ROLE OF THE EMPANELLED
CONSULTANTS
Bureau of Energy EfficiencyBureau of Energy EfficiencyMay 29, 2009May 29, 2009
-
8/8/2019 Role of Empanelled Consultants
2/19
BACKGROUND
EC Act came into force on 2001 : Anact to provide for efficient use of energy and itsconservation.
Institutional Mechanism: Nodal Agency : BEE
State Level Agency : SDA
-
8/8/2019 Role of Empanelled Consultants
3/19
ROLE OF SDAs
A DEVELOPMENT AGENCY:Database, Policy formulation, Annual reports& review, Awareness creation, knowledgecentre, capacity building
A FACILITATOR : Demo project, PPP
A REGULATORY AGENCY : Notifyvarious mandatory requirements for DCs,S&L and other schemes of MoP/BEE and its
implementation
-
8/8/2019 Role of Empanelled Consultants
4/19
ROLE OF SDAS
SDAs are the statutory bodies set up under section
15(d) of the EC Act,2001 to play an effective roleto:
Collection, Collation and analysis of data regardingenergy use
Dissemination of information to the massesregarding use of efficient energy.
Create public awareness and understanding aboutthe values of energy conservation
Implementation of the EC Act,2001
Stimulating market transformation at the local
level
-
8/8/2019 Role of Empanelled Consultants
5/19
INITIATIVES OF BEE FOR
SUPPORTING SDAs
NPC as a consultant to help SDAs to prepare
Action Plan
Organize meetings and workshops
Help SDAs technically and financially to takeup different activities as per the action plan
Support during implementation
-
8/8/2019 Role of Empanelled Consultants
6/19
SCHEME FOR
STRENGTHENING SDAs
The total expenditure under this scheme is estimatedto be Rs. 49.47 crores over a 5 year periodcommencing from year 2007-08.
The year wise expenditure for the respective yearsfor the XI plan period is tabulated below:
Year Amount (Rs. In Lakhs)
2007-08 755
2008-09 2371
2009-10 1047
2010-11 387
2011-12 387
Total 4947
-
8/8/2019 Role of Empanelled Consultants
7/19
ACTION PLAN
19 points Deliverables have been formulated by BEE whichare as per the EC Act.
The 19 deliverables include activities on Policy Preparation of database Dissemination of information
Publications, publicity, awareness Training Designated Consumers Demo projects Appliances/ Equipments
Energy Conservation Building Codes
Details are uploaded in the w ebsite: www.bee.gov.in
For any further clarification please post your queries at
[email protected], [email protected] [email protected]
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
8/8/2019 Role of Empanelled Consultants
8/19
5/29/2009 8
STATUSSTATUS AN OVERVIEWAN OVERVIEW
Rs. 755 lacs disbursed to 24 SDAs for the FY 2007-08
towards the Annual Action Plan
Rs. 2762 lacs disbursed to 27 SDAs for the FY 2008-09 tilldate
Rs. 836 lacs for Annual Action P lan to 22 SDAs
Rs. 404 lacs for IGEA of 409 Govt. buildings to 24
SDAs 40 demonstration project identified on energy efficient
street lighting, revamping of drinking water pumping
system and energy efficiency in SMEs cluster
Rs. 1188 lacs for implementation of 24 demo projects
All the SDAs except Lakshadweep have prepared their
Energy Conservation Action P lan
-
8/8/2019 Role of Empanelled Consultants
9/19
ROLE OF THE
EMPANELLLED
CONSULTANTS
ASSISTANCE TO SDAs
-
8/8/2019 Role of Empanelled Consultants
10/19
5/29/2009 10
ASSISTANCE TO SDAsASSISTANCE TO SDAs
Assist SDAs towards
industry interaction
interaction w ith other State Govt. dept. / agencies
awareness campaign, conduct State Level Awards
preparation & budget estimation of Yearly Action
Planimplementation of Energy Conservation Activities in
the states
IGEA of Govt. buildings and its implementationimplementation of demonstration projects
organizing seminars / workshops
preparation of Annual Reportothers, as per SDA requirement
-
8/8/2019 Role of Empanelled Consultants
11/19
5/29/2009 11
ASSISTANCE TO SDAsASSISTANCE TO SDAs
No. State / UT Name of SDA Location
1. Rajasthan Rajasthan Renewable Energy Corporation Ltd. Jaipur
2. Assam O/o Chief Electrical Inspector-cum-Adviser Guwahati
3. Madhya
Pradesh
M.P. Urja Vikas Nigam Limited Bhopal
4. HimachalPradesh
H.P. State Electricity Board Shimla
5. Bihar Bihar Renewable Energy Development Agency Patna
6. Meghalaya O/o Senior Electrical Inspector Shillong
7. Pondicherry Renewable Energy Agency of Pondicherry Pondicherry
8. Uttar Pradesh U.P. Power Corporation Ltd. Lucknow
9. Chandigarh O/o Chief Engineer Chandigarh
10. Jharkhand O/o Chief Engineer-cum-Chief Electrical Inspector Ranchi
11. Orissa O/o Chief Electrical Inspector Bhubaneswar
12. Andaman & Nicobar
Electricity Department, A&N Administration Port Blair
13. Manipur O/o Chief Engineer Imphal
14. Tripura Tripura State Electricity Corporation Ltd. Agartala15. Lakshwadeep Electricity Department, Lakshwadeep Administration Kavaratti
-
8/8/2019 Role of Empanelled Consultants
12/19
5/29/2009 12
PAYMENT TO CONSULTANTSPAYMENT TO CONSULTANTS
Rs. 4000/ - per man day for deputing a technical
person for assisting the SDAs
The technical person is to be deputed in the city where
the SDA is headquartered
The technical person should be a BEE certified Energy
Manager / Energy Auditor w ith a minimum of two
years work experience in the field of energy efficiency
Payment will be made through SDAs or by BEE onreceipt of letter from SDA
-
8/8/2019 Role of Empanelled Consultants
13/19
5/29/2009 13
EXPECTATIONSEXPECTATIONS
Should send a detailed CV to BEE of the technical
person prior to deputing them to SDAs for approval
Should be stationed at SDA headquarter and use their
office space
Should carry their own laptop and data card for
internet access
No change of personnel at frequent intervals
Any change of the deputed personnel to be done w ith
the consent of SDA or BEE
Should work towards fulfillment of the roles assigned
to SDAs under the EC Act 2001 and by the BEE
-
8/8/2019 Role of Empanelled Consultants
14/19
ROLE OF THE EMPANELLLED
CONSULTANTS
PREPARATION OF DPR FOR
DEMONSTRATIONPROJECTS
-
8/8/2019 Role of Empanelled Consultants
15/19
5/29/2009 15
DEMO PROJECTSDEMO PROJECTS
SDAs will identify demonstration projects with high
impact value in big cities
The demonstration projects may be
energy efficiency lighting project for upcoming
flyovers or centrally located park, or a place ofcultural or tourism importance within the city
drinking water supply in a government owned
residential or office complex small / medium enterprises industry cluster, having
high replicability
-
8/8/2019 Role of Empanelled Consultants
16/19
5/29/2009 16
DEMO PROJECTSDEMO PROJECTS
Based on proposal of demo projects obtained
from SDAs, BEE w ill prepare a scope of work
Consultants w ill submit their financial bid based
on the scope of work
A consultant will be awarded a demo projectbased on the lowest financial bid
Demo project is to be conducted in consultation
with SDA, State Government Agency /Department which has to implement the project
-
8/8/2019 Role of Empanelled Consultants
17/19
5/29/2009 17
DEMO PROJECTSDEMO PROJECTS
Conduct f ield visits
Technical parameters to be measured
Choose the best energy efficient device for this
particular project
A study is to be carried out by placing the mostefficient option to obtain a real data
Analysis of the reduction in Electrical Energy
Consumption (KWH & KVAH)
Meters to be installed on site to verify the reduction in
energy savings achieved
-
8/8/2019 Role of Empanelled Consultants
18/19
5/29/2009 18
DEMO PROJECTSDEMO PROJECTS
Cost-benefit analysis showing the simple pay-back
period, Return on Investment (RoI), Net Present
Value (NPV) and Internal Rate of Return (IRR)
Providing a list of manufacturers / suppliers
Providing bid document
Development of monitoring protocol
-