rosatom: implementing unique experience in npp projects ......president, rusatom overseas. the...

14
THE STATE ATOMIC ENERGY CORPORATION ROSATOM Rosatom: implementing unique experience in NPP projects development Evgeny Pakermanov President, Rusatom Overseas

Upload: others

Post on 08-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

THE STATE ATOMIC ENERGY CORPORATION ROSATOM

Rosatom: implementing unique experience

in NPP projects development

Evgeny Pakermanov

President, Rusatom Overseas

Page 2: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

DEMAND FOR DECARBONIZED ELECTRICITY IN EUROPE CONTINUES TO GROW

BULGARIA LONG-TERM CLIMATE

CHANGE STRATEGY:

to pursue the indicative level 21 Mt

CO2-eq in 2050 compared to 64 Mt CO2-

eq in 2005

EU PLANS TO SHIFT

TO LOW-EMISSION ECONOMY:

to reduce greenhouse gas emissions

by at least 80–95% by 2050

compared to 1990

0NUCLEAR

of indirect

emissions

CO2kg perMW*h

12

Nuclear power is a tool to hit

sustainable development goals

2

Page 3: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

FROM COAL TO CLEAN: A NEED FOR TRANSITION IN EUROPE

of coal to be shut down by

2040 in the Balkan region

NUCLEAR POWER:

Dispatchable

electricity

Reliability of supply

Costs predictability

Low carbon footprint

THE FUTURE ENERGY DEFICIT

has to be covered with the modern energy

sources

COAL-FIRED PLANTS

IN BALKANS ARE AGING :

14 GW

3

Page 4: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

NUCLEAR POWER TODAY:A TOOL FOR ENERGY TRANSFORMATION

STABLE OPERATION

OF THE NATIONAL POWER SYSTEM

EMISSIONS DECREASE

AND CLIMATE CHANGE MITIGATION

DIVERSIFICATION

OF THE NATIONAL ENERGY MIX

ECONOMIC GROWTH AND

NATIONAL PROSPERITY

Incorporating nuclear power into

energy mix provides for:

4

Page 5: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

ROSATOM TODAY: NUCLEAR ENERGY MAJOR

133.5 Bn. USDBacklog of FOREIGN ORDERS

R&D INVESTMENT 4.5%of revenue

250 000EMPLOYEES

42 UNITS (1000-1200 MW)in implementationaround the world

global leader in NPP construction

over 50 countries of business around the globe

4.7 Bn. USD EBITDA

0 INES LEVEL–2 incidents

Russian NPPs DOMESTIC and ABROAD PREVENTED

565 M tonnes of CO2

ROSATOM – over 74 years of experience and expertise

2020: 75 YEARS ANNIVERSARY

5

Page 6: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

Tianwan 3

ROSATOM: THE ONLY COMPANY IMPLEMENTING SERIAL NPP CONSTRUCTION DOMESTIC AND ABROAD

Tianwan 2

Rostov 2

Busher 1

Kalinin 4

Kudankulam 1

Rostov 3

Beloyarsk 4

Kudankulam 2

Novovoronezh 6

Tianwan 1

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Rostov 4

Leningrad 2-1

Continuous success: 14 NPPs in 13 YEARS

NPP construction abroad NPP construction in Russia

Tianwan 4

2018

6

Page 7: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

ROSATOM: 2018 FIRST CONCRETE

Akkuyu NPP, Turkey

Kursk-2 NPP

Rooppur NPP, Bangladesh

Out of 5 NPP «first concrete» globally, 3 were implemented by Rosatom

7

Page 8: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

ROSATOM: 2018 CONNECTION TO THE GRID

Rostov-4 NPP

Leningrad 2-1 NPP

Tianwan-4 NPP

8

Page 9: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

LARGE SCALE

NPPs

ROSATOM: VARIETY OF SOLUTIONS TO FIT PARTNER’S NEEDS

SMR based NPPs

FLOATING

IN-LAND

9

Page 10: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

ROSATOM SMRs: THE MOST ADVANCED SOLUTION TO COVER MARKET NEEDS

Modularity

Load-following capabilities

50 MW capacity

Generation III+ safety systems

Off-grid deployment

Short construction period

More than 6 years fuel

campaign

OFFSHORE

Electricity Heat Desalination

OFFSHORE

Plant area13 acres

(0.05 km2)

Construction

period3 - 4 years

Design life 60 yearsONSHORE

Flexible, tailor-made small NPP solution,

based on RITM series SMR, which is

designed to address most peculiar

customer demands

10

Page 11: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

NPPs UNIT TYPECAPACITY*

Gross MW

Grid

Connectionyear

Kozloduy-1 VVER-440 V-213 440 1974

Kozloduy-2 VVER-440 V-213 440 1975

Kozloduy-3 VVER-440 V-213 440 1980

Kozloduy-4 VVER-440 V-213 440 1982

Kozloduy-5 VVER-1000 V-320 1000 1987

Kozloduy-6 VVER-1000 V-320 1000 1991

Total (6) 3760

BULGARIA AND ROSATOM: A 50-YEAR LONG SUCCESSFUL COOPERATION TRACKRECORDS

Over 50 years experience of

efficient collaboration between

Bulgarian partners and Rosatom on

VVER TECHNOLOGY

Operating NPPs in Bulgaria

Kozloduy NPP* IAEA PRIS

11

Page 12: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.

NPP EXTENSION - ROSATOM FLEXIBLE APPROACH TO NPP PROJECT DEVELOPMENT

OPERATION EXTENSIONNPP KOZLODUY UNIT 5 AND 6

In 2017-2018 Rosatom completed works for

operational extension of the units UP TO 60 YEARS

12

Projected life span of the NPP was DOUBLED

KOZLODUY production accounts for 40%

of national energy consumption

Today NPP produces annually 15 TWh of clean

and cheap energy

Page 13: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 13

KEY PARAMETERS OF BELENE NPP PROJECT:

Bulgaria

Romania

Serbia

Macedonia

Greece

BELENE NPP

Turkey

BELENE NPP LOCATION

2 units of VVER-1000

ROSATOM IS WILLING TO KEEP SHARING EXPERTISE AND EXPERIENCE

EU approved Belene NPP project in 2007

according to Euroatom treaty

Major nuclear island equipment manufactured and supplied

Belene project licensing status: 60% works done.

Bulgaria to resume licensing of Project

WORKS COMPLETED:

Nominal capacity: 2000 MW

Annual output of 2 units:

~15 TWh/year

VVER advanced technology:

▪ Gen III+

▪ Compliance with EU

standards (EUR) and

“post Fukushima”

requirements

Operation lifetime 60+ years

Page 14: Rosatom: implementing unique experience in NPP projects ......President, Rusatom Overseas. The content of this presentation is for discussion purposes only, shall not be considered

THANK YOU FOR YOUR ATTENTION!