Route 220 Safety Improvement Project State Project Number: 0220-011-786, 0220-011-788, 0220-011-789
UPCs: 105543, 105544, 105545
Federal Number: NH-5128(326)
March 12, 2015
Salem District
Route 220 Safety Improvement Project
1. Corridor
2. Previously Considered Improvements
3. Existing Conditions
4. Upgraded Two-lane Roadway
5. Project Schedule and Funding
Introduction
Corridor
A. Commercial Corridor
B. Intermodal Connectivity
C. National Highway System (NHS)
D. Statewide Significance
Corridor
A. Commercial Corridor
B. Intermodal Connectivity
C. National Highway System (NHS)
D. Statewide Significance Connections with
other States
1964 - Study examined potential to widen Route 220 between Clifton Forge
and Roanoke.
1990’s - Study examined a section of Route 220 from Roanoke to Clifton
Forge as part of the TransAmerica Corridor to provide 4 lanes.
Funding not acquired as part of this effort.
Early 2000’s - Preliminary plans developed for three projects to 4-lane
approximately 7.2 miles. Portion of right of way acquired.
Insufficient funds to finalize design and acquire all right of way.
2012 thru 2013 - Highway Safety Improvement Projects extended shoulders where
possible, upgraded and installed guardrail, upgraded signs, added
rumble strips, and enhanced markings in roadway.
2015 - Final plans being developed as a Safety Improvement Project
replacing two narrow bridges north of Route 43 Intersection.
2015 - Begin development of preliminary plans as a safety improvement
project to upgrade the two-lane roadway from Route 43 Intersection
to Route 727 Intersection. Proposed as three (3) projects in the Six
Year Plan. Phase 1 is fully funded.
Previously Considered Improvements
6
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Sight Distance around Curves
Alignment – Vertical Curves
Sight Distance
Over Hills
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Vertical Curves
Sight Distance
Over Hills
Stopping Sight
Distance
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Alignment – Vertical Curves
Sight Distance
Over Hills
Stopping Sight
Distance
Stopping Sight
Distance
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Curve Banking
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Curve Banking
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Narrow Lanes and Narrow Shoulders
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Narrow Lanes and Narrow Shoulders
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Narrow Lanes and Narrow Shoulders
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Narrow Bridges and Structures
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Narrow Bridges and Structures
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Limited Passing Opportunities
Direction
Passing
Zones
Length
(miles)
Northbound 4 1.3
Southbound 5 0.9
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Intersections
Street Name Route RT Turn LT Turn
Narrow Passage Road Route 43 Yes No
Gala Loop Road Route 694 Yes No
Gala Loop Road Route 622 (S) Yes No
Prices Bluff Road Route 622 (N) No No
Chatham Road Route 722 (S) No No
Chatham Road Route 722 (N) No No
Locust Bottom Route 696 (S) No No
Buhrman Road Route 696 (N) No No
McKinney Hollow Route 633 No No
Glen Wilton Road Route 633 No No
Simmons Lane Route 700 No No
Fork Farm Road Route 727 No No
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Crash History
8/1/2010 - 7/31/2014
Total Crashes 72
Fixed Object – Off Road 23
Animal 21
Rear End 14
Angle 4
Non-collision 3
Head-on 3
Sideswipe – Opposite Direction 2
Sideswipe – Same Direction 1
Pedestrian 1
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Crash History
Existing S-Curve
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
32
Crash History
Existing Horizontal Curve
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Traffic Volumes
Route County 2013 AADT % Trucks Truck Volume 24 Bedford 15000 2% 300
811 Bedford 14000 2% 280
114 Montgomery 10000 1% 100
685 Montgomery 9900 2% 198
122 Franklin 9300 4% 372
40 Franklin 9200 6% 552
311 Roanoke 9100 3% 273
8 Montgomery 8500 4% 340
122 Bedford 7700 5% 385
221 Floyd 7500 3% 225
221 Bedford 7100 5% 355
221 Carroll 6900 3% 207
8 Floyd 6800 3% 204
221 Roanoke 6800 3% 204
611 Pulaski 6700 7% 469
220 Botetourt 5500 7% 385
779 Botetourt 5300 11% 583
8 Patrick 5000 7% 350
100 Pulaski 4000 9% 360 33
Traffic Volumes
34
Route County 2013 AADT % Trucks Truck Volume
779 Botetourt 5300 11% 583
40 Franklin 9200 6% 552
611 Pulaski 6700 7% 469
220 Botetourt 5500 7% 385
122 Bedford 7700 5% 385
Route County 2013 AADT % Trucks Truck Volume
779 Botetourt 5300 11% 583
100 Pulaski 4000 9% 360
611 Pulaski 6700 7% 469
220 Botetourt 5500 7% 385
8 Patrick 5000 7% 350
Where are we?
35
Where are we?
36
Multiple Studies – spread over a half a century
Four-lane Dropped…
Highway Safety Improvements Funded and
Constructed
Highway Safety Improvements Funded
Past Environmental Studies Conducted
2015 Safety Improvements
No Four-lane?
Two-lane upgrade
Environmental
Status
Where are we?
37
Multiple Studies – spread over a half a century
Four-lane Dropped…
Highway Safety Improvements Funded and
Constructed
Highway Safety Improvements Funded
Past Environmental Studies Conducted
2015 Safety Improvements
No Four-lane?
Two-lane upgrade
Environmental
Status
Where are we?
38
Multiple Studies – spread over a half a century
Four-lane Dropped…
Highway Safety Improvements Funded and
Constructed
Highway Safety Improvements Funded
Past Environmental Studies Conducted
2015 Safety Improvements
No Four-lane?
Two-lane upgrade
Environmental
Status
(Focus on Safety Improvements)
Upgraded Two-Lane Roadway
A. Proposed Roadway
Characteristics
B. Intersections
C. Schedule and Funding
Alignment – Horizontal Curves
Upgraded Two-Lane Highway
1) Proposed Roadway Characteristics
2) Intersections
3) Scheduling and Funding
Improve Geometrics
Alignment – Horizontal Curves
Upgraded Two-Lane Highway
1) Proposed Roadway Characteristics
2) Intersections
3) Scheduling and Funding
Improve Geometrics
Alignment – Horizontal Curves
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
“Straighten” Curves
Curve Banking (Super-elevation)
Upgraded Two-Lane Highway
1) Proposed Roadway Characteristics
2) Intersections
3) Scheduling and Funding
44
Wider Lanes and
Wider Shoulders
Additional Passing Opportunities
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Direction
Existing
Length
(miles)
Added
Length
(miles)
Proposed
Length
(miles)
Northbound 1.3 +1.3 2.6
Southbound 0.9 +1.4 2.3
Direction
Existing
Zones
Proposed
Zones
Northbound 5 8
Southbound 4 8
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Funding (Six Year Plan) Estimated Cost: $10 Million
Available Funding: $10 Million
Schedule* Design – Underway
Right of Way – Summer 2015
Advertisement – Fall 2016
Bridge (Structure) Replacement Project
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Funding (Six Year Plan) Estimated Cost: $10 Million
Available Funding: $10 Million
Schedule* Design – Underway
Right of Way – Summer 2015
Advertisement – Fall 2016
Bridge (Structure) Replacement Project
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Funding (Six Year Plan) Estimated Cost: $10 Million
Available Funding: $10 Million
Schedule* Design – Underway
Right of Way – Summer 2015
Advertisement – Fall 2016
Bridge (Structure) Replacement Project
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Street Name Route RT Turn LT Turn
Narrow Passage Road Route 43 Yes Yes
Gala Loop Road Route 694 Yes Yes
Gala Loop Road Route 622 (S) Yes Yes
Prices Bluff Road Route 622 (N) Yes Yes
Chatham Road Route 722 (S) Yes Yes
Chatham Road Route 722 (N) Yes Yes
Locust Bottom/
Buhrman Road Route 696 Yes Yes
McKinney Hollow/
Glen Wilton Road Route 633 Yes Yes
Simmons Lane Route 700 Yes Yes
Fork Farm Road Route 727 Yes No
Add Left and Right Turn
Tapers/Lanes
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Street Name Route RT Turn LT Turn
Narrow Passage Road Route 43 Yes Yes
Gala Loop Road Route 694 Yes Yes
Gala Loop Road Route 622 (S) Yes Yes
Prices Bluff Road Route 622 (N) Yes Yes
Chatham Road Route 722 (S) Yes Yes
Chatham Road Route 722 (N) Yes Yes
Locust Bottom/
Buhrman Road Route 696 Yes Yes
McKinney Hollow/
Glen Wilton Road Route 633 Yes Yes
Simmons Lane Route 700 Yes Yes
Fork Farm Road Route 727 Yes No
Add Left and Right Turn
Tapers/Lanes
Add Left and Right Turn Lanes
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Add Left and Right Turn Lanes
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Re-aligning
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Re-aligning
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Project Summary
Length: 10 miles
Estimated Cost: $150 Million
SYP Funding: $78 Million
Project Schedule and Funding
A. Project Schedule
Phase 1 – Advertise Summer 2019
Phase 2 – Advertise Fall 2021
Phase 3 – Advertise Fall 2022
B. Funding
Phase 1 – Fully Funded
Phase 2 – Partially Funded
Phase 3 – Partially Funded
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
56
Phase 1
Funding (Six Year Plan) Design (PE) - Funded
Right of Way (RW) - Funded
Construction (CN) - Funded
Estimated Cost: $65 Million
Available Funding: $65 Million
*Schedule dependent on funding
Schedule* Design – Spring 2015
Right of Way – Summer 2017
Advertisement – Summer 2019
Funding (Six Year Plan) Design (PE) - Funded
Right of Way (RW) - Funded
Construction (CN) - No Funds
Estimated Cost: $40 Million
Available Funding: $8 Million
57
Phase 2
Schedule* Design – Fall 2015
Right of Way – Summer 2018
Advertisement – Fall 2021
*Schedule dependent on funding
58
Phase 3
Funding (Six Year Plan) Design (PE) - Funded
Right of Way (RW) - No Funds
Construction (CN) - No Funds
Estimated Cost: $45 Million
Available Funding: $5 Million
*Schedule dependent on funding
Schedule* Design – Fall 2016
Right of Way – Summer 2019
Advertisement – Fall 2022
59
Project Summary Approximately 10 miles
Estimated Cost: $150 Million
Funding: $78 Million
Build on previous work
Improved Alignment
Wider Lanes
Wider Shoulders
Improved Intersections
Realignment
Turn Lane
Summary
60
Summary
61