roof renovation project aldine independent school … · school superintendent rose avalos aldine...
TRANSCRIPT
DR. WANDA BAMBERG
SCHOOL SUPERINTENDENT
ROSE AVALOS
ALDINE I.S.D. SCHOOL BOARD MEMBERS
59
10610
290
HARDY TOLL RD
.
45
288
610
45
10
Atascocita
rd.
610
90
59
PROJECT
LOCATION
ROOF RENOVATION PROJECT
LOCATION MAP
RICK OGDEN
ALDINE INDEPENDENT SCHOOL DISTRICT
BELTWAY 8
S
COVER SHEET
TAPER PLAN
SHEET NO.
12345 VICKERY LANE
DETAILS
CS1
TP1
SHEET NO 1 OF 8 SHEETS
DS2
OLESON ELEMENTARY SCHOOL
DR. VIOLA M. GARCIA
MERLIN GRIGGS SR.
STEVE MEAD
DR. ALTON SMITH
GUADELUPE MUNOZ
VICINITY MAP
INDEX OF DRAWINGS
BELTWAY 8
DETAILS DS1
DS3DETAILS
LOCATION
PROJECT
VICKERY LN
12345 VICKERY LANE
HOUSTON, TEXAS 77039
HOUSTON, TEXAS 77041
13010 EMMETT ROAD
BUILDING ENVELOPE
CONSULTANTS, LLC
CH
OOL
D I STRI C
H
E
EX C E L L
EN
C
T
OUSTON
TEXAS
APRIL, 2013
SCHOOL PRINCIPAL
HOUSTON, TEXAS
59
ALDINE MAIL RD
GLOGER
DETERM
INED DR
DEBENEY DR
OTLERBURY DR
FANTASY DR
BOREAS DR
MACNAUGHTON DR
DETAILS DS4
C
E
S
W
S
ETET FO
AT
S
R
DE
42 281
AX
NO
T
I
R
DIG
STE
AR
AE D
CLS.
HCR
ARK ET
4-24-2013
ROOF PLAN RP1
ROOF DECK PLAN RDP1
BUILDING ENVELOPE CONSULTANTS, LLC
13010 EMMETT ROAD
HOUSTON, TEXAS 77041
DS213-0009
HOUSTON, TEXAS 77032
ALDINE I.S.D. - OLESON ELEMENTARY SCHOOL
ALDINE INDEPENDENT SCHOOL DISTRICT
14910 ALDINE WESTFIELD ROAD
DATE:
4/24/2013
CLIENT:
PROJECT:
NOT TO SCALE
SCALE:
12345 VICKERY LANE
HOUSTON, TEXAS 77039
DRAWN BY:
T.E.M.
REVISED:
PROJECT NUMBER:
APPROVED BY:
V.K.
D10
DS2EXHAUSTER/VENTILATORNOT TO SCALE
D12
DS2
CURBED A.C. UNITNOT TO SCALE
D6
DS2
HOODED VENTNOT TO SCALE
NEW 2-PLY STRIP-IN.
NEW .060 STAINLESS STEEL
GALV. VENT AND BASE TO
REPLACE EXISTING (SIZE AND STYLE TO MATCH EXISTING), NAIL 5-PER SIDE STAGGERED.
NOTE:
INSTALL HEAT RESISTANT INSULATION
AROUND HEATER STACKS.
HOODED VENT
TURBINE VENT
NEW EDGE SEALANT
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW 2" POLYISOCYANURATE
INSULATION MECHANICALLY
FASTEN PER FM REQUIREMENTS.
NEW 2-LAYERS 2X6 TREATED WOOD NAILERS,
BOTTOM NAILER MECH. FASTEN 2'-0" O.C., TOP NAILER NAIL 6" O.C. STAGGERED.
NEW 22 GA. GALV. METAL DECKING,
ATTACH PER FM REQUIREMENTS.
NEW TREATED WOOD CANT, NAIL 6" O.C., STAGGERED.
NEW ANGLE TERMINATION BAR.
NEW NEOPRENE EXPANSION JOINT COVER WITH 24 GA.
PRE-FINISHED FLANGES, SCREW FASTEN 12" O.C.
NEW FIBERGLASS BATT INSULATION
SET IN A POLYETHYLENE SLING,
NAIL 12" O.C.
NEW ELASTOMERIC UNDERLAYMENT.
NEW 2-PLY FIBERGLASS FELT
AND ASPHALT BASE FLASHING.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
EXISTING LIGHTWEIGHT CONCRETE FILL OVER METAL
DECK.
NEW 2X6 TREATED WOOD NAILER
MECH. FASTEN BOTTOM 2'-0" O.C.
PLASTIC CEMENT AND NAIL 3-PER SIDE
STAGGERED.
NEW 2 1/2 LB. LEAD FLASHING, SET IN
NEW ANGLE TERMINATION BAR, NAIL
NEW 2X10 TREATED WOOD BLOCKING, NAIL
EXISTING EXHAUSTER, LIFT, RESET AND
NEW 24 GA. PRE-FINISHED COUNTERFLASHING,
SCREW FASTEN 12" O.C. (USE NEOPREN
NEW WOOD CANT, NAIL 6" O.C. STAGGERED
WASHERS)
VENTILATOR
6" O.C.
3" O.C.
RESECURE.
EXISTING LIGHTWEIGHT CONCRETE FILL
OVER METAL DECK
NEW VENTING BASE SHEET, MECH. ATTACH.
NEW 2X6 TREATED WOOD NAILER,
MECH. FASTEN 2'-0" O.C.
NEW EDGE SEALANT
NEW 2-PLY STRIP-IN
NEW 3-PLY BUILT-UP ROOF
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
EXISTING LIGHTWEIGHT CONCRETE FILL
OVER METAL DECK
NEW PLYWOOD NAILER(S) TO MATCH INSULATION
THICKNESS, NAIL 6" O.C. STAGGERED.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW 3-PLY FIBERGLASS
FELT AND ASPHALT
BUILT-UP ROOF.
NEW 2X6 TREATED WOOD
NAILER(S), MECH. FASTEN 2'-0" O.C.
D7
DS2
PIPE SUPPORTNOT TO SCALE
VERIFY
VER
IFY
4" TYP.
ADDITIONAL HANGERS MAY BE
REQUIRED, CONTRACTOR TO VERIFY.
NEW PROTECTION PADS
ROLLER HANGER FOR
USE WITH GAS AND
OTHER BARE PIPES.
BAND HANGER FOR USE
WITH HVAC AND OTHER
INSULATED PIPES.
CLEVIS HANGER FOR
USE WITH HVAC AND
OTHER INSULATED PIPES.
NEW PRE-MANUFACTURED
PIPE SUPPORT 10'-0" O.C.
MAX.
NOTE:
NUMBER AND LOCATION OF SUPPORTS
REQUIRED TO BE DETERMINED BY
MANUFACTURER.
D8
DS2
METAL EDGE AT GUTTERNOT TO SCALE
D9
DS2
PLUMBING VENTNOT TO SCALE
NEW 1" POLYISOCYANURATE INSULATION, MECH-FASTEN PER FM REQUIREMENTS
NEW 1" POLYISOCYANURATE INSULATION, MECH-FASTEN PER FM REQUIREMENTS
D11
DS2
NEW EXPANSION JOINTNOT TO SCALE
NEW 2" POLYISOCYANURATE INSULATION, MECH-FASTEN PER FM REQUIREMENTS
NEW VENTING BASE SHEET, MECH. ATTACH
NEW VENTING BASE SHEET, MECH. ATTACH
EXPANSION JOINT AT METAL EDGE
TAPER EXPANSION JOINT DOWN TO
METAL EDGE 4'-0" FROM PERIMETER
NEW 3/4" PLYWOOD, MECH. FASTEN TOP AND BOTTOM 12" O.C., STAGGERED.
EXISTING MECHANICAL EQUIPMENT, LIFT RESET AND
RESECURE AS REQUIRED FOR NEW ROOF
INSTALLATION.
NEW 24 GA. PRE-FINISHED COUNTERFLASHING,
SCREW FASTEN 12" O.C.
NEW TERMINATION BAR, FASTEN 6" O.C. AND SEAL WITH 3-COURSE OF FABRIC AND MASTIC.
NEW 22 GA. WIND CLIP, SECURE BEHIND TERMINATION BAR PRIOR TO 3-COURSING
NEW FIBEROUS CANT, SET IN ASPHALT.
NEW 2-PLY FIBERGLASS FELT AND ASPHALT BASE FLASHING.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW 2X6 WOOD NAILER.
NAIL 6" O.C., STAGGERED.
NEW 2X6 TREATED WOOD NAILER,
MECH. FASTEN 2'-0" O.C.
NEW 22 GA. GALV. METAL DECKING,
ATTACH PER REQUIREMENTS.
NEW 2" POLYISOCYANURATE INSULATION
MECHANICALLY FASTEN PER FM REQUIREMENTS.
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
NEW 22 GA. GALV. METAL
DECKING, ATTACH PER FM
REQUIREMENTS.
NEW FIRE-RATED MODIFIED
BITUMEN CAP SHEET WITH A
FACTORY APPLIED COOL ROOF
COATING.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
NEW FIRE-RATED MODIFIED
BITUMEN CAP SHEET WITH A
FACTORY APPLIED COOL ROOF
COATING.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, DECKING INSULATION OR FLASHINGS
AS REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW 1
8" P.L.F. TAPERED POLYISOCYANURATE
INSULATION SYSTEM SET IN HOT ASPHALT.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, DECKING INSULATION OR FLASHINGS
AS REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, DECKING INSULATION OR FLASHINGS
AS REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NEW FIRE-RATED MODIFIED BITUMEN BASE FLASHING WITH
A FACTORY APPLIED COOL ROOF COATING.
NEW 1
2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW FIRE-RATED MODIFIED BITUMEN CAP SHEET
WITH A FACTORY APPLIED COOL ROOF COATING.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
NEW 1
2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW FIRE-RATED MODIFIED BITUMEN CAP SHEET
WITH A FACTORY APPLIED COOL ROOF COATING.
NEW FIRE-RATED MODIFIED BITUMEN BASE FLASHING WITH
A FACTORY APPLIED COOL ROOF COATING.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, DECKING INSULATION OR FLASHINGS
AS REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NEW FIRE-RATED MODIFIED BITUMEN
CAP SHEET WITH A FACTORY APPLIED
COOL ROOF COATING.
NEW FIRE-RATED MODIFIED BITUMEN BASE
FLASHING WITH A FACTORY APPLIED COOL
ROOF COATING.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE
INSULATION SYSTEM SET
IN HOT ASPHALT.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, DECKING INSULATION OR FLASHINGS
AS REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
NEW 1
2" GYPSUM FIBER
BOARD SET IN ASPHALT.
NOTE: ACTUAL INSULATION DEPTH NOT SHOWN
ON DRAWING TO INCLUDE TAPERED INSULATION
AND CRICKETS.
C
E
S
W
S
ETET FO
AT
S
R
DE
42 281
AX
NO
T
I
R
DIG
STE
AR
AE D
CLS.
HCR
ARK ET
4-24-2013
NEW 24 GA. PRE-FINISHED METAL
CLOSURE, SCREW FASTEN 12" O.C.
NEW VENTING BASE SHEET, MECHANICALLY
FASTENED PER FM REQUIREMENTS.
EXISTING WOOD BLOCKING.
EXISTING LIGHTWEIGHT CONCRETE
FILL OVER METAL DECK.
NEW FIRE-RATED MODIFIED
BITUMEN CAP SHEET.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NOTE: SEE DETAIL D16/DS3 FOR TYPICAL GUTTER NOTES.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, INSULATION OR FLASHINGS AS
REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NEW CONCRETE SPLASHBLOCK
NEW 24 GA. PRE-FINISHED METAL
CLOSURE, SCREW FASTEN 12" O.C.
NEW 24 GA. PRE-FINISHED DOWNSPOUT, SECURE TO WALL WITH 3-STRAPS PER
DOWNSPOUT.
NEW 1/8" X 1" STEEL GUTTER HANGER, SCREW FASTEN 2-PER HANGER. HANGER TO BE PRIMED AND
COATED WITH 2-COATS OF PAINT.
NEW 24 GA. PRE-FINISHED DOWNSPOUT
NECK, POP-RIVET AND SEAL
NEW 24 GA. PRE-FINISHED DOWNSPOUT
STRAP, MECH. FASTEN TO WALL AND DOWNSPOUT ON EACH SIDE.
NEW
SEALANT.
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
NEW 24 GA. PRE-FINISHED GUTTER
STRAP, POP-RIVETED.
NEW 24 GA. PRE-FINISHED METAL EDGE,
NAIL 3" O.C. STAGGERED.
NEW ELASTOMERIC UNDERLAYMENT
SET IN A FULL BED OF MASTIC.
NEW EDGE SEALANT.
NEW 2X TREATED WOOD NAILER(S), MECH. FASTEN 2'-0" O.C.
NEW 24 GA. GUTTER, SECURE 6" O.C. THROUGH PRE-DRILLED
OVERSIZED HOLE.
NEW 2-PLY STRIP-IN.NEW 1/2" GYPSUM FIBER BOARD, SET IN ASPHALT.
NEW 1" POLYISOCYANURATE INSULATION, MECH. FASTEN PER FM REQUIREMENTS.
NEW 1" POLYISOCYANURATE INSULATION, MECH. FASTEN PER FM REQUIREMENTS.
BUILDING ENVELOPE CONSULTANTS, LLC
13010 EMMETT ROAD
HOUSTON, TEXAS 77041
DS313-0009
HOUSTON, TEXAS 77032
ALDINE I.S.D. - OLESON ELEMENTARY SCHOOL
ALDINE INDEPENDENT SCHOOL DISTRICT
14910 ALDINE WESTFIELD ROAD
DATE:
4/24/2013
CLIENT:
PROJECT:
NOT TO SCALE
SCALE:
12345 VICKERY LANE
HOUSTON, TEXAS 77039
DRAWN BY:
T.E.M.
REVISED:
PROJECT NUMBER:
APPROVED BY:
V.K.
D14
DS3
METAL EDGE & GUTTERNOT TO SCALE
D13
DS3
RISEWALL FLASHING AND GUTTERNOT TO SCALE
D16
DS3
MISCELLANEOUS GUTTER DETAILSNOT TO SCALE
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, INSULATION OR FLASHINGS AS
REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NEW 2X6 TREATED WOOD NAILER,
MECH. FASTEN 2'-0" O.C.
NEW 22 GA. GALV. METAL DECKING, ATTACH AS SPECIFIED
NEW 3/4" PLYWOOD, MECH. FASTEN TOP AND BOTTOM
12" O.C., STAGGERED.
NEW 24 GA. PRE-FINISHED
COUNTERFLASHING/RECEIVER, SCREW FASTEN 12" O.C.
NEW PRE-FORMED FOAM
CLOSURE STRIP.
EXISTING MASONRY WALL
NOTE: CONTRACTOR TO PROVIDE CLOSURES
AT ALL END TERMINATIONS AND CORNERS.
WALL PANEL CLOSURES
NEW SEALANT.
NEW 24 GA. PRE-FINISHED
METAL WALL PANEL, SCREW FASTEN PER SPECIFICATIONS.
NEW 24 GA. PRE-FINISHED
METAL CLOSURE, SCREW
FASTEN 12" O.C. NEW 18 GA. STEEL OPEN HAT
SECTION (MAXIMUM SPACING 30" O.C.), MECH. FASTEN 2'-0" O.C. TOP AND BOTTOM.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
EXISTING WOOD BLOCKING.
REPLACE ALL NON-TREATED AND
DETERIORATED UNITS, RESECURE
AS REQUIRED.
NEW 2-PLY STRIP-IN.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW 2-PLY STRIP-IN.
EXISTING WOOD BLOCKING.
NEW 2-PLY FIBERGLASS FELT
AND ASPHALT BASE FLASHING.
NEW MODIFIED BITUMEN BASE
FLASHING.
NEW FIBEROUS CANT, SET IN ASPHALT.
NEW 22 GA. WIND CLIP, SECURE BEHIND TERMINATION BAR PRIOR TO 3-COURSING
NEW CONCRETE SPLASHBLOCK
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW EDGE SEALANT
NEW 24 GA. PRE-FINISHED METAL EDGE,
NAIL 3" O.C. STAGGERED.
NEW ELASTOMERIC UNDERLAYMENT
SET IN A FULL BED OF MASTIC.
NEW 24 GA. PRE-FINISHED
GUTTER STRAP, POP-RIVETED.
NEW 1/8" X 1" STEEL GUTTER HANGER, SCREW FASTEN 2-PER HANGER. HANGER TO BE
PRIMED AND COATED WITH
2-COATS OF PAINT.
NEW 24 GA. PRE-FINISHED
DOWNSPOUT NECK, POP-RIVET AND SEAL
NEW 24 GA. PRE-FINISHED
DOWNSPOUT STRAP, MECH. FASTEN TO WALL AND
DOWNSPOUT ON EACH SIDE.
NEW 24 GA. PRE-FINISHED
METAL WALL PANEL, SCREW FASTEN PER SPECIFICATIONS.
NEW TERMINATION BAR, FASTEN 6" O.C. AND SEAL WITH 3-COURSE
OF FABRIC AND MASTIC.
NEW 24 GA. PRE-FINISHED
COUNTERFLASHING, SCREW
FASTEN 12" O.C.
NEW 24 GA. PRE-FINISHED
DOWNSPOUT, SECURE TO WALL WITH 3-STRAPS PER DOWNSPOUT.
NEW 24 GA. GUTTER, SECURE
6" O.C. THROUGH PRE-DRILLED
OVERSIZED HOLE.
NEW 2X TREATED WOOD NAILER(S), MECH. FASTEN 2'-0" O.C.
NEW 24 GA. GUTTER, SECURE 6" O.C. THROUGH PRE-DRILLED
OVERSIZED HOLE.
NEW 24 GA. PRE-FINISHED DOWNSPOUT
STRAP, MECH. FASTEN TO WALL AND DOWNSPOUT ON EACH SIDE.
NEW 24 GA. PRE-FINISHED DOWNSPOUT
NECK, POP-RIVET AND SEAL
NEW 1/8" X 1" STEEL GUTTER HANGER, SCREW FASTEN 2-PER HANGER. HANGER TO BE PRIMED AND
COATED WITH 2-COATS OF PAINT.
NEW 24 GA. PRE-FINISHED DOWNSPOUT, SECURE TO WALL WITH 3-STRAPS PER
DOWNSPOUT.
NEW 2X TREATED WOOD NAILER(S), MECH. FASTEN 2'-0" O.C.
NEW EDGE SEALANT
NEW ELASTOMERIC UNDERLAYMENT
SET IN A FULL BED OF MASTIC.
NEW 24 GA. PRE-FINISHED METAL EDGE,
NAIL 3" O.C. STAGGERED.
NEW 24 GA. PRE-FINISHED GUTTER
STRAP, POP-RIVETED.
NEW 24 GA. PRE-FINISHED METAL
CLOSURE, SCREW FASTEN 12" O.C.
NEW
SEALANT.
NEW 24 GA. PRE-FINISHED METAL
CLOSURE, SCREW FASTEN 12" O.C.
NEW CONCRETE SPLASHBLOCK
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, INSULATION OR FLASHINGS AS
REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
EXISTING WOOD BLOCKING.
EXISTING LIGHTWEIGHT CONCRETE
FILL OVER METAL DECK.
NEW VENTING BASE SHEET, MECHANICALLY
FASTENED PER FM REQUIREMENTS.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW 24 GA. PRE-FINISHED METAL
CLOSURE, SCREW FASTEN 12" O.C.
NEW 24 GA. PRE-FINISHED METAL
CLOSURE, SCREW FASTEN 12" O.C.
NEW 24 GA. PRE-FINISHED DOWNSPOUT, SECURE TO WALL WITH 3-STRAPS PER
DOWNSPOUT.
NEW 24 GA. PRE-FINISHED DOWNSPOUT
NECK, POP-RIVET AND SEAL
NEW 1/8" X 1" STEEL GUTTER HANGER, SCREW FASTEN 2-PER HANGER. HANGER TO BE PRIMED AND
COATED WITH 2-COATS OF PAINT.
NEW
SEALANT.
NEW EDGE SEALANT
NEW 2X TREATED WOOD NAILER(S), MECH. FASTEN 2'-0" O.C.
NEW 24 GA. PRE-FINISHED GUTTER
STRAP, POP-RIVETED.
NEW ELASTOMERIC UNDERLAYMENT
SET IN A FULL BED OF MASTIC.
NEW 24 GA. PRE-FINISHED METAL EDGE,
NAIL 3" O.C. STAGGERED.
NEW 24 GA. GUTTER, SECURE 6" O.C. THROUGH PRE-DRILLED
OVERSIZED HOLE.
NEW 2-PLY STRIP-IN.
D15
DS3
METAL EDGE & GUTTER @ OVERHANGNOT TO SCALE
ELEVATION
NEW GUTTER
NEW
DOWNSPOUT
NEW
DOWNSPOUT
STRAPS
NEW CONCRETE
SPLASHBLOCK
CONCRETE SPLASHBLOCK
GUTTER STRAP @ WINDOW MULLION
GUTTER STRAP
DOWNSPOUT STRAP @ MASONRY/STUCCO
GUTTERDOWNSPOUT
6" 1"
8"
1"
1"
5"
6"
12"
VERIFY
6.25"
1"
1"
3/4"
18" MIN.
12" MIN.
4"
6.25"VERIFY
1.5"
1.5"
DOWNSPOUT NECK ON GROUND LEVEL
NOTE: SEE DETAIL D16/DS3 FOR TYPICAL GUTTER NOTES.
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
NOTE: SEE DETAIL D16/DS3 FOR TYPICAL GUTTER NOTES.
NOTE: DETAIL SHALL BE CONSIDERED SIMILAR
FOR DIFFERENT LOCATIONS OF VARYING ROOF
SYSTEM CONSTRUCTION. CONTRACTOR SHALL
ADJUST OR MODIFY SHEET METAL, WOOD
NAILERS, INSULATION OR FLASHINGS AS
REQUIRED TO ACCOMODATE VARYING
LOCATIONS.
NOTE: SEE DETAIL D16/DS3 FOR TYPICAL GUTTER NOTES.
NOTE: PROVIDE NEW PRE-FINISH METAL
FLASHINGS AT PENETRATIONS THRU WALL.
SEAL PENETRATION AND FLASHING.
NEW 2X6 WOOD NAILER(S). NAIL 6" O.C., STAGGERED. ADD ADDITIONAL NAILERS AS
REQUIRED TO MATCH
INSULATION THICKNESS.
C
E
S
W
S
ETET FO
AT
S
R
DE
42 281
AX
NO
T
I
R
DIG
STE
AR
AE D
CLS.
HCR
ARK ET
4-24-2013
NEW FIRE-RATED MODIFIED BITUMEN CAP SHEET
WITH A FACTORY APPLIED COOL ROOF COATING.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
NEW 2" POLYISOCYANURATE
INSULATION MECHANICALLY
FASTEN PER FM REQUIREMENTS.
NEW FIRE-RATED MODIFIED BITUMEN CAP SHEET
WITH A FACTORY APPLIED COOL ROOF COATING.
NEW 1
8" P.L.F. TAPERED POLYISOCYANURATE
INSULATION SYSTEM SET IN HOT ASPHALT.
NEW 2" POLYISOCYANURATE INSULATION, MECH. FASTEN PER FM REQUIREMENTS.
NEW 1
2" SECUROCK SEPARATOR
BOARD, SET IN HOT ASPHALT.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW 22 GA.
METAL DECK
NEW 1" POLYISOCYANURATE INSULATION, MECH. FASTEN PER FM REQUIREMENTS.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT.
NEW FIRE-RATED MODIFIED BITUMEN CAP SHEET WITH
A FACTORY APPLIED COOL ROOF COATING.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE
INSULATION SYSTEM SET
IN HOT ASPHALT.
NEW FIRE-RATED MODIFIED BITUMEN CAP
SHEET WITH A FACTORY APPLIED COOL
ROOF COATING.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT
NEW 2" POLYISOCYANURATE
INSULATION MECHANICALLY
FASTEN PER FM REQUIREMENTS.NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
ALTERNATE FLASHING AT METAL EDGE
NEW 24 GA. PRE-FINISHED
COUNTERFLASHING
BUILDING ENVELOPE CONSULTANTS, LLC
13010 EMMETT ROAD
HOUSTON, TEXAS 77041
DS413-0009
HOUSTON, TEXAS 77032
ALDINE I.S.D. - OLESON ELEMENTARY SCHOOL
ALDINE INDEPENDENT SCHOOL DISTRICT
14910 ALDINE WESTFIELD ROAD
DATE:
4/24/2013
CLIENT:
PROJECT:
NOT TO SCALE
SCALE:
12345 VICKERY LANE
HOUSTON, TEXAS 77039
DRAWN BY:
T.E.M.
REVISED:
PROJECT NUMBER:
APPROVED BY:
V.K.
NEW PLYWOOD NAILER(S) TO MATCH INSULATION THICKNESS, NAIL 6" O.C. STAGGERED.
NEW VENTING BASE SHEET, MECH. ATTACH
NEW 2X6 TREATED WOOD NAILER
MECH. FASTEN BOTTOM 2'-0" O.C.
EXISTING LIGHTWEIGHT CONCRETE FILL OVER METAL
DECK.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW GRANULE SURFACED SBS
MODIFIED BITUMEN BASE FLASHING.
NEW 2-PLY FIBERGLASS FELT
AND ASPHALT BASE FLASHING.
NEW NEOPRENE EXPANSION JOINT COVER WITH 24 GA.
PRE-FINISHED FLANGES, SCREW FASTEN 12" O.C.
NEW ANGLE TERMINATION BAR.
NEW 1/2" GYPSUM FIBER BOARD SET IN ASPHALT
NEW 2" POLYISOCYANURATE INSULATION, MECH-FASTEN PER FM REQUIREMENTS
NEW 22 GA. GALV. METAL
DECKING, ATTACH PER FM
REQUIREMENTS.
D17
DS4
NEW EXPANSION JOINT @ N.I.C. AREANOT TO SCALE
EXPANSION JOINT AT METAL EDGE
NEW ELASTOMERIC UNDERLAYMENT.
NEW FIBERGLASS BATT INSULATION SET IN A
POLYETHYLENE SLING, NAIL 12" O.C.
NEW TREATED WOOD CANT, NAIL 6" O.C., STAGGERED.
TAPER EXPANSION JOINT DOWN TO
METAL EDGE 4'-0" FROM PERIMETER
NOTE: CONTRACTOR SHALL TRIM NEW WOOD
BLOCKING TO MAINTAIN SAME ELEVATION ON
BOTH SIDES AS NEEDED.
NEW 1/4" P.L.F. TAPERED PERLITE INSULATION SYSTEM SET IN ASPHALT.
4'-0"2'-0"
EXISTING GRAVEL SURFACE B.U.R., SPUD
BACK, PRIME, INSTALL NEW EXPANSION JOINT AND ROOFING MATERIAL AND REGRAVEL.
C
E
S
W
S
ETET FO
AT
S
R
DE
42 281
AX
NO
T
I
R
DIG
STE
AR
AE D
CLS.
HCR
ARK ET
4-24-2013
NEW FIRE-RATED MODIFIED BITUMEN BASE FLASHING
WITH A FACTORY APPLIED COOL ROOF COATING.
NEW FIRE-RATED MODIFIED BITUMEN BASE
FLASHING WITH A FACTORY APPLIED COOL
ROOF COATING.
NEW 2-PLY FIBERGLASS FELT AND
ASPHALT BASE FLASHING.
NEW FIRE-RATED MODIFIED BITUMEN CAP SHEET
WITH A FACTORY APPLIED COOL ROOF COATING.
NEW 3-PLY FIBERGLASS FELT
AND ASPHALT BUILT-UP ROOF.
NEW 2X6 TREATED WOOD
NAILERS, MECH. FASTEN
BOTTOM 2'-0" O.C. AND NAIL
TOP LAYERS 6" O.C.
STAGGERED. ADD PLYWOOD
NAILERS TO MATCH INSULATION
THICKNESS.
NEW 1
8" P.L.F. TAPERED
POLYISOCYANURATE INSULATION
SYSTEM SET IN HOT ASPHALT.
D18
DS4
DUCT SUPPORTNOT TO SCALE
NOTE:
NUMBER AND LOCATION OF SUPPORTS REQUIRED
TO BE DETERMINED BY MANUFACTURER. ADHERE
SUPPORTS TO WALKPADS WITH MANUFACTURER'S
APPROVED ADHESIVE.
NEW GALVANIZED STEEL TUBE
FRAME DUCT SUPPORT.
NEW MODIFIED BITUMEN
PROTECTION PAD
4"
NEW 18" X 18" MOLDED
PLASTIC BASE
EXISTING DUCT, LIFT, RESET, RESECURE AND SEAL ALL
OPEN JOINTS.
HOUSTON, TEXAS 77039
HOUSTON, TEXAS 77032
14910 ALDINE WESTFIELD ROAD
ALDINE INDEPENDENT SCHOOL DISTRICT
ALDINE I.S.D. - OLESON ELEMENTARY SCHOOL
12345 VICKERY LANE
PROJECT:
SCALE:
CLIENT:
DATE:
1/16" = 1'-0" APPROX.
4/24/2013
DRAWN BY:
13-0009
T.E.M.
APPROVED BY:
REVISED:
PROJECT NUMBER:
RP1
V.K.
NORTH HOUSTON, TEXAS 77041
13010 EMMETT ROAD
BUILDING ENVELOPE CONSULTANTS, LLC
A B C
F
JK K
H
I
I
G
F
E
E
E
E
E
E
E
EXPANSION/CONTROL JOINT
DUCT PENETRATION
PARAPET
MECHANICAL
ON SUPPORTS
ROOF DRAIN
PITCH PANS
EXHAUST FAN
SYMBOL LEGEND
(ON CURBS)
HOODED VENT
HOODED VENT
PLUMBING VENT
(SOIL STACK)
HOODED VENT
(HOT)
VENTILATOR
G
G
G
G
E
E
E
E
E
E
E
E
G G
E
G
E E
E
G
E
E
E
E
M
OPEN TO BELOW
OPEN TO BELOW
E
E
E
E
E
XX
E
G
BOX
TURBINE VENT
AREA DESIGNATION
ELECTRICAL LINE
GAS LINE
PIPE PENETRATION
76'-0" 79'-0" 79'-0"
327'-6"
149'-0"63'-6"
195'-0"
54'-9"
83'-6"
20'-0"
60'-3"
81'-0"
OLESON ELEMENTARY SCHOOL - ROOF PLAN
SCALE: 1
16" = 1'-0"
D
U U
UU
U
U
U U
U
U
UU U U
UU
UU
N.I.C.
N.I.C.
N.I.C.
N.I.C.
K
L
EQUIPMENT
MECHANICAL
EQUIPMENT
UTILITY LINE
NOT IN CONTRACT
DOWNSPOUT
GUTTER
U
GENERAL NOTES
ROOF AREAS D, E, F, G, H, I AND L
PROJECT PLANS AND DETAILS ARE PROVIDED FOR
BIDDING PURPOSES AND ARE NOT REPRESENTATIVE
OF EXACT EXISTING CONDITIONS. BIDDERS SHALL
FIELD VERIFY ALL EXISTING CONDITIONS AS A
CONDITION OF BID SUBMISSION.
DETAILS ARE BALLOONED AT REPRESENTATIVE
LOCATIONS ON THE PLANS. BIDDERS SHALL
CONSIDER SIMILAR LOCATIONS AND CONDITIONS TO
BE TREATED THE SAME.
CONTRACTOR SHALL PERFORM THE SCOPE OF
WORK AS PART OF THE BASE BID WHICH
INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
1)
2)
3)
REMOVE THE EXISTING ROOF SYSTEM DOWN
TO THE EXISTING LIGHTWEIGHT CONCRETE
FILL OVER STEEL DECK AND PROPERLY
DISPOSE OF AS REQUIRED.
A.
INSTALL NEW ROOF SYSTEM IN ACCORDANCE
WITH WITH THE PROJECT MANUAL.
CONTRACTOR SHALL RAISE OR LOWER ALL
EQUIPMENT, UTILITY LINES, PENETRATIONS, ETC.,
AS REQUIRED TO INSTALL THE NEW ROOF
SYSTEM.
PAINT ALL ROOF TOP EQUIPMENT AND
PENETRATIONS WITH ALUMINUM COATING.
D.
C.
B.
E.
NEW ROOF CONSTRUCTION INFORMATION IS PROVIDED
BELOW:5)
INSTALL A NEW 22 GA. GALV. STEEL DECK FOLLOWED
BY A SINGLE-LAYER OF MECHANICALLY FASTENED 2"
POLYISOCYANURATE INSULATION, THEN A 1/8" P.L.F. TAPERED POLYISOCYANURATE INSULATION SYSTEM SET
IN HOT ASPHALT THEN A TOP LAYER OF 1/2" GYPSUM FIBER BOARD IN HOT ASPHALT AND THEN A 3-PLY
FIBERGLASS FELT AND ASPHALT BUILT-UP ROOF WITH
A CLASS "A" FIRE-RATED ELASTOMERIC COATED CAP
SHEET.
ROOF AREAS D, F, G AND I
ON AREAS D, G AND I REMOVE THE EXISTING LIGHTWEIGHT CONCRETE FILL AND
STEEL DECKING DOWN TO THE EXISTING
STEEL STRUCTURE AND PROPERLY DISPOSE
OF AS REQUIRED.
EXISTING ROOF CONSTRUCTION INFORMATION
IS PROVIDED BELOW:
ROOF AREAS D, E, F, H AND I
EXISTING METAL DECK AND LIGHTWEIGHT
CONCRETE FILL, 1" OF INSULATION AND A MULTI-PLY ASPHALT B.U.R. WITH GRAVEL
SURFACING.
4)
INSTALL A NEW VENTING BASE SHEET FOLLOWED BY A
SINGLE-LAYER OF MECHANICALLY FASTENED 1"
POLYISOCYANURATE INSULATION, THEN A 1/8" P.L.F. TAPERED POLYISOCYANURATE INSULATION SYSTEM SET
IN HOT ASPHALT, THEN A SINGLE-LAYER OF 1/2" GYPSUM FIBER BOARD AND CRICKETS IN HOT ASPHALT, THEN A 3-PLY FIBERGLASS FELT AND ASPHALT
BUILT-UP ROOF WITH A CLASS "A" FIRE-RATED
ELASTOMERIC COATED CAP SHEET.
ROOF AREAS E, H AND L
CONTRACTOR SHALL ATTACH NEW METAL DECKING AS
SPECIFIED AND INDICATED ON THE DRAWINGS. ALL
ATTACHMENT SHALL BE IN COMPLIANCE WITH FM
REQUIREMENTS.
7)
CONTRACTOR SHALL MECHANICALLY FASTEN THE BASE
LAYER OF INSULATION AS SPECIFIED AND INDICATED
ON THE DRAWINGS. ALL ATTACHMENT SHALL BE IN
COMPLIANCE WITH FM REQUIREMENTS.
8)
CONTRACTOR SHALL REMOVE ALL
ABANDONED PENETRATIONS.
F.
CONTRACTOR SHALL USE ONLY THOSE SETUP AREAS
AS SHOWN ON THE PLANS OR AS APPROVED BY
THE OWNER.
9)
CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY REGULATIONS AND WILL
PROVIDE AND PAY FOR ALL LICENSES, PERMITS,
ETC., AS REQUIRED.
10)
ROOF AREAS J, K, M AND N ARE NOT INCLUDED IN THE CONTRACT WITH THE
EXCEPTIONS OF TIE-INS AT NEW EXPANSION
JOINTS.
G.
EXISTING METAL DECK AND LIGHTWEIGHT
CONCRETE FILL AND A MULTI-PLY ASPHALT
B.U.R. WITH GRAVEL SURFACING.
ROOF AREA G
CONTRACTOR SHALL COMPLY WITH ALL ALDINE I.S.D.
SAFETY RULES AND CONTRACT REQUIREMENTS.11)
CONTRACTOR SHALL SUPPLY A TWENTY-YEAR
NO-DOLLAR-LIMIT (NDL) WARRANTY FROM THE ROOFING MATERIAL MANUFACTURER AND A FIVE YEAR
CONTRACTORS STANDARD WARRANTY.
12)
CONTRACTOR SHALL SUPPLY ALL INTERIOR
PROTECTION AND CLEAN UP (AS SPECIFIED) IN AREAS TO RECIEVE NEW METAL DECKING.
6)
D14
DS3
D11
DS2
D18
DS4
D15
DS3
D15
DS3
D15
DS3
D17
DS4
D17
DS4
D15
DS3
D12
DS2
D8
DS2
D15
DS3
D14
DS3
D15
DS3
D14
DS3
D14
DS3
D14
DS3
D14
DS3
D14
DS3
D4
DS1
D13
DS3
D13
DS3
D12
DS2
D11
DS2
D4
DS1
D4
DS1
D10
DS2
D3
DS1
D7
DS2
D9
DS2
D6
DS2
D14
DS3
INSTALL NEW EXPANSION JOINT BETWEEN
AREAS "A" & "D", "B" & "F", "E" & "F",
"H" & "I", "I" & "L", AND "C" & "I".
K.
INSTALL NEW EXPANSION JOINT BETWEEN
AREAS "L" & "I".
M.
TIE-IN NEW GUTTER AND DOWNSPOUT
SYSTEM ON ALL NOT IN CONTRACT AREAS
L.
N.I.C.
TYP
ICAL
TIE-
IN
TYPICAL
TIE-IN
4'-0"
CONTRACTOR SHALL REMOVE ALL ROOF
DRAINS AND CAP ALL DRAIN LINES BELOW
THE DECK.
H.
CONTRACTOR SHALL INSTALL NEW PIPE
SUPPORTS AND UTILITY LINE SUPPORTS PER
DETAIL DRAWINGS AND AS SPECIFIED.
I.
INSTALL NEW METAL WALL PANEL SYSTEM
FROM AREAS G TO F AND F TO N.
J.
4'-0"
TYP
ICAL
TIE-
IN
4'-0"
TYP
ICAL
TIE-
IN
N.I.C. N.I.C.
D17
DS4
D8
DS2
D14
DS3
D11
DS2
D9
DS2
N
36'-9"
63'-1"
GUARD RAIL
4-24-2013
N.I.C.
ROOF DRAIN
OVERFLOW
D14
DS3
D15
DS3
D4
DS1
D9
DS2
D15
DS3
D3
DS1
D7
DS2
D4
DS1
D10
DS2
D13
DS3
D12
DS2
D17
DS4
D17
DS4
D10
DS2
D6
DS2
HOUSTON, TEXAS 77039
HOUSTON, TEXAS 77032
14910 ALDINE WESTFIELD ROAD
ALDINE INDEPENDENT SCHOOL DISTRICT
ALDINE I.S.D. - OLESON ELEMENTARY SCHOOL
12345 VICKERY LANE
PROJECT:
SCALE:
CLIENT:
DATE:
1/16" = 1'-0" APPROX.
4/24/2013
DRAWN BY:
13-0009
T.E.M.
APPROVED BY:
REVISED:
PROJECT NUMBER:
TP1
V.K.
NORTH HOUSTON, TEXAS 77041
13010 EMMETT ROAD
BUILDING ENVELOPE CONSULTANTS, LLC
A B C
F
JK K
H
I
I
G
F
E
EXPANSION/CONTROL JOINT
PARAPET
MECHANICAL
ON SUPPORTS
ROOF DRAIN
SYMBOL LEGEND
VENTILATOR
M
OPEN TO BELOW
OPEN TO BELOW
XX AREA DESIGNATION
76'-0" 79'-0" 79'-0"
327'-6"
149'-0"63'-6"
195'-0"
54'-9"
83'-6"
20'-0"
60'-3"
81'-0"
OLESON ELEMENTARY SCHOOL - TAPER PLAN
SCALE: 1
16" = 1'-0"
D
N.I.C.
N.I.C.
N.I.C.
N.I.C.
K
L
EQUIPMENT
MECHANICAL
EQUIPMENT
NOT IN CONTRACT
DOWNSPOUT
GUTTER
N.I.C.
TYP
ICAL
TIE-
IN
TYPICAL
TIE-IN
4'-0"
4'-0"
TYP
ICAL
TIE-
IN
4'-0"
TYP
ICAL
TIE-
IN
N.I.C. N.I.C.
N
36'-9"
63'-1"
4-24-2013
OVERFLOW
ROOF DRAIN
SLOPE
DIRECTION
CONTRACTOR SHALL REMOVE ALL EXISTING ROOF DRAINS AND OVERFLOW DRAINS AND
CAP EXISTING DRAIN LINES BELOW THE DECK. ALL PLUMBING WORK SHALL BE DONE BY
A LICENSED PLUMBER.
CONTRACTOR SHALL REMOVE THE ROOF SYSTEM DOWN TO THE EXISTING DECKING OR
BAR ON ALL AREAS AS INDICATED ON THE DRAWINGS. PERFORM ALL REQUIRED REPAIRS
AND INSTALL THE NEW ROOF SYSTEM AS SPECIFIED. ALL DRAINAGE COMPONENT REPAIRS
AND NEW OVERFLOW DRAINS SHALL BE INSTALLED PRIOR TO INSTALLATION OF THE NEW
TAPERED INSULATION CRICKETS AND ROOF SYSTEMS.
CONTRACTOR SHALL INSTALL NEW TAPERED INSULATION AND CRICKET SYSTEMS AS
SPECIFIED TO PROVIDE POSITIVE DRAINAGE.
CONTRACTOR SHALL REMOVE EXISTING AND INSTALL NEW SYSTEM INCLUDING 3-PLY
B.U.R. AND DECKING WHERE SPECIFIED ON ONE AREA AT A TIME PRIOR TO STARTING
THE NEXT AREA. ALL TEMPORARY TIE-INS SHALL BE INSTALLED ON A DAILY BASIS.
NEW TAPERED INSULATION AND CRICKET SYSTEMS LAYOUT PLAN SHALL BE PROVIDED BY
THE MANUFACTURER AND SUBMITTED FOR REVIEW. CONTRACTOR SHALL INCLUDE ALL
COSTS FOR NEW TAPERED INSULATION AND CRICKET SYSTEMS IN BASE BID.
CONTRACTOR SHALL BE RESPONSIBLE FOR RAISING OR LOWERING ALL EQUIPMENT,
PENETRATIONS, SUPPORTS, METAL FLASHING SYSTEMS, ETC., AS REQUIRED FOR INSTALLATION OF THE NEW TAPERED INSULATION AND ROOF SYSTEMS.
CONTRACTOR SHALL COORDINATE ROOF REPLACEMENT WORK WITH MEP REPAIR WORK.
8)
6)
7)
5)
2)
3)
1)
GENERAL NOTES
SLOPES SHOWN ON SLOPE PLAN ARE REPRESENTATIVE OF NEW SLOPE EXPECTATIONS.
FINAL TAPERED INSULATION LAYOUT WILL BE DESIGNED BY THE INSULATION
MANUFACTURER AND SUBMITTED FOR APPROVAL BY THE OWNER.
4)