route from wendover dean to stoke mandeville - drawing
TRANSCRIPT
www.arup.com
T +44(0)121 213 3000 F +44(0)121 213 3001
Solihull, West Midlands B90 8AE
The Arup Campus, Blythe Gate, Blythe Valley Park
Feasibility Study
High Speed 2
Sheet 9 of 33
Plan and Profile
Rail
209742-00
HS2-ARP-00-DR-RW-05009 3.0
As Shown
/ /2212 11 CO MP CL
For Coordination
2.0
/ /05 0112 CO MP CL
3.0
Post Consultation Route
J:\209000\2
09742-0
0\4 Intern
al Project
Data\4-1
0 P
ost
Consultation Dra
win
gs\0
_Dra
win
gs\H
S2-A
RP-0
0-D
R-R
W-0
5009.d
gn
Approved
Approved
100
100
100
100
100
100
100
100
100
100
100
120
120
120
120
120
120
120
120
140
140
140
140
140
140
140
140 140140
140
140
140
140
140
160
160
160
160
160
160
160
160 16
0
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
200
200
200
200
200 200
200
200
200
200
200
200
200
200
200
200
200
200
200
220
220
220
220
220
220
220
220
220
220
220
220
220
220220
220
240
240 240
240
240
240
51+000
52+00053+000
54+000
55+000
56+000
57+000
58+000
60.0
70.0
80.0
90.0
100.0
110.0
120.0
130.0
140.0
150.0
160.0
170.0
180.0
190.0
60.0
70.0
80.0
90.0
100.0
110.0
120.0
130.0
140.0
150.0
160.0
170.0
180.0
190.0
Chainage
51+200
51+300
51+400
51+500
51+600
51+700
51+800
51+900
52+000
52+100
52+200
52+300
52+400
52+500
52+600
52+700
52+800
52+900
53+000
53+100
53+200
53+300
53+400
53+500
53+600
53+700
53+800
53+900
54+000
54+100
54+200
54+300
54+400
54+500
54+600
54+700
54+800
54+900
55+000
55+100
55+200
55+300
55+400
55+500
55+600
55+700
55+800
55+900
56+000
56+100
56+200
56+300
56+400
56+500
56+600
56+700
56+800
56+900
57+000
57+100
57+200
57+300
57+400
57+500
57+600
Horizontal Alignment L=1745.8
L=375.0R=8220.0
L=3729.8
L=375.0L=2826.5
Vertical Alignment L=394.8
R=56000.0
L=1536.2
G=-1.10%
L=559.8
R=56000.0L=819.2
G=-2.10%
L=537.5
R=-56000.0
L=1437.9
G=-1.14%
L=401.4
R=-56000.0L=1825.2
G=-0.42%
Existing Level 180.3
181.6
179.9
176.3
172.2
168.5
165.3
164.0
161.7
159.4
157.1
154.6
153.6
153.2
152.7
151.7
146.9
147.1
151.0
154.2
146.9
140.2
145.0
145.2
144.1
142.8
143.6
146.9
152.6
152.9
145.4
137.4
133.2
134.1
131.8
129.9
128.7
128.1
128.5
128.2
128.1
128.0
125.7
122.9
121.0
120.0
118.7
117.0
115.5
114.5
113.3
112.2
111.3
109.6
107.3
105.3
103.8
103.9
104.2
103.9
103.1
101.5
99.8
99.2
98.7
Proposed Level 176.4
175.4
174.3
173.2
172.1
171.0
169.9
168.8
167.7
166.6
165.5
164.4
163.3
162.2
161.1
160.0
158.9
157.8
156.6
155.1
153.5
151.7
149.7
147.6
145.5
143.4
141.3
139.2
137.1
135.0
132.9
130.9
129.0
127.2
125.7
124.3
123.1
122.0
120.9
119.7
118.6
117.4
116.3
115.2
114.0
112.9
111.7
110.6
109.5
108.3
107.2
106.1
105.2
104.5
104.0
103.5
103.1
102.7
102.3
101.8
101.4
101.0
100.6
100.1
99.7
+2.5
+4.6
+4.8
+6.0
+7.2
+8.4
+9.8
+9.7
+9.0
+8.4
+8.3
+12.0
+10.7
+5.6
+0.9
+6.6
+11.5
+4.7
+2.4
+1.4
+0.6
+0.8
+0.9
+1.0
Cut and Fill -3.9
-6.2
-5.6
-3.1
-0.1
-2.3
-7.7
-15.5
-17.9
-12.5
-6.5
-4.2
-6.9
-6.1
-5.6
-5.6
-6.1
-7.6
-8.5
-9.5
-10.6
-9.4
-7.7
-7.0
-7.1
-7.0
-6.4
-6.0
-6.2
-6.1
-6.1
-6.1
-5.1
-3.3
-1.8
-0.7
-1.2
-1.9
-2.1
-1.7
-0.5
Design Speed 400km/h
Ch.5
1323.6
12
TP.1
75.1
75
Ch.5
2859.7
67
TP.1
58.2
77
Ch.5
3419.5
45
TP.1
49.3
21
Ch.5
4238.7
59
TP.1
32.1
17
Ch.5
4776.2
44
TP.1
23.4
11
Ch.5
6214.1
78
TP.1
07.0
21
Ch.5
6615.5
86
TP.1
03.8
84
New HS2 Viaduct over Existing Road, Railway and A413 500m
New HS2 Green Tunnel 1280m
Ellesborough Road to be
reinstated over Green Tunnel
Ellesborough Road to be
reinstated over Green Tunnel
Existing A413 Road
Existing Railway
New Nash Lee Road
(B4009) Bridge over HS2
Possible Road Closure
New Possible Permanent Connection
to Bacombe Lane
Existing Road
New HS2 Green Tunnel
Portal
New Nash Lee Road
(B4009) Bridge over HS2
New Possible Permanent
Rocky Lane Diversion under HS2
New HS2 Green
Tunnel
New Possible Permanent Rocky Lane
Diversion under HS2
WENDOVER
PlanScale 1:10000
ProfileScale H 1:10000 V 1:1000
N
For
Continuation R
efer
To H
S2-A
RP-D
R-R
W-0
5010 F
or C
ontin
uatio
n R
efer T
o H
S2-A
RP-D
R-R
W-0
5008
Legend National Parks
Flood Risk Zones
Special Areas of Conservation
Special Protection Areas
National Nature Reserves
Parks and Gardens
Scheduled Ancient Monuments
Historical Battlefields
Listed buildings
Area of Outstanding Natural Beauty
RAMSAR
World Heritage Site
SSSI
A1 A
9
B C D E F G H I J K L M N O P
Drawing No
Drawing Status
Discipline
Scale at A1
Job No
Issue
Drawing Title
Issue Date By Chkd Appd
Job TitleClient
10
8
7
6
5
4
2
1
3
' Arup
' Crown copyright and database rights 2011 Ordnance Survey 10049190
0.040.02 0.030 0.01 0.05 Metres at 1:1 (Scale with caution as distortion can occur)
Railway
Embankment
Highway
Embankment
Highway
Cutting
Railway
Cutting