route to 2012 daniel epstein presentation 10.06.09

28

Upload: think-london

Post on 26-Jan-2015

1.632 views

Category:

Business


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Route To 2012 Daniel Epstein Presentation 10.06.09
Page 2: Route To 2012 Daniel Epstein Presentation 10.06.09

Sustainability at the Olympic Delivery Authority

Think London Panel Event

June 2009

Dan Epstein – Head of Sustainable Development & Design

Page 3: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

3

Who we are

Olympic

Board

BOA

GLA

LOCOG

Govt.

IOC

LOCOG

Olympic Delivery

Authority

CLM Delivery Partner

Page 4: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

4

Central

LondonOlympic Park

Lea

Valley

Park

Central

London

Page 5: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

5

Progress on London 2012

Page 6: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

6

The Olympic Park

– 2.5km2 (618 acres)

– £9.3bn budget

– 3 year construction programme

– 30 new bridges

– 190 buildings demolished

– 600,000t contaminated soil

washed

– 0.1 av. accident frequency

– 7.7m spectators

– 15,000 athletes

– 20,000 accredited media

Page 7: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

7

Page 8: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

8

Page 9: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

9

Page 10: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

10

Page 11: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

11

Page 12: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

12

Page 13: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

13

Page 14: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

14

Page 15: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

15

Page 16: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

16

Sustainable Development Strategy - A Holistic Approach

Environmental Sustainability– Carbon– Water– Waste– Materials– Biodiversity– Environmental impacts

Socio-economic Sustainability– Supporting Communities– Transport and mobility – Access– Employment and business – Health and well-being– Inclusion

Page 18: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

18

Page 19: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

19

Page 20: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

20

Aquatics Centre – Games-time exterior – aerial view

Page 21: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

21

Page 22: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

22

Energy Strategy

MEAN

Energy

efficiency

Efficient

conversion

(CHP)

Renewable energy

MEAN…

LEAN…

GREEN…

£ / CO2 emission savings

Energy

efficiency

Efficient

conversion

(CHP)

Renewable energy

MEAN…

LEAN…

GREEN…

£ / CO2 emission savings

MEAN - Delivered by Venue

Teams: Reduction on Part L for

all Legacy Buildings;

LEAN - Delivered by the Energy

Centre Contractor (CCHP);

GREEN - Delivered by the Energy

Centre Contractor (Biomass), Wind

Turbine Contractor and Venues;

Page 23: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

23

Energy Centre

•20% CO2 savings contractually

agreed;

•30% CO2 savings by reasonable

endeavours to 2013/14;

•3MWth energy from biomass

•Gasification technology using

wood chip

•16 km of pipe and wire

Page 24: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

24

Page 25: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

25

London 2012 Carbon Footprint

Transport

Infrastructure

12%

Operations

6%

Venues

49%

Spectators

33%

Page 26: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

26

Embodied Energy

Trade associations and WRAP

- Lean design and construction

- Recycled aggregate

- Carbon emissions in concrete

- Sustainable transport

Page 27: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

27

Challenges

1. Costs are an issue but ODA

constantly driving VfM

2. Strategic approach to SD

across programme

3. Commitment by venues is

essential (BREEAM) coupled

with pragmatism

4. Critical to get strategy into

construction tenders and

contracts

5. Strong and robust assurance

system vital

6. Partnership with other

stakeholders is vital to deliver

greenest games ever

Page 28: Route To 2012 Daniel Epstein Presentation 10.06.09

30.4.2009

28The official Emblem of the London Organising Committee of the Olympic Games

and Paralympic Games Ltd is protected by copyright. © London Organising Committee

of the Olympic Games and Paralympic Games Ltd 2007. All rights reserved.

Thank you