royal government of bhutan ministry of works ......pointseasting stn 5 northing elevation 1000.745...
TRANSCRIPT
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGE
OVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,
TRASIGANG DZONGKHAG
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
FOR TENDER ONLY
DRAWING LIST
COVER PAGE
DRAWING NO.DESCRIPTION
LIST OF DRAWINGS
GENERAL NOTES(1)
SL.NO.
01
02
03
04
05
06
07
08
09
10
11
12
13
GENERAL ELEVATION
UB-DL-01
14
15
16
GENERAL NOTES(2)
GENERAL PLAN
17
18
19
20
DRAWING NO.DESCRIPTIONSL.NO.
UB-GN-02
UB-GN-03
UB-GE-04
UB-GP-05
UB-LABT-06LEFT ABUTMENT FORM
LEFT ABUTMENT REINF. 1
LEFT ABUTMENT REINF. 2
LEFT ABUTMENT REINF. 3
LEFT ABUTMENT REINF. 4
LEFT ABUTMENT REINF. SCH. 1
LEFT ABUTMENT REINF. SCH. 2
UB-LABT-07
UB-LABT-08
UB-LABT-09
UB-LABT-10
UB-LABT-11
UB-LABT-12
RIGHT ABUTMENT FORM & REINF.
RIGHT ABUTMENT REINF. SCH.
UB-RABT-13
UB-RABT-14
ANCHORAGE BLOCK FORM 1
ANCHORAGE BLOCK FORM 2
ANCHORAGE BLOCK REINF. 1
ANCHORAGE BLOCK REINF. 2
ANCHORAGE BLOCK REINF. SCH.
UB-AB-15
UB-AB-16
UB-AB-17
UB-AB-18
UB-AB-19
21 RRM WALL DETAILS 1 UB-RRM-20
22 RRM WALL DETAILS 2 UB-RRM-21
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
DRAWING LIST
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-DL-01DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
C. REINFORCEMENT1. ALL REINFORCING STEEL SHALL BE OF HIGHYIELD STRENGTH DEFORMED BARS (MIN fy = 500 MPa) CONFORMING TO IS 17862. BENDING OF REINFORCEMENT BARS SHALL BE AS PER ARTICLE 5.10.2 OFAASHTO / 2007.3. LAPS IN REINFORCEMENT BARS IN TENSION ZONE SHALL BE AVOIDED AS
FAR AS POSSIBLE. LAPS MAY BE PROVIDED, IF UNAVOIDABLE. HOWEVER,IN SUCH CASES:
(A) FOR 50 % OF REINFORCEMENT BARS LAP, LAP SPLICE OFCLLSS "B" SHALL BE USED AND FOR 100% LAP, LAP SPLICE OFCLASS "C" SHALL BE USED AS MENTION IN THE TABLE BELOW.
(B) FOR CLOSELY SPACED BARS LAPPING MAY BE AVOIDED BYPROVIDING SUITABLE TYPE OF MECHANICAL ANCHORAGE (WITH PRIOR APPROVAL).
(C) MINIMUM LAP LENGTH OF REINFORCEMENT SHALL CONFORM TO ARTICLE 5.11.2 AND 5.11.5 OF AASHTO / 2007SPECIFIED LENGTH OF THE LAP SPLICE SHALL BE
4. CLEAR CONCRETE COVER TO REINFORCING STEEL SHALL BE MAINTAINED AS FOLLOWS UNLESS OTHERWISE SHOWN IN THE DRAWINGS OR AS DIRECTED BY THE ENGINEER.
A. REINFORCED CONCRETE STRUCTURES
● FOOTING & ABUTMENT - 50 mm
5. SPECIALLY MADE COVER BLOCKS OF SAME STRENGTH AS THATOF CONCRETE SHALL ONLY BE USED.
6. WELDING OF REINFORCEMENT BARS SHALL NOT BE PERMITTED, UNLESS APPROVED BY THE ENGINEER.
D. WATERWATER TO BE USED IN CONCRETING AND CURING SHALL BE POTABLEWATER TO BE TESTED AS PER AASHTO T26-79.
E. MATERIAL SPECIFICATIONMATERIAL SPECIFICATIONS AND WORKMANSHIP SHALL BE IN ACCORDANCEWITH THE TECHNICAL SPECIFICATION AS SPELT OUT IN THE CONTRACTDOCUMENT.
F. WORKMANSHIP / DETAILING1. ALL SHARP EDGES OF CONCRETE SHALL BE CHAMFERED
(10mm x 10mm). OR AS DIRECTED BY THE ENGINEER
2. FORM WORK DETAILS SHALL BE SUBMITTED BY THE CONTRACTOR FOR THE APPROVAL AND SHALL BE TESTED IN ACCORDANCE WITH THE SPECIFICATION.
3. CONSTRUCTION JOINT : THE LOCATIONS AND PROVISION OF CONSTRUCTION JOINTS SHALL BE APPROVED BY THEENGINEER-IN-CHARGE. THE CONCRETING OPERATION SHALLBE CARRIED CONTINUOUSLY UP TO THE CONSTRUCTION JOINT.
B. CONCRETE;UNLESS OTHERWISE SPECIFICALLY MENTIONED IN THE DRAWING OR DIRECTEDBY THE ENGINEER, CONCRETE GRADE SHALL BE AS PER RELATED SECTION OFCONTRACT DOCUMENT PARTLY REPRODUCED BELOW:
APPLICATION LOCATION SPECIFIED COMPRESSIVE STRENGTH IN CUBE (28 DAYS) IN MPa
REINFORCED CONCRETE (RCC)
1. FOOTING SLAB, ABUTMENT & RETURN WALLS AND ANCHORAGE BLOCK M25 as per IS 456
2. PCC FOR LEVELING/BLINDING CONCRETE AND CONCRETE BLOCKS M10 (1:3:6)
*** ALL THE MATERIALS FOR CONCRETE SHALL BE TESTED AND MIX DESIGN & TRIAL MIXES CARRIED OUT BEFORE CASTING CONCRETE.
A. GENERAL1. THE NOTES IN THIS DRAWING SHALL BE READ INCONJUNCTION WITH ALL RELEVANT DRAWINGS PERTAINING TO THE BRIDGE.
2. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS ARE IN MILLIMETER (mm) AND ALL LEVELS ARE IN m. DIMENSIONS ARE NOT TO BE SCALED AND ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
3. THE CONTRACTOR SHALL VERIFY ALL CHAINAGES, REDUCED LEVELS, COORDINATES AND DIMENSIONS BEFORE START OF THE WORK. IN CASEOF ANY DISCREPANCY, THE MATTER SHALL BE BROUGHT TO THE NOTICE OF THE ENGINEER BEFORE EXECUTION.
G. SUPERVISION1. THE CONSTRUCTION WORK MUST BE SUPERVISED BY A
COMPETENT SUPERVISION ENGINEER.2. THE BACKFILL BEHIND THE ABUTMENTS SHOULD BE COMPACTED IN LAYERS 0F NOT MORE THAN 200 MM THICK.
GENERAL NOTES FOR RCC CONSTRUCTION
10 30012 41216 732
20 114422 138425 178728 2241
18 926
32 2927
BAR DIA,mmLAP SPLICE,mm(Class B)
LAP SPLICE,mm(Class C)
374538957
1495180923372931
1211
3828
220317563
880106413741724
713
2252
Dev. Length,mm(Ld)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
GENERAL NOTES (1)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-GN-02DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
SHAPE CODE
SHPAE
00
a
11
b
Total Length :a
a
Total Length :
r
a
bd
c51
Total Length :2(a+b)+16d
21
b
a c
Total Length :a+b+c-r-2d
SHAPE CODE AS PER ISO 4066 : 2000
LEGEND :
r = BENDING RADIUS AS PER TABLE 4d = DIAMETER OF BARa/b/c/d = AS SHOWN
a+b - İ r-d
45Á HOOK
90Á HOOK
135Á HOOK
180Á HOOK
REBAR HOOK SPECIFICATION REBAR DESIGNATION DIA, mm
AREA, mm2
UNIT WT., kg/m REBAR TYPE
T10 10 79 0.617 IS : 1786 GRADE Fe 500T12 12 113 0.888T16 16 201 1.578T20 20 314 2.466T25 25 491 3.853T28 28 616 4.834T32 32 804 6.313
IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500
TABLE 3 : STANDARD RE-BAR PROPERTIES(UNIT WT. 0.00785 kg / mmĮ /m)
IS : 1786 GRADE Fe 500
1(ART. 5.10 AASHTO LRFD 2007)
TIE/STIRRUPS OTHER 900 1350 900 1800
T10 40 60 60 75 120 65T12 48 72 72 75 144 65T16 64 96 96 96 192 65T20 - 120 240 120 240 80T25 - 150 300 150 300 100T28 - 168 168 336 112T32 - 256 192 384 128
1 ALL REINFORCEMENT SHALL BE COLD BEND
REBAR DESIGNATION
BENDING DIAMETER
TIE/STIRRUPS
STANDARD HOOK EXTENSION, mm
OTHER
TABLE 4 : STANDARD HOOK AND BEND REQUIREMENT
NOTES:
A. GENERALALL DIMENSIONS ARE IN MILLIMETER UNLESSOTHERWISE MENTIONED
B. SHAPE CODE & BAR SHAPETHE STANDARD SHAPE CODES AND ITS METHODOF MEASUREMENT HAVE BEEN PREPARED ASPER EUROPEAN STANDARD BS EN ISO 4006 : 2000.
TYPE OF REBAR DIA OF REBAR
SPACING
LOCATION/REMARKS
BAR MARK
NOS. OF BAR
BAR MARK
20 - 05 - T 20 - 150 - EF
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
GENERAL NOTES (2)
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-GN-03DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
Existing profile
Leveling Concrete
POINTS EASTINGSTN 5
NORTHING ELEVATION1000.745 1998.611 499.851
STN O1 1000.000 2000.000 500.000BM 1 993.792 2037.208 500.137
REMARKS
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
GENERAL ELEVATION
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 500
UB-GE-04DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
POINTS EASTINGSTN 5
NORTHING ELEVATION1000.745 1998.611 499.851
STN O1 1000.000 2000.000 500.000BM 1 993.792 2037.208 500.137
REMARKS
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
GENERAL PLAN
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 500
UB-GP-05DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
ELEVATION
PLAN
CENTRE OFABUTMENT
CENTRE OFTOWER
CENTRE OFABUTMENT
CENTRE OFTOWER
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. FORM
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-LABT-06DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
REINFORCEMENT DETAILS (SECTION A-A)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. REINF. 1
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-LABT-07DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
REINFORCEMENT DETAILS (SECTION B-B)
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. REINF. 2
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-LABT-08DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
WEB REINFORCEMENT DETAILS
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. REINF. 3
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-LABT-09DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
Mesh Type "A"2x2=4-45-T12-100-both directions
Mesh Type "B"2x2=4-46-T12-100-both directions
REINFORCEMENT DETAILS ATBEARING LOCATION & TOWER BASE
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. REINF. 4
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-LABT-10DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. REINF. SCH. 1
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-LABT-11DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
LEFT ABT. REINF. SCH. 2
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-LABT-12DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
ELEVATION
PLAN
REINFORCEMENT DETAILS
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
RIGHT ABT. FORM& REINF.
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-RABT-13DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
RIGHT ABT. REINF. SCH.
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-RABT-14DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
Ground Level Ground Level
SIDE ELEVATION
Undistrub soilUndistrub soil
11
PLAN
3 3
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
ANCHORAGE BLOCK FORM 1
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-AB-15DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
Ground Level Ground Level
FRONT ELEVATION (View 1-1)
Undistrub soilUndistrub soil
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
ANCHORAGE BLOCK FORM 2
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-AB-16DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
36x2x2=144-02-T20-150-FRONT Reinf.
36x2x2=144-01-T20-150-BACK Reinf.
36x2x4=288-07-T16-150-Anchorage Reinf.
27x2x2=108-03-T20-150-BOTT
31x2x2=124-05-T206-150-BACK
37x2x2=148-06-T20-150-TOP
34x2x2=136-04-T20-150-FRONT
11
2 2
REINFORCEMENT DETAILS (Section 3-3)
6x2x2=24-08-T16
Mesh Type "C"1x2=2-09-T16-100-both directions
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
ANCHORAGE BLOCKREINF. 1
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-AB-17DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
REINFORCEMENT DETAILS (View 2-2) REINFORCEMENT DETAILS (View 1-1)
36x2x2=144-01-T20-150-BACK Reinf.
36x2x2=144-02-T20-150-FRONT Reinf.
37x2x2=148-06-T20-150-TOP
27x2x2=108-03-T20-150-BOTT
34x2x2=136-04-T20-150-FRONT36x2x2=144-02-T20-150FRONT Reinf.
36x2x2=144-01-T20-150BACK Reinf.
34x2x2=136-04-T20-150-FRONT
31x2x2=124-05-T20-150-BACK
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
ANCHORAGE BLOCKREINF. 2
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-AB-18DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
ANCHORAGE BLOCKREINF. SCH.
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
NTS
UB-AB-19DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
SIDE ELEVATION
PCC (1:3:6)
Random Rubble
Masonry in CM 1:4
Backfill side
Valley Side
Note: (1) Provide Weep holes for wingwalls @1.5m c/c in Both direction
(2) The Dimension of weep hole is 10cmX10cm in Slope 1:20
(3) Provide Bond stone stagger @1m c/c in both direction
(3) Provide RRM in CM 1:4 for Wingwalls
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
RRM WALL DETAILS 1
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-RRM-20DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY
Weep hole 10cmx10cm
Slope: 1 in 20
Weep hole 10cmx10cm
Slope: 1 in 20
SHEET CONTENTS :
ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement
Department of Roads, Regional OfficeTrashigang, Bhutan
RRM WALL DETAILS 2
REVISION DATE DRAWING NO.
SCALE:
FIRST ISSUE
NAME & SIGNATURE
(as Sheet A3 size)
1 : 50
UB-RRM-21DESIGN
DRAWN
CHECKED
APPROVED
PROJECT:
TSHERING WANGMO (JE, RO, DoR)
CONSTRUCTION OF 360 FEET BAILEY SUSPENSION BRIDGEOVER GONGRI AT SHINGPHURTUMA, UDZORONG GEWOG,TRASHIGANG DZONGKHAG
Nov. 2015 KARMA WANGDI (CE)
UGYEN PHUNTSHO (ENG, BD, DoR)
KARMA WANGDI (CE)
FOR TENDER ONLY