route from west kilburn to park royal - drawing number hs2...
TRANSCRIPT
www.arup.com
T +44(0)121 213 3000 F +44(0)121 213 3001
Solihull, West Midlands B90 8AE
The Arup Campus, Blythe Gate, Blythe Valley Park
Feasibility Study
High Speed 2
Sheet 2 of 33
Plan and Profile
Rail
209742-00
HS2-ARP-00-DR-RW-05002 3.0
As Shown
/ /2212 11 CO MP CL
2.0
Post Consultation Route
J:\209000\2
09742-0
0\4 Intern
al Project
Data\4-1
0 P
ost
Consultation Dra
win
gs\0
_Dra
win
gs\H
S2-A
RP-0
0-D
R-R
W-0
5002.d
gn
ApprovedFor Coordination
/ /05 0112 SH MP CL
Approved
3.0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20 20
20
20
20
20
20
20
40
4040
40
40
4040
40
40
40
40 40
4040
40
40
40
40
40
40
40
40
40
40
40
40
40
40
40
4040
40
40
40
40
40
4040
40
40
40
40
40
40
60
60
60
60
60
60
60
6+000
7+000
8+000
9+000
10+000
11+000
12+000
13+000
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
-10.0
-20.0
-30.0
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
-10.0
-20.0
-30.0
Chainage 6+400
6+500
6+600
6+700
6+800
6+900
7+000
7+100
7+200
7+300
7+400
7+500
7+600
7+700
7+800
7+900
8+000
8+100
8+200
8+300
8+400
8+500
8+600
8+700
8+800
8+900
9+000
9+100
9+200
9+300
9+400
9+500
9+600
9+700
9+800
9+900
10+000
10+100
10+200
10+300
10+400
10+500
10+600
10+700
10+800
10+900
11+000
11+100
11+200
11+300
11+400
11+500
11+600
11+700
11+800
11+900
12+000
12+100
12+200
12+300
12+400
12+500
12+600
12+700
12+800
Horizontal Alignment L=1949.4
L=200.0R=4050.0
L=646.0L=200
.0L=210.3L=411.8
L=140.0R=2000.0
L=804.0L=200
.0L=1769.3
L=200.0
R=3500.0
L=58.2
L=200.0L=164.3
Vertical Alignment L=302.3G=1.45%
L=665.2
R=46000.0
L=2179.4
G=-0.00%
L=187.8
R=-22000.0
L=423.5G=0.85%
L=303.0
R=-22500.0
L=342.4G=2.20%
L=506.9
R=22500.0
L=1249.7
G=-0.05%
L=154.8
R=80000.0L=834.8
G=-0.25%
Existing Level 32.7
32.5
34.0
35.1
35.5
35.3
34.9
34.2
33.6
33.3
33.7
33.8
35.5
32.6
33.0
33.9
33.7
33.3
29.9
28.0
26.2
25.2
25.3
25.5
25.5
25.6
25.6
25.8
26.0
26.4
26.7
29.2
32.3
29.5
32.2
34.9
34.5
32.7
30.2
29.4
30.0
29.1
29.2
29.8
31.7
29.5
31.4
32.3
32.7
33.5
33.1
38.6
34.2
39.4
34.8
37.4
35.1
36.0
36.3
34.2
34.3
32.9
31.2
30.3
30.1
Proposed Level
0.5
2.0
3.4
4.9
6.2
7.3
8.1
8.8
9.2
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.6
10.1
11.0
11.8
12.7
13.5
14.5
15.8
17.6
19.7
21.9
24.1
26.3
28.2
29.7
30.8
31.4
31.5
31.5
31.4
31.4
31.3
31.3
31.2
31.2
31.1
31.0
31.0
30.9
30.9
30.8
30.6
30.4
+0.3
+0.3
Cut and Fill -32.2
-30.5
-30.6
-30.2
-29.3
-28.0
-26.8
-25.4
-24.4
-23.8
-24.2
-24.3
-26.0
-23.1
-23.5
-24.4
-24.2
-23.8
-20.4
-18.5
-16.7
-15.7
-15.8
-16.0
-16.0
-16.1
-16.1
-16.3
-16.5
-16.9
-17.2
-19.7
-22.7
-19.4
-21.2
-23.1
-21.8
-19.2
-15.7
-13.6
-12.4
-9.4
-7.3
-5.7
-5.4
-1.3
-1.7
-1.5
-1.3
-2.0
-1.6
-7.2
-2.8
-8.1
-3.5
-6.2
-3.9
-4.9
-5.3
-3.2
-3.4
-2.0
-0.4
Design Speed 225km/h250km/h
L=30.0
R=600.0
L=31.5
L=30.0
R=600.0
L=30.3
L=30.0
L=30.0
Ch.6
688.2
46
TP.4.6
90
Ch.7
353.4
15
TP.9.5
00
Ch.9
532.7
83
TP.9.5
00
Ch.9
720.5
45
TP.1
0.3
01
Ch.1
0144.0
84
TP.1
3.9
16
Ch.1
0447.0
78
TP.1
8.5
42
Ch.1
0789.5
15
TP.2
6.0
78
Ch.1
1296.4
03
TP.3
1.5
21
Ch.1
2546.1
36
TP.3
0.8
62
Ch.1
2700.9
56
TP.3
0.6
31
New Hanger Lane East
Bridge over HS2New Old Oak Common to ActonTwin Bore 7.25Ø Tunnel 800m New Euston to Old Oak Common Twin Bore 7.25Ø Tunnel 7400mOld Oak Common Station boxNew HS2 Retaining Structure 1650m
New Hanger Lane East
Bridge over HS2
New Great Western
Main Line Station
Possible Tunnel Shaft Location
New HS2 Tunnel Portal
New HS2 RetainingStructure
Old Oak Common Station BoxFor Station Drawing refer toHS2-ARP-00-DR-RW-05301
PlanScale 1:10000
ProfileScale H 1:10000 V 1:1000
N
For
Continuation R
efer
To H
S2-A
RP-D
R-R
W-0
5003 F
or C
ontin
uatio
n R
efer T
o H
S2-A
RP-D
R-R
W-0
5001
Legend National Parks
Flood Risk Zones
Special Areas of Conservation
Special Protection Areas
National Nature Reserves
Parks and Gardens
Scheduled Ancient Monuments
Historical Battlefields
Listed buildings
Area of Outstanding Natural Beauty
RAMSAR
World Heritage Site
SSSI
A1 A
9
B C D E F G H I J K L M N O P
Drawing No
Drawing Status
Discipline
Scale at A1
Job No
Issue
Drawing Title
Issue Date By Chkd Appd
Job TitleClient
10
8
7
6
5
4
2
1
3
' Arup
' Crown copyright and database rights 2011 Ordnance Survey 10049190
0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)
Railway
Embankment
Highway
Embankment
Highway
Cutting
Railway
Cutting