rosatom: implementing unique experience in npp projects ......president, rusatom overseas. the...
TRANSCRIPT
THE STATE ATOMIC ENERGY CORPORATION ROSATOM
Rosatom: implementing unique experience
in NPP projects development
Evgeny Pakermanov
President, Rusatom Overseas
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
DEMAND FOR DECARBONIZED ELECTRICITY IN EUROPE CONTINUES TO GROW
BULGARIA LONG-TERM CLIMATE
CHANGE STRATEGY:
to pursue the indicative level 21 Mt
CO2-eq in 2050 compared to 64 Mt CO2-
eq in 2005
EU PLANS TO SHIFT
TO LOW-EMISSION ECONOMY:
to reduce greenhouse gas emissions
by at least 80–95% by 2050
compared to 1990
0NUCLEAR
of indirect
emissions
CO2kg perMW*h
12
Nuclear power is a tool to hit
sustainable development goals
2
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
FROM COAL TO CLEAN: A NEED FOR TRANSITION IN EUROPE
of coal to be shut down by
2040 in the Balkan region
NUCLEAR POWER:
Dispatchable
electricity
Reliability of supply
Costs predictability
Low carbon footprint
THE FUTURE ENERGY DEFICIT
has to be covered with the modern energy
sources
COAL-FIRED PLANTS
IN BALKANS ARE AGING :
14 GW
3
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
NUCLEAR POWER TODAY:A TOOL FOR ENERGY TRANSFORMATION
STABLE OPERATION
OF THE NATIONAL POWER SYSTEM
EMISSIONS DECREASE
AND CLIMATE CHANGE MITIGATION
DIVERSIFICATION
OF THE NATIONAL ENERGY MIX
ECONOMIC GROWTH AND
NATIONAL PROSPERITY
Incorporating nuclear power into
energy mix provides for:
4
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
ROSATOM TODAY: NUCLEAR ENERGY MAJOR
133.5 Bn. USDBacklog of FOREIGN ORDERS
R&D INVESTMENT 4.5%of revenue
250 000EMPLOYEES
42 UNITS (1000-1200 MW)in implementationaround the world
global leader in NPP construction
over 50 countries of business around the globe
4.7 Bn. USD EBITDA
0 INES LEVEL–2 incidents
Russian NPPs DOMESTIC and ABROAD PREVENTED
565 M tonnes of CO2
ROSATOM – over 74 years of experience and expertise
2020: 75 YEARS ANNIVERSARY
5
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Tianwan 3
ROSATOM: THE ONLY COMPANY IMPLEMENTING SERIAL NPP CONSTRUCTION DOMESTIC AND ABROAD
Tianwan 2
Rostov 2
Busher 1
Kalinin 4
Kudankulam 1
Rostov 3
Beloyarsk 4
Kudankulam 2
Novovoronezh 6
Tianwan 1
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Rostov 4
Leningrad 2-1
Continuous success: 14 NPPs in 13 YEARS
NPP construction abroad NPP construction in Russia
Tianwan 4
2018
6
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
ROSATOM: 2018 FIRST CONCRETE
Akkuyu NPP, Turkey
Kursk-2 NPP
Rooppur NPP, Bangladesh
Out of 5 NPP «first concrete» globally, 3 were implemented by Rosatom
7
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
ROSATOM: 2018 CONNECTION TO THE GRID
Rostov-4 NPP
Leningrad 2-1 NPP
Tianwan-4 NPP
8
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
LARGE SCALE
NPPs
ROSATOM: VARIETY OF SOLUTIONS TO FIT PARTNER’S NEEDS
SMR based NPPs
FLOATING
IN-LAND
9
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
ROSATOM SMRs: THE MOST ADVANCED SOLUTION TO COVER MARKET NEEDS
Modularity
Load-following capabilities
50 MW capacity
Generation III+ safety systems
Off-grid deployment
Short construction period
More than 6 years fuel
campaign
OFFSHORE
Electricity Heat Desalination
OFFSHORE
Plant area13 acres
(0.05 km2)
Construction
period3 - 4 years
Design life 60 yearsONSHORE
Flexible, tailor-made small NPP solution,
based on RITM series SMR, which is
designed to address most peculiar
customer demands
10
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
NPPs UNIT TYPECAPACITY*
Gross MW
Grid
Connectionyear
Kozloduy-1 VVER-440 V-213 440 1974
Kozloduy-2 VVER-440 V-213 440 1975
Kozloduy-3 VVER-440 V-213 440 1980
Kozloduy-4 VVER-440 V-213 440 1982
Kozloduy-5 VVER-1000 V-320 1000 1987
Kozloduy-6 VVER-1000 V-320 1000 1991
Total (6) 3760
BULGARIA AND ROSATOM: A 50-YEAR LONG SUCCESSFUL COOPERATION TRACKRECORDS
Over 50 years experience of
efficient collaboration between
Bulgarian partners and Rosatom on
VVER TECHNOLOGY
Operating NPPs in Bulgaria
Kozloduy NPP* IAEA PRIS
11
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
NPP EXTENSION - ROSATOM FLEXIBLE APPROACH TO NPP PROJECT DEVELOPMENT
OPERATION EXTENSIONNPP KOZLODUY UNIT 5 AND 6
In 2017-2018 Rosatom completed works for
operational extension of the units UP TO 60 YEARS
12
Projected life span of the NPP was DOUBLED
KOZLODUY production accounts for 40%
of national energy consumption
Today NPP produces annually 15 TWh of clean
and cheap energy
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 13
KEY PARAMETERS OF BELENE NPP PROJECT:
Bulgaria
Romania
Serbia
Macedonia
Greece
BELENE NPP
Turkey
BELENE NPP LOCATION
2 units of VVER-1000
ROSATOM IS WILLING TO KEEP SHARING EXPERTISE AND EXPERIENCE
EU approved Belene NPP project in 2007
according to Euroatom treaty
Major nuclear island equipment manufactured and supplied
Belene project licensing status: 60% works done.
Bulgaria to resume licensing of Project
WORKS COMPLETED:
Nominal capacity: 2000 MW
Annual output of 2 units:
~15 TWh/year
VVER advanced technology:
▪ Gen III+
▪ Compliance with EU
standards (EUR) and
“post Fukushima”
requirements
Operation lifetime 60+ years
THANK YOU FOR YOUR ATTENTION!