/Xti/Y
Rehabilitation
OD MN Authonzsd Work
Assays
Assignment from Reserve
Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
[attach a schedule M necessary)
Dei lineation of Donoflclal Interest * See Note No. 1 on reverse sidel certify that at the Mm* the work was performed, the claims covered in this work report were recorded in Ae current holder's name or held under a beneficial Interest by ttw current rooonM
Dole Recorded Holder or Agent (Signature)
Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after its completion and annexed report is true.
Name and Address of Parson Ceftifyhig
6. /?l perTetopont) No.
977Date Certified By (Signature)
For Office Use Only x on -j iu o mn i cTotal Value Gr. Recorded
jo, zzy
Dflto Recofdod
Doomod Approval Date
/V**. Cr/fS
Mining Recorder \ "w "
,/^-C. \JLJ6Ju^-o^ mDate Approved j
Date Notice for Amendments Sam
RWMwd Stamp' " J "
ISIAI-J dlilNIW V8 y^GNOHi QBM'DT'J
OZ41 (DM1)
-
i
OJ
O*-^
Total Vslu* Work Don*
|.,
fiP
0
-4-
-
-
rsi Moo
004
\^1
Valu* of Assessment Work Don* on this Claim
ijflf
O
VDO-c:
-o
OQ
Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (**) one of the following:1. D Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.
In the event that you have not specified your choice of priority, option one will be implemented.
Note 1: Examples of beneficial interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.
Note 2: If work has been performed on patented or leased land, please complete the following:
l certify that the recorded holder had a beneficial interest in the patented or leased land at the time the work was performed.
Signature Date
-
Ontario
Ministry olNorthern Developmentand Mines
Ministere du Developpement du Nord et des mines
Statement of Costs for Assessment Creditftat des coots aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction NoJN* de transaction
Personal information collected on this form is obtained under the authority of the Mining Act. This information wH be used to maintain a record and ongoing status of the mining daim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands. Ministry of Northern Development and Mines. 4th Floor. 159 Cedar Street. Sudbury. Ontario P3E 6A5. telephone (70S) 670-7264.
Les ranseignements personnels contends dans la present* formula sent recueilis en vertu de la Lot sur les mines ei serviront ft tenir a jour un regjstre des concessions minieres. Adresser toute question sur la collece de ces renseignements au chef provincial des terrains miniers. ministere du Devetoppement du Nord el des Mhws. 159. rue Cedar. 40 etage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.
1. Direct Costs/Coats directs
Type
Wages
Contractor's
FeesDrafts de ['entrepreneur et de I'expert-
SuppHea Used Foumfturea ufltooes -rf
W^
Equipment Rental Location denwwftol
i
Description
Labour / fo/Ja^ Main-d'oeuvre 3^4^
Field Supervision Supervision sur le terrain
Type
Typ* fJLt./eict^
(5*5 t o, c
Type ^ f tfa^ )
UWTFZ fun P
Amount Montan!
y 3o v-
300^-
/foo^.
Total Direct Coste Total des couts directs
Totals Total global
WDO-
3*0.1*
'j f 00. l
-
fooo-t
2. Indirect Costs/Couts indirects* * Note: When claiming RehabOnation work Indirect costs are not
allowable as assessment work. Pour le remboursement des travaux de rehabilitation, les coOts indirects ne sont pas adrnissMes en tant que travaux d'evaluation.
Type
Transportation Transport3cff /-**i
&C- k *~
3 J /f?*
Food and Lodging Noufriture ethebergementMobilization andDemobilization MoMllsaaon et demoblHsation
Description
Type /^P 3fk* V '-***
Amount Montant
76?.?.
Sub Total of Indirect Costs Total partJel des couts indirects
Amount Allowable (not greater than 20H of Direct Costs) Hontant admhislbie (n'excedant pas 20 M des coots directs)
Total Value of Asaessment Credit Vateur Male du credrt[Total of Direct and AMowable o evswsllon tadrad cMtet fTaM dH caen dtaeto
Totals Total global
;
~~7m-Z
76,8-2
73L3-
The recorded holder win be required to verify expendrtures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note: Letrtutoireenregistre sera tenu de verifier IBS dap der. ideas dansle present etat des couts dans les 30 jours survant une demande a cet effet. Si la verification n'est pas effectuea. to rninistre paul rejeter tout ou une partie des travaux d'evaluation presentes.
RRng Discounts Remises pour depot
1. Work filed within two years of completion is claimed at 10046 of the above Total Value of Assessment Credit.
1. Les travaux deposes dans les deux ans suivant tour achevement sont rembourses ft 100 9b de la vateur Mate susmentionnee du cri* d'evaluation.
2. Work filed three, four or five years after completion is claimed at 5G"Vb ot the above Total Value of Assessment Credit. See calculations below:
Total Value ot Assessment Credit Total Assessment Claimed
x 0.50
2. Les travaux deposes trois. quatre ou cinq ans apres leur achevercent sont rembourses a 50 "H* de la vateur totals du credit d'evaluation susmenfonne. Voir les calculs ti-dessous.
Vateur totale du credit d'evaluationx 0.50
Evaluation totale demandee
Certification Verifying Statement of Costs Attestation de I'etat des couts
hereby certify:that the amounts shown are as accurate as possible and these costs were incurred white conducting assessment work on the lands shown on the accompanying Report of Work form.
that as(Recorded HoUer. Agent. Position in Company)
to make this certification
J'atteste par la presente :que les montants indiques sont to plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formute de rapport de travail ct-joint.
l am authorized Et qu'a litre de __________________ je suis autorise (titutaire emeflislrt. representant, post* occup* dans la cornpagnie)
a faire cotte attestation.
Nota : Dans cene formule. lorsqu'il designe des personnes. le masculin est utilise au sens neutre.
-
OntarioMinistry of Ministeredu Geoscience Approvals Office Northern Development Devetoppement du Nord 933 Ramsey Lake Road and Mines et des Mines 6th Floor
Sudbury, OntarioP3E 6B5
Our File: 2.15791 Transaction #: W9440.00324
March 23, 1995 Telephone: (705) 670-5853Fax: (705) 670-5863
Mining RecorderMinistry of Northern Development t Mines435 James Street SouthSuite B003Thunder Bay, OntarioP7E 6E3
Dear Sir/Madam:
Subject: APPROVAL Or ASSESSMENT WORK CREDITS OH MIHIHG CLAIMS TB.1183530 BT AL IB TARTAN LAKE AREA
The deficiencies in the original submission have for the most part been rectified.
Assessment work credits have been approved as outlined on the report of work form for the submission. The credits have been approved under Section 10, Physical Work, Mining Act Regulations.
It is noted that the hours and dates of the field work were not provided as required by subsection 10(2) (a) of the Regulations. Please keep a record of this type of information and include it in future Physical Work submissions.
The approval date is March 20, 1995. Please indicate this approval on the claim record sheets.
...12
-
-2-March 23, 1995Mining Recorder - Thunder Bay
If you have any questions regarding this correspondence, please contact Bruce Gates at (70S) 670-5856.
Yours sincerely.
Ron C. GashinskiSenior Manager, Mining Lands Section Mining and Land Management Branch Mines and Minerals Division
BIG/jl Enclosure:
cc: Resident GeologistThunder Bay, Ontario
L/Assesessment Files Library Sudbury, Ontario
-
N
*1̂ **^
DORIONSTWP
MCTlAVISH TWPFOR STATU/3 REFER TO TWP PLAN
G-675
\ II83S36 l \ 1183595
1198737 iL—- J
_ i_JS,..___—1-^- — ———— ~~ fre \TTB L/^—V
nasr7 i"94847 i
/Vi 166702)———ll—JCLr^^--
MACGREGOR
NOTICE:
The Information that appears on this map hat been compiled from various sources, and accuracy Is not guaranteed. Those wishing to stake mlnma claims should consult with the Mining Recorder, Ministry of Northern Development and Mines, for additional Information on the status of the lands shown hereon.
LEGEND
PATENTED LAND CROWN LAND SALE LEASESLOCATED LAND LICENSE OF OCCUPATION MINING RIGHTS ONLY SURFACE RIGHTS ONLY ROADSIMPROVED ROADS KING'S HIGHWAYS RAILWAYS POWER LINES MARSH OR MUSKEG
- MINESCANCELLED
LAND USE PEWITS FOR COMMERCIAL TOURISM. OUTPOSTC.
CAMPS
REFERENCESAREAS WITHDRAWN FROM DISPOSITION
M.R.O. - MINING RIGHTS ONLY
S.R.O. -SURFACE RIGHTS ONLY
M.+ S. - MINING AND SURFACE RIGHTS
DMcnption Order No. Dit* Dhpoiltlon F H*
SCALE: 1 INCH = 40 CHAINS
O 1OOO 2OOO 4OOO 6OOO 8000
O 200 METRES
100011 KM)
' 2000(2 K M)
TARTAN LAKEM. N. R. ADMINISTRATIVE DISTRICT
THUNDER BAYMINING DIVISION
THUNDER BAYLAND TITLES/ REGISTRY DIVISION
THUNDER BAY
Ministry ofNaturalResources
Ministry ofNorthern Developmentand Mines
DateJULY, 1991
In Service July 23/93. G-2706
52A1ONWOOOB 2 167o7 TARTAfTuAKE
200