a b c d e f ... ... MARK OUT THE ROOF 33 14,3 16,5 EAVE LINE AT THE CENTER OF THE ROOF PITCH MARK 2 VERTICAL LINES TO EVERY ROW OF SHINGLES STAGGER 14,3 14,3 14,3 x y NAIL POSITIONS 15° < PITCH < 60° 60° < PITCH < 85° 2,5 cm 1 MINUETTO 2016v01 DIMENSIONS INSTALL ATION 33,7 100 x 16,5 cm 25 cm OF BITUMINO US MEMBRANE EAVE LINE y a SECOND ROW OVERLAP SHINGES ON EVERY ROW AT 14,3 cm USE THE VERTICAL LINE TO STAGGER SHINGLE HORIZONTALLY 16,5 cm b x y c SECOND ROW FIRST ROW BITUMINOUS MEMBRANE

Upload: others

Post on 26-Jan-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

  • a

    b

    c

    d

    e

    f

    ...

    ...

    MARK OUT THE ROOF

    33

    14,3

    16,5

    EAVE LINE

    AT THE CENTER OF THE ROOF PITCH

    MARK 2 VERTICAL LINES

    TO EVERY ROW OF SHINGLESSTAGGER

    14,3

    14,3

    14,3

    x y

    NAIL POSITIONS

    15° < PITCH < 60°

    60° < PITCH < 85°

    2,5

    cm

    1

    MINUETTO

    2016v01

    DIMENSIONS

    INSTALL ATION

    33,7

    100

    x

    16,5 cm 25 cm OF BITUMINO US MEMBRANE

    EAVE LINE

    y

    a

    SECOND ROW

    OVERLAP SHINGES ON EVERY ROW AT 14,3 cmUSE THE VERTICAL LINE TO STAGGER SHINGLE HORIZONTALLY 16,5 cm

    b

    x y

    c

    SECOND ROW

    FIRST ROW

    BITUMINOUS MEMBRANE

  • MINUETTO

    2016v01

    HIP AND RIDGE

    DON’T NAIL THE SHINGLES LESS THAN 40 cm FROM THE CENTER OF THE VALLEY

    2

    33

    100

    14,3

    VALLEY- INSTALL THE SHINGLES ON THE FIRST ROOF PITCH AND CROSS THE CENTER OF THE VALLEY AT LEAST 25 cm- COMPLETE THE SECOND ROOF PITCH AND CUT THE SHINGLES ALONG A LINE AT 5cm FROM THE CENTER OF THE VALLEY

    BITUMINOUS MEMBRANE 1m WIDTH