rodic consultantsrodicconsultants.com/admin/downloads/cb8f4d1edfff49858e...under north eastern state...

8
RODIC CONSULTANTS EMPLOYEE TIMES Issue 01 Rodic Consultants EMPLOYEE TIMES September 2013 BUILD TOGETHER. A BETTER WORLD As Editor of Rodic Newsletter, I would like to inform all the Rodic family members that we are visualizing to bring out this Newsletter on a monthly basis, the periodicity of the Newsletter can be reviewed depending on the enthusiasm & response by our family members. The objective of bringing out the Newsletter is to develop Kinship & Camaraderie among Rodic family, bring in transparency in the function of the company & keep all the members informed about the welfare schemes & growth related activities of the company. To this end we have divided the Newsletter as mentioned: 1) Opening Page 2) 2 nd Page: Present & Future Rodic 3) 3 rd Page: Rodic Family 4) 4 th & 5 th Page: Health Tips & Useful informative news & facts. 5) 6&7 th Page:Creativity& Talent-Hunt, Write-up, Article & Jokes. I as the Editor of the Rodic Newsletter & soliciting the help of our family to come forward & contribute for the subsequent issues & give constructive suggestions for consideration & improving the Rodic Newsletter. I would like to thank the MD & CEO because of their continuous support & insistence; we have been able to roll out this 1st Edition of Rodic Newsletter- Employee Times. As the Editor I will take this opportunity to congratulate all members of Rodic family for this Nobel initiative. Quazikund- Banihal Tunnel Project (J&K) in Progress J&K Project We are on the threshold of starting our 2 new Hydro Electric Power Projects (Lower Kalnai HEP & Parnai HEP) in J&K Shillong by Pass We have successfully completed Independent Engineer Consultancy services for 2 laning project of Shillong by pass connecting NH-40 & NH-44 on 31 st May 2013.19 months ahead of scheduled completion date. The Client, Concessionaire & EPF contractor was NHAI, Shillong Expressway Pvt Ltd & G R Infra Projects respectively. KUDOS! From the Editor Desk By Aakaar Amit

Upload: vananh

Post on 25-May-2018

247 views

Category:

Documents


0 download

TRANSCRIPT

RODIC CONSULTANTS EMPLOYEE TIMES Issue 01

Rodic Consultants

EMPLOYEE TIMES

September 2013

S

BUILD TOGETHER. A BETTER WORLD

As Editor of Rodic Newsletter, I would like to inform all the Rodic family members that we are visualizing to bring out this Newsletter on a monthly basis, the periodicity of the Newsletter can be reviewed depending on the enthusiasm & response by our family members.

The objective of bringing out the Newsletter is to develop Kinship & Camaraderie among Rodic family, bring in transparency in the function of the company & keep all the members informed about the welfare schemes & growth related activities of the company.

To this end we have divided the Newsletter as mentioned:

1) Opening Page 2) 2nd Page: Present & Future

Rodic 3) 3rdPage: Rodic Family 4) 4th & 5thPage: Health Tips &

Useful informative news & facts.

5) 6&7thPage:Creativity& Talent-Hunt, Write-up, Article & Jokes.

I as the Editor of the Rodic Newsletter & soliciting the help of our family to come forward & contribute for the subsequent issues & give constructive suggestions for consideration & improving the Rodic Newsletter.

I would like to thank the MD & CEO because of their continuous support & insistence; we have been able to roll out this 1st Edition of Rodic Newsletter- Employee Times.

As the Editor I will take this opportunity to congratulate all members of Rodic family for this Nobel

initiative.

Quazikund- Banihal Tunnel Project (J&K) in Progress

J&K Project

We are on the threshold of starting our 2 new Hydro Electric Power Projects (Lower Kalnai HEP & Parnai HEP) in J&K

Shillong by Pass We have successfully completed Independent Engineer Consultancy services for 2 laning project of Shillong by pass connecting NH-40 & NH-44 on 31st May 2013.19 months ahead of scheduled completion date. The Client, Concessionaire & EPF contractor was NHAI, Shillong Expressway Pvt Ltd & G R

Infra Projects respectively. KUDOS!

From the Editor Desk By Aakaar Amit

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 2

Financial Progress

We have touched the INR 32 Cr turnover in the financial year 2012-2013, and our projected turnover for the assessment year 2013-2014 is 60 Cr with aggressive marketing strategy and sound project execution plan

Our New Avenues!

Hydro Power

We are on the threshold of entering the Hydro Power sector. We have built expert manpower resource to undertake Project Identification, fact finding surveys, preliminary engineering, and Project Management and Construction supervision. Our Hydro Power team is extremely focused to take giant leaps in

this sector.

1)Project: Selection of Consultant for providing of comprehensive contract management services for Implementation of EPC Contract, for construction of 48MW Lower Kalnai HEP, In Kishtwar & Doda districts of J&K

State.

2) Project: Selection of Consultant for providing of comprehensive contract management services for implementation of EPC contract, for construction of 37.7mw parnai HEP,

in poonch district of J&K state.

Urban Infrastructure and Water Supply

We are now focused on entering the fields of Urban Infrastructure and Water Supply. We have recently opened our Water Division. We are in the process of building a strong team in Water and Sewerage planning and design. We are aggressively bidding and are confident of picking few projects with our esteemed associates in this financial year.

Our Upcoming Projects

A. Manipur ADB- Manipur

Construction Supervision Consultant for MN-CW1 & MN-CW2 Manipur – State Road Project, length: 98 Km,

B. Jowai –Meghalaya

Independent Engineer Services for Two laning of Jowai-Meghalaya/ Assam Border Section of NH-44 (Km. 69.200 to Km. 173.200), length: 102 Km.

C. Lower Kalnai HEP- J & K

Selection of consultant for providing of comprehensive contract management services for implementation of EPC contract, for construction of 48mw.

D. Parnai HEP – J & K,

Selection of consultant for providing of comprehensive contract management services for implementation of EPC contract for construction of 37.7mw

E. Goa-Kundapur –Karnataka

Independent Engineer Services for 4-laning of Goa / Karnataka Border – Kundapur Section of NH-17 from existing Km. 93.700 to Km. 283.300

Our Running Projects

A. Meghalaya ADB- Meghalaya

Consultancy Services for Construction Supervision of Improvement and up gradation of road from Garobadha to Dalu Km.0 to Km.93.400.

B. Assam ADB- Assam

Consultancy Services for Construction Supervision of AS-CW1 and AS-CW2 Assam under North Eastern State Roads Investment Program

C. Assam WB- Assam

Consultancy Services for Construction Supervision ASSAM Road Project funded by World Bank

Present & Future Rodic !

-

10.00

20.00

30.00

40.00

50.00

60.00

70.00

Rs.

In C

rore

s

Financial Year

FINANCIAL GROWTH CHART

TurnOver

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 3

D. Agra Aligarh- UP

Independent Engineer Services for 2-Laning with Paved shoulders of Agra to Aligarh Section of NH-93 from Km 0.000 to Km 79.000 in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer(DBFOT) on Toll Basis under NHDP-Phase-IVA)

E. Ara Mohania- Bihar

Independent Engineering Consultancy Services for the project of Construction of 4-lanning of Mohania – Ara Section of NH-30 (Length-116.760)

F. Greenfield- Bihar

Independent Engineering Consultancy Services for development of Greenfield Bridge across river Ganges and its approaches connecting Bakhityarpur Bypass of NH-31 near village Karjan and NH-28 at Tajpur.

G. Debang Arunachal – AP

Independent Engineering Services for Construction of 12.9 M wide Bridges across Dibang River system Road betweem Bomjur-Meka (NH-52) & Construction of Bridge across River Lohit at alubari Ghat and connecting Road Between Chowkham-Digaru (Length: 30.95 KM)

H. Delhi Agra- Haryana/UP

Independent Engineer Service for Six Laning of Delhi-Agra Section of NH-2 from Km.20.500 to 200.000 (Length 179.5 Kms)

I. Farakka – Raiganj- WB

Independent Engineer Services for Four Laning of Farakka – Raiganj Section of NH-34 from Km 295.000 to 398.000 in the State of West Bengal under NHDP-III in Design, Build.

J. Raiganj – Dalkhola- WB

Independent Engineer Services for Four Laning of Raiganj - Dalkhola, section of NH-34 from Km 398.000 to Km 452.000 in the State of West Bengal.

K. Varanasi – Aurangabad- UP

Independent Engineering Services for the work of 6 laning of Varanas Aurangabad Section of NH-2 form Km 786.000 to km 978.000 in the State of UP / Bihar.

L. Bihar – ADB- Bihar

Construction Supervision for 1) Sikkadi- Nasrigunj (SH-81).

2) Mohammadpur-Chhapra (SH-90) and Birpur.

3) Udaikishangunj (SH-91), funded by ADB.

4) Siwan-Siswan (SH 89).

M. Jammu – Udhampur- J & K

Independent Engineer Services for Rehabilitation, Strengthening and 4-laning of Jammu - Udhampur section of NH-1A, from km 15.00 (on Jammu Bypass) to km 67.00

N. Hungund Hosepet- Karnataka

Independent Engineer Services for Four Laning of Hungund-Hospet Section of NH-13 from Km 202.000 to 299.000 in the State of

Karnataka on Design.

O. Quazigund Banihal – J & K

Independent Engineer services for Four Laning of Quazigund to Banihal section from Km 189.350 to Km 204.700 of NH 1A including 2 tunnels (2 lane) of 0.69 km and 8.45 km length on NH - 1A.

P. Jharkhand ADB – Jharkhand

Consultancy Services for Construction Supervision for Jharkhand State Roads Project, funded by ADB, Length: 311 km

Q. Uttrakhand ADB – Uttrakhand

Consultancy Services Construction Supervision of improvement/ up gradation of roads in uttarakhand (USRIP Project-2); Package - 1, 274.10 Km.

R. DFCCIL- Bihar

Project Management Consultancy Services for Design & Build contract of Construction of formation including blanketing, Major Bridges, Minor Bridges, RUBs, Robs, Supply and Spreading of Ballast and other related infrastructural works for dedicated Freight Corridor from chainage 14.108 Km.

S. DPR NHDP-IVB- Jharkhand

Govindpur Junction with NH-2, Dhanbad-Bokaro-Ramgarh (NH-32 & 23) 130 Km.

Govindpur Junction with NH-2, Chas-JHR/WB Border (NH-32) 71 Km.

Jamshedpur-Kharagpur (NH-6 & NH-23), 150 Km.

Road & Bridges, Length: 351 Kms of 2/4 Lane)

T. DPR State Highways SH101-Bihar

Consultancy Services for Preparation of Detailed Project Report of State Highways – Package No. XI, Amba (NH-98)-Deo-Madanpur-Gaya of SH-101 in the state of Bihar, Total Length: 80.00 Km.

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 4

Launching & Staging of Pier & Curing in Progress (J&K)

Jammu Udhampur Project

Delhi Agra Project

Ara Mohania Project

Rodic at work!

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 5

Join me in welcoming our new members

WELCOME

Mr.Ashutosh Kumar Singh (Horticulture cum Landscaping Expert West Bengal Project)

Mr. Shalender Kumar (CAD Engineer, Bihar Project)

Following members moved on in life. We wish them and their families all the very best in their future endeavors.

GOOD BYE

Swapnil Sinha (HR Executive, Head Office)

Ashwin Rupchand Nagdeve

(Asst. Bridge Engineer ,Head Office)

Yadu Sharma (AVP-BD, Head Office)

MANY HAPPY RETURNS OF THE DAY. FOLLOWING MEMBERS CELEBERATE THEIR BIRTHDAY IN

THE ENSUING MONTH. WE WISH THEM HEALTH, WEALTH AND PROSPERITY IN THE YEARS TO COME.

Employee Name Designation Location B'Day Date

Satyendra Nath Kapoor Sr Accounts cum Admin Manager Ranchi Office 01, October

Rakesh Ranjan Assistant Highway Engineer Varanasi 05, October

Tej Pratap Singh Bridge Engineer Meghalaya ADB 06, October

Rajiv Ghoshal Territory Project Manager Patna Office 08, October

Deepak Negi Asst CAD Design Head Office 10, October

Rashmi Singh Medical Supervisor Head Office 10, October

Zahoor Ahmad Mallik Project Manager Jammu 10, October

Manaw Field Engineer - Bridge DFCC Sasaram 11, October

Vijay Kumar Gupta Survey Engineer Ranchi DPR 12, October

Mahesh Chandra Punetha Structure/Drainage Engineer Pithoragarh 15, October

Sanjay Kumar Assistant Resident Engineer Road Bihar ADB 24, October

Ashutosh Kumar Singh Horticulture cum Landscaping Expert Bahrampore 25, October

Jagdish Mishra Field Engineer - Road Rosra 25, October

Radhe Shyam Maurya Survey Engineer Varanasi 27, October

Mahbub Ali Ahmed Site Engineer - Road Assam ADB 30, October

Rodic Family

Our Team at Banihal

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 6

Healthy Eating:

5 A Day Fruit and Vegetables

Eating the recommended 5 a

day servings of fruit and

vegetables is the most

important element of any

healthy eating plan.

What is a Portion of Fruit and

Veg?

1 apple, banana, pear,

orange or other similar

sized fruit

2 plums, satsumas, kiwi

fruit or other similar sized

fruit

1⁄2 a grapefruit or

avocado

1 large slice of melon or

fresh pineapple

3 heaped tablespoons of

vegetables, beans or

pulses

heaped tablespoons of

fruit salad or stewed

fruit

1heaped tablespoon of

raisins or sultanas

3 dried apricots

1 cupful of grapes,

cherries or berries

1 dessert bowl of salad

1 small glass (150ml) of

pure fruit juice

Heart Attack and Water - I never knew all of this! Interesting....... Correct time to drink water... Very Important. >From a Cardiac Specialist! Drinking water at a certain time maximizes its effectiveness on the body:

2 glasses of water after waking up - helps activate internal organs 1 glass of water 30 minutes before a meal - helps digestion 1 glass of water before taking a bath - helps lower blood pressure

1 glass of water before going to bed - avoids stroke or heart attack

My Physician told me that water at bed time will also help prevent night time leg cramps. Your leg muscles are seeking hydration when they cramp and wake you up with a Charlie Horse.

Source: Mumbai Business Community

RBI RULE FROM 1st JANUARY 2014. NO BANK WILL ACCEPT ANYTHING WRITTEN ON CURRENCY NOTE. YOU CAN NOT ALSO DEPOSIT THAT NOTE IN BANK. BY ORDER: R.B.I.

Interesting fact about our country, INDIA!

India has the largest number of Post Offices in the world. However, it is not unusual for a letter to take two weeks to travel just 30 miles.

Interesting fact about the World!

2013 is the first year since 1987 that consists for four different digits.

HEALTH TIPS

USEFUL INFORMATIVE NEWS & FACTS

Check it out!

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 7

People, Work and Happiness

1. A true LEADER creates conditions for HIS people to achieve the GOALS.

2. A GREAT person shows his GREATNESS by the way he treats LITTLE men

3. It is natural for people to forget to be grateful; so if we go around expecting GRATITUDE, we are headed straight for a lot of HEARTACHES!

4. People's NEEDS can be met, GREEDS never!

5. Anyone can live by working from" 8 to 5", but success is achieved by working from "5 to 8"! (Remember: Napoleon was an early RISER!)

6. When we have accepted the WORST, then we have NOTHING more to LOSE!

7. Whenever you get MEDALS, give them to your colleagues—you will get MORE!

Note: Kindly send your contributions such as Write ups, Jokes, photo of

8. WHY people/ clients QUIT?

-1% DIE. -3% MOVE away. -5% form other FRIENDSHIPS. -9% for competitive REASONS. 14% because of Dissatisfaction. 68% because of you or Your TEAM's attitude of INDIFFERENCE towards others!!(Please NOTE the %)

9. Coming together is

BEGINNING; --Keeping together is PROGRESS; -- Working together is SUCCESS!

-----*****-----

Worst JOB!

Quotes!

Do not led by others, awaken your own mind, amass your own experience,

and decide for your-self your own path.

family occasions or brief about project development and

Eager To Impress The Boss

A young executive was leaving

the office late one evening when

he found the CEO standing in

front of a shredder with a piece

of paper in his hand.

"Listen," said the CEO, "this is a

very sensitive and important

document here and my secretary

has gone for the night. Can you

make this thing work?"

"Certainly," said the young

executive. He turned the

machine on, inserted the paper,

and pressed the start button.

"Excellent, excellent!" said the

CEO as his paper disappeared

inside the machine.

"I just need one copy

Riddle

Solve this geographical riddle.

I am the first on earth,

The second in heaven,

I appear two times in a week,

You can only see me once in a

year although i am in the

middle of the sea,

What am I ?

Your IQ test. achievements. On E-mail ID

[email protected]

Creativity & Talent Hunt!

RODIC CONSULTANTS EMPLOYEE TIMES | Issue 01 8

We have Sponsored

India Oil Corporation

Jagriti Club

Mela held on

2nd October 2013

at

Barauni, Bihar.

Our Presence !

Quazigund – Banihal Tunnel visit by Hon’ble Chief Minister of Jammu &

Kashmir Mr. Omar Abdullah with the Rodic Team.