roadway projects alameda county · alameda county state highway projects i-80 gilman interchange...

174
Roadway Projects Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: On Gilman Avenue at I-80: Reconfigure interchange providing dual roundabout at the entrance & exits from I-80 as well as the Eastshore Highway and West Frontage Rd and bike/ped overcrossing. Project also references RTP ID 17-01-0001 Project Name: Description: Alameda County Transportation Commission (ACTC) Sponsor: Alameda County Transportation Implementing Agency: ALA050079 TIP ID: County: Alameda State System: 17-01-0040 RTP ID: 2060000366 CTIPS Air Quality Exempt Code: 5.04 - EXEMPT (40 CFR 93.127) - Changes in vertical and horizontal alignment 80 6.4 6.8 Route: Post Mile From: Post Mile To: Toll Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total Programmed All funding in thousands of dollars EARMARK PE $ 1,080 $ 1,080 OTHER LOCAL PE $ 354 $ 354 SALESTAX-MEASURE PE $ 5,066 $ 5,066 SALESTAX-MEASURE PSE $ 5,200 $ 5,200 RTP-LRP ROW $ 1,126 $ 1,126 SALESTAX-MEASURE ROW $ 1,734 $ 1,734 ATP-REG CON $ 4,152 $ 4,152 RIP CON $ 25,784 $ 25,784 RTP-LRP CON $ 9,164 $ 9,164 SALESTAX-MEASURE CON $ 2,340 $ 2,340 $ 6,492 $ 25,784 $ 10,290 $ 56,000 $ 13,434 Total Programmed Funding: I-80/Ashby Avenue Interchange Improvements Alameda County: I-80/Ashby IC: Reconstruct the interchange including constructing new bridge, two roundabouts and bike/ped improvements Project Name: Description: Alameda County Transportation Commission (ACTC) Sponsor: Alameda County Transportation Implementing Agency: ALA170002 TIP ID: County: Alameda State System: 17-01-0037 RTP ID: 2060000607 CTIPS Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects 80 Route: Post Mile From: Post Mile To: Toll Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total Programmed All funding in thousands of dollars SALESTAX-MEASURE PE $ 6,000 $ 4,000 $ 2,000 SALESTAX-MEASURE ROW $ 1,500 $ 1,500 OTHER LOCAL CON $ 2,000 $ 2,000 RTP-LRP CON $ 44,060 $ 44,060 $ 3,500 $ 2,000 $ 44,060 $ 53,560 $ 4,000 Total Programmed Funding: SR 84 Expressway Widening In Livermore: Widen Route 84 from Jack London Blvd. to Pigeon Pass. Project Name: Description: Alameda County Transportation Commission (ACTC) Sponsor: Alameda County Transportation Implementing Agency: ALA050014 TIP ID: County: Alameda State System: 17-01-0032 RTP ID: 2060000280 CTIPS Air Quality Exempt Code: NON-EXEMPT 84 22.3 27.3 Route: Post Mile From: Post Mile To: Toll $ 4,247,341 Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total Programmed All funding in thousands of dollars XTRAN ENV $ 3,000 $ 3,000 XTRAN PSE $ 9,000 $ 9,000 SALESTAX-MEASURE ROW $ 7,311 $ 7,311 XTRAN ROW $ 17,510 $ 17,510 XTRAN CON-CT $ 3,852 $ 3,852 PROP CON $ 20,000 $ 20,000 RIP CON $ 42,130 $ 42,130 SALESTAX-MEASURE CON $ 2,689 $ 2,689 XTRAN CON $ 9,927 $ 9,927 RIP CON-CE $ 4,900 $ 4,900 $ 120,319 $ 120,319 Total Programmed Funding: 2019 TIP September 26, 2018 73 S4 -

Upload: others

Post on 02-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyState Highway Projects

I-80 Gilman Interchange ImprovementsBerkeley: On Gilman Avenue at I-80: Reconfigure interchange providing dual roundabout at the entrance & exits from I-80 aswell as the Eastshore Highway and West Frontage Rd and bike/ped overcrossing. Project also references RTP ID 17-01-0001

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA050079TIP ID: County: Alameda StateSystem: 17-01-0040RTP ID: 2060000366CTIPS

Air Quality Exempt Code: 5.04 - EXEMPT (40 CFR 93.127) - Changes in vertical and horizontal alignment80 6.4 6.8Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 1,080$ 1,080OTHER LOCALPE $ 354$ 354SALESTAX-MEASUREPE $ 5,066$ 5,066SALESTAX-MEASUREPSE $ 5,200$ 5,200RTP-LRPROW $ 1,126$ 1,126

SALESTAX-MEASUREROW $ 1,734$ 1,734ATP-REGCON $ 4,152$ 4,152

RIPCON $ 25,784$ 25,784

RTP-LRPCON $ 9,164$ 9,164

SALESTAX-MEASURECON $ 2,340$ 2,340

$ 6,492 $ 25,784 $ 10,290 $ 56,000$ 13,434Total Programmed Funding:

I-80/Ashby Avenue Interchange ImprovementsAlameda County: I-80/Ashby IC: Reconstruct the interchange including constructing new bridge, two roundabouts andbike/ped improvements

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170002TIP ID: County: Alameda StateSystem: 17-01-0037RTP ID: 2060000607CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects80Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 6,000$ 4,000 $ 2,000

SALESTAX-MEASUREROW $ 1,500$ 1,500

OTHER LOCALCON $ 2,000$ 2,000

RTP-LRPCON $ 44,060$ 44,060

$ 3,500 $ 2,000 $ 44,060 $ 53,560$ 4,000Total Programmed Funding:

SR 84 Expressway WideningIn Livermore: Widen Route 84 from Jack London Blvd. to Pigeon Pass.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA050014TIP ID: County: Alameda StateSystem: 17-01-0032RTP ID: 2060000280CTIPS

Air Quality Exempt Code: NON-EXEMPT84 22.3 27.3Route: Post Mile From: Post Mile To: Toll $ 4,247,341

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

XTRANENV $ 3,000$ 3,000XTRANPSE $ 9,000$ 9,000SALESTAX-MEASUREROW $ 7,311$ 7,311XTRANROW $ 17,510$ 17,510XTRANCON-CT $ 3,852$ 3,852PROPCON $ 20,000$ 20,000RIPCON $ 42,130$ 42,130SALESTAX-MEASURECON $ 2,689$ 2,689XTRANCON $ 9,927$ 9,927RIPCON-CE $ 4,900$ 4,900

$ 120,319$ 120,319Total Programmed Funding:

2019 TIP September 26, 201873S4 -

Page 2: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyState Highway Projects

Rte 84 Widening, south of Ruby Hill Dr to I-680In Alameda County, on State Route 84 from south of Ruby Hill Drive to I-680, upgrade from 2-lane conventional highway to 4-lane expressway, make operational improvements to SR84/I-680 I/C and extend SB express lane about two miles to thenorth.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA150001TIP ID: County: Alameda StateSystem: 17-01-0029RTP ID: 2060000581CTIPS

Air Quality Exempt Code: NON-EXEMPT84 17.9 22Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,200$ 1,200SALESTAX-MEASUREENV $ 5,000$ 5,000SALESTAX-MEASUREPE $ 16,700$ 16,700SALESTAX-MEASUREROW $ 29,000$ 29,000

RIPCON $ 11,114$ 11,114

RTP-LRPCON $ 156,986$ 156,986

$ 29,000 $ 11,114 $ 156,986 $ 220,000$ 22,900Total Programmed Funding:

Rt 92/Clawiter/Whitesell Interchange ImprovementsHayward: Rt 92/Clawiter Rd: Upgrade existing Clawiter interchange. Add ramps and overcrossing for Whitesell St. extension.Signalize ramp intersections.

Project Name:Description:

HaywardSponsor: HaywardImplementing Agency:

ALA090016TIP ID: County: Alameda StateSystem: 17-01-0036RTP ID: 2060000434CTIPS

Air Quality Exempt Code: NON-EXEMPT92Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 4,200$ 4,200OTHER LOCALROW $ 6,600$ 6,600OTHER LOCALCON $ 1,900$ 1,900

RTP-LRPCON $ 42,300$ 42,300

$ 1,900 $ 42,300 $ 55,000$ 10,800Total Programmed Funding:

State Route 262 (Mission Blvd) ImprovementsIn Fremont: Mission Blvd/I-680 IC: widen Mission Blvd to 3 lanes each direction through IC, rebuild the NB and SB I-680 onand off ramps

Project Name:Description:

FremontSponsor: Alameda County TransportationImplementing Agency:

ALA170001TIP ID: County: Alameda StateSystem: 17-01-0020RTP ID: 2060000607CTIPS

Air Quality Exempt Code: NON-EXEMPT262Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 6,500$ 6,500

OTHER LOCALPSE $ 500$ 500

RTP-LRPPSE $ 9,500$ 9,500

OTHER LOCAL $ 500ROW $ 500

RTP-LRPROW $ 4,500$ 4,500

RTP-LRPCON $ 90,500$ 90,500

$ 6,500 $ 500 $ 500 $ 104,500 $ 112,000Total Programmed Funding:

I-580/680 Interchange HOV/HOT WideningAlameda County: On I-580 between Hacienda Dr. and San Ramon/Foothill Road and on I-680 between Stoneridge Dr. andAmado: Widen to add one HOV/HOT lane for WB 580 to SB 680 and NB 680 to EB 580 movements at connector and toTassajara Road

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170008TIP ID: County: Alameda StateSystem: 17-01-0028RTP ID: 2060000609CTIPS

Air Quality Exempt Code: NON-EXEMPT580 18.8 21.4Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 2,000$ 2,000

SALESTAX-MEASUREENV $ 6,000$ 6,000

RTP-LRPPSE $ 25,000$ 25,000

RTP-LRPROW $ 15,000$ 15,000

RTP-LRPCON $ 252,000$ 252,000

$ 8,000 $ 292,000 $ 300,000Total Programmed Funding:

2019 TIP September 26, 201874S4 -

Page 3: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyState Highway Projects

I-580 Interchange Imps at Hacienda/Fallon Rd, Ph 2Dublin: I580/Fallon Rd IC: Ph 2 - Reconstruct overcrossing to widen to 4 lanes in each direction, reconstruct and widenramps, add bike/ped imps; I580 Hacienda Dr IC: Reconstruct overcrossing to add NB lane, modify and widen ramps, addbike/ped imps

Project Name:Description:

DublinSponsor: Alameda County TransportationImplementing Agency:

ALA170045TIP ID: County: Alameda StateSystem: 17-01-0038RTP ID: 2060000624CTIPS

Air Quality Exempt Code: NON-EXEMPT580Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 700$ 700

RTP-LRPENV $ 5,800$ 5,800

OTHER LOCAL $ 500PSE $ 500

RTP-LRPPSE $ 5,500$ 5,500

OTHER LOCAL $ 200ROW $ 200

RTP-LRPROW $ 5,300$ 5,300

RTP-LRPCON $ 40,000$ 40,000

$ 700 $ 700 $ 56,600 $ 58,000Total Programmed Funding:

I-680 NB HOV/HOT LaneRoute I-680: from South of Auto Mall Parkway to State Route 84 in Alameda County: Construct NB HOV/HOT Lane.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA130034TIP ID: County: Alameda StateSystem: 17-10-0058RTP ID: 2060000581CTIPS

Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 8,500$ 8,500SALESTAX-MEASUREPE $ 8,270$ 8,270TCRPPE $ 7,000$ 7,000SALESTAX-MEASUREROW $ 6,000$ 6,000SALESTAX-MEASURECON $ 128,654$ 128,654TCRPCON $ 13,874$ 13,874SALESTAX-MEASURECON-CE $ 25,180$ 25,180SALESTAX-MEASUREROW- $ 720$ 720

$ 198,198$ 198,198Total Programmed Funding:

Oakland/Alameda Access ProjectOakland and Alameda: Between Oak Street and Union Street: Reconfigure interchange and intersections to improveconnections between I-880, the Posey and Webster tubes and the downtown Oakland area.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA070009TIP ID: County: Alameda StateSystem: 17-01-0030RTP ID: 2060000367CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 3,000$ 2,500 $ 500

RTP-LRPPE $ 4,900$ 4,900

SALESTAX-MEASUREPE $ 5,600$ 5,600RTP-LRPROW $ 1,000$ 1,000

OTHER LOCAL $ 1,000CON $ 1,000

RTP-LRPCON $ 67,500$ 67,500

$ 500 $ 1,000 $ 73,400 $ 83,000$ 8,100Total Programmed Funding:

I-880 Auxiliary lanes at Industrial ParkwayHayward: I-880 NB between Industrial Pkwy and Alameda Creek; I-808 SB between Industrial Pkwy and Whipple Rd:Construct auxiliary lanes

Project Name:Description:

HaywardSponsor: HaywardImplementing Agency:

ALA090020TIP ID: County: Alameda StateSystem: 17-01-0007RTP ID: 2060000426CTIPS

Air Quality Exempt Code: NON-EXEMPT880 14.53 13.669Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,510$ 1,510

RTP-LRPROW $ 250$ 250

RTP-LRPCON $ 8,040$ 8,040

$ 1,510 $ 8,290 $ 9,800Total Programmed Funding:

2019 TIP September 26, 201875S4 -

Page 4: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyState Highway Projects

I-880/Industrial Parkway West InterchangeIn Hayward: At I-880/Industrial Parkway West: Reconstruct interchange, add on/off-ramp lanes, widen ramp lanes, provideHOV bypass lanes and routine accommodation for bicyclists and pedestrians.

Project Name:Description:

HaywardSponsor: Alameda County TransportationImplementing Agency:

ALA110002TIP ID: County: Alameda StateSystem: 17-01-0023RTP ID: 2060000462CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 7,000$ 2,500 $ 4,500

SALESTAX-MEASUREROW $ 7,675$ 7,675

RTP-LRPCON $ 13,000$ 13,000

SALESTAX-MEASURE $ 29,325CON $ 29,325

$ 12,175 $ 29,325 $ 13,000 $ 57,000$ 2,500Total Programmed Funding:

I-880/West Winton Avenue InterchangeHayward: At I-880/West Winton Avenue I/C: Reconstruct I/C including reconfiguration of eastbound to southbound on rampand new connection to Southland Mall Drive

Project Name:Description:

HaywardSponsor: Alameda County TransportationImplementing Agency:

ALA170004TIP ID: County: Alameda StateSystem: 17-01-0041RTP ID: 2060000607CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 1,500$ 1,500SALESTAX-MEASUREPSE $ 5,500$ 5,500

OTHER LOCAL $ 2,000ROW $ 2,000

RTP-LRPCON $ 32,000$ 32,000

$ 5,500 $ 2,000 $ 32,000 $ 41,000$ 1,500Total Programmed Funding:

I-880/Whipple Rd Industrial Pkwy SW I/C ImpsIn Union City/Hayward: at I-880/Whipple Rd Interchange: Implement full interchange improvements including northbound off-ramp, surface street improvements and realignment, and bike/ped improvements

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170005TIP ID: County: Alameda StateSystem: 17-01-0021RTP ID: 2060000607CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 11,500$ 4,000 $ 7,500

SALESTAX-MEASUREROW $ 3,325$ 3,325

RTP-LRPCON $ 20,000$ 20,000

SALESTAX-MEASURE $ 45,175CON $ 45,175

$ 10,825 $ 45,175 $ 20,000 $ 80,000$ 4,000Total Programmed Funding:

I-880 NB HOV/HOT: North of Hacienda to HegenbergerAlameda County: I-880 in the northbound direction from north of Hacienda Ave to Hegenberger Road: Widen to provide oneHOV/express lane

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170010TIP ID: County: Alameda StateSystem: 17-10-0057RTP ID: 2060000610CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 5,000$ 3,500$ 1,500

RTP-LRPPSE $ 20,000$ 20,000

RTP-LRPROW $ 15,000$ 15,000

RTP-LRPCON $ 181,000$ 181,000

$ 1,500 $ 3,500 $ 216,000 $ 221,000Total Programmed Funding:

2019 TIP September 26, 201876S4 -

Page 5: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyState Highway Projects

I-880/A Street Interchange ReconstructionHayward: I-880/A St. I/C: Reconstruct interchange to widen A St from 5 to 6 lanes, add bike lanes, and provide additional lanecapacity for potential future freeway widening, modify signals and reconfigures intersections to improve truck-turningmaneuvers

Project Name:Description:

HaywardSponsor: Alameda County TransportationImplementing Agency:

ALA170046TIP ID: County: Alameda StateSystem: 17-01-0024RTP ID: 2060000624CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,500$ 1,500

RTP-LRPENV $ 1,261$ 1,261

OTHER LOCAL $ 500PSE $ 500

RTP-LRPPSE $ 5,000$ 5,000

RTP-LRPROW $ 2,000$ 2,000

RTP-LRPCON $ 43,739$ 43,739

$ 1,500 $ 500 $ 52,000 $ 54,000Total Programmed Funding:

I-880 Integrated Corridor Management - CentralAlameda County: I-880 Corridor from Davis St in San Leandro to Whipple Rd in Union City: Identify how existing and plannedincident management strategies and operations can be better coordinated and integrated across networks and jurisdictionalboundaries

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

ALA170057TIP ID: County: Alameda StateSystem: 17-10-0013RTP ID: 2060000628CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

880Route: Post Mile From: Post Mile To: Toll $ 933,887

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 1,142$ 1,142CMAQCON $ 7,698$ 7,698

$ 7,698 $ 8,840$ 1,142Total Programmed Funding:

I-880 North Safety ImprovementsOakland: I-880 between 23rd Ave to 29th Ave: Reconfigure Interchange, including new ramps.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA050019TIP ID: County: Alameda StateSystem: 17-01-0031RTP ID: 2060000332CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll $ 504,680

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 4,100$ 4,100EARMARKPE $ 1,787$ 1,787BTPSE $ 3,810$ 3,810RIPPSE $ 2,000$ 2,000ACROW $ 4,400$ 4,400BTROW $ 750$ 750OTHER LOCALROW $ 2,300$ 2,300SALESTAX-MEASUREROW $ 5,000$ 5,000XTRANROW $ 8,049$ 8,049BTCON $ 1,340$ 1,340OTHER LOCALCON $ 1,661$ 1,661PROPCON $ 73,433$ 73,433

$ 108,630$ 108,630Total Programmed Funding:

2019 TIP September 26, 201877S4 -

Page 6: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyState Highway Projects

Widen I-680 NB Imprv SB for EL: SR-84 to AlcostaAlameda County: NB I-680 from SR-84 to Alcosta Blvd: Widen for express lanes; SB I-680 from SR-84 to Alcosta Blvd:express lane improvements. Project also references RTP ID 17-01-0014

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170009TIP ID: County: Alameda StateSystem: 17-10-0058RTP ID: 2060000609CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RTP-LRPPE $ 4,000$ 4,000

SALESTAX-MEASUREPE $ 17,500$ 6,500 $ 11,000

RTP-LRPROW $ 5,000$ 5,000

SALESTAX-MEASUREROW $ 1,500$ 1,500

RTP-LRPCON $ 366,000$ 366,000

$ 12,500 $ 375,000 $ 394,000$ 6,500Total Programmed Funding:

Bay Bridge Forward - West Grand HOV/Bus Only LaneIn Oakland: Grand Avenue on-ramp: Convert shoulder to Bus/HOV only lane

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

ALA170011TIP ID: County: Alameda StateSystem: 17-10-0033RTP ID: 2060000612CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 660$ 660OTHER LOCALENV $ 98$ 98BTPSE $ 600$ 200 $ 400

BTCON $ 4,619$ 2,500 $ 2,119

$ 2,519 $ 5,977$ 3,458Total Programmed Funding:

GL: Alameda County - TOS-MobilityAlameda County: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and 40 CFR Part93.127 Table 3 categories

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

ALA170060TIP ID: County: Alameda StateSystem: 17-10-0033RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 13,517,050

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ACCON $ 97,847$ 41,425 $ 56,422

CMAQCON $ 20,000$ 20,000

$ 56,422 $ 117,847$ 61,425Total Programmed Funding:

East-West Connector in Fremont & Union CityIn Fremont & Union City: From I-880 to Route 238 (Mission Blvd): Construct new 4-lane roadway and widen existingroadways. Project is phased.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA978004TIP ID: County: Alameda StateSystem: 17-01-0047RTP ID: 1060000044CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll $ 1,376,400

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 5,290$ 5,290SALESTAX-MEASUREPSE $ 15,798$ 15,798SALESTAX-MEASUREROW $ 35,455$ 35,455OTHER LOCALCON $ 14,300$ 14,300

RTP-LRPCON $ 132,834$ 132,834

SALESTAX-MEASURECON $ 32,323$ 32,323

$ 46,623 $ 132,834 $ 236,000$ 56,543Total Programmed Funding:

End of section

2019 TIP September 26, 201878S4 -

Page 7: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

Alameda City-Wide Pavement RehabilitationAlameda: Buena Vista Ave from Willow St to Park St and Kofman Pkwy from Tralee Ln to Aughinbaugh Way: Resurface andrehabilitate pavement

Project Name:Description:

Alameda (City)Sponsor: Alameda (City)Implementing Agency:

ALA170074TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 60$ 60OTHER LOCALCON $ 172$ 172

STPCON $ 827$ 827

$ 999 $ 1,059$ 60Total Programmed Funding:

Crow Canyon Safety ImprovementsAlameda County: On Crow Canyon Road from I-580 north to the Alameda/Contra Costa County line: Safety improvements,shoulder widening and curve realignment.

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA010003TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 1060000072CTIPS

Air Quality Exempt Code: 1.04 - EXEMPT (40 CFR 93.126) - Shoulder improvementsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 500$ 500OTHER LOCALPSE $ 450$ 450OTHER LOCALROW $ 550$ 550OTHER LOCALCON $ 1,500$ 1,500

$ 1,500 $ 3,000$ 1,500Total Programmed Funding:

Alameda: Vasco Road Safety ImprovementsLivermore: On Vasco Road from 1,000' South of Dalton Ave to CC County line; Realign roadway, provide standard shoulderwidths, install median barriers and add truck-climbing lanes. (Total length of truck lanes is .9 miles). Project is phased.

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA030002TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 2060000238CTIPS

Air Quality Exempt Code: 1.17 - EXEMPT (40 CFR 93.126) - Truck climbing lanes outside the urbanized areaRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 337$ 337TCRPENV $ 150$ 150EARMARKPE $ 755$ 755OTHER LOCALPE $ 120$ 120STPPE $ 480$ 480OTHER LOCALPSE $ 510$ 510OTHER LOCALROW $ 2,080$ 1,980 $ 100

STPROW $ 3,900$ 3,900XTRANROW $ 1,500$ 1,500ACCON $ 320$ 320OTHER LOCAL $ 500CON $ 8,621$ 8,121RIPCON $ 4,600$ 4,600RTP-LRPCON $ 18,500$ 18,500

STPCON $ 8,635$ 8,635TCRPCON $ 6,350$ 6,350

$ 100 $ 500 $ 18,500 $ 56,858$ 37,758Total Programmed Funding:

2019 TIP September 26, 201879S4 -

Page 8: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

Estuary Bridges Seismic Retrofit and RepairsOakland: 3 Oakland Estuary bridges: Seismic retrofit and repairs

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA090022TIP ID: County: Alameda Local RoadSystem: 17-10-0024RTP ID: 2060000426CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 400$ 400OTHER LOCALROW $ 300$ 300BR-SEISMICCON $ 3,400$ 3,400

OTHER LOCALCON $ 800$ 800

$ 3,400 $ 4,900$ 1,500Total Programmed Funding:

Fruitvale Ave Roadway Bridge LifelineAlameda County: Fruitvale Roadway Bridge: Retrofit bridge to a lifeline facility

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA090023TIP ID: County: Alameda Local RoadSystem: 17-10-0024RTP ID: 2060000426CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,500$ 500$ 1,000

OTHER LOCAL $ 500ROW $ 500

OTHER LOCALCON $ 500$ 500

RTP-LRPCON $ 9,500$ 9,500

$ 1,500 $ 500 $ 500 $ 9,500 $ 12,000Total Programmed Funding:

Alameda Co-Various Streets and Roads PreservationUnincorporated Alameda County: Various roadways: Rehabilitate pavement

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA130018TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 2060000563CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 133$ 133STPPE $ 196$ 196OTHER LOCALCON $ 784$ 234 $ 270$ 280

STPCON $ 5,654$ 1,704 $ 2,171$ 1,779

$ 2,059 $ 2,441 $ 6,767$ 2,267Total Programmed Funding:

Niles Canyon Rd (SR 84)/Pleas-Sunol Rd Inter. ImpsIn Sunol Area: At Niles Canyon Rd(SR 84), Pleasanton Sunol Rd and Paloma Rd intersection: intersection improvements atthe four corners includeing installation of a traffic signal, shoulder improvements and a right lane modification

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA150002TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 2060000584CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500

OTHER LOCALROW $ 300$ 300

OTHER LOCALCON $ 1,700$ 1,700

$ 500 $ 300 $ 1,700 $ 2,500Total Programmed Funding:

2019 TIP September 26, 201880S4 -

Page 9: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

7th Street Grade Separation EastOakland: 7th St and rail tracks between I880 and Maritime St in the Port of Oakland: Reconstruct the existing 7th Stunderpass on an adjacent alignment, rail tracks, and other rail infrastructure. No through lanes will be added; 7th St path:improve trail

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170085TIP ID: County: Alameda Local RoadSystem: 17-01-0015RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 5.04 - EXEMPT (40 CFR 93.127) - Changes in vertical and horizontal alignmentRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 6,593$ 6,593SB1ENV $ 907$ 907SALESTAX-MEASUREPSE $ 12,427$ 12,427

SB1PSE $ 7,073$ 7,073

EARMARKCON $ 0$ 0

OTHER LOCALCON $ 2,000$ 2,000

RTP-LRPCON $ 223,000$ 223,000

$ 19,500 $ 2,000 $ 223,000 $ 252,000$ 7,500Total Programmed Funding:

7th Street Grade Separation WestOakland: Within the Port: Implement road and rail improvements, realign and grade separate 7th St and Maritime intersection,reconstruct and widen multi-use path; Between Joint Intermodal Terminal and the Oakland Harbor Intermodal Terminal: Addrail spur

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170086TIP ID: County: Alameda Local RoadSystem: 17-01-0018RTP ID: 2060000648CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 19,000$ 19,000EARMARKCON $ 21$ 21

OTHER LOCALCON $ 2,000$ 2,000

RTP-LRPCON $ 143,979$ 143,979

$ 2,021 $ 143,979 $ 165,000$ 19,000Total Programmed Funding:

Freight Intelligent Transportation System (FITS)Oakland: In the Port of Oakland and surrounding areas: Implement ITS improvements, signal systems, and other technologiesto cost-effectively manage truck arrivals and improve incident response

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170087TIP ID: County: Alameda Local RoadSystem: 17-01-0026RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 2,500$ 2,500SALESTAX-MEASUREPSE $ 4,100$ 4,100OTHER FEDERALCON $ 11,544$ 11,544

SB1CON $ 12,456$ 12,456

$ 24,000 $ 30,600$ 6,600Total Programmed Funding:

Shattuck Complete Streets and De-coupletBerkeley: Shattuck Ave, Shattuck Square and Berkeley Square from Allston Way to University Ave intersection: Reconfiguretravel lanes and parking, repair pavement and make other improvements

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA130026TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000572CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 970$ 970OTHER LOCALCON $ 2,851$ 2,851STPCON $ 2,777$ 2,777

$ 6,598$ 6,598Total Programmed Funding:

2019 TIP September 26, 201881S4 -

Page 10: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

goBerkeley Residential Shared Parking PilotIn Berkeley: In residential areas adjacent to Southside/Telegraph and Elmwood goBerkeley program areas: Implementparking pricing pilot; In pilot areas: Implement TDM strategies and outreach focused on businesses and residents

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA150049TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 950$ 950OTHER LOCALCON $ 470$ 470

$ 1,420$ 1,420Total Programmed Funding:

Dougherty Road wideningDublin: Dougherty Road from Sierra Lane to North City Limit: Widen from 4 lanes to 6 lanes

Project Name:Description:

DublinSponsor: DublinImplementing Agency:

ALA130005TIP ID: County: Alameda Local RoadSystem: 17-01-0053RTP ID: 2060000572CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 2,150$ 2,150OTHER LOCALROW $ 1,240$ 1,240OTHER LOCALCON $ 1,817$ 1,817SALESTAX-MEASURECON $ 13,783$ 13,783

$ 18,990$ 18,990Total Programmed Funding:

Dublin Boulevard wideningIn Dublin: Dublin Blvd between Sierra Court and Dublin Court: Widenfrom 4 lanes to 6 lanes and install Class II bike lanes

Project Name:Description:

DublinSponsor: DublinImplementing Agency:

ALA130006TIP ID: County: Alameda Local RoadSystem: 17-01-0057RTP ID: 2060000572CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 262$ 262OTHER LOCALPE $ 419$ 419OTHER LOCALROW $ 381$ 381OTHER LOCALCON $ 268$ 268SALESTAX-MEASURECON $ 3,000$ 3,000

$ 3,000 $ 4,330$ 1,330Total Programmed Funding:

Dublin Blvd. - North Canyons Pkwy ExtensionAlameda County, Dublin and Livermore: Dublin Blvd-North Canyons Parkway from Fallon Rd to Croak Rd: Construct six laneextension; Dublin Blvd-North Canyons Parkway from Croak Rd to Doolan Rd: Construct four lane extension

Project Name:Description:

DublinSponsor: Alameda County TransportationImplementing Agency:

ALA150003TIP ID: County: Alameda Local RoadSystem: 17-01-0048RTP ID: 2060000584CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 715$ 715SALESTAX-MEASUREENV $ 2,374$ 2,374EARMARKPE $ 540$ 540

SALESTAX-MEASUREPSE $ 5,374$ 5,374

OTHER LOCALROW $ 500$ 500

RTP-LRPROW $ 17,417$ 17,417

OTHER LOCAL $ 100CON $ 100

RTP-LRPCON $ 61,233$ 61,233

$ 6,414 $ 100 $ 78,650 $ 88,253$ 3,089Total Programmed Funding:

2019 TIP September 26, 201882S4 -

Page 11: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

Dublin Blvd RehabilitationDublin: Segments of Dublin Boulevard from Scarlet Drive to Hacienda Drive: Rehabilitate pavement

Project Name:Description:

DublinSponsor: DublinImplementing Agency:

ALA170062TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 55$ 55

OTHER LOCALCON $ 284$ 284

STPCON $ 661$ 661

$ 55 $ 945 $ 1,000Total Programmed Funding:

Frontage Rd, 65th St and Powell St Pavement MaintEmeryville: Various Locations on Frontage Road, 65th St, Powell St: Pavement maintenance

Project Name:Description:

EmeryvilleSponsor: EmeryvilleImplementing Agency:

ALA170072TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 15$ 15

OTHER LOCALCON $ 30$ 30

STPCON $ 225$ 225

$ 15 $ 255 $ 270Total Programmed Funding:

Widen Kato Rd from Warren Avenue to Milmont DriveFremont: Kato Road from Warren Avenue to Milmont Drive: Widen to provide left turn pockets, median island improvements,bike lanes on both sides of the roadway, and modify traffic signal at Kato Rd/Milmont Ave.

Project Name:Description:

FremontSponsor: FremontImplementing Agency:

ALA130001TIP ID: County: Alameda Local RoadSystem: 17-01-0006RTP ID: 2060000572CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 50$ 50OTHER LOCALPE $ 100$ 100OTHER LOCALPSE $ 250$ 250OTHER LOCALCON $ 2,000$ 2,000

RTP-LRPCON $ 10,290$ 10,290

$ 2,000 $ 10,290 $ 12,690$ 400Total Programmed Funding:

Fremont City Center Multi-Modal ImprovementsFremont: Capitol Ave from State St to Fremont Blvd: Construct roadway extension; Various locations around Fremont CityCenter and Fremont BART Station: Implement multi-modal improvements to enhance bike/ped connections. Project is phased

Project Name:Description:

FremontSponsor: FremontImplementing Agency:

ALA130025TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000568CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 943$ 943OTHER LOCALROW $ 5,300$ 5,300OTHER LOCALCON $ 2,244$ 2,244STPCON $ 6,266$ 6,266

$ 14,753$ 14,753Total Programmed Funding:

2019 TIP September 26, 201883S4 -

Page 12: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

City of Fremont Pavement RehabilitationFremont: Various Locations: Rehabilitate pavement and implement bike/ped improvements

Project Name:Description:

FremontSponsor: FremontImplementing Agency:

ALA170069TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 360$ 360OTHER LOCALCON $ 649$ 649

STPCON $ 3,419$ 3,419

$ 4,068 $ 4,428$ 360Total Programmed Funding:

Hayward - Main Street Complete StreetHayward: Main St from Mc Keever to D St: Reduce roadway from 4 to 2 lanes, construct bike lanes, widen sidewalks and addcomplete street elements

Project Name:Description:

HaywardSponsor: HaywardImplementing Agency:

ALA170065TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 175$ 175

STPPE $ 175$ 175

CMAQCON $ 500$ 500

OTHER LOCALCON $ 375$ 375

STPCON $ 1,000$ 1,000

$ 350 $ 1,875 $ 2,225Total Programmed Funding:

Winton Ave Complete StreetHayward: On Winton Ave from Hesperian Blvd to Santa Clara St: Rehabilitate pavement, upgrade curb ramps andstreetlights; On Winton Ave just east of Santa Clara St: Landscape median

Project Name:Description:

HaywardSponsor: HaywardImplementing Agency:

ALA170066TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 13$ 13

STPPE $ 88$ 88

OTHER LOCALCON $ 217$ 217

STPCON $ 1,662$ 1,662

$ 101 $ 1,879 $ 1,980Total Programmed Funding:

Livermore Pavement Rehabilitation - MTS RoutesLivermore: Various Locations: Repair and/or rehabilitate pavement

Project Name:Description:

LivermoreSponsor: LivermoreImplementing Agency:

ALA170068TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 165$ 165OTHER LOCALCON $ 405$ 405

STPCON $ 1,382$ 1,382

$ 1,787 $ 1,952$ 165Total Programmed Funding:

2019 TIP September 26, 201884S4 -

Page 13: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

Regional Planning Activities and PPM - AlamedaAlameda: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA170007TIP ID: County: Alameda Local RoadSystem: 17-10-0023RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 3,736$ 1,636 $ 1,535$ 565

OTHER LOCALPE $ 711$ 711STPPE $ 8,289$ 5,489 $ 2,800

$ 3,365 $ 1,535 $ 12,736$ 7,836Total Programmed Funding:

I-880 Integrated Corridor Management North SegmentAlameda County: I-880 corridor from I-880/I-980 IC to I-880/Davis St. IC: Install intelligent transportation system infrastructureto facilitate the active management of traffic that naturally diverts onto local streets due to incidents.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

ALA170040TIP ID: County: Alameda Local RoadSystem: 17-10-0013RTP ID: 2060000622CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll $ 1,637,687

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 14,278$ 14,278$ 14,278$ 14,278Total Programmed Funding:

Central Avenue Railroad Overpass at UPRRNewark: On Central Avenue at the Union Pacific Railroad tracks: Construct grade separation. No new lanes. Project isphased.

Project Name:Description:

NewarkSponsor: NewarkImplementing Agency:

ALA010052TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 2060000217CTIPS

Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 2,765$ 2,765OTHER LOCALPSE $ 238$ 238SALESTAX-MEASUREROW $ 2,235$ 2,235OTHER LOCALCON $ 146$ 146RTP-LRPCON $ 2,302$ 2,302

SALESTAX-MEASURECON $ 10,765$ 10,765XGENCON-CE $ 630$ 630

$ 2,302 $ 19,081$ 16,779Total Programmed Funding:

Thornton Avenue Pavement RehabilitationNewark: On Thornton Ave between Spruce and Hickory St: Rehabilitate pavement

Project Name:Description:

NewarkSponsor: NewarkImplementing Agency:

ALA170061TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 80$ 80OTHER LOCALCON $ 204$ 204

STPCON $ 592$ 592

$ 796 $ 876$ 80Total Programmed Funding:

2019 TIP September 26, 201885S4 -

Page 14: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

Oakland Parking and Mobility ManagementOakland: Montclair and select areas of Downtown: Implement demand-responsive parking management and transportationdemand management initiatives

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150050TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 1,300$ 1,300OTHER LOCALCON $ 284$ 284

$ 1,584$ 1,584Total Programmed Funding:

Oakland Various Streets ImprovementsIn Oakland: Citywide: Implement paving Improvements including pavement resurfacing, bicycle transportation, curb, gutter,drainage, sidewalks, pedestrian safety, and ADA compliant curb ramps

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170064TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 636$ 636

OTHER LOCALCON $ 634$ 634

STPCON $ 4,895$ 4,895

$ 636 $ 5,529 $ 6,165Total Programmed Funding:

42nd Ave. & High St. I-880 Access Improv.Oakland: In the vicinity of the I-880/42nd & High interchange: Widening and re-alignment of local streets Including modifiedtraffic signals and intersection improvements.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA991081TIP ID: County: Alameda Local RoadSystem: 17-01-0043RTP ID: 2060000076CTIPS

Air Quality Exempt Code: NON-EXEMPT77 27.4 28Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 800$ 800RIPPSE $ 1,000$ 1,000RIPROW $ 5,990$ 5,990SALESTAX-MEASURECON $ 10,000$ 10,000

$ 10,000 $ 17,790$ 7,790Total Programmed Funding:

Piedmont - Oakland Avenue ImprovementsPiedmont: Oakland Ave between Grand Ave and western city limits: Pavement rehabilitation and installation of bicycle andpedestrian safety improvements

Project Name:Description:

PiedmontSponsor: PiedmontImplementing Agency:

ALA170084TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 60$ 60OTHER LOCAL $ 281CON $ 281

STP $ 168CON $ 168

$ 449 $ 509$ 60Total Programmed Funding:

2019 TIP September 26, 201886S4 -

Page 15: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

Pavement Rehabilitation Hacienda Business ParkPleasanton: Various locations near the Hacienda Business Park: Pavement rehabilitation and bike/ped improvements

Project Name:Description:

PleasantonSponsor: PleasantonImplementing Agency:

ALA170070TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 70$ 70OTHER LOCALCON $ 800$ 800

STPCON $ 1,095$ 1,095

$ 1,895 $ 1,965$ 70Total Programmed Funding:

SR 185- E. 14th St/ Hesperian Blvd/150th AveSan Leandro: 150th/E. 14th/Hesperian: Construct NB left turn Ln from Hesperian to E.14th, EB left turn Ln from E.14th to150th Av & SB Ln from Hesperian to 150th and other traffic circulation improvements. Project is phased.

Project Name:Description:

San LeandroSponsor: San LeandroImplementing Agency:

ALA050002TIP ID: County: Alameda Local RoadSystem: 17-01-0007RTP ID: 2060000278CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projects185 3.64 3.86Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 160$ 160SALESTAX-MEASUREPE $ 69$ 69OTHER LOCALPSE $ 1,001$ 1,001SALESTAX-MEASUREPSE $ 409$ 409OTHER LOCALROW $ 175$ 175SALESTAX-MEASUREROW $ 1,018$ 1,018OTHER LOCAL $ 88CON $ 2,678$ 2,590

RTP-LRPCON $ 891$ 891

SALESTAX-MEASURE $ 763CON $ 763

SALESTAX-MEASURECON-CE $ 40$ 40

SALESTAX-MEASUREROW- $ 28$ 28

$ 2,630 $ 852 $ 891 $ 7,232$ 2,859Total Programmed Funding:

San Leandro Washington Avenue RehabilitationSan Leandro: Washington Ave from W. Juana Ave to Castro St: Reconstruct roadway

Project Name:Description:

San LeandroSponsor: San LeandroImplementing Agency:

ALA170075TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 10$ 10

STPPE $ 73$ 73

OTHER LOCALCON $ 127$ 127

STPCON $ 975$ 975

$ 83 $ 1,102 $ 1,185Total Programmed Funding:

Union City-Dyer Street Pavement RehabilitationUnion City: On Dyer St from Alvarado Blvd to Deborah Dr: Rehabilitate pavement

Project Name:Description:

Union CitySponsor: Union CityImplementing Agency:

ALA170071TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 55$ 55OTHER LOCALCON $ 113$ 113

STPCON $ 872$ 872

$ 985 $ 1,040$ 55Total Programmed Funding:

End of section

2019 TIP September 26, 201887S4 -

Page 16: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 201888S4 -

Page 17: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Central Avenue Safety ImprovementsAlameda: On Central Ave from Main St to Sherman St: Implement multimodal street improvements including reduction from 4to 3 lanes, a center turn lane, bike lanes, a 2-way separated bikeway, 2 traffic signals, and other safety improvements.

Project Name:Description:

Alameda (City)Sponsor: Alameda (City)Implementing Agency:

ALA170049TIP ID: County: Alameda StateSystem: 17-01-0004RTP ID: 2060000625CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant Project61 21.22 21.97Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 557$ 557ATP-STCON $ 7,326$ 7,326

CMAQCON $ 1,487$ 1,487

OTHER LOCALCON $ 844$ 844

STPCON $ 2,000$ 2,000

$ 11,657 $ 12,214$ 557Total Programmed Funding:

Cross Alameda Trail (includes SRTS component)City of Alameda: Between Webster St and Sherman St: Construct a new trail with an on-street portion.

Project Name:Description:

Alameda (City)Sponsor: Alameda (City)Implementing Agency:

ALA150007TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000586CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGPSE $ 226$ 226OTHER LOCALPSE $ 24$ 24SALESTAX-MEASUREPSE $ 6$ 6ATP-REGCON $ 2,005$ 2,005OTHER LOCALCON $ 207$ 207SALESTAX-MEASURECON $ 53$ 53

$ 2,521$ 2,521Total Programmed Funding:

Clement Avenue Complete StreetsAlameda: On Clement Avenue between Broadway and Grand St: Complete street improvements including Class II bike lanes,curb extensions, flashing beacons, bus shelters, sidewalk/curb ramp improvements, railroad track removal, resurfacing andtrees

Project Name:Description:

Alameda (City)Sponsor: Alameda (City)Implementing Agency:

ALA170073TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 567$ 567

OTHER LOCALPE $ 74$ 74

CMAQCON $ 2,451$ 2,451

OTHER LOCALCON $ 578$ 578

STPCON $ 2,000$ 2,000

$ 641 $ 5,029 $ 5,670Total Programmed Funding:

2019 TIP September 26, 201889S4 -

Page 18: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Cherryland/Ashland/CastroValley/Fairview BikePedCherryland, Ashland, Castro Valley, Fairview, San Lorenzo and other Unincorporated Areas of Alameda County: VariousLocations: Sidewalk, bike lanes and other safety improvements in the vicinity of Schools within unincorporated AlamedaCounty area.

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA050035TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000336CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 29$ 29CMAQPE $ 130$ 130EARMARKPE $ 1,059$ 1,059OTHER LOCALPE $ 1,195$ 1,195ATP-REGPSE $ 1,922$ 650 $ 1,272

OTHER LOCALPSE $ 432$ 205 $ 227

OTHER LOCAL $ 212ROW $ 399$ 187ATP-REGCON $ 1,233$ 858 $ 375

CMAQ $ 8,300CON $ 8,600$ 300EARMARKCON $ 3,330$ 3,330OTHER LOCAL $ 2,800CON $ 3,249$ 369 $ 80

RIP-TECON $ 1,150$ 1,150RTP-LRPCON $ 8,340$ 8,340

STP $ 1,000CON $ 1,000

$ 1,727 $ 227 $ 12,312 $ 8,340 $ 32,068$ 9,462Total Programmed Funding:

Active Oakland: A Comprehensive SR2S ProgramOakland: In Oakland Unified School District's most disadvantages schools: Promote walking and cycling

Project Name:Description:

Alameda CountySponsor: Alameda CountyImplementing Agency:

ALA170047TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGCON $ 977$ 977

$ 977 $ 977Total Programmed Funding:

Alameda County Safe Routes to SchoolAlameda County: Countywide: SR2S Program including education & outreach in various K-12 schools, ridesharing, & projectdevelopment.

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA110033TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 2060000490CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 13,025$ 13,025OTHER LOCALCON $ 2,569$ 1,569 $ 1,000

SALESTAX-MEASURECON $ 1,087$ 1,087STPCON $ 3,709$ 2,400 $ 1,309

$ 2,309 $ 20,390$ 18,081Total Programmed Funding:

East Bay GreenwayAlameda County: Generally along the BART alignment from Lake Merritt BART station to South Hayward BART station: Installa trail facility consisting of Class I & Class IV bikeway facilities. Includes 2 road diet segments & intersection modifications

Project Name:Description:

Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:

ALA150008TIP ID: County: Alameda PublicSystem: 17-01-0001RTP ID: 2060000586CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 2,656$ 2,656SALESTAX-MEASUREENV $ 3,845$ 3,845RTP-LRPPSE $ 22,000$ 22,000

RTP-LRPROW $ 14,000$ 14,000

RTP-LRPCON $ 161,000$ 161,000

$ 197,000 $ 203,501$ 6,501Total Programmed Funding:

2019 TIP September 26, 201890S4 -

Page 19: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

San Pablo Ave & Buchanan St Pedestrian Imps.Albany: Various Locations on Buchanan St and San Pablo Ave: Streetscape improvements including medians, bulb outs,signal modifications, striping of high visibility crosswalks. Project is phased.

Project Name:Description:

AlbanySponsor: AlbanyImplementing Agency:

ALA170088TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

123 4.873 4.873Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STPSE $ 335$ 335OTHER LOCALPSE $ 65$ 65OTHER LOCALCON $ 535$ 535

RTP-LRPCON $ 4,000$ 4,000

STPCON $ 340$ 340

$ 535 $ 340 $ 4,000 $ 5,275$ 400Total Programmed Funding:

Hearst Avenue Complete StreetsIn Berkeley: Hearst St from Shattuck Ave to Gayley/La Loma: Implement access and safety improvements to DowntownBerkeley PDA for all modes, includes a road diet from Shattuck Ave to Euclid Ave

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA130028TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000573CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 545$ 545OTHER LOCALCON $ 723$ 723STPCON $ 2,256$ 2,256

$ 3,524$ 3,524Total Programmed Funding:

Bay Trail Shoreline Access Staging AreaBerkeley: Berkeley Marina: Construct segment 3 of Bay Trail Extension, construct new public restroom, and renovate existingpublic parking area and windsurf staging area.

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA130035TIP ID: County: Alameda PublicSystem: 17-01-0001RTP ID: 2060000583CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities80Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 77$ 77OTHER STATEPE $ 204$ 204OTHER LOCALCON $ 903$ 903OTHER STATECON $ 456$ 456STPCON $ 500$ 500

$ 2,140$ 2,140Total Programmed Funding:

9th St Bicycle Blvd Extension Pathway Ph IIIn Berkeley: Between the 9th Street Bicycle Boulevard (south of Heinz Avenue) and Murray Street: Install a shared-use path

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA150048TIP ID: County: Alameda PublicSystem: 17-01-0001RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 20$ 20OTHER LOCALENV $ 1$ 1ATP-STPSE $ 125$ 125OTHER LOCALPSE $ 7$ 7ATP-STCON $ 705$ 705OTHER LOCALCON $ 37$ 37

$ 895$ 895Total Programmed Funding:

2019 TIP September 26, 201891S4 -

Page 20: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

John Muir Safe Routes to SchoolBerkeley: Along Claremont south of Ashby near John Muir School: Install speed feedback signs; At the intersection ofClaremont and Claremont Crescent: Implement crossing improvements

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA170054TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 38$ 38ATP-REGCON $ 270$ 270OTHER LOCALCON $ 66$ 66

$ 374$ 374Total Programmed Funding:

Southside Complete Streets & Transit ImprovementBerkeley: Various locations south of UC Berkeley: Construct two-way cycle tracks, signal mods, transit imps and TSP, loadingzone imps, pedestrian safety imps, and repaving; On Telegraph from Channing to Bancroft: Implement road diet for transitonly lane

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA170067TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000631CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 772$ 772

OTHER LOCALPE $ 159$ 159

STPPE $ 228$ 228

CMAQCON $ 3,658$ 3,658

OTHER LOCALCON $ 2,135$ 2,135

STPCON $ 2,463$ 2,463

$ 1,159 $ 8,256 $ 9,415Total Programmed Funding:

Berkeley - Sacramento St Complete Streets ImpsBerkeley: On Sacramento Street at 4 intersections (Virginia, Delaware, University, & Addison): Construct bike/ped crossingimprovements; On Acton between Virginia & Delaware and on Delaware between Acton and Sacramento: Construct bikewayimprovements

Project Name:Description:

BerkeleySponsor: BerkeleyImplementing Agency:

ALA170094TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000654CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STPSE $ 185$ 185

SALESTAX-MEASUREPSE $ 33$ 33

ATP-STCON $ 1,357$ 1,357

SALESTAX-MEASURECON $ 239$ 239

$ 218 $ 1,596 $ 1,814Total Programmed Funding:

Doolittle Drive Bay TrailOakland: Along Doolittle Dr. from the MLK Regional Shoreline Center near Langley Street 2,300 feet to the north end of theexisting SF Bay Trail at the fishing dock, north of Swan Way: Construct SF Bay Trail

Project Name:Description:

East Bay Regional Park District (EBRPD)Sponsor: East Bay Regional Park DistrictImplementing Agency:

ALA170077TIP ID: County: Alameda PublicSystem: 17-01-0001RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities61Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 500$ 500OTHER LOCALPSE $ 800$ 800ATP-STCON $ 4,000$ 4,000

OTHER LOCALCON $ 3,000$ 3,000

SALESTAX-MEASURECON $ 2,800$ 2,800

$ 9,800 $ 11,100$ 1,300Total Programmed Funding:

2019 TIP September 26, 201892S4 -

Page 21: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Emeryville Greenway Crossing ImprovementsEmeryville: Greenway trail crossings at 65th, 66th, and 67th: Improve crossings with raised crosswalks, RRFBs, parkingadjustments and signage and add bike share station

Project Name:Description:

EmeryvilleSponsor: EmeryvilleImplementing Agency:

ALA170050TIP ID: County: Alameda PublicSystem: 17-01-0001RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER STATEENV $ 25$ 25OTHER LOCALPSE $ 25$ 25ATP-REGCON $ 265$ 265

OTHER LOCALCON $ 15$ 15

$ 280 $ 330$ 50Total Programmed Funding:

Complete Streets Upgrade of Relinquished SR84Fremont: Thornton Ave (Blacow Rd to Fremont Blvd), Fremont Blvd (Alder Ave to Mattos Dr) and Peralta Blvd (Fremont Blvdto Sequoia Rd): Implement complete streets improvements; On Peralta Blvd (Fremont Blvd to approx. 0.1 miles east):Implement road diet

Project Name:Description:

FremontSponsor: FremontImplementing Agency:

ALA170076TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

84 7.0 8.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 1,185$ 1,185

OTHER LOCALPE $ 154$ 154

CMAQCON $ 3,000$ 3,000

OTHER LOCALCON $ 844$ 844

STPCON $ 3,510$ 3,510

$ 1,339 $ 7,354 $ 8,693Total Programmed Funding:

Bay Bridge ParkOakland: At the Oakland Touchdown of the new East Span of the Bay Bridge: Bay Bridge Park (Project previously titled"SFOBB Gateway Park")

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: CaltransImplementing Agency:

ALA110104TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000535CTIPS

Air Quality Exempt Code: NON-EXEMPT80 1.2 2.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 2,000$ 2,000BTPSE $ 2,500$ 2,500OTHER LOCALPSE $ 1,000$ 1,000BTCON $ 6,000$ 6,000

OTHER LOCALCON $ 5,000$ 5,000

$ 11,000 $ 16,500$ 5,500Total Programmed Funding:

Improved Bike/Ped Access to East Span of SFOBBIn Oakland: In the vicinity of the East Span of the San Francisco-Oakland Bay Bridge: Construct improved bicycle andpedestrian access. Project is phased.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: CaltransImplementing Agency:

ALA130030TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000575CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 1,000$ 1,000BTPSE $ 3,500$ 3,500BT $ 2,000CON $ 2,000

RTP-LRPCON $ 30,000$ 30,000

$ 2,000 $ 30,000 $ 36,500$ 4,500Total Programmed Funding:

2019 TIP September 26, 201893S4 -

Page 22: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Bay Bridge Forward-Commuter Parking Access Imps.Albany and Oakland: Adjacent to Park and Ride lots at I-80/Buchanan Ave, I-880/High St, I-880/Fruitvale:Bicycle/pedestrian/bus stop improvements to facilitate safer access to and from lots; toll credits applied in lieu of match

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

ALA170012TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 2060000613CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 94,054

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCAL $ 820CON $ 820

$ 820 $ 820Total Programmed Funding:

Oakland Waterfront Bay TrailOakland: From Emeryville border to San Leandro border; Construct new segments of the Bay Trail.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA070039TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000399CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 3,738$ 3,738OTHER LOCALPSE $ 530$ 430 $ 100

CMAQCON $ 899$ 899OTHER FEDERALCON $ 643$ 643OTHER LOCALCON $ 1,125$ 1,025 $ 100

OTHER STATECON $ 1,664$ 1,664RTP-LRPCON $ 30,000$ 30,000

$ 200 $ 30,000 $ 38,599$ 8,399Total Programmed Funding:

Lake Merritt Improvement ProjectIn Oakland: Adjacent to Lake Merritt: Reconfigure roadways and construct paths, walls, structures, lighting, parking andlandscaping; no added capacity

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA110072TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000517CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKCON $ 828$ 828$ 828$ 828Total Programmed Funding:

Lake Merritt to Bay Trail Bike/Ped BridgeOakland: Over Embarcadero and UPRR tracks under I880 between the Estuary and Lake Merritt along the Channel:Construct ADA accessible bicycle pedestrian bridge to link Bay Trail to Lake Merritt.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA130003TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000536CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 833$ 833ATP-REGPSE $ 2,885$ 2,885ATP-REGROW $ 325$ 325OTHER LOCAL $ 100CON $ 100

OTHER STATECON $ 1,000$ 1,000

RTP-LRPCON $ 14,069$ 14,069

$ 100 $ 15,069 $ 19,212$ 4,043Total Programmed Funding:

2019 TIP September 26, 201894S4 -

Page 23: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

7th Street West Oakland Transit Village, Phase IIIn Oakland: On 7th Street between Wood Street and Peralta Street: Construct road diet, bicycle lanes, sidewalkenhancement, pedestrian amenities, traffic signal mods, street and pedestrian lights, storm drain system mods, and streetresurfacing.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA130014TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000567CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 352$ 352OTHER LOCALCON $ 511$ 511SALESTAX-MEASURECON $ 456$ 456STPCON $ 3,288$ 3,288

$ 4,607$ 4,607Total Programmed Funding:

Lakeside Complete Streets and Road DietOakland: Along Harrison Street and Lakeside Drive between 19th Street and Grand Avenue: implement road diet and installbike and pedestrian facilities

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA130024TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000559CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 965$ 965CMAQCON $ 4,754$ 4,754OTHER LOCALCON $ 3,340$ 3,340SALESTAX-MEASURECON $ 2,200$ 2,200STPCON $ 4,446$ 4,446

$ 15,705$ 15,705Total Programmed Funding:

International Boulevard Improvement ProjectOakland: International Boulevard (1st Ave to Durant) and East 12th Street (1st Ave to 14th Ave): Install pedestrian scalelighting along the corridor, repair sidewalk damage, and install curb ramps.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150010TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000587CTIPS

Air Quality Exempt Code: 1.18 - EXEMPT (40 CFR 93.126) - Lighting improvementsRoute: Post Mile From: Post Mile To: Toll $ 284,571

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPSE $ 279$ 279ATP-STCON $ 2,481$ 2,481OTHER LOCALCON $ 3,494$ 3,494

$ 6,254$ 6,254Total Programmed Funding:

Laurel Access to Mills, Maxwell Park and SeminaryOakland: MacArthur Boulevard from High St to Simmons St: Implement bicycle and pedestrian improvements

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150012TIP ID: County: Alameda Local RoadSystem: 17-01-0007RTP ID: 2060000588CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPSE $ 530$ 530SALESTAX-MEASUREROW $ 50$ 50ATP-STCON $ 3,598$ 3,598SALESTAX-MEASURECON $ 2,729$ 2,729SB1CON $ 150$ 150

$ 7,057$ 7,057Total Programmed Funding:

2019 TIP September 26, 201895S4 -

Page 24: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Oakland: Telegraph Ave Bike/Ped Imps and Road DietHSIP7-04-014: In Oakland: Telegraph Ave from 29th to 45th St: Install crosswalk enhancements, painted bulb-outs, andpainted median refuges; from 29th to 41st St: Implement road diet with buffered bike lanes; Telegraph at 29th and 45th St:modify signals

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150042TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000599CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HSIPPE $ 199$ 199OTHER LOCALPE $ 22$ 22HSIPCON $ 1,145$ 1,145

OTHER LOCALCON $ 127$ 127

$ 1,272 $ 1,494$ 221Total Programmed Funding:

Oakland: Shattuck and Claremont Bike/Ped ImpsHSIP7-04-016 Oakland: On Claremont from Telegraph to Clifton: Implement road diet with bike lanes; Shattuck at 49th,51St, 59th St, Alactraz: Construct crosswalk enhancements, RRFBs, bulb-out, and/or median refuges; at Shattuck/Alcatraz:prot. left-turn

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150043TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000599CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HSIPPE $ 181$ 181OTHER LOCALPE $ 20$ 20HSIP $ 1,223CON $ 1,223

OTHER LOCAL $ 136CON $ 136

$ 1,359 $ 1,560$ 201Total Programmed Funding:

19th St BART to Lake Merritt Urban GreenwayIn Oakland: Between Broadway and Harrison Street: Improvements include sidewalk widening and bulbouts, ped crossingimprovements, bikelanes, new traffic signals and signal mods, street/ped lighting, signage, and landscape improvements.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150044TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000602CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll $ 525,670

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 150$ 150ATP-STPSE $ 550$ 550ATP-STCON $ 3,883$ 3,883

OTHER LOCALCON $ 100$ 100

$ 3,983 $ 4,683$ 700Total Programmed Funding:

Oakland: Telegraph Avenue Complete StreetsOakland: on Telegraph Avenue between 20th St and 41st St: Implement complete street project inc. road diet, buffered bikelanes, ped crossing improvements, bulbouts, bus boarding islands, traffic signal improvements, and pavement repair.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA150047TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000603CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll $ 522,344

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGENV $ 175$ 175ATP-REGPSE $ 702$ 702ATP-REGCON $ 3,677$ 3,677

OTHER LOCALCON $ 360$ 360

$ 4,037 $ 4,914$ 877Total Programmed Funding:

2019 TIP September 26, 201896S4 -

Page 25: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Oakland - 14th Street Safe Routes in the CityIn Oakland: On 14th St between Brush St and Oak St: Reduce travel lanes from 4 to 2, add paved Class IV protected bicyclelanes; transit boarding islands; improve ped facilities including refuges, crossings, signals; and implement rain gardens.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170043TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000624CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 807$ 807ATP-STPSE $ 1,235$ 1,235

OTHER LOCALPSE $ 279$ 279

ATP-STCON $ 9,343$ 9,343

OTHER LOCALCON $ 2,368$ 2,368

$ 1,514 $ 11,711 $ 14,032$ 807Total Programmed Funding:

Fruitvale Alive Bike/Ped Gap ClosureIn Oakland: On Fruitvale Ave between Alameda Ave and E. 12th: Install class 4 cycle tracks and landscaped buffers, widensidewalks, improve ped crossings, add ped scale lighting, reconfigure conflicting auxil and slip lanes.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170051TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 250$ 250ATP-STPSE $ 800$ 800OTHER LOCALPSE $ 466$ 466ATP-STCON $ 5,000$ 5,000

OTHER LOCALCON $ 1,975$ 1,975

ATP-STROW- $ 50$ 50

$ 6,975 $ 8,541$ 1,566Total Programmed Funding:

Oakland Fruitvale Ave Bike/Ped Imprvmnts H8-04-014Oakland: Fruitvale Ave from E 10th St to E 23th St: H8-04-014 Install crosswalk enhancements, RRFBs, signal upgrades andmodifications, signing, striping, markings. Implement road diet, parking lane reduction and Class II bicycle lane.

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170052TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000625CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HSIPPE $ 257$ 257OTHER LOCALPE $ 84$ 84HSIPCON $ 848$ 848

OTHER LOCALCON $ 277$ 277

$ 1,126 $ 1,467$ 341Total Programmed Funding:

Oakland 35th Ave Bike/Ped Improvements H8-04-015Oakland: 35th Ave from San Leandro St to Sutter St: H8-04-015 Install crossing enhancements, HAWKs, RRFBs, signalupgrades/modifications, signing, striping, markings; 35th Ave from Int Blvd to E 12th St: Implement road diet, Class II bufferedbicycle lane

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170053TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HSIPPE $ 508$ 508OTHER LOCALPE $ 166$ 166HSIPCON $ 1,680$ 1,680

OTHER LOCALCON $ 549$ 549

$ 2,230 $ 2,904$ 674Total Programmed Funding:

2019 TIP September 26, 201897S4 -

Page 26: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyBike/Pedestrian Projects

Lakeside Family StreetsIn Oakland: On Harrison St between 20th St and 27th St, and along Grand Ave from west of Harrison to east of Bay Place:install cycle track, parking protected bikeways and protected intersection; On Harrison between Grand and 27th St: implementroad diet

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170063TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 400$ 400

OTHER LOCALPE $ 53$ 53

CMAQCON $ 2,446$ 2,446

OTHER LOCALCON $ 570$ 570

STPCON $ 1,946$ 1,946

$ 453 $ 4,962 $ 5,415Total Programmed Funding:

Oakland - Crossing to SafetyOakland: At Park Blvd/Excelsior Ave-Grosvenor Place and Park Blvd/13th Ave-East 38th St: Provide sidewalks and shorterpedestrian crossings; At the Park Blvd intersection near Edna Brewer Middle School: Install a HAWK beacon

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA170078TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 150$ 150ATP-REGPSE $ 331$ 331

ATP-STCON $ 1,564$ 1,564

OTHER LOCALCON $ 72$ 72

$ 331 $ 1,636 $ 2,117$ 150Total Programmed Funding:

End of section

2019 TIP September 26, 201898S4 -

Page 27: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyPort, Freight and Rail Projects

Oakland Army Base Infrastructure ImprovementsIn Oakland: At former Oakland Army Base: Implementing Army Base Infrastructure Master Plan including TCIF funded OHITimprovements implemented by City of Oakland. For the related Port project, see ALA090026. Project also references RTP ID17-01-0017

Project Name:Description:

OaklandSponsor: OaklandImplementing Agency:

ALA110046TIP ID: County: Alameda Port/FreightSystem: 17-01-0016RTP ID: 2060000508CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 4,269$ 4,269OTHER LOCALPE $ 3,770$ 3,770FED-DISCPE $ 2,000$ 2,000OTHER LOCALPSE $ 3,000$ 3,000PRIVATEPSE $ 13,200$ 13,200OTHER LOCALCON $ 18,000$ 18,000PROPCON $ 176,341$ 176,341RTP-LRPCON $ 34,000$ 34,000

SALESTAX-MEASURECON $ 46,000$ 12,000 $ 17,000 $ 17,000

$ 17,000 $ 17,000 $ 34,000 $ 300,580$ 232,580Total Programmed Funding:

End of section

2019 TIP September 26, 201899S4 -

Page 28: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Alameda CountyPort, Freight and Rail Projects

The page left Intentionally blank

2019 TIP September 26, 2018100S4 -

Page 29: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyState Highway Projects

I-680 / SR 4 Interchange Reconstruction - Phase 3In Pacheco: At the I 680/Route 4 interchange: Widen SR4 in the median to provide a third lane in each direction from MorelloAvenue to Port Chicago (SR242). Work includes widening of bridges within project limits.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-130046TIP ID: County: Contra Costa StateSystem: 17-02-0019RTP ID: 2060000579CTIPS

Air Quality Exempt Code: NON-EXEMPT4 11.2 15.1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 5,000$ 5,000SALESTAX-MEASUREPSE $ 9,800$ 9,800RIPROW $ 4,800$ 4,800SALESTAX-MEASUREROW $ 13,900$ 13,900ACCON $ 21,596$ 21,596

RIPCON $ 18,800$ 18,800

SALESTAX-MEASURECON $ 22,900$ 22,900

SB1CON $ 38,399$ 38,399

RIPROW- $ 300$ 300SALESTAX-MEASUREROW- $ 700$ 700

$ 82,895 $ 18,800 $ 136,195$ 34,500Total Programmed Funding:

SR 4 Integrated Corridor ManagementContra Costa County: Along SR 4 between I-80 in Hercules to the SR 4/SR 160 Interchange in the City of Antioch: ImplementIntegrated Corridor Management along corridor.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-150013TIP ID: County: Contra Costa StateSystem: 17-02-0010RTP ID: 2060000596CTIPS

Air Quality Exempt Code: NON-EXEMPT4 0 31.0Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER FEDERALPE $ 200$ 200SALESTAX-MEASUREPE $ 200$ 200SALESTAX-MEASUREPSE $ 200$ 200RTP-LRPCON $ 14,400$ 14,400

$ 14,400 $ 15,000$ 600Total Programmed Funding:

SR-4 Operational Improvements - Initial PhasesContra Costa County: On SR-4 between I-680 and Bailey Road: Implement operational improvements including addinggeneral purpose and auxiliary lanes at various locations

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-170018TIP ID: County: Contra Costa StateSystem: 17-02-0020RTP ID: 2060000624CTIPS

Air Quality Exempt Code: NON-EXEMPT4Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 2,100$ 2,100

RIP $ 7,500PSE $ 7,500

SALESTAX-MEASURE $ 250ROW $ 250

RTP-LRPCON $ 134,150$ 134,150

$ 2,100 $ 7,750 $ 134,150 $ 144,000Total Programmed Funding:

2019 TIP September 26, 2018101S4 -

Page 30: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyState Highway Projects

Reconstruct I-80/San Pablo Dam Rd InterchangeSan Pablo: I-80/San Pablo Dam Rd I/C: Reconstruct I/C-relocating WB El Portal on-ramp to the full I/C northwards, providingaccess to McBryde through a new road from SPDR I/C, and replacing Riverside ped OC. CON is phased.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-070035TIP ID: County: Contra Costa StateSystem: 17-02-0021RTP ID: 2060000376CTIPS

Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll $ 802,900

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 2,369$ 2,369BTPSE $ 583$ 583OTHER LOCALPSE $ 2,417$ 2,417RTP-LRPPSE $ 1,936$ 1,936

SALESTAX-MEASUREPSE $ 3,906$ 3,906BTROW $ 7,417$ 7,417RIP $ 9,200ROW $ 9,200

RTP-LRPROW $ 4,254$ 4,254

SALESTAX-MEASUREROW $ 801$ 801ATP-REGCON $ 2,000$ 2,000OTHER LOCALCON $ 7,683$ 583 $ 7,100

RIPCON $ 15,000$ 15,000RTP-LRPCON $ 57,718$ 57,718

SALESTAX-MEASURECON $ 2,544$ 2,544STPCON $ 1,100$ 1,100

$ 7,100 $ 9,200 $ 63,908 $ 118,928$ 38,720Total Programmed Funding:

SR 239 - New State Highway StudySR 239 between SR4 in Brentwood and I-205 in Tracy: Conduct environmental and design studies to create a new alignmentfor SR239 and develop corridor improvements from Brentwood to Tracy.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-110066TIP ID: County: Contra Costa StateSystem: 17-02-0017RTP ID: 2060000526CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.C239Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 12,906$ 8,209 $ 4,697

OTHER LOCALPE $ 3,338$ 2,164 $ 1,174

RTP-LRPPE $ 13,000$ 13,000

$ 5,871 $ 13,000 $ 29,244$ 10,373Total Programmed Funding:

SR 242 / Clayton Road Interchange ImprovementsConcord: At the SR242/Clayton Rd Interchange: Construct NB on-ramp and SB off-ramp

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-070024TIP ID: County: Contra Costa StateSystem: 17-02-0016RTP ID: 2060000375CTIPS

Air Quality Exempt Code: NON-EXEMPT242Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 2,400$ 2,400RTP-LRPPSE $ 3,110$ 3,110

SALESTAX-MEASUREPSE $ 2,590$ 2,590RTP-LRPROW $ 16,200$ 16,200

RTP-LRPCON $ 41,700$ 41,700

$ 61,010 $ 66,000$ 4,990Total Programmed Funding:

2019 TIP September 26, 2018102S4 -

Page 31: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyState Highway Projects

I-680/SR 4 I/C Reconstruction - Phases1 & 2Contra Costa Acounty: I-680/SR4 I/C: Reconstruct I/C, provide 2 lane direct connector from NB 680 to WB SR4 w/slip rampsat Pacheco Blvd, and 2 lane direct WB SR4 to SB I-680. Phases 1 and 2. Env Doc covers all phases.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-010023TIP ID: County: Contra Costa StateSystem: 17-02-0019RTP ID: 2060000212CTIPS

Air Quality Exempt Code: NON-EXEMPT680 20.2 22.2Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RTP-LRPPSE $ 18,649$ 18,649

SALESTAX-MEASUREPSE $ 2,000$ 2,000

RTP-LRPROW $ 4,870$ 4,870

RTP-LRPCON $ 132,084$ 132,084

$ 2,000 $ 155,603 $ 157,603Total Programmed Funding:

I-680 SB HOV Lane CompletionContra Costa County: I-680 from North Main Street to Livorna in the southbound direction: Construct a HOV lane

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-050028TIP ID: County: Contra Costa StateSystem: 17-02-0022RTP ID: 2060000338CTIPS

Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll $ 637,388

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 3,375$ 3,375SALESTAX-MEASUREENV $ 2$ 2BTPSE $ 6,316$ 6,316SALESTAX-MEASUREPSE $ 614$ 614BTROW $ 341$ 341BTCON $ 3,819$ 3,819

RIPCON $ 15,557$ 15,557

SALESTAX-MEASURECON $ 41,039$ 41,039

TOLLSCON $ 5,140$ 5,140

$ 60,415 $ 5,140 $ 76,203$ 10,648Total Programmed Funding:

I-680 NB Exp Lane Conversion/HOV Ext & Op ImpContra Costa County: NB I680 from Livorna Rd to SR242: Extend HOV lane; NB I680 from Livorna to Benicia-MartinezBridge: Convert HOV to EL; NB I680 from N Main St to Treat Blvd and from Livorna Rd to Rudgear Rd: Operational imps suchas auxiliary lanes

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Metropolitan TransportationImplementing Agency:

CC-170017TIP ID: County: Contra Costa StateSystem: 17-02-0012RTP ID: 2060000624CTIPS

Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 6,700$ 6,700STPENV $ 8,000$ 8,000RTP-LRPPSE $ 34,200$ 34,200

RTP-LRPROW $ 5,000$ 5,000

RTP-LRPCON $ 171,100$ 171,100

$ 210,300 $ 225,000$ 14,700Total Programmed Funding:

I-680 Advanced TechologiesContra Costa County: I-680 from the Solano County line to the Alameda County line: Deploy a suite of technology-basedsolutions to maximize the efficiency of I-680.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-170062TIP ID: County: Contra Costa StateSystem: 17-02-0051RTP ID: 2060000650CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 4,800$ 4,800SALESTAX-MEASUREPSE $ 5,400$ 5,400

RTP-LRPCON $ 37,500$ 37,500

SALESTAX-MEASURECON $ 5,000$ 5,000

$ 5,400 $ 5,000 $ 37,500 $ 52,700$ 4,800Total Programmed Funding:

End of section

2019 TIP September 26, 2018103S4 -

Page 32: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyState Highway Projects

The page left Intentionally blank

2019 TIP September 26, 2018104S4 -

Page 33: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Laurel Road ExtensionAntioch: On Laurel Road between Kirk Lane and SR4 Bypass: Construct new 4 lane divided extension with bike lanes,sidewalks, and bus stops.

Project Name:Description:

AntiochSponsor: AntiochImplementing Agency:

CC-070008TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 2060000373CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 300$ 300OTHER LOCALPSE $ 600$ 600

OTHER LOCALROW $ 50$ 50RTP-LRPCON $ 10,000$ 10,000

$ 600 $ 10,000 $ 10,950$ 350Total Programmed Funding:

Slatten Ranch Road Extension Phase IAntioch: Slatten Ranch Road between Hillcrest Avenue to Wicklow Road: Phase I - Construct new 4 lane road.

Project Name:Description:

AntiochSponsor: AntiochImplementing Agency:

CC-070009TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 2060000374CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 50$ 50OTHER LOCALPSE $ 300$ 300OTHER LOCALCON $ 3,600$ 3,600

$ 3,600 $ 3,950$ 350Total Programmed Funding:

Antioch - L Street Pathway to TransitAntioch: On L Street from Hwy 4 to Antioch Marina: Widen street in various locations and restripe to provide continuous bikelanes and sidewalks, upgrade existing traffic signals, install new bus shelters

Project Name:Description:

AntiochSponsor: AntiochImplementing Agency:

CC-170035TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 25$ 25

OTHER LOCALPSE $ 225$ 225

OTHER LOCALROW $ 100$ 100

CMAQCON $ 1,223$ 1,223

OTHER LOCALCON $ 1,227$ 1,227

OTHER LOCALCON-CE $ 200$ 200

$ 350 $ 2,650 $ 3,000Total Programmed Funding:

Antioch Pavement RehabilitationIn Antioch: On various roadways: Pavement Rehabilitation (Grind/overlay, plug pavement base failures, and/or cape seal)replace concrete curb ramps, curbs and sidewalks, replace traffic signal loops, place rubberized cape seal and/or trafficrestriping.

Project Name:Description:

AntiochSponsor: AntiochImplementing Agency:

CC-170036TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 45$ 45

OTHER LOCALROW $ 5$ 5

OTHER LOCALCON $ 676$ 676

STPCON $ 2,474$ 2,474

$ 50 $ 3,150 $ 3,200Total Programmed Funding:

2019 TIP September 26, 2018105S4 -

Page 34: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Brentwood Boulevard Widening - North (Phase I)Brentwood: Brentwood Boulevard from Havenwood Avenue to Homecoming Way: Phase I-Widen from 2 to 4 lanes includinga new parallel bridge over Marsh Creek, traffic signal modifications, and utilities undergrounding.

Project Name:Description:

BrentwoodSponsor: BrentwoodImplementing Agency:

CC-070011TIP ID: County: Contra Costa Local RoadSystem: 17-02-0030RTP ID: 2060000374CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 35$ 35OTHER LOCALPSE $ 600$ 600

OTHER LOCALROW $ 170$ 170OTHER LOCALCON $ 5,895$ 5,895

$ 6,495 $ 6,700$ 205Total Programmed Funding:

Lone Tree Way UndercrossingBrentwood: On Lone Tree Way at the UPRR track: Construct 4-lane grade separation undercrossing.

Project Name:Description:

BrentwoodSponsor: BrentwoodImplementing Agency:

CC-070013TIP ID: County: Contra Costa Local RoadSystem: 17-02-0035RTP ID: 2060000374CTIPS

Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 2,010$ 2,010OTHER LOCALROW $ 1,500$ 1,500RTP-LRPCON $ 12,490$ 12,490

$ 12,490 $ 16,000$ 3,510Total Programmed Funding:

John Muir Parkway Extension: Ph. IIBrentwood: John Muir Parkway northerly from Briones Valley Rd to a logical termini on Concord Avenue: Extend roadway(1lane + 1 bike lane per direction).

Project Name:Description:

BrentwoodSponsor: BrentwoodImplementing Agency:

CC-070078TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 2060000400CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 208$ 208OTHER LOCALPSE $ 302$ 302EARMARKCON $ 735$ 735

ECCRFACON $ 3,535$ 3,535

OTHER LOCALCON $ 680$ 680

$ 4,950 $ 5,460$ 510Total Programmed Funding:

Brentwood Boulevard Widening - North (Phase II)Brentwood: Brentwood Blvd. between Homecoming Way and Lone Tree Way: Widen existing roadway from 2 to 4 lanes

Project Name:Description:

BrentwoodSponsor: BrentwoodImplementing Agency:

CC-170015TIP ID: County: Contra Costa Local RoadSystem: 17-02-0030RTP ID: 2060000623CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 820$ 820

RTP-LRPROW $ 890$ 890

RTP-LRPCON $ 7,790$ 7,790

$ 820 $ 8,680 $ 9,500Total Programmed Funding:

2019 TIP September 26, 2018106S4 -

Page 35: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Brentwood Various Streets and Roads PreservationIn Brentwood: Various locations: Pavement preservation

Project Name:Description:

BrentwoodSponsor: BrentwoodImplementing Agency:

CC-170034TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 189,599

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 216$ 216

STPCON $ 1,653$ 1,653

$ 216 $ 1,653 $ 1,869Total Programmed Funding:

Clayton Neighborhood Street RehabIn Clayton: On various neighborhood streets: Pavement maintenance and rehabilitation including replacing pavementmarkings

Project Name:Description:

ClaytonSponsor: ClaytonImplementing Agency:

CC-170047TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 25$ 25

OTHER LOCAL $ 60CON $ 60

STP $ 308CON $ 308

$ 25 $ 368 $ 393Total Programmed Funding:

Ygnacio Valley Road WideningConcord: Ygnacio Valley Road from Michigan Boulevard to Cowell Road: widen from 4 lanes to 6 lanes

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-090026TIP ID: County: Contra Costa Local RoadSystem: 17-02-0032RTP ID: 2060000438CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,200$ 1,200OTHER LOCALROW $ 1,200$ 1,200

RTP-LRPCON $ 17,600$ 17,600

$ 1,200 $ 17,600 $ 20,000$ 1,200Total Programmed Funding:

Commerce Ave Complete StreetsConcord: Along Commerce Ave: Upgrade street to Complete Streets standards including installing a Class III bike route,reconstruct asphalt pavement , ADA compliant sidewalk improvements, improved lighting and improved access to transit

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-170022TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 165,168

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 170$ 170OTHER LOCALROW $ 250$ 250OTHER LOCALCON $ 755$ 755

STPCON $ 1,440$ 1,440

$ 2,195 $ 2,615$ 420Total Programmed Funding:

2019 TIP September 26, 2018107S4 -

Page 36: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Concord Willow Pass Road Repaving and 6th St SRTSIn Concord: On Willow Pass Rd between Galindo St and San Vincente Dr: Rehabilitate pavement, repair sidewalk, and installADA curb ramps; On 6th Street between Concord Blvd and nearly Willow Pass Road: Bike/ped improvements to WrenElementary School

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-170037TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 603,322

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,031$ 1,031

SALESTAX-MEASUREPE $ 120$ 120

OTHER LOCALROW $ 106$ 106

CMAQCON $ 1,077$ 1,077

STPCON $ 4,183$ 4,183

$ 1,257 $ 5,260 $ 6,517Total Programmed Funding:

Vasco Road Safety ImprovementsContra Costa County: Vasco Road from Walnut Blvd to the Alameda/Contra Costa County line: widen road and placeconcrete median barrier for 2.5 miles. Phase 1 completed a 1 mile widening segment. Phase 2 will extend median barrier for1.5 miles.

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-050030TIP ID: County: Contra Costa Local RoadSystem: 17-02-0004RTP ID: 2060000339CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 4,400$ 4,400OTHER LOCALROW $ 200$ 100 $ 100

EARMARKCON $ 61$ 61OTHER LOCALCON $ 1,500$ 1,500

RTP-LRPCON $ 15,000$ 15,000

ST-STPCON $ 635$ 635STPCON $ 10,644$ 10,644XGENCON $ 654$ 654

$ 1,500 $ 100 $ 15,000 $ 33,094$ 16,494Total Programmed Funding:

Kirker Pass Road NB Truck Climbing LanesUnincorporated Contra Costa County: On Kirker Pass Road from Clearbrook Drive to approximately 1,000 feet beyond thecrest of Kirker Pass Road; Construct northbound truck climbing lane and paved shoulders

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-070075TIP ID: County: Contra Costa Local RoadSystem: 17-02-0014RTP ID: 2060000400CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 492$ 492SALESTAX-MEASUREPE $ 2,574$ 2,574OTHER LOCALROW $ 135$ 135OTHER LOCALCON $ 8,689$ 8,689

RIPCON $ 2,650$ 2,650

SALESTAX-MEASURECON $ 3,777$ 3,777

$ 15,116 $ 18,317$ 3,201Total Programmed Funding:

Byron Highway - Vasco Road ConnectionContra Costa County: between Byron Highway and Vasco Road: Construct an east-west connection road

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-070081TIP ID: County: Contra Costa Local RoadSystem: 17-02-0015RTP ID: 2060000401CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500OTHER LOCALROW $ 450$ 450RTP-LRPCON $ 39,050$ 39,050

$ 39,050 $ 40,000$ 950Total Programmed Funding:

2019 TIP September 26, 2018108S4 -

Page 37: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Camino Tassajara Realignment, S of Windemere PkwyContra Costa County: Camino Tassajara between Windemere Parkway and the City of Dublin: Realign curves and widen roadto four lanes

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-170016TIP ID: County: Contra Costa Local RoadSystem: 17-02-0033RTP ID: 2060000624CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 2,000$ 2,000RTP-LRPPE $ 2,000$ 2,000

OTHER LOCALROW $ 1,000$ 1,000

RTP-LRPCON $ 12,000$ 12,000

$ 1,000 $ 14,000 $ 17,000$ 2,000Total Programmed Funding:

Local Streets and Roads Preservation Project - CCCContra Costa County: Various local streets and roads: Pavement preservation

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-170027TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 400$ 400OTHER LOCALCON $ 1,045$ 1,045

STPCON $ 4,327$ 4,327

$ 5,372 $ 5,772$ 400Total Programmed Funding:

Kirker Pass Road Open Grade OverlayContra Costa County: On Kirker Pass Rd from the Concord City Limits to approximately 140 feet east of the driveway to 6141Kirker Pass Rd: Pavement rehabilitation

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-170028TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 175$ 175OTHER LOCALCON $ 877$ 877

STPCON $ 1,343$ 1,343

$ 2,220 $ 2,395$ 175Total Programmed Funding:

CCTA - Carshare 4 AllContra Costa County: Various locations: Expand carshare access at transit locations and conduct outreach

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: City CarShareImplementing Agency:

CC-150009TIP ID: County: Contra Costa Local RoadSystem: 17-10-0015RTP ID: 2060000593CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 61$ 61CMAQCON $ 573$ 573OTHER LOCALCON $ 74$ 74

$ 708$ 708Total Programmed Funding:

2019 TIP September 26, 2018109S4 -

Page 38: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Diablo Road Imps. - Green Valley to Avenida NeuvaDanville: Diablo Rd at Clydesdale Dr: add EB left turn pocket; Diablo Rd from Green Valley to Avenida: Drainageimprovements, replace 1300 LF retaining wall, overlay roadway, replace guardrail

Project Name:Description:

DanvilleSponsor: DanvilleImplementing Agency:

CC-090001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0008RTP ID: 2060000421CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 200$ 200OTHER LOCALPSE $ 400$ 400OTHER LOCALROW $ 60$ 60OTHER LOCAL $ 3,500CON $ 3,500

$ 3,500 $ 4,160$ 660Total Programmed Funding:

Danville Various Streets and Roads PreservationDanville: Sycamore Valley Road from Camino Ramon to San Ramon Valley Boulevard including the bus loop within theadjoining Park-and-Ride Lot, and El Cerro Boulevard from El Pintado Road to just east of El Cerro Bridge: PavementRehabilitation

Project Name:Description:

DanvilleSponsor: DanvilleImplementing Agency:

CC-130023TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000568CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 19$ 19STPPE $ 140$ 140OTHER LOCALCON $ 955$ 955STPCON $ 793$ 793

$ 1,907$ 1,907Total Programmed Funding:

San Ramon Valley Blvd Lane Addition and OverlayIn Danville: On San Ramon Blvd between Jewel Terrace and Podva Rd: Lane addition and rehabilitate roadway.

Project Name:Description:

DanvilleSponsor: DanvilleImplementing Agency:

CC-170001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0052RTP ID: 2060000607CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 10$ 10

SALESTAX-MEASUREPE $ 20$ 20

SALESTAX-MEASUREPSE $ 67$ 67

SALESTAX-MEASUREROW $ 30$ 30

OTHER LOCALCON $ 35$ 35

SALESTAX-MEASURECON $ 791$ 791

$ 953 $ 953Total Programmed Funding:

Camino Ramon ImprovementsIn Danville: On Camino Ramon between Kelley Lane and Fostoria Way: Rehabilitate roadway

Project Name:Description:

DanvilleSponsor: DanvilleImplementing Agency:

CC-170058TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 149$ 149

SALESTAX-MEASURE $ 465CON $ 465

STP $ 1,357CON $ 1,357

$ 149 $ 1,822 $ 1,971Total Programmed Funding:

2019 TIP September 26, 2018110S4 -

Page 39: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Carlson Blvd and Central Ave Pavement RehabIn El Cerrito: On Central Ave from Santa Clara Ave to San Pablo Ave and Carlson Blvd from Central Ave to the northern citylimits: Rehabilitate roadway including existing Class II bike lanes and pedestrian facilities.

Project Name:Description:

El CerritoSponsor: El CerritoImplementing Agency:

CC-170030TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 110$ 110OTHER LOCALCON $ 532$ 532

STPCON $ 544$ 544

$ 1,076 $ 1,186$ 110Total Programmed Funding:

Hercules -Sycamore/Willow Pavement RehabilitationIn Hercules: Sycamore Ave from Civic Dr to Willow/Palm Ave and Willow Ave from Mariners Pointe to the SR4 overcrossing:Pavement rehabilitation

Project Name:Description:

HerculesSponsor: HerculesImplementing Agency:

CC-170043TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 148$ 148

STPCON $ 492$ 492

$ 640 $ 640Total Programmed Funding:

Pleasant Hill Rd Pavement Rehab & MaintenanceIn Lafayette: On Pleasant Hill Rd between Mt Diablo Blvd and Taylor Blvd: Rehabilitate roadway, including adjacent ramp,curb, gutter, and sidewalk repairs.

Project Name:Description:

LafayetteSponsor: LafayetteImplementing Agency:

CC-170033TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 66,411

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 77$ 77STPCON $ 579$ 579

$ 579 $ 656$ 77Total Programmed Funding:

Martinez Various Streets and Roads PreservationMartinez: Various Streets and Roads: Rehab and reconstruction of roadways, modify curb ramps to meet current ADAstandards, including constructing bulb-outs where there is insufficient room and resetting roadside signs

Project Name:Description:

MartinezSponsor: MartinezImplementing Agency:

CC-130025TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000558CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 162$ 162STPCON $ 1,023$ 1,023

$ 1,285$ 1,285Total Programmed Funding:

Martinez Downtown Streets RehabilitationMartinez: Various streets in the Downtown Core Area (in or adjacent to the Downtown PDA): Pavement Rehabilitation

Project Name:Description:

MartinezSponsor: MartinezImplementing Agency:

CC-170059TIP ID: County: Contra Costa Local RoadSystem: 17-10-0023RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPSE $ 100$ 100

SALESTAX-MEASURE $ 166CON $ 166

STP $ 846CON $ 846

$ 100 $ 1,012 $ 1,112Total Programmed Funding:

2019 TIP September 26, 2018111S4 -

Page 40: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Regional Planning Activities and PPM - CC CountyContra Costa: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Contra Costa TransportationImplementing Agency:

CC-170004TIP ID: County: Contra Costa Local RoadSystem: 17-10-0023RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 356ENV $ 2,585$ 356$ 1,064 $ 355$ 454

OTHER LOCALPE $ 563$ 563STPPE $ 4,342$ 4,342

$ 454 $ 355 $ 356 $ 356 $ 7,490$ 5,969Total Programmed Funding:

Moraga Way and Canyon/Camino Pablo ImprovementsMoraga: Moraga Way from Moraga Rd to Ivy Dr: Resurface, close sidewalk gap, and improve bike facilities; Canyon Rd &Camino Pablo intersection: Install crosswalk improvements; Canyon Rd from Constance Pl to De La Cruz Way: Reduce travellanes from 4 to 2

Project Name:Description:

MoragaSponsor: MoragaImplementing Agency:

CC-170046TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 253$ 253CMAQCON $ 607$ 607

OTHER LOCALCON $ 822$ 822

SALESTAX-MEASURECON $ 350$ 350

STPCON $ 596$ 596

$ 2,375 $ 2,628$ 253Total Programmed Funding:

Oakley Street Repair and ResurfacingOakley: Vintage Parkway: Rehabilitate including new curb ramps and striping

Project Name:Description:

OakleySponsor: OakleyImplementing Agency:

CC-170041TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 26$ 26OTHER LOCALPSE $ 100$ 100OTHER LOCALCON $ 496$ 496

STPCON $ 969$ 969

$ 1,465 $ 1,591$ 126Total Programmed Funding:

Orinda Way Pavement RehabilitationOrinda: Orinda Way between cul de sac near Santa Maria Way and Camino Pablo through the Orinda Village downtowndistrict: Perform pavement rehabilitation/maintenance including required upgrades for ADA curb ramps and ADA parkingspaces.

Project Name:Description:

OrindaSponsor: OrindaImplementing Agency:

CC-170032TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 30$ 30

OTHER LOCALCON $ 100$ 100

STPCON $ 620$ 620

$ 30 $ 720 $ 750Total Programmed Funding:

2019 TIP September 26, 2018112S4 -

Page 41: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Pinole - San Pablo Avenue RehabilitationIn Pinole: On San Pablo Avenue from City Limits to Pinole Shores Dr: Rehabilitate roadway and make accessibility upgradesas warranted

Project Name:Description:

PinoleSponsor: PinoleImplementing Agency:

CC-170048TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation123Route: Post Mile From: Post Mile To: Toll $ 67,214

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 77$ 77

STPCON $ 586$ 586

$ 77 $ 586 $ 663Total Programmed Funding:

City of Pittsburg Pavement ImprovementsIn Pittsburg: On West Leland Rd from Woodhill Rd to Railroad Ave and on Loveridge Rd from Buchanan Rd to Pittsburg-Antioch Highway: Rehabilitate roadway

Project Name:Description:

PittsburgSponsor: PittsburgImplementing Agency:

CC-170042TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation4 19.58 24.376Route: Post Mile From: Post Mile To: Toll $ 158,860

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 180$ 180

STPCON $ 1,385$ 1,385

$ 180 $ 1,385 $ 1,565Total Programmed Funding:

Pleasant Hill Road ImprovementsIn Pleasant Hill: Along Pleasant Hill Rd between Taylor Blvd and Gregory Ln: Pavement rehabilitation, install new bike lanes,repair sidewalk, modify signals, and landscape medians

Project Name:Description:

Pleasant HillSponsor: Pleasant HillImplementing Agency:

CC-170044TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 205$ 205OTHER LOCALCON $ 2,172$ 2,172

SALESTAX-MEASURECON $ 98$ 98

STPCON $ 920$ 920

OTHER LOCALCON-CE $ 350$ 350

$ 3,540 $ 3,745$ 205Total Programmed Funding:

I-80/Central Avenue - Local PortionRichmond: I-80/Central Ave Interchange: Connect Pierce St to San Mateo and relocate signal at Pierce/Central to SanMateo/Central intersection.

Project Name:Description:

RichmondSponsor: RichmondImplementing Agency:

CC-050076TIP ID: County: Contra Costa Local RoadSystem: 17-02-0026RTP ID: 2060000373CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 500$ 500SALESTAX-MEASUREPSE $ 2,000$ 2,000

RIPROW $ 5,900$ 5,900

SALESTAX-MEASUREROW $ 600$ 600

OTHER LOCAL $ 3,427CON $ 3,427

RIP $ 1,873CON $ 1,873

SALESTAX-MEASURE $ 200CON $ 200

$ 2,000 $ 6,500 $ 5,500 $ 14,500$ 500Total Programmed Funding:

2019 TIP September 26, 2018113S4 -

Page 42: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Richmond: Citywide Pavement Rehab ADA ImprovementRichmond: Various locations: Pavement rehabilitation, and ADA, bicycle facility, pedestrian safety, and vehicular efficiencyimprovements

Project Name:Description:

RichmondSponsor: RichmondImplementing Agency:

CC-170057TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200OTHER LOCAL $ 355CON $ 355

STP $ 2,205CON $ 2,205

$ 2,560 $ 2,760$ 200Total Programmed Funding:

San Pablo - Market Street Pavement RehabilitationSan Pablo: On Market Street between Church Lane and 23rd Street: Rehabilitate roadway

Project Name:Description:

San PabloSponsor: San PabloImplementing Agency:

CC-170031TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 81$ 81

STPCON $ 618$ 618

$ 699 $ 699Total Programmed Funding:

Bollinger Canyon Road Widening (Alcosta to SRVB)San Ramon: Bollinger Canyon Road between Alcosta Blvd and San Ramon Valley Blvd: Widen from six to eight lanes.Project is phased.

Project Name:Description:

San RamonSponsor: San RamonImplementing Agency:

CC-090019TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 2060000430CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,756$ 1,756OTHER LOCALROW $ 235$ 235OTHER LOCALCON $ 8,621$ 8,621

$ 10,613$ 10,613Total Programmed Funding:

Alcosta Boulevard Pavement RehabIn San Ramon: On Alcosta Blvd (southbound and northbound) from Montevideo Drive to Fircrest Lane: Rehabilitate roadwayincluding stripping for class 3 bike path

Project Name:Description:

San RamonSponsor: San RamonImplementing Agency:

CC-170045TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 150$ 150

OTHER LOCALPSE $ 400$ 400

OTHER LOCALCON $ 475$ 475

STPCON $ 1,175$ 1,175

$ 550 $ 1,650 $ 2,200Total Programmed Funding:

2019 TIP September 26, 2018114S4 -

Page 43: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

Crow Canyon Road (Alcosta to Indian Rice) WideningSan Ramon: Crow Canyon Rd from Alcosta Blvd to Indian Rice Rd: Widen to three lanes in each direction

Project Name:Description:

San RamonSponsor: San RamonImplementing Agency:

CC-190001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 2060000651CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPSE $ 473$ 473RTP-LRPCON $ 18,663$ 18,663

SALESTAX-MEASURECON $ 939$ 939

$ 939 $ 18,663 $ 20,075$ 473Total Programmed Funding:

Walnut Creek-Parking Guidance System PilotWalnut Creek: Downtown core area: Implement Parking Guidance System connected to all public parking in downtown corearea.

Project Name:Description:

Walnut CreekSponsor: Walnut CreekImplementing Agency:

CC-150018TIP ID: County: Contra Costa Local RoadSystem: 17-02-0008RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 48$ 48

SALESTAX-MEASUREPE $ 252$ 252

OTHER LOCALCON $ 102$ 102

SALESTAX-MEASURECON $ 531$ 531

$ 933 $ 933Total Programmed Funding:

Walnut Creek-N. Main St Rehab - I680 to CaliforniaWalnut Creek: North Main Street between the Interstate 680 Overpass and California Boulevard: Rehabilitate Roadway

Project Name:Description:

Walnut CreekSponsor: Walnut CreekImplementing Agency:

CC-170025TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000629CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 85$ 85OTHER LOCALCON $ 102$ 102

STPCON $ 783$ 783

$ 885 $ 970$ 85Total Programmed Funding:

Ygancio Valley & Oak Grove Road RehabilitationWalnut Creek: Ygnacio Valley Rd from Civic Dr to San Carlos Dr, Oak Grove Rd from Ygnacio Valley Rd to Mitchell Rd:Rehab pavement, striping, adjust covers, ADA upgrades and install video detection at select intersections.

Project Name:Description:

Walnut CreekSponsor: Walnut CreekImplementing Agency:

CC-170038TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 345$ 345

STPCON $ 2,608$ 2,608

$ 2,953 $ 3,053$ 100Total Programmed Funding:

End of section

2019 TIP September 26, 2018115S4 -

Page 44: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018116S4 -

Page 45: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Concord BART Station Bike/Ped Access ImprovementsConcord: Near the Downtown Concord BART Station: Implement bike/ped access improvements including road diets,buffered bike lanes (0.7 mi), Class 2 bike lanes (0.6 mi), and Class 3 bike routes (0.1 mi), and improvements at three un-signalized crosswalks

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-130006TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000567CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 25$ 25RIPPSE $ 188$ 188OTHER LOCALROW $ 20$ 20OTHER LOCALCON $ 585$ 585RIPCON $ 1,007$ 1,007

$ 1,825$ 1,825Total Programmed Funding:

Monument Boulevard Class I PathIn Concord: Monument Blvd from Systron Dr to Cowell Rd and Cowell Rd from Monument Blvd to Mesa St: Install a Class Ipath and related improvements at signalized intersections

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-170039TIP ID: County: Contra Costa PublicSystem: 17-02-0003RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 653$ 653

OTHER LOCALPE $ 329$ 329

OTHER LOCALROW $ 32$ 32

CMAQ $ 3,715CON $ 3,715

OTHER LOCAL $ 600CON $ 600

$ 1,014 $ 4,315 $ 5,329Total Programmed Funding:

Downtown Corridors Bike/Pedestrian ImprovementsConcord: Various locations:Implement bicycle and pedestrian safety improvements to three corridors connecting DowntownConcord to regional transit, senior housing, and low income communities.

Project Name:Description:

ConcordSponsor: ConcordImplementing Agency:

CC-170050TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGENV $ 134$ 134OTHER LOCALENV $ 23$ 23ATP-REGPSE $ 404$ 404

OTHER LOCALPSE $ 68$ 68

ATP-REGROW $ 85$ 85

OTHER LOCALROW $ 15$ 15

$ 572 $ 729$ 157Total Programmed Funding:

Bailey Road-State Route 4 InterchangeIn Bay Point: At the Bailey Road-State Route 4 interchange; modify ramps and Bailey Road to improve bicycle and pedestriancirculation. Project is phased.

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-130001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0020RTP ID: 2060000553CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects4Route: Post Mile From: Post Mile To: Toll $ 394,568

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 270$ 270SALESTAX-MEASUREENV $ 445$ 445ATP-STPSE $ 720$ 720OTHER LOCALPSE $ 190$ 190OTHER LOCALROW $ 10$ 10ATP-STCON $ 3,440$ 60 $ 3,380

OTHER LOCALCON $ 120$ 120

$ 3,500 $ 5,195$ 1,695Total Programmed Funding:

2019 TIP September 26, 2018117S4 -

Page 46: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Bailey Road Bike and Pedestrian ImprovementsBay Point: Bailey Rd from Willow Pass Rd to SR 4: Improve bicycle and pedestrian accessibility. Improvements will expandsidewalks and construct uniform bike lanes to create a corridor conducive to all modes of travel. Project is phased

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-130003TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000554CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,123$ 1,123OTHER LOCALROW $ 115$ 115

OTHER LOCALCON $ 500$ 500

RTP-LRPCON $ 3,036$ 3,036

$ 115 $ 500 $ 3,036 $ 4,774$ 1,123Total Programmed Funding:

Port Chicago Hwy/Willow Pass Rd Bike Ped UpgradesBay Point: Near the intersection of Port Chicago Hwy and Willow Pass Rd: Install bike lane, sidewalk, curb and gutter,bike/ped access improvements, and intersection channelization

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-130027TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 2060000564CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll $ 129,749

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 110$ 110OTHER LOCALPE $ 481$ 481ATP-REGCON $ 800$ 800CMAQCON $ 331$ 331

$ 1,723$ 1,723Total Programmed Funding:

CC County - Rio Vista Elementary Ped ConnectionContra Costa County: On Pacifica Avenue between Mariners Cove Drive and Wharf Drive: Install sidewalks, bike lanes,flashing beacons, speed feedback sign, retaining wall and drainage improvements and repair and widen pavement.

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-150010TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000594CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 25$ 25OTHER LOCALPSE $ 155$ 155OTHER LOCALROW $ 125$ 125ATP-STCON $ 600$ 600

$ 905$ 905Total Programmed Funding:

Fred Jackson Way First Mile/Last Mile ConnectionIn Richmond: On Fred Jackson Way from Grove Avenue to Wildcat Creek Trail: Construct ADA accessible sidewalks withstreet trees; and from Wildcat Creek to Brookside Dr: Construct pedestrian path and Class II bike lanes

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-170020TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 361$ 361

ATP-REGPSE $ 161$ 161

OTHER LOCALPSE $ 356$ 95 $ 261

OTHER STATEPSE $ 70$ 70

ATP-REGROW $ 200$ 200

OTHER LOCALROW $ 444$ 244 $ 200

ATP-REGCON $ 2,937$ 2,937

OTHER STATECON $ 164$ 164

$ 409 $ 1,347 $ 2,937 $ 4,693Total Programmed Funding:

2019 TIP September 26, 2018118S4 -

Page 47: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Pacheco Blvd Sidewalk Gap Closure Phase 3In Martinez: Adjacent to Las Juntas Elementary School and across Vine Hill Creek on Pacheco Boulevard: Close a gap insidewalk infrastructure and extend a 6' x 8' concrete culvert

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-170021TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 41$ 41SALESTAX-MEASUREENV $ 4$ 4OTHER LOCALPSE $ 82$ 82SALESTAX-MEASUREPSE $ 496$ 496SALESTAX-MEASUREROW $ 30$ 30ATP-REGCON $ 479$ 479

OTHER LOCALCON $ 37$ 37

ATP-REGCON-CE $ 140$ 140

OTHER LOCALROW- $ 10$ 10SALESTAX-MEASUREROW- $ 40$ 40

$ 656 $ 1,359$ 703Total Programmed Funding:

West County Walk and Bike LeadersContra Costa County: At 7 high schools in West Contra Costa: Provide comprehensive bicycle and pedestrian education,encouragement, and engagement activities to foster a walk-and-bike-to-school culture

Project Name:Description:

Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:

CC-170029TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000632CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 561$ 561

OTHER LOCALCON $ 73$ 73

$ 634 $ 634Total Programmed Funding:

Mokelumne Trail Bike/Ped OvercrossingBrentwood: Near the Mokelumne Trail at State Route 4 in Brentwood: Construct a pedestrian and bicycle overcrossing.

Project Name:Description:

Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-070067TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000379CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities4 33.5 33.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 200$ 200

SALESTAX-MEASUREPSE $ 672$ 672

RTP-LRPROW $ 1,000$ 1,000

RTP-LRPCON $ 8,000$ 8,000

RTP-LRPCON-CE $ 1,400$ 1,400

ECCRFAROW- $ 200$ 200

$ 1,072 $ 10,400 $ 11,472Total Programmed Funding:

Vista Grande Street Pedestrian Improvements/SR2SDanville: Vista Grande Street between Camino Tassajara and Diablo Road/Vista Grande Elmentary School: Constructseparated asphalt concrete pathway and safety enhancements to provide direct ped/bike access to Vista Grande Elementary

Project Name:Description:

DanvilleSponsor: DanvilleImplementing Agency:

CC-130038TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000560CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 29$ 29CMAQCON $ 157$ 157OTHER LOCALCON $ 21$ 21

$ 207$ 207Total Programmed Funding:

2019 TIP September 26, 2018119S4 -

Page 48: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Conta Costa Parks Bike/Ped Trail ImprovementsContra Costa County: Various County Parks; Various bicycle and pedestrian trail improvements. Construction will be done indifferent phases.

Project Name:Description:

East Bay Regional Park District (EBRPD)Sponsor: East Bay Regional Park DistrictImplementing Agency:

CC-070033TIP ID: County: Contra Costa PublicSystem: 17-02-0003RTP ID: 2060000376CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 32$ 32OTHER LOCALENV $ 10$ 10OTHER LOCALPSE $ 30$ 30EARMARKCON $ 688$ 567 $ 121

OTHER LOCALCON $ 191$ 160 $ 31

$ 152 $ 951$ 799Total Programmed Funding:

SF Bay Trail, Pinole Shores to Bay Front ParkPinole: Between Pinole Shores and Bayfront Park, approximately 0.5-mile: Construct a section of the San Francisco Bay Trail.Project is phased

Project Name:Description:

East Bay Regional Park District (EBRPD)Sponsor: East Bay Regional Park DistrictImplementing Agency:

CC-130050TIP ID: County: Contra Costa PublicSystem: 17-02-0003RTP ID: 2060000583CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 310$ 310ATP-REGCON $ 4,000$ 4,000OTHER FEDERALCON $ 1,312$ 1,312OTHER LOCALCON $ 1,880$ 1,880STPCON $ 120$ 120

$ 7,622$ 7,622Total Programmed Funding:

El Cerrito del Norte Area TOD Complete Street ImpsEl Cerrito: El Cerrito del Norte BART Station Area: Complete Streets improvements to access, circulation and safety forbicyclists, pedestrians, local and regional bus, rapid bus, and automobile connections to BART and TOD/PDA development

Project Name:Description:

El CerritoSponsor: El CerritoImplementing Agency:

CC-070046TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 2060000377CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant Project123Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 760$ 750 $ 10

OTHER LOCALPSE $ 90$ 90

SALESTAX-MEASUREPSE $ 1,163$ 1,163

OTHER LOCALROW $ 5$ 5

CMAQ $ 4,840CON $ 4,840

OTHER LOCAL $ 726CON $ 726

SALESTAX-MEASURE $ 1,149CON $ 1,149

$ 100 $ 1,168 $ 6,715 $ 8,733$ 750Total Programmed Funding:

Ohlone Greenway Station Area Bike/Ped ImprovementsEl Cerrito: On Ohlone Greenway at El Cerrito del Norte & Plaza BART Stations & at intersections of Hill, Cutting, Central &Fairmount, widen path & improve ped & bike facilities.

Project Name:Description:

El CerritoSponsor: El CerritoImplementing Agency:

CC-130024TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000564CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 443$ 443OTHER LOCALPE $ 40$ 40SALESTAX-MEASUREPE $ 34$ 34CMAQCON $ 3,025$ 3,025OTHER LOCALCON $ 413$ 413SALESTAX-MEASURECON $ 766$ 766

$ 766 $ 4,721$ 3,956Total Programmed Funding:

2019 TIP September 26, 2018120S4 -

Page 49: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Pittsburg BART Pedestrian and Bicycle ConnectivityIn Pittsburg: On California Ave, Bliss Ave, and Railroad Ave in the vicinity of the Pittsburg Center eBART station: ConstructClass I and IV bikeways and associated improvements

Project Name:Description:

PittsburgSponsor: PittsburgImplementing Agency:

CC-170040TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 2060000633CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities4 23.05 23.395Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 483$ 483

OTHER LOCALPE $ 25$ 25

SALESTAX-MEASUREPE $ 160$ 160

OTHER LOCALROW $ 25$ 25

CMAQCON $ 3,387$ 3,387

SALESTAX-MEASURECON $ 440$ 440

$ 693 $ 3,827 $ 4,520Total Programmed Funding:

Pittsburg Active Transp. and Safe Routes PlanPittsburg: Citywide: Identify and prioritize citywide bicycle and pedestrian improvements that would increase safety,accessibility, and connectivity between housing, schools, transit, parks, community centers, and commercial areas over thenext 15 years

Project Name:Description:

PittsburgSponsor: PittsburgImplementing Agency:

CC-170049TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STCON $ 312$ 312$ 312$ 312Total Programmed Funding:

37th Street Bicycle & Pedestrian ImprovementsRichmond: On 37th St from Cerritto Ave to Center Ave: Install bike lanes and pedestrian countdown heads and upgrade trafficsignals; On 37th from Barrett to Center: Implement road diet with one lane each direction, center turn lane and bike lanes

Project Name:Description:

RichmondSponsor: RichmondImplementing Agency:

CC-130047TIP ID: County: Contra Costa Local RoadSystem: 17-02-0004RTP ID: 2060000581CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 39$ 39OTHER LOCALROW $ 5$ 5HSIPCON $ 287$ 287OTHER LOCALCON $ 38$ 38

$ 369$ 369Total Programmed Funding:

The Yellow Brick Road in Richmond's Iron TriangleRichmond: Various locations outlined in the the Yellow Brick Road Plan: Implement bike/ped improvements

Project Name:Description:

RichmondSponsor: RichmondImplementing Agency:

CC-150016TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000602CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 712,173

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 207$ 207OTHER LOCALENV $ 7$ 7ATP-STPSE $ 725$ 725OTHER LOCALPSE $ 28$ 28ATP-STCON $ 5,277$ 5,277

OTHER LOCALCON $ 208$ 208

$ 208 $ 5,277 $ 6,452$ 967Total Programmed Funding:

2019 TIP September 26, 2018121S4 -

Page 50: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Lincoln Elementary SRTS Pedestrian EnhancementsIn Richmond: Along Chanslor, 5th St and 6th St near Lincoln School and at Chanslor Ave and 4th St: Pedestrianenhancements to improve the safety for school children by adding median refuges and curb extensions and a raisedintersection

Project Name:Description:

RichmondSponsor: RichmondImplementing Agency:

CC-170056TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 25$ 25

CMAQCON $ 320$ 320

OTHER LOCALCON $ 25$ 25

SALESTAX-MEASURECON $ 63$ 63

$ 25 $ 408 $ 433Total Programmed Funding:

San Pablo Avenue Bicycle and Ped ImprovementsSan Pablo and Richmond: San Pablo Ave from Rumrill Blvd to La Puerta Rd: Reconfigure travel lanes, install sidewalks, bikelanes, lighting, medians, signals, modify existing medians and traffic signals, build retaining walls, replace landscaping,restripe

Project Name:Description:

San PabloSponsor: San PabloImplementing Agency:

CC-130032TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000567CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll $ 685,677

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 580$ 580CMAQCON $ 5,978$ 5,978OTHER LOCALCON $ 149$ 149OTHER LOCALCON-CE $ 501$ 501

$ 7,208$ 7,208Total Programmed Funding:

Rumrill Blvd Complete Streets ImprovementsSan Pablo: Along Rumrill Boulevard between San Pablo Avenue to the North and Costa Avenue to the South: CompleteStreets Improvements and road diet. Project is phased.

Project Name:Description:

San PabloSponsor: San PabloImplementing Agency:

CC-150017TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 100$ 100OTHER FEDERALPE $ 75$ 75ATP-REGPSE $ 300$ 300OTHER LOCALPSE $ 200$ 200OTHER FEDERALPSE $ 50$ 50OTHER STATEPSE $ 435$ 435ATP-REGCON $ 4,010$ 4,010

OTHER LOCALCON $ 300$ 300

OTHER FEDERALCON $ 714$ 714

OTHER STATECON $ 3,540$ 3,540

SALESTAX-MEASURECON $ 1,000$ 1,000

SB1CON $ 3,200$ 3,200

TDACON $ 85$ 85

$ 9,649 $ 3,200 $ 14,009$ 1,160Total Programmed Funding:

2019 TIP September 26, 2018122S4 -

Page 51: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

Iron Horse Trail Bike and Pedestrian OvercrossingSan Ramon: At the intersections of Bollinger Canyon Road and the Iron Horse Trail: Construct bicycle/pedestrianovercrossing

Project Name:Description:

San RamonSponsor: San RamonImplementing Agency:

CC-170014TIP ID: County: Contra Costa PublicSystem: 17-02-0003RTP ID: 2060000623CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 911$ 911CMAQCON $ 4,840$ 4,840

OTHER LOCALCON $ 6,649$ 6,649

SALESTAX-MEASURECON $ 2,011$ 2,011

$ 13,500 $ 14,411$ 911Total Programmed Funding:

San Ramon Valley Street SmartsSan Ramon Valley: At elementary, middle and high schools: Bicycle, Pedestrian and traffic safety education

Project Name:Description:

San RamonSponsor: San RamonImplementing Agency:

CC-170026TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programs680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 300$ 300

OTHER LOCALCON $ 102$ 102

$ 402 $ 402Total Programmed Funding:

End of section

2019 TIP September 26, 2018123S4 -

Page 52: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Contra Costa CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018124S4 -

Page 53: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyState Highway Projects

US 101 HOV Lanes - Marin-Sonoma Narrows (Marin)Marin and Sonoma Counties: From SR 37 in Novato to Old Redwood Highway in Petaluma; Convert expressway to freewayand widen to 6 lanes for HOV lanes.

Project Name:Description:

Transportation Authority of Marin (TAM)Sponsor: Transportation Authority of MarinImplementing Agency:

MRN050034TIP ID: County: Marin StateSystem: 17-03-0006RTP ID: 2060000380CTIPS

Air Quality Exempt Code: NON-EXEMPT101 0 7.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 842$ 842IIPENV $ 9,600$ 9,600TCRPENV $ 9,410$ 9,410OTHER LOCALPE $ 8,000$ 8,000

IIPPSE $ 13$ 13RIPPSE $ 8,897$ 8,897SB1PSE $ 500$ 500TCRPPSE $ 8,770$ 8,770IIPROW-CT $ 265$ 265RIPROW-CT $ 2,390$ 2,390EARMARKROW $ 16,312$ 16,312IIPROW $ 15,189$ 15,189RIPROW $ 7,128$ 7,128IIPCON-CT $ 14,460$ 14,460PROPCON-CT $ 7,550$ 7,550IIPCON $ 52,113$ 52,113PROPCON $ 58,968$ 58,968RIPCON $ 20,355$ 20,355RTP-LRPCON $ 111,782$ 111,782

RIPCON-CE $ 675$ 675

$ 8,000 $ 111,782 $ 353,219$ 233,437Total Programmed Funding:

GL: Marin County - TOS-MobilityMarin County: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and 40 CFR Part 93.127Table 3 categories

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

MRN170018TIP ID: County: Marin StateSystem: 17-10-0033RTP ID: 2060000630CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 1,486,512

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ACCON $ 12,960$ 12,960

$ 12,960 $ 12,960Total Programmed Funding:

End of section

2019 TIP September 26, 2018125S4 -

Page 54: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyState Highway Projects

The page left Intentionally blank

2019 TIP September 26, 2018126S4 -

Page 55: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyLocal Road Projects

Marin Parklands Visitor Access, Phase 2Marin County: Pacific Way bridge at Big Lagoon: Reconstruct bridge and widen to add bike lanes. No added motor-vehiclecapacity

Project Name:Description:

Marin CountySponsor: Marin CountyImplementing Agency:

MRN070019TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000411CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

FLHPPE $ 490$ 490FLHPPSE $ 546$ 546OTHER LOCALCON $ 3,410$ 3,410

$ 4,446$ 4,446Total Programmed Funding:

Mountain View Rd Bridge Replacement - 27C0154Marin County: On Mountain View Rd. over San Geronimo Creek (Bridge No. 27C0154) near the intersection with Sir FrancisDrake Blvd: Replace existing one-lane bridge with a new two-lane bridge. Toll credits are used in lieu of match for all phases

Project Name:Description:

Marin CountySponsor: Marin CountyImplementing Agency:

MRN110035TIP ID: County: Marin Local RoadSystem: 17-10-0024RTP ID: 2060000545CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll $ 170,572

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 504$ 504HBPROW $ 73$ 73

HBPCON $ 911$ 911

$ 73 $ 911 $ 1,487$ 504Total Programmed Funding:

Hicks Valley/MarshallPetaluma/Wilson Hill Rd RehabMarin County: Hicks Valley Rd from Point Reyes-Petaluma Rd to Marshall-Petaluma Rd, Wilson Hill Rd from Marshall-Petaluma Rd to Chileno Valley Rd, Marshall-Petaluma Rd from Hicks Valley Rd (milepost 2.84) to milepost 3.87: Rehabilitatepavement

Project Name:Description:

Marin CountySponsor: Marin CountyImplementing Agency:

MRN170027TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 300$ 300OTHER LOCAL $ 2,364CON $ 2,364

STP $ 1,181CON $ 1,181

$ 3,545 $ 3,845$ 300Total Programmed Funding:

Regional Planning Activities and PPM - MarinMarin: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Transportation Authority of MarinImplementing Agency:

MRN170001TIP ID: County: Marin Local RoadSystem: 17-10-0023RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 699$ 412 $ 287

OTHER LOCALPE $ 495$ 495STPPE $ 3,822$ 3,822

$ 287 $ 5,016$ 4,729Total Programmed Funding:

2019 TIP September 26, 2018127S4 -

Page 56: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyLocal Road Projects

Novato Boulevard Widening, Diablo to GrantNovato: Novato Blvd between Diablo and Grant Ave.: Improvements to roadway including including widening existingtwo/three lanes to four lanes and adding turn lanes, bike lanes, curbs, and sidewalks.

Project Name:Description:

NovatoSponsor: NovatoImplementing Agency:

MRN070006TIP ID: County: Marin Local RoadSystem: 17-03-0011RTP ID: 2060000381CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 1,063$ 401 $ 662

RTP-LRPCON $ 7,000$ 7,000

SALESTAX-MEASURECON $ 2,000$ 2,000

$ 662 $ 2,000 $ 7,000 $ 10,063$ 401Total Programmed Funding:

Vineyard Road ImprovementsNovato: Vineyard Road from Wilson Avenue to Sutro Avenue: Perform pavement rehabilitation, install bicycle lanes, andproperty owner-funded frontage improvements

Project Name:Description:

NovatoSponsor: NovatoImplementing Agency:

MRN150016TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 2060000611CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 84$ 84OTHER LOCALCON $ 172$ 172STPCON $ 1,015$ 750 $ 265

$ 265 $ 1,271$ 1,006Total Programmed Funding:

Novato Downtown SMART Station Commuter LotNovato: At the future Downtown SMART Station: Construct parking lot improvements to the former railroad depot site

Project Name:Description:

NovatoSponsor: NovatoImplementing Agency:

MRN170017TIP ID: County: Marin Local RoadSystem: 17-03-0005RTP ID: 2060000629CTIPS

Air Quality Exempt Code: 1.18 - EXEMPT (40 CFR 93.126) - Lighting improvementsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 50$ 50OTHER LOCALCON $ 89$ 89

STPCON $ 500$ 500

$ 589 $ 639$ 50Total Programmed Funding:

Novato-Measure A Group 10 Pavement RehabilitationIn the City of Novato: Nave Dr from Alameda Del Prado to Bel Marin Keys Blvd and Bel Marin Keys Blvd from Nave Dr to GalliDr: Pavement Rehabilitation

Project Name:Description:

NovatoSponsor: NovatoImplementing Agency:

MRN170022TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200SALESTAX-MEASURECON $ 500$ 500

STPCON $ 1,554$ 1,554

$ 2,054 $ 2,254$ 200Total Programmed Funding:

2019 TIP September 26, 2018128S4 -

Page 57: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyLocal Road Projects

San Anselmo - Center Blvd Bridge Replace (27C0079)San Anselmo: Center Blvd Bridge over San Anselmo Creek, at Sycamore Ave: Replace existing 2 lane bridge with 3 lanebridge

Project Name:Description:

San AnselmoSponsor: San AnselmoImplementing Agency:

MRN110032TIP ID: County: Marin Local RoadSystem: 17-10-0024RTP ID: 2060000533CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 938$ 938OTHER LOCALPE $ 122$ 122HBPROW $ 1,107$ 1,107

OTHER LOCALROW $ 143$ 143

HBPCON $ 3,105$ 3,105

OTHER LOCALCON $ 402$ 402

$ 1,250 $ 3,507 $ 5,817$ 1,060Total Programmed Funding:

Sir Francis Drake Blvd Pavement RehabilitationIn the Town of San Anselmo: On Sir Francis Drake Boulevard between Center Boulevard/Red Hill Avenue (The Hub) andBolinas Avenue: Rehabilitate existing roadway pavements and install intersection improvements

Project Name:Description:

San AnselmoSponsor: San AnselmoImplementing Agency:

MRN170021TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 15$ 15

STPPE $ 115$ 115

OTHER LOCALCON $ 132$ 132

STPCON $ 1,019$ 1,019

$ 130 $ 1,151 $ 1,281Total Programmed Funding:

San Rafael Transit Center Pedestrian Access Imps.San Rafael: In the vicinity of the Bettini Transit Center and the future SMART station: Upgrade existing traffic signalequipment to be compliant with rail and improve pedestrian facilities

Project Name:Description:

San RafaelSponsor: San RafaelImplementing Agency:

MRN130005TIP ID: County: Marin Local RoadSystem: 17-03-0016RTP ID: 2060000570CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 475$ 475CMAQCON $ 1,900$ 1,900OTHER LOCALCON $ 300$ 300

$ 2,675$ 2,675Total Programmed Funding:

End of section

2019 TIP September 26, 2018129S4 -

Page 58: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018130S4 -

Page 59: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyBike/Pedestrian Projects

Corte Madera-Paradise Drive Multiuse PathCorte Madera: Along Paradise Dr. between San Clemente Dr. and Seawolf Passage: Extend multiuse pathway

Project Name:Description:

Corte MaderaSponsor: Corte MaderaImplementing Agency:

MRN170019TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 372$ 372CMAQCON $ 595$ 595

OTHER LOCALCON $ 78$ 78

$ 673 $ 1,045$ 372Total Programmed Funding:

Central Marin Regional Pathway Gap ClosureCorte Madera: On the west side of US 101 along Nellen Ave and Wornum Dr: separated pedestrian and bicycle facilitiesincluding protected bikeway, sidewalk and a pedestrian refuge island with walkway, barrier, and RRFB for transit stop access.

Project Name:Description:

Corte MaderaSponsor: Corte MaderaImplementing Agency:

MRN170023TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGENV $ 70$ 70OTHER LOCALENV $ 9$ 9ATP-REGPSE $ 345$ 345

OTHER LOCALPSE $ 45$ 45

$ 390 $ 469$ 79Total Programmed Funding:

Parkade Circulation and Safety ImprovementsFairfax: Between Sir Francis Drake Boulevard, Pacheco Avenue, Claus Drive and Broadway: Improve bicycle, pedestrian,transit, and vehicular circulation and safety around and through the Parkade in Downtown Fairfax

Project Name:Description:

FairfaxSponsor: FairfaxImplementing Agency:

MRN130009TIP ID: County: Marin Local RoadSystem: 17-03-0005RTP ID: 2060000575CTIPS

Air Quality Exempt Code: 5.06 - EXEMPT (40 CFR 93.127) - Bus terminals and transfer pointsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 45$ 45RIPPSE $ 45$ 45OTHER LOCALCON $ 55$ 55RIPCON $ 255$ 255

$ 400$ 400Total Programmed Funding:

Fort Baker's Vista Point TrailGolden Gate National Recreation Area: Between the Dana Bowers Vista Point Parking Area and both Fort Baker andSausalito: Construct the Vista Point Trail, a new multi-use segment of the Bay Trail.

Project Name:Description:

National Park ServiceSponsor: National Park ServiceImplementing Agency:

MRN170028TIP ID: County: Marin PublicSystem: 17-03-0001RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 100$ 100

OTHER LOCAL $ 1,000CON $ 1,000

STP $ 500CON $ 500

$ 100 $ 1,500 $ 1,600Total Programmed Funding:

2019 TIP September 26, 2018131S4 -

Page 60: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyBike/Pedestrian Projects

Hill Recreation Area ImprovementsNovato: At the Hill Recreation Area: Add a network of bicycle and pedestrian walkways and multi-purpose pathways topreserve and enhance an existing park to increase recreational opportunities

Project Name:Description:

NovatoSponsor: NovatoImplementing Agency:

MRN170026TIP ID: County: Marin PublicSystem: 17-03-0001RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 794$ 794

$ 794 $ 794Total Programmed Funding:

Sunny Hill Ridge and Red Hill TrailsIn San Anselmo: Near Sunny Hill and Red Hill: Construct three miles of hiking trails

Project Name:Description:

San AnselmoSponsor: San AnselmoImplementing Agency:

MRN130013TIP ID: County: Marin PublicSystem: 17-03-0001RTP ID: 2060000576CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 40$ 40STPPE $ 40$ 40OTHER LOCALCON $ 80$ 80

$ 160$ 160Total Programmed Funding:

San Anselmo Bike SpineSan Anselmo: In the vicinity of St. Anselm School, Wade Thomas ES, Sir Francis Drake HS, and Brookside ES: Install sharedlane markings, roadway striping, school bike route signs, crossing enhancements and educational outreach. Project isphased.

Project Name:Description:

San AnselmoSponsor: San AnselmoImplementing Agency:

MRN170020TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 41$ 41

OTHER LOCALPE $ 5$ 5

CMAQCON $ 228$ 228

OTHER LOCALCON $ 30$ 30

$ 46 $ 258 $ 304Total Programmed Funding:

Grand Avenue Bicycle Pedestrian ImprovementsSan Rafael: Grand Ave accross the San Rafael Canal: Construct bridge and sidewalk improvements for bicyclists andpedestrians

Project Name:Description:

San RafaelSponsor: San RafaelImplementing Agency:

MRN150008TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000596CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 378$ 378OTHER LOCALROW $ 224$ 224CMAQCON $ 1,000$ 1,000

SALESTAX-MEASURECON $ 549$ 549

$ 1,549 $ 2,150$ 601Total Programmed Funding:

2019 TIP September 26, 2018132S4 -

Page 61: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyBike/Pedestrian Projects

Francisco Boulevard East Sidewalk WideningIn San Rafael: Francisco Blvd East and Grand Ave from Vivian St to Second St: Widen existing sidewalk and construct apedestrian/bicyclist bridge over the Canal Waterway and a sidewalk on the west side of Grand Ave. Project development doneon MRN070009

Project Name:Description:

San RafaelSponsor: San RafaelImplementing Agency:

MRN170012TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGCON $ 4,025$ 4,025

CMAQCON $ 2,100$ 2,100

OTHER LOCALCON $ 707$ 707

$ 4,732 $ 2,100 $ 6,832Total Programmed Funding:

Francisco Blvd West Multi-Use PathwaySan Rafael: On Francisco Blvd West between Second St. and Anderson Dr.: Construct a multi-use path.

Project Name:Description:

San RafaelSponsor: San RafaelImplementing Agency:

MRN170016TIP ID: County: Marin Local RoadSystem: 17-09-0018RTP ID: 2060000628CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 400$ 400OTHER LOCALCON $ 562$ 562

RTP-LRPCON $ 2,950$ 2,950

SALESTAX-MEASURECON $ 288$ 288

SB1CON $ 502$ 502

$ 850 $ 2,950 $ 4,702$ 902Total Programmed Funding:

Sausalito - Bridgeway/US 101 Off Ramp Bicycle ImpsSausalito: Highway 101 Off Ramp/Bridgeway/Gate 6 Intersection: Implement bicycle improvements

Project Name:Description:

SausalitoSponsor: SausalitoImplementing Agency:

MRN110010TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000494CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 88$ 88OTHER LOCALPE $ 75$ 75CMAQCON $ 250$ 250

OTHER LOCALCON $ 441$ 441

$ 691 $ 854$ 163Total Programmed Funding:

North-South Greenway Gap ClosureMarin County: Northern Segment: US101 off-ramp over Corte Madera Creek and along Old Redwood Highway to US101overcrossing: widen to add bike/ped path. Southern Segment: From Northern Segment to SMART right-of-way: close gaps inpath

Project Name:Description:

Transportation Authority of Marin (TAM)Sponsor: Transportation Authority of MarinImplementing Agency:

MRN170011TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 2,600$ 2,600BTPSE $ 3,200$ 3,200BTROW $ 1,450$ 1,450BTCON $ 11,800$ 11,800

$ 11,800 $ 19,050$ 7,250Total Programmed Funding:

End of section

2019 TIP September 26, 2018133S4 -

Page 62: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018134S4 -

Page 63: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyPublic Land and Trail Projects

Carmel Open Space AcquisitionNovato: Within the Carmel Open Space: Acquire a private parcel for use as a Priority Conservation Area

Project Name:Description:

NovatoSponsor: NovatoImplementing Agency:

MRN170029TIP ID: County: Marin PublicSystem: 17-03-0003RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 4.08 - EXEMPT (40 CFR 93.126) - Acquisition of scenic easementsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 312$ 312

$ 312 $ 312Total Programmed Funding:

End of section

2019 TIP September 26, 2018135S4 -

Page 64: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Marin CountyPublic Land and Trail Projects

The page left Intentionally blank

2019 TIP September 26, 2018136S4 -

Page 65: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyState Highway Projects

SR 12/29/221 Soscol Junction Interchange Imps.In Napa County: At SR-221/SR-29 I/C: Construct new southbound Route 221 to southbound Route 29 flyover (includingauxiliary lane to Route 12/Route 29)

Project Name:Description:

Napa Valley Transportation AuthoritySponsor: CaltransImplementing Agency:

NAP090003TIP ID: County: Napa StateSystem: 17-04-0009RTP ID: 2060000445CTIPS

Air Quality Exempt Code: NON-EXEMPT29Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 6,100$ 6,100RIPPSE $ 3,000$ 3,000

RIPROW $ 300$ 300

RIP $ 3,119CON $ 3,119

RTP-LRPCON $ 18,381$ 18,381

RTP-LRPCON-CE $ 4,800$ 4,800

RIPROW- $ 300$ 300

$ 3,600 $ 3,119 $ 23,181 $ 36,000$ 6,100Total Programmed Funding:

Silverado Trail Five-Way Intersection ImprovementsIn City of Napa: At the intersection of Silverado Trail, Third St, Coombsville Rd, and East Ave: Construct roundabout

Project Name:Description:

Napa (City)Sponsor: Napa (City)Implementing Agency:

NAP170009TIP ID: County: Napa StateSystem: 17-04-0005RTP ID: 2060000650CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projects121Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ACENV $ 1,400$ 1,400OTHER LOCALENV $ 50$ 50ACPSE $ 1,500$ 1,500ACROW $ 247$ 247

OTHER LOCALROW $ 500$ 500

RIP $ 1,153ROW $ 1,153

CMAQ $ 2,000CON $ 2,000

OTHER LOCAL $ 3,000CON $ 3,000

AC $ 353CON-CE $ 353

ACROW- $ 400$ 400

$ 1,147 $ 6,506 $ 10,603$ 2,950Total Programmed Funding:

SR 128 and Petrified Forest Intersection ImpIn Calistoga: On SR 128 and Petrified Forest Road, convert 4-way stop controlled intersection to a traffic signal.

Project Name:Description:

CalistogaSponsor: CalistogaImplementing Agency:

NAP150001TIP ID: County: Napa StateSystem: 17-04-0002RTP ID: 2060000584CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersections128 3.52 3.72Route: Post Mile From: Post Mile To: Toll $ 66,527

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 13$ 13OTHER LOCALPSE $ 40$ 40RIPPSE $ 105$ 105OTHER LOCALROW $ 7$ 7

RIPROW $ 50$ 50

OTHER LOCALCON $ 11$ 11

RIPCON $ 475$ 475

$ 7 $ 536 $ 701$ 158Total Programmed Funding:

End of section

2019 TIP September 26, 2018137S4 -

Page 66: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyState Highway Projects

The page left Intentionally blank

2019 TIP September 26, 2018138S4 -

Page 67: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyLocal Road Projects

Eucalyptus Drive Realignment Complete StreetsAmerican Canyon: Eucalyptus Dr. from Theresa Rd to Hwy 29: Extend roadway and reconfigure intersection of Eucalyptus Drand Hwy 29 and Eucalyptus Drive and Theresa Road. Create complete street areas for pedestrians and bicyclist along theextension.

Project Name:Description:

American CanyonSponsor: American CanyonImplementing Agency:

NAP110029TIP ID: County: Napa Local RoadSystem: 17-04-0004RTP ID: 2060000555CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 528$ 528OTHER LOCALPSE $ 1,240$ 1,240OTHER LOCALROW $ 776$ 776OTHER LOCALCON $ 826$ 826

RTP-LRPCON $ 2,819$ 2,819

$ 826 $ 2,819 $ 6,189$ 2,544Total Programmed Funding:

Devlin Road and Vine Trail ExtensionAmerican Canyon: Devlin Road from the southern terminus 2,500 feet south to Green Island Road: Construct roadwayextension and Class I multipurpose path

Project Name:Description:

American CanyonSponsor: American CanyonImplementing Agency:

NAP130006TIP ID: County: Napa Local RoadSystem: 17-04-0004RTP ID: 2060000580CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 297$ 297OTHER LOCALROW-CT $ 800$ 800OTHER LOCALCON $ 2,320$ 2,320

RIPCON $ 4,151$ 4,151

$ 2,320 $ 4,151 $ 7,568$ 1,097Total Programmed Funding:

Regional Planning Activities and PPM - NapaNapa: Countywide: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Napa Valley TransportationImplementing Agency:

NAP170001TIP ID: County: Napa Local RoadSystem: 17-10-0023RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 64ENV $ 468$ 64$ 275 $ 65

OTHER LOCALPE $ 495$ 495STPPE $ 3,822$ 3,822

$ 65 $ 64 $ 64 $ 4,785$ 4,592Total Programmed Funding:

California Boulevard RoundaboutsCity of Napa: At First Street/ California Blvd. and Second Street/ California Blvd: Construct roundaboutsCaltrans: Constructroundabout at Northbound off-ramp of SR 29 and First Street

Project Name:Description:

Napa (City)Sponsor: CaltransImplementing Agency:

NAP110028TIP ID: County: Napa Local RoadSystem: 17-04-0005RTP ID: 2060000555CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll $ 625,574

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 460$ 460ACPSE $ 250$ 250

OTHER LOCALPSE $ 1,126$ 1,126CMAQROW $ 723$ 723OTHER LOCALROW $ 426$ 146 $ 280

RIPROW $ 431$ 431ACCON $ 4,500$ 4,500

CMAQCON $ 1,740$ 1,740

OTHER LOCALCON $ 4,063$ 563 $ 3,500

RIPCON $ 1,070$ 1,070ACCON-CE $ 2,200$ 2,200

OTHER LOCALROW- $ 210$ 210

$ 12,470 $ 17,199$ 4,729Total Programmed Funding:

2019 TIP September 26, 2018139S4 -

Page 68: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyLocal Road Projects

Hardin Rd Bridge Replacement - 21C0058Napa County: On Harding Rd at Maxwell Creek, 1.6M SE of Pope Cyn Rd: Replace existing one lane bridge with new 2-lanebridge to meet standards. Toll credits are used in lieu of match for all phases.

Project Name:Description:

Napa CountySponsor: Napa CountyImplementing Agency:

NAP110026TIP ID: County: Napa Local RoadSystem: 17-10-0024RTP ID: 2060000555CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 699,670

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 900$ 900

HBPROW $ 200$ 200

HBPCON $ 5,000$ 5,000

$ 900 $ 5,200 $ 6,100Total Programmed Funding:

Loma Vista Dr Bridge Replacement - 21C0080Napa County: Loma Vista Dr over Soda Creek, 1.4 miles north of Silverado Trail: replace existing one lane bridge with newtwo lane bridge to meet standards. Toll credits are used in lieu of match for all phases.

Project Name:Description:

Napa CountySponsor: Napa CountyImplementing Agency:

NAP110027TIP ID: County: Napa Local RoadSystem: 17-10-0024RTP ID: 2060000555CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 699,670

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 900$ 900

HBPROW $ 200$ 200

HBPCON $ 5,000$ 5,000

$ 900 $ 5,200 $ 6,100Total Programmed Funding:

Airport Boulevard RehabilitationIn Napa County: On Airport Boulevard between SR 29 and Napa County Airport: Rehabilitate roadway and retrofit curb rampsat 3 intersections, retaining existing Class II bicycle lanes.

Project Name:Description:

Napa CountySponsor: Napa CountyImplementing Agency:

NAP130003TIP ID: County: Napa Local RoadSystem: 17-10-0022RTP ID: 2060000575CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCAL $ 64PSE $ 64

OTHER LOCAL $ 1,852CON $ 1,852

$ 1,916 $ 1,916Total Programmed Funding:

Napa County: 2014 Earthquake Pavement RepairIn Napa County: On various federal-aid system roads: Repair pavement damage caused by 2014 earthquake.

Project Name:Description:

Napa CountySponsor: Napa CountyImplementing Agency:

NAP170002TIP ID: County: Napa Local RoadSystem: 17-10-0022RTP ID: 2060000614CTIPS

Air Quality Exempt Code: 4.13 - EXEMPT (40 CFR 93.126) - Repair of damage caused by natural disasters, civil unrest, or terrorist acts,except projects involving substantial functional, locational or capacity changes

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ERPE $ 91$ 91ERCON $ 1,000$ 1,000

ERCON-CE $ 137$ 137

$ 1,137 $ 1,228$ 91Total Programmed Funding:

2019 TIP September 26, 2018140S4 -

Page 69: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyLocal Road Projects

Silverado Trail Phase L RehabNapa County: On Silverado Trail from Oak Knoll Ave to Hardman Ave: Rehabilitate existing asphalt concrete pavement, retainexisting Class II bicycle lanes, replace existing rumble dots (audible pavement markers) along bike lane line following overlay.

Project Name:Description:

Napa CountySponsor: Napa CountyImplementing Agency:

NAP170008TIP ID: County: Napa Local RoadSystem: 17-10-0022RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 22,482

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 25$ 25

OTHER LOCALPE $ 189$ 189

OTHER LOCALCON $ 1,411$ 1,411

RIPCON $ 196$ 196

STPCON $ 689$ 689

OTHER LOCALCON-CE $ 189$ 189

$ 214 $ 2,485 $ 2,699Total Programmed Funding:

End of section

2019 TIP September 26, 2018141S4 -

Page 70: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018142S4 -

Page 71: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyBike/Pedestrian Projects

Main Street St. Helena Pedestrian ImprovementsSaint Helena: Along Main Street (SR29) from Mitchell Dr to Pine St: Replace and upgrade pedestrian facilities and installtraffic calming devices

Project Name:Description:

Saint HelenaSponsor: Saint HelenaImplementing Agency:

NAP170005TIP ID: County: Napa StateSystem: 17-04-0003RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

29 28.48 28.848Route: Post Mile From: Post Mile To: Toll $ 138,328

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 187$ 187STPCON $ 1,206$ 1,206

$ 1,206 $ 1,393$ 187Total Programmed Funding:

Green Island Road Class IAmerican Canyon: Green Island Road in the Green Island Industrial District (GRID): Construct new Class 1 multi-use trail.

Project Name:Description:

American CanyonSponsor: American CanyonImplementing Agency:

NAP170006TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities29Route: Post Mile From: Post Mile To: Toll $ 114,700

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 43$ 43OTHER LOCALROW $ 36$ 36

STPCON $ 1,000$ 1,000

$ 36 $ 1,000 $ 1,079$ 43Total Programmed Funding:

State Route 29 Bicycle & Pedestrian UndercrossingNapa: On the North side of Napa Creek under Highway 29: Construct a Class 1 bicycle and pedestrian path

Project Name:Description:

Napa (City)Sponsor: Napa (City)Implementing Agency:

NAP130004TIP ID: County: Napa PublicSystem: 17-04-0001RTP ID: 2060000576CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

TFCAENV $ 24$ 24BTAPE $ 25$ 25TDAPE $ 72$ 72TFCAPSE $ 57$ 57TFCAROW $ 40$ 40

ATP-REGCON $ 531$ 531

TFCACON $ 40$ 40

$ 40 $ 571 $ 789$ 178Total Programmed Funding:

Vine Trail Gap Closure - Soscol Avenue CorridorNapa: Between Third St and Vallejo St in Downtown Napa: Construct a Class I multi-use trail to close a gap in the NapaValley Vine Trail

Project Name:Description:

Napa (City)Sponsor: Napa (City)Implementing Agency:

NAP170007TIP ID: County: Napa PublicSystem: 17-04-0001RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 5$ 5

OTHER LOCALPSE $ 15$ 15OTHER LOCALROW $ 5$ 5

OTHER LOCALCON $ 75$ 75

STPCON $ 650$ 650

$ 10 $ 725 $ 750$ 15Total Programmed Funding:

2019 TIP September 26, 2018143S4 -

Page 72: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Napa CountyBike/Pedestrian Projects

Napa Valley Vine Trail Design and ConstructionNapa County: Various locations: Design and construction of individual segments of Vine Trail.

Project Name:Description:

Napa Valley Transportation AuthoritySponsor: Napa Valley TransportationImplementing Agency:

NAP110014TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 2060000495CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 211$ 211OTHER LOCALPE $ 228$ 228TCSPPE $ 800$ 800OTHER LOCALROW $ 1$ 1TCSPROW $ 7$ 7ATP-STCON $ 3,600$ 3,600OTHER LOCALCON $ 2,305$ 2,305TCSPCON $ 1,693$ 1,693TDACON $ 425$ 425

$ 9,269$ 9,269Total Programmed Funding:

Napa Valley Vine Trail Calistoga-St. Helena Seg.In Napa County: From Calistoga to St. Helena: Construct multi-use trail

Project Name:Description:

Napa Valley Transportation AuthoritySponsor: Napa Valley TransportationImplementing Agency:

NAP150003TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

PRIVATEENV $ 212$ 212PRIVATEPSE $ 220$ 220PRIVATEROW $ 60$ 60ATP-REGCON $ 6,106$ 6,106

OTHER LOCALCON $ 750$ 250 $ 500

PRIVATECON $ 1,858$ 1,054 $ 804

$ 7,410 $ 9,206$ 1,796Total Programmed Funding:

Napa County Safe Routes to SchoolsNapa County: County-wide: Safe Routes to Schools Program, Non-Infrastructure

Project Name:Description:

Napa Valley Transportation AuthoritySponsor: Napa Valley TransportationImplementing Agency:

NAP170004TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 2060000629CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGCON $ 437$ 437OTHER LOCALCON $ 147$ 147STPCON $ 227$ 227

$ 811$ 811Total Programmed Funding:

Hopper Creek Pedestrian Bridge and Path ProjectYountville: Along Hopper Creek from Oak Circle Open Space to Mission St: Construct multi-use pathway and a pedestrianbridge across Hopper Creek

Project Name:Description:

YountvilleSponsor: YountvilleImplementing Agency:

NAP130008TIP ID: County: Napa PublicSystem: 17-04-0001RTP ID: 2060000581CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 100$ 100

RIPCON $ 500$ 500

$ 100 $ 500 $ 600Total Programmed Funding:

End of section

2019 TIP September 26, 2018144S4 -

Page 73: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyState Highway Projects

Yerba Buena Island (YBI) Ramp ImprovementsSan Francisco: Existing on and off ramps at the Yerba Buena Island (YBI) interchange at US I-80: Reconst ramps; On thewest side of the Island: Rehabilitate existing deficient bridges.

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:

SF-070027TIP ID: County: San Francisco StateSystem: 17-05-0023RTP ID: 2060000403CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects80 7.8 8.1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 19,319$ 19,319OTHER LOCALPE $ 2,503$ 2,503BR-SEISMICROW $ 361$ 212 $ 149

HBPROW $ 2,789$ 1,638 $ 1,151

ACCON $ 67,781$ 5,504 $ 20,721 $ 41,556

BR-SEISMICCON $ 17,048$ 6,118$ 8,896 $ 795 $ 1,238

HBPCON $ 142,748$ 47,222$ 68,665 $ 10,278$ 6,140 $ 10,443

OTHER LOCALCON $ 8,782$ 713 $ 2,685 $ 5,384

$ 31,641 $ 58,621 $ 10,278 $ 53,340 $ 261,331$ 107,449Total Programmed Funding:

HOV/HOT Lanes on U.S.101 and I-280 in SFSan Francisco: On US 101 from SF/SM County line to I-280 interchange and on I-280 from US 101 interchange to 6th Streetofframp: Convert an existing mixed traffic lane and/or shoulder/excess ROW in each direction to HOV and project develop forHOT

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:

SF-130008TIP ID: County: San Francisco StateSystem: 17-05-0020RTP ID: 2060000555CTIPS

Air Quality Exempt Code: NON-EXEMPT101 0.0 2.92Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500OTHER LOCALROW $ 500$ 500

OTHER LOCALCON $ 900$ 900

RTP-LRPCON $ 41,000$ 41,000

$ 1,400 $ 41,000 $ 42,900$ 500Total Programmed Funding:

2019 TIP September 26, 2018145S4 -

Page 74: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyState Highway Projects

US 101 Doyle Drive ReplacementSan Francisco: US 101 (Doyle Drive) from Lombard Street/Richardson Avenue to Route 1 Interchange; Replace/rehabilitateroadway.

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: CaltransImplementing Agency:

SF-991030TIP ID: County: San Francisco StateSystem: 17-10-0025RTP ID: 2060000144CTIPS

Air Quality Exempt Code: NON-EXEMPT101 8.0 9.8Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 5,437$ 5,437FLHPENV $ 7,200$ 7,200SALESTAX-MEASUREENV $ 5,874$ 5,874TCRPENV $ 9,000$ 9,000ACPSE $ 20,240$ 20,240EARMARKPSE $ 4,538$ 4,538FLHPPSE $ 21,904$ 21,904RIPPSE $ 6,374$ 6,374SALESTAX-MEASUREPSE $ 3,004$ 3,004TCRPPSE $ 4,700$ 4,700ACROW-CT $ 1,100$ 1,100RIPROW-CT $ 391$ 391SALESTAX-MEASUREROW-CT $ 6,000$ 6,000ACROW $ 32,300$ 32,300EARMARKROW $ 2,622$ 2,622FLHPROW $ 31,261$ 31,261RIPROW $ 10,101$ 10,101AB1171-AB144CON-CT $ 3,000$ 3,000ACCON-CT $ 32,030$ 32,030ST-STPCON-CT $ 10,863$ 10,863TCRPCON-CT $ 1,300$ 1,300AB1171-AB144CON $ 77,000$ 77,000ACCON $ 303,720$ 303,720FLHPCON $ 3,704$ 3,704OTHER LOCALCON $ 75,000$ 75,000PROPCON $ 19,366$ 19,366RIPCON $ 72,235$ 72,235SALESTAX-MEASURECON $ 50,683$ 50,683SHA $ 21,200CON $ 1,115,070$ 966,670$ 63,600 $ 21,200$ 21,200 $ 21,200

ST-STPCON $ 75,819$ 75,819STPCON $ 49,000$ 34,000 $ 15,000

TIGERCON $ 46,000$ 46,000

$ 36,200 $ 21,200 $ 21,200 $ 21,200 $ 966,670 $ 2,106,837$ 1,040,367Total Programmed Funding:

Bay Bridge Forward-Sterling/Bryant St Managed LaneSterling/Bryant St. and Regionwide: Pilot Vehicle Occupancy Detection (VOD) technology and increased CHP enforcement atSterling and other pilot sites, support planned HOV lanes to bridge; convert HOV lane to express lane

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

SF-170003TIP ID: County: San Francisco StateSystem: 17-10-0033RTP ID: 2060000612CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 2,447$ 1,330 $ 1,117

BTPSE $ 1,200$ 1,200

BTCON $ 3,986$ 3,986

$ 6,303 $ 7,633$ 1,330Total Programmed Funding:

End of section

2019 TIP September 26, 2018146S4 -

Page 75: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyLocal Road Projects

Regional Planning Activities and PPM - SF CountySan Francisco: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: San Francisco County TransportImplementing Agency:

SF-170002TIP ID: County: San Francisco Local RoadSystem: 17-10-0023RTP ID: 2060000609CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 259ENV $ 1,892$ 259$ 1,114 $ 260

OTHER LOCALPE $ 518$ 518STPPE $ 5,897$ 3,997 $ 1,900

$ 1,900 $ 260 $ 259 $ 259 $ 8,307$ 5,629Total Programmed Funding:

Cargo Way and Amador Street ImprovementsIn San Francisco: On Cargo Way from Jennings to 3rd Street and Amador Street from Illinois Street to 2,300 ft. east: designand construct a complete street project.

Project Name:Description:

Port of San FranciscoSponsor: Port of San FranciscoImplementing Agency:

SF-170012TIP ID: County: San Francisco Local RoadSystem: 17-05-0014RTP ID: 2060000623CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500

RTP-LRPCON $ 29,500$ 29,500

$ 500 $ 29,500 $ 30,000Total Programmed Funding:

Treasure Island Congestion Pricing ProgramSan Francisco: Treasure Island: Implement Congestion Pricing Program. project is phased

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:

SF-110049TIP ID: County: San Francisco Local RoadSystem: 17-05-0030RTP ID: 2060000545CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 2,150$ 2,150RTP-LRPPE $ 1,051$ 1,051

SALESTAX-MEASUREPE $ 260$ 260VPPPPE $ 480$ 480OTHER LOCALPSE $ 500$ 500PRIVATEPSE $ 1,000$ 1,000

RTP-LRPPSE $ 5,174$ 5,174

OTHER LOCALCON $ 1,000$ 1,000

RTP-LRPCON $ 1,140$ 1,140

$ 2,000 $ 7,365 $ 12,755$ 3,390Total Programmed Funding:

Treasure Is/Yerba Buena Is Street ImprovementsSan Francisco: On Treasure Island: Implement Treasure Island/Yerba Buena Island street network Project includes a newstreet network, traffic calming, bike & pedestrian improvements, streetscape and transit/shuttle stops.

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:

SF-130004TIP ID: County: San Francisco Local RoadSystem: 17-05-0030RTP ID: 2060000554CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500OTHER LOCALROW $ 1,000$ 1,000PRIVATECON $ 46,460$ 35,460$ 5,000$ 1,000 $ 5,000

$ 1,000 $ 5,000 $ 5,000 $ 35,460 $ 47,960$ 1,500Total Programmed Funding:

2019 TIP September 26, 2018147S4 -

Page 76: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyLocal Road Projects

SF Downtown Congestion PricingSan Francisco: In the downtown area: Implement a demonstration value pricing (tolls and incentives) program

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:

SF-130017TIP ID: County: San Francisco Local RoadSystem: 17-05-0029RTP ID: 2060000571CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 100$ 100SALESTAX-MEASUREPE $ 200$ 200OTHER LOCALCON $ 1,000$ 1,000

RTP-LRPCON $ 124,700$ 124,700

$ 1,000 $ 124,700 $ 126,000$ 300Total Programmed Funding:

Quint-Jerrold Connector RoadSan Francisco: From Oakdale Ave to Jerrold Ave: Provide an alternate access route between Oakdale and Jerrold Avenuesand across the Caltrain tracks, to be coordinated with Caltrain's Quint Street Bridge Replacement project which closed QuintStreet.

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-150008TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 2060000592CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 183$ 183OTHER LOCALPE $ 2$ 2SALESTAX-MEASUREPE $ 598$ 598OTHER LOCALPSE $ 107$ 107

SALESTAX-MEASUREPSE $ 376$ 376

SALESTAX-MEASUREROW $ 1,914$ 1,914OTHER LOCALCON $ 1,791$ 1,791

RTP-LRPCON $ 10,851$ 10,851

SALESTAX-MEASURECON $ 4,118$ 4,118

$ 483 $ 5,909 $ 10,851 $ 19,940$ 2,697Total Programmed Funding:

Bayview Transportation ImprovementsIn San Francisco: From US 101 to the Hunters Point Shipyard along: 25th, I280-Illinois; Cesar Chavez, US101-Illinois; Illinois,25th-Cargo; Cargo, Illinois-Jennings; Jennings, Cargo-Evans; Evans, Cesar Chavez-Jennings: Implement direct accessroutes

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-010038TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 2060000226CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 7,889$ 7,889OTHER LOCALENV $ 1,972$ 1,972RTP-LRPPSE $ 500$ 500

RTP-LRPROW $ 788$ 788

EARMARKCON $ 907$ 907RTP-LRPCON $ 31,084$ 31,084

$ 32,372 $ 43,139$ 10,768Total Programmed Funding:

2019 TIP September 26, 2018148S4 -

Page 77: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyLocal Road Projects

Harney Way Roadway WideningSan Francisco: Harney Way from US 101 to Jamestown: Improvements including right-of-way engineering, land acquisitionfor future widening of roadway, design, landscaping and sidewalk improvements, roadway construction, and traffic signalimprovements.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-090004TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 2060000427CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 300$ 300EARMARKPE $ 63$ 63OTHER LOCALPE $ 37$ 37PRIVATEPE $ 600$ 600EARMARKROW $ 475$ 475OTHER LOCALROW $ 205$ 205OTHER LOCALCON $ 320$ 320PRIVATECON $ 23,500$ 23,500RTP-LRPCON $ 2,000$ 2,000

$ 2,000 $ 27,500$ 25,500Total Programmed Funding:

Great Highway RestorationSan Francisco: Great Highway From Sloat to Skyline Hwy: Ph 1. Restore and stabilize roadway, stop bluff slides, and protectinfrastructure. Phase 2. Implement road diet by closing remaining SB lane and converting 2 NB lanes to 1 NB lane and 1 SBlane.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-110005TIP ID: County: San Francisco Local RoadSystem: 17-10-0022RTP ID: 2060000462CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ERSPE $ 795$ 795SALESTAX-MEASUREPE $ 103$ 103ERSCON $ 5,580$ 5,580SALESTAX-MEASURECON $ 347$ 347

$ 6,826$ 6,826Total Programmed Funding:

Hunters Pt Shipyard and Candlestick Pt Local RoadsIn San Francisco: Hunters Point Shipyard and Candlestick Point: Implement new local streets to support multi-modal mixeduse development. The project is phased.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-110006TIP ID: County: San Francisco Local RoadSystem: 17-05-0027RTP ID: 2060000463CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 50$ 50PRIVATEPE $ 36,950$ 36,950PRIVATEROW $ 30,000$ 2,000 $ 28,000

PRIVATECON $ 354,100$ 351,100$ 3,000

$ 28,000 $ 351,100 $ 421,100$ 42,000Total Programmed Funding:

2019 TIP September 26, 2018149S4 -

Page 78: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyLocal Road Projects

SF- Better Market Street Transportation ElementsIn San Francisco: Market St from Steuart St to Octavia Blvd: improve roadway, including resurfacing, sidewalk and transitboarding improvements, transit connections, traffic signals, transportation circulation changes and utility relocation andupgrade.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-130001TIP ID: County: San Francisco Local RoadSystem: 17-05-0016RTP ID: 2060000555CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,000$ 1,000OTHER LOCAL $ 2,071PE $ 2,071

STP $ 15,980PE $ 15,980

OTHER LOCALPSE $ 6,429$ 6,429OTHER LOCAL $ 500ROW $ 500

OTHER LOCAL $ 1,500CON $ 1,500

RTP-LRPCON $ 387,520$ 387,520

$ 20,051 $ 387,520 $ 415,000$ 7,429Total Programmed Funding:

Southeast Waterfront Transportation ImprovementsSan Francisco: Between HP Shipyard and Candlestick Pt: improve roadways to facilitate 5-mile, multi-modal corridor,connecting project area with the Bayshore Intermodal Station. Project development and AQ conformity analysis were part ofSF-010038.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-130006TIP ID: County: San Francisco Local RoadSystem: 17-05-0031RTP ID: 2060000553CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200OTHER LOCALCON $ 1,800$ 1,800PRIVATECON $ 103,568$ 103,568RTP-LRPCON $ 162,933$ 162,933

$ 162,933 $ 268,501$ 105,568Total Programmed Funding:

HOPE SF Street Network - Hunters ViewSan Francisco: Hunters View in Southeast: Realign streets and add new streets at public housing sites with new affordablehousing units to improve transit, walking, and biking. Project is phased. Phase I and II are completed.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco City/CountyImplementing Agency:

SF-130007TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 2060000554CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 3,000$ 3,000OTHER LOCALCON $ 9,000$ 8,000 $ 1,000

$ 1,000 $ 12,000$ 11,000Total Programmed Funding:

HOPE SF Street Network - Sunnydale and PotreroSan Francisco: Sunnydale and Potrero neighborhoods: Construct new and realigned street networks throughout the tworemaining HOPE SF sites, including traffic calming pedestrian and bike network, and transit/shuttle stops

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-170013TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 2060000624CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,500$ 1,500RTP-LRPPE $ 4,500$ 4,500

OTHER LOCALCON $ 4,500$ 4,500

RTP-LRPCON $ 23,500$ 23,500

$ 4,500 $ 28,000 $ 34,000$ 1,500Total Programmed Funding:

End of section

2019 TIP September 26, 2018150S4 -

Page 79: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyBike/Pedestrian Projects

Pier 70 19th Street & Illinois Street SidewalkSan Francisco: 19th St to 20th St (via Georgia St): Extend roadway and install bike/ped improvements.

Project Name:Description:

Port of San FranciscoSponsor: Port of San FranciscoImplementing Agency:

SF-130021TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 2060000583CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 225$ 225OTHER LOCALCON $ 1,160$ 1,160

STPCON $ 1,000$ 1,000

$ 2,160 $ 2,385$ 225Total Programmed Funding:

SB I-280 Off-Ramp at Ocean Ave RealignmentSan Francisco: I-280/Ocean Avenue Interchange: Realign the southbound I-280 off-ramp to Ocean Avenue into a Tintersection with a new signal on Ocean Avenue

Project Name:Description:

San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:

SF-150013TIP ID: County: San Francisco Local RoadSystem: 17-05-0009RTP ID: 2060000597CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 750$ 750OTHER LOCALPSE $ 500$ 500

OTHER LOCALCON $ 1,000$ 1,000

RTP-LRPCON $ 3,350$ 3,350

$ 500 $ 1,000 $ 3,350 $ 5,600$ 750Total Programmed Funding:

SF Safe Routes to School 2017-2019San Francisco: Citywide: Implement a pilot proposal that includes innovative educational, encouragement, and evaluationactivities and deliverables to increase safe walking and biking by schoolchildren and their families for school years 2017-2019.

Project Name:Description:

San Francisco Depart of Public Health (SFDPH)Sponsor: San Francisco Depart of PublicImplementing Agency:

SF-150017TIP ID: County: San Francisco Local RoadSystem: 17-05-0003RTP ID: 2060000605CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 276,542

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGCON $ 2,411$ 2,411OTHER LOCALCON $ 133$ 67 $ 67

$ 67 $ 2,544$ 2,478Total Programmed Funding:

SF- Second Street Complete Streets and Road DietIn San Francisco: On Second Street between Market and King; Design and construct a complete streets project including theremoval of a vehicular travel lane from Market to Townsend

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-130011TIP ID: County: San Francisco Local RoadSystem: 17-05-0004RTP ID: 2060000570CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 469$ 469SALESTAX-MEASUREPE $ 173$ 173STPPE $ 1,334$ 1,334OTHER LOCALCON $ 1,180$ 1,180SALESTAX-MEASURECON $ 1,550$ 1,550STPCON $ 9,782$ 9,782

$ 14,488$ 14,488Total Programmed Funding:

2019 TIP September 26, 2018151S4 -

Page 80: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Francisco CountyBike/Pedestrian Projects

John Yehall Chin Safe Routes to SchoolIn San Francisco: 5 intersections near 350 Broadway Street: Construct curb extensions.

Project Name:Description:

San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:

SF-150001TIP ID: County: San Francisco Local RoadSystem: 17-05-0003RTP ID: 2060000587CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 41,063

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 21$ 21SALESTAX-MEASUREENV $ 40$ 40ATP-STPSE $ 337$ 337OTHER LOCALCON $ 1,497$ 1,497

STPCON $ 3,366$ 3,366

$ 4,863 $ 5,261$ 398Total Programmed Funding:

SF - Powell Street Safety ImprovementIn SF: Powell Street from Ellis to Post: Improve pedestrian safety and reduce sidewalk crowding to encourage more people towalk, especially to jobs.

Project Name:Description:

San Francisco Municipal Transport Agency (SFMTA)Sponsor: San Francisco Municipal TransportImplementing Agency:

SF-170014TIP ID: County: San Francisco Local RoadSystem: 17-05-0001RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,090$ 1,090PROPENV $ 500$ 500OTHER LOCALPE $ 1,350$ 1,350OTHER LOCALROW $ 100$ 100ATP-REGCON $ 4,400$ 4,400

OTHER LOCALCON $ 2,449$ 2,449

$ 6,849 $ 9,889$ 3,040Total Programmed Funding:

Vision Zero SF: Safer IntersectionsSan Francisco Citywide: Education and outreach program targeting unsafe left turns in intersections.

Project Name:Description:

San Francisco Municipal Transport Agency (SFMTA)Sponsor: San Francisco Municipal TransportImplementing Agency:

SF-170017TIP ID: County: San Francisco Local RoadSystem: 17-05-0003RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGCON $ 2,002$ 2,002OTHER LOCALCON $ 60$ 60

$ 2,062$ 2,062Total Programmed Funding:

SF Safe Routes to School Non-InfrastructureSan Francisco: Citywide: Coordinate school transportation services, including planning, operations, education, outreach andcapital improvement activities. It will improve the safety of students who walk and bike to school.

Project Name:Description:

San Francisco Municipal Transport Agency (SFMTA)Sponsor: San Francisco Municipal TransportImplementing Agency:

SF-170023TIP ID: County: San Francisco Local RoadSystem: 17-05-0003RTP ID: 2060000651CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 2,813$ 2,813

SALESTAX-MEASURECON $ 365$ 365

$ 3,178 $ 3,178Total Programmed Funding:

End of section

2019 TIP September 26, 2018152S4 -

Page 81: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyState Highway Projects

Route 1 improvements in Half Moon BayHalf Moon Bay: On SR-1: Improve safety, including adding protected turn lanes, adding through lanes, and new ped/bikepath; SR-1 from N. Main to Kehoe: Extend four lane configuration; Frontage Rd and Grand Blvd: Connect to Terrace Ave

Project Name:Description:

Half Moon BaySponsor: San Mateo County TransportationImplementing Agency:

SM-090015TIP ID: County: San Mateo StateSystem: 17-06-0023RTP ID: 2060000435CTIPS

Air Quality Exempt Code: NON-EXEMPT1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 600$ 600OTHER LOCALROW $ 50$ 50OTHER LOCALCON $ 3,100$ 3,100

SALESTAX-MEASURECON $ 6,400$ 6,400

$ 6,400 $ 3,100 $ 10,150$ 650Total Programmed Funding:

Hwy 1 Congestion & Safety improvementsIn San Mateo County along 7 miles of Highway 1 between Pacifica in the north and Half Moon Bay in the south; Install raisedmedians, left turn lanes, acceleration lanes, and pedestrian crossings.

Project Name:Description:

San Mateo CountySponsor: San Mateo CountyImplementing Agency:

SM-170001TIP ID: County: San Mateo StateSystem: 17-06-0020RTP ID: 2060000607CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projects1 30 38.31Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 150$ 150SALESTAX-MEASUREENV $ 1,000$ 1,000OTHER LOCALPE $ 300$ 300OTHER LOCALCON $ 850$ 850

RTP-LRPCON $ 4,900$ 4,900

$ 850 $ 4,900 $ 7,200$ 1,450Total Programmed Funding:

SSF Grand Blvd Improvements Kaiser Way to McLellanSouth San Francisco: Along El Camino Real between Kaiser Way and McLellan Drive: Implement bike and pedestrianenhancements, street trees, rain gardens and median landscaping as well as sustainable/green streets features.

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-130030TIP ID: County: San Mateo StateSystem: 17-06-0003RTP ID: 2060000582CTIPS

Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)

82 20.5 21.6Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 457$ 457OTHER LOCALCON $ 548$ 548RIPCON $ 1,991$ 1,991

$ 2,996$ 2,996Total Programmed Funding:

SSF Grand Boulevard Complete Streets (Phase III)South San Francisco: El Camino Real from Arroyo Dr to Kaiser Way: Implement Grand Boulevard Complete Streetsimprovements

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-170016TIP ID: County: San Mateo StateSystem: 17-06-0003RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities82 20.9 21.2Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 125$ 125

OTHER LOCALPE $ 25$ 25

CMAQCON $ 875$ 875

OTHER LOCALCON $ 250$ 250

$ 150 $ 1,125 $ 1,275Total Programmed Funding:

2019 TIP September 26, 2018153S4 -

Page 82: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyState Highway Projects

SR92/El Camino Real (SR82) Ramp ModificationsSan Mateo: At the SR92/El Camino Real (SR82) interchange: Modify existing on/off rampsto improve the ingress and egressof the interchange.

Project Name:Description:

CaltransSponsor: San Mateo (City)Implementing Agency:

SM-110047TIP ID: County: San Mateo StateSystem: 17-06-0019RTP ID: 2060000520CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects92 11.21 11.21Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 980$ 980OTHER LOCALPE $ 125$ 125SALESTAX-MEASUREPE $ 500$ 500EARMARKPSE $ 1,000$ 1,000OTHER LOCALPSE $ 100$ 100SALESTAX-MEASUREPSE $ 1,500$ 1,500EARMARKCON $ 865$ 865PRIVATECON $ 2,030$ 2,030RIPCON $ 2,000$ 2,000SALESTAX-MEASURECON $ 16,000$ 16,000RIPCON-CE $ 3,000$ 3,000

$ 28,100$ 28,100Total Programmed Funding:

US 101 / Willow Road Interchange ReconstructionMenlo Park: US 101 at Willow Road Interchange: Reconstruct and reconfigure interchange (No additional travel lanes).

Project Name:Description:

Menlo ParkSponsor: Menlo ParkImplementing Agency:

SM-010047TIP ID: County: San Mateo StateSystem: 17-06-0014RTP ID: 2060000213CTIPS

Air Quality Exempt Code: 5.04 - EXEMPT (40 CFR 93.127) - Changes in vertical and horizontal alignment101 1.7 2.1Route: Post Mile From: Post Mile To: Toll $ 774,455

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 3,534$ 3,534RIPPSE $ 4,946$ 4,946RIPROW $ 2,217$ 2,217SALESTAX-MEASURECON $ 56,000$ 56,000RIPCON-CE $ 8,000$ 8,000RIPROW- $ 855$ 855SALESTAX-MEASUREROW- $ 100$ 100

$ 75,652$ 75,652Total Programmed Funding:

US 101 / Woodside Interchange ImprovementRedwood City: US101/Woodside Rd Interchange: Reconstruct and reconfigure interchange including direct-connect flyoverramp to Veterans Blvd; Seaport Blvd and SR84 from US101/SR84 separation to Spring St: Widen to six lanes plus turnpockets.

Project Name:Description:

Redwood CitySponsor: Redwood CityImplementing Agency:

SM-050027TIP ID: County: San Mateo StateSystem: 17-06-0010RTP ID: 2060000348CTIPS

Air Quality Exempt Code: NON-EXEMPT101 5.1 6.0Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 780$ 780SALESTAX-MEASUREENV $ 3,420$ 3,420SALESTAX-MEASUREPE $ 1,000$ 1,000OTHER LOCALPSE $ 2,110$ 2,110SALESTAX-MEASUREPSE $ 7,140$ 7,140OTHER LOCALROW $ 9,000$ 9,000

RIP $ 8,000ROW $ 8,000

SALESTAX-MEASUREROW $ 20,000$ 20,000

RTP-LRPCON $ 37,300$ 37,300

RTP-LRPCON-CE $ 1,000$ 1,000

SALESTAX-MEASUREROW- $ 1,000$ 1,000

$ 29,000 $ 8,000 $ 38,300 $ 90,750$ 15,450Total Programmed Funding:

2019 TIP September 26, 2018154S4 -

Page 83: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyState Highway Projects

US 101/Candlestick I/C ReconfigurationIn San Mateo County: U.S. 101/Candlestick Point Interchange: Planning and environmental studies for interchangereconfiguration to allow for safer and better flow of traffic

Project Name:Description:

BrisbaneSponsor: BrisbaneImplementing Agency:

SM-090004TIP ID: County: San Mateo StateSystem: 17-06-0021RTP ID: 2060000431CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCAL $ 1,500PE $ 1,990$ 490RTP-LRPPE $ 22,610$ 22,610

SALESTAX-MEASUREPE $ 400$ 400

$ 1,500 $ 22,610 $ 25,000$ 890Total Programmed Funding:

US 101 Aux lanes from Sierra Point to SF Co. LineSan Mateo County: On US 101 from Sierra Point to SF County Line; Construct auxiliary lanes or managed lanes. Project alsoreferences RTP ID 240060 for managed lanes

Project Name:Description:

San Mateo County Transportation AuthoritySponsor: San Mateo County TransportationImplementing Agency:

SM-090009TIP ID: County: San Mateo StateSystem: 17-06-0008RTP ID: 2060000436CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 8,000$ 8,000SALESTAX-MEASUREPE $ 1,000$ 1,000OTHER LOCALPSE $ 800$ 800RTP-LRPCON $ 65,000$ 65,000

$ 65,000 $ 74,800$ 9,800Total Programmed Funding:

Improve US 101 operations near Rte 92City of San Mateo: On US 101 near Route 92: Operational improvements

Project Name:Description:

San Mateo (City)Sponsor: San Mateo County TransportationImplementing Agency:

SM-090014TIP ID: County: San Mateo StateSystem: 17-06-0009RTP ID: 2060000432CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll $ 276,542

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 2,411$ 2,411

OTHER LOCALPE $ 93$ 93SALESTAX-MEASUREPE $ 3,130$ 3,130SB1PE $ 207$ 207

RIPPSE $ 3,217$ 3,217

RTP-LRPCON $ 18,211$ 18,211

$ 207 $ 2,411 $ 3,217 $ 18,211 $ 27,269$ 3,223Total Programmed Funding:

US 101/Produce Avenue New InterchangeSouth San Francisco: On US Highway 101 from Utah Avenue on the east side to the vicinity of Produce Avenue on the westside: Construct a local interchange

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-110003TIP ID: County: San Mateo StateSystem: 17-06-0011RTP ID: 2060000470CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 150$ 150SALESTAX-MEASUREENV $ 3,000$ 3,000OTHER LOCALPE $ 1,040$ 1,040SALESTAX-MEASUREPE $ 500$ 500OTHER LOCALPSE $ 1,300$ 1,300

RIPPSE $ 5,000$ 5,000

OTHER LOCALCON $ 2,000$ 2,000

RTP-LRPCON $ 123,500$ 123,500

$ 6,300 $ 125,500 $ 136,490$ 4,690Total Programmed Funding:

2019 TIP September 26, 2018155S4 -

Page 84: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyState Highway Projects

US101 Managed Lanes: Santa Clara Co-S of Grand AveSan Mateo County: On US101 from 2 miles south of the Santa Clara County Line to 0.3 miles south of Grand Ave I/C: InstallExpress Lanes. Use existing aux lanes where possible and add aux lanes where needed for operations. SMCTA is co-sponsoring project.

Project Name:Description:

San Mateo CCAGSponsor: CaltransImplementing Agency:

SM-150017TIP ID: County: San Mateo StateSystem: 17-06-0007RTP ID: 2060000605CTIPS

Air Quality Exempt Code: NON-EXEMPT101 0 21.8Route: Post Mile From: Post Mile To: Toll $ 1,899,852

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SB1ENV $ 1,550$ 1,550

EARMARKPE $ 9,548$ 9,548PRIVATEPE $ 3,000$ 3,000SALESTAX-MEASUREPE $ 8,500$ 8,500IIPPSE $ 18,000$ 18,000

SALESTAX-MEASUREPSE $ 19,450$ 19,450SB1PSE $ 270$ 270

RIPROW $ 16,000$ 16,000

PRIVATECON $ 50,000$ 50,000

SALESTAX-MEASURECON $ 1,550$ 1,550

SB1CON $ 196,500$ 196,500

TOLLSCON $ 148,000$ 148,000

RIPCON-CE $ 17,500$ 17,500

SB1CON-CE $ 23,500$ 23,500

SALESTAX-MEASUREROW- $ 1,000$ 1,000

$ 36,820 $ 437,050 $ 514,368$ 40,498Total Programmed Funding:

US 101/Peninsula Avenue Interchange ImprovementsSan Mateo: US-101 at Peninsula Ave and East Poplar Ave: Convert a partial interchange to a full interchange by adding newsouthbound on- and off-ramps and closing the southbound on- and off-ramps at East Poplar Avenue.

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-170011TIP ID: County: San Mateo StateSystem: 17-06-0012RTP ID: 2060000628CTIPS

Air Quality Exempt Code: NON-EXEMPT101 14.5 14.9Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 2,500$ 2,500OTHER LOCALPSE $ 1,900$ 1,900

RTP-LRPCON $ 84,600$ 84,600

$ 1,900 $ 84,600 $ 89,000$ 2,500Total Programmed Funding:

End of section

2019 TIP September 26, 2018156S4 -

Page 85: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

Belmont Pavement PreservationBelmont: Various streets and roads: Pavement preservation

Project Name:Description:

BelmontSponsor: BelmontImplementing Agency:

SM-170043TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 53$ 53OTHER LOCAL $ 80CON $ 80

STP $ 467CON $ 467

$ 547 $ 600$ 53Total Programmed Funding:

Brisbane - Tunnel Ave RehabilitationBrisbane: Tunnel Ave from northern city limits (N/O Beatty Ave) to 1500 ft. south: Rehabilitate pavement

Project Name:Description:

BrisbaneSponsor: BrisbaneImplementing Agency:

SM-170019TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 10$ 10OTHER LOCALCON $ 19$ 19

STPCON $ 137$ 137

$ 156 $ 166$ 10Total Programmed Funding:

Carolan Ave Complete Streets and Road DietBurlingame: Carolan Ave between Broadway and Oak Grove Ave: Implement road diet by converting a 4-lane roadway into a2-lane roadway with a center turn lane, Class II bike lanes, and intersection bulb-outs.

Project Name:Description:

BurlingameSponsor: BurlingameImplementing Agency:

SM-130021TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 2060000557CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll $ 113,094

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 174$ 174CMAQCON $ 986$ 986

$ 1,160$ 1,160Total Programmed Funding:

Hoover School Area Sidewalk Impvts (Summit Dr.)Burlingame: Summit Dr from Hillside Circle to Easton Dr and immediately adjacent to the new Hoover Elementary School:Construct sidewalk and bicycle improvements

Project Name:Description:

BurlingameSponsor: BurlingameImplementing Agency:

SM-170015TIP ID: County: San Mateo Local RoadSystem: 17-06-0002RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 116$ 116

OTHER LOCALPE $ 33$ 33

CMAQCON $ 584$ 584

OTHER LOCALCON $ 165$ 165

$ 149 $ 749 $ 898Total Programmed Funding:

Burlingame Street ResurfacingBurlingame: Various streets and roads: Roadway resurfacing

Project Name:Description:

BurlingameSponsor: BurlingameImplementing Agency:

SM-170021TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200OTHER LOCALCON $ 600$ 600

STPCON $ 571$ 571

$ 1,171 $ 1,371$ 200Total Programmed Funding:

2019 TIP September 26, 2018157S4 -

Page 86: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

Daly City Street Resurfacing and Slurry SealDaly City: Various streets and roads: Pavement preservation

Project Name:Description:

Daly CitySponsor: Daly CityImplementing Agency:

SM-170023TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 150,257

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 170$ 170STPCON $ 1,310$ 1,310

$ 1,310 $ 1,480$ 170Total Programmed Funding:

East Palo Alto Citywide Street ResurfacingEast Palo Alto: Various streets and roads: Rehabilitate roadway

Project Name:Description:

East Palo AltoSponsor: East Palo AltoImplementing Agency:

SM-170024TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 52$ 52OTHER LOCALCON $ 426$ 426

STPCON $ 416$ 416

$ 842 $ 894$ 52Total Programmed Funding:

Foster City - Pavement RehabilitationFoster City: Various streets and roads: Pavement rehabilitation

Project Name:Description:

Foster CitySponsor: Foster CityImplementing Agency:

SM-170025TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 171$ 171OTHER LOCALCON $ 1,289$ 1,289

STPCON $ 441$ 441

$ 1,730 $ 1,901$ 171Total Programmed Funding:

Hillsborough Street ResurfacingHillsborough: Various roadways: Resurfacing and preventative maintenance

Project Name:Description:

HillsboroughSponsor: HillsboroughImplementing Agency:

SM-170026TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 46,798

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 53$ 53STPCON $ 408$ 408

$ 408 $ 461$ 53Total Programmed Funding:

Menlo Park - Santa Cruz and Middle Avenues RehabMenlo Park: Santa Cruz Ave between Olive St and Orange Ave and Middle Ave between Olive St and San Mateo Dr:Pavement Rehabilitation and installation of rectangular rapid flashing beacon

Project Name:Description:

Menlo ParkSponsor: Menlo ParkImplementing Agency:

SM-170027TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 75$ 75OTHER LOCALCON $ 255$ 255

STPCON $ 647$ 647

$ 902 $ 977$ 75Total Programmed Funding:

2019 TIP September 26, 2018158S4 -

Page 87: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

Regional Planning Activities and PPM - San MateoSan Mateo: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: San Mateo CCAGImplementing Agency:

SM-170002TIP ID: County: San Mateo Local RoadSystem: 17-10-0023RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 262ENV $ 1,925$ 262$ 800 $ 263$ 338

OTHER LOCALPE $ 495$ 495STPPE $ 5,334$ 3,822 $ 1,512

$ 1,850 $ 263 $ 262 $ 262 $ 7,754$ 5,117Total Programmed Funding:

Millbrae Street RehabilitationMillbrea: Various streets and roads: Pavement rehabilitation

Project Name:Description:

MillbraeSponsor: MillbraeImplementing Agency:

SM-170028TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 85$ 85OTHER LOCALCON $ 130$ 130

STPCON $ 387$ 387

$ 517 $ 602$ 85Total Programmed Funding:

Palmetto Avenue StreetscapePacifica: Palmetto Avenue from Bella Vista Avenue to Clarendon Road: Pavement rehabilitation and pedestrian sidewalkimprovements.

Project Name:Description:

PacificaSponsor: PacificaImplementing Agency:

SM-130016TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 2060000565CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 375$ 375CMAQCON $ 1,000$ 1,000OTHER LOCALCON $ 2,500$ 2,500

$ 3,875$ 3,875Total Programmed Funding:

Manor Drive Overcrossing and Milagra On RampIn Pacifica: Hwy 1 and Manor Drive I/C: Widen the existing overcrossing; Hwy 1 and Milagra: Construct a new on-ramp; Bothintersections: install signals

Project Name:Description:

PacificaSponsor: PacificaImplementing Agency:

SM-170004TIP ID: County: San Mateo Local RoadSystem: 17-06-0004RTP ID: 2060000609CTIPS

Air Quality Exempt Code: NON-EXEMPT1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,070$ 1,070

SALESTAX-MEASUREENV $ 645$ 645

RTP-LRPCON $ 18,560$ 18,560

$ 1,715 $ 18,560 $ 20,275Total Programmed Funding:

Pacifica Pavement RehabilitationPacifica: Various streets and roads: Rehabilitate pavement

Project Name:Description:

PacificaSponsor: PacificaImplementing Agency:

SM-170031TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 76,964

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 87$ 87STPCON $ 671$ 671

$ 671 $ 758$ 87Total Programmed Funding:

2019 TIP September 26, 2018159S4 -

Page 88: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

Portola Valley Street PreservationPortola Valley: Various streets and roads: Pavement preservation

Project Name:Description:

Portola ValleySponsor: Portola ValleyImplementing Agency:

SM-170044TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 23,055

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 27$ 27STPCON $ 201$ 201

$ 201 $ 228$ 27Total Programmed Funding:

Blomquist Street ExtensionIn Redwood City: On Blomquist Street from Seaport Blvd to Bair Island Road: Extend roadway. Project may be phased.

Project Name:Description:

Redwood CitySponsor: Redwood CityImplementing Agency:

SM-090007TIP ID: County: San Mateo Local RoadSystem: 17-06-0040RTP ID: 2060000432CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,600$ 100 $ 1,500

OTHER LOCALPSE $ 2,800$ 2,800

RTP-LRPCON $ 18,000$ 18,000

$ 4,300 $ 18,000 $ 22,400$ 100Total Programmed Funding:

Redwood City Pavement PreservationRedwood City: Twin Dolphin Parkway from Marine Parkway to Redwood Shores Parkway: Pavement preservation

Project Name:Description:

Redwood CitySponsor: Redwood CityImplementing Agency:

SM-170032TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 136$ 136OTHER LOCALCON $ 160$ 160

STPCON $ 1,266$ 1,266

$ 1,426 $ 1,562$ 136Total Programmed Funding:

Huntington/San Antonio Street RehabilitationSan Bruno: Huntington Ave between San Mateo Ave and San Felipe Ave, and San Antonio Ave between San Felipe Ave andSanta Inez Ave: pavement rehabilitation and preventive maintenance

Project Name:Description:

San BrunoSponsor: San BrunoImplementing Agency:

SM-170033TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 70$ 70OTHER LOCALCON $ 88$ 88

STPCON $ 673$ 673

$ 761 $ 831$ 70Total Programmed Funding:

Cedar and Brittan Ave Pavement RehabSan Carlos: On Cedar Street, between San Carlos Avenue and the City of Belmont, and Brittan Avenue, between Elm Streetand El Camino Real: Rehabilitate pavement and install ADA compliant facilities

Project Name:Description:

San CarlosSponsor: San CarlosImplementing Agency:

SM-170035TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 65,953

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 75$ 75STPCON $ 575$ 575

$ 575 $ 650$ 75Total Programmed Funding:

2019 TIP September 26, 2018160S4 -

Page 89: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

Brittan Ave. WideningSan Carlos: At the intersection of Brittan and Industrial Road: Widen to accommodate three new left turn pockets

Project Name:Description:

San CarlosSponsor: San CarlosImplementing Agency:

SM-190001TIP ID: County: San Mateo Local RoadSystem: 17-06-0004RTP ID: 2060000653CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 50$ 50

OTHER LOCALPSE $ 400$ 400

RTP-LRPCON $ 4,500$ 4,500

$ 450 $ 4,500 $ 4,950Total Programmed Funding:

San Mateo Downtown Parking Tech ImplementationIn San Mateo: Various Locations Downtown: Replace existing parking meters, and pay stations and install parking availabilitysigns at City facilities.

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-150016TIP ID: County: San Mateo Local RoadSystem: 17-10-0015RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 115$ 115OTHER LOCALPE $ 35$ 35CMAQCON $ 1,885$ 1,885OTHER LOCALCON $ 465$ 465

$ 2,500$ 2,500Total Programmed Funding:

San Mateo Street RehabilitationSan Mateo: Various streets and roads: Resurface and/or rehabilitate the roadway, implement bicycle elements and upgradeADA ramps

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-170040TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 207$ 207STP $ 1,593CON $ 1,593

$ 1,593 $ 1,800$ 207Total Programmed Funding:

San Mateo Countywide ITS ImprovementsSan Mateo County: County-wide; ITS improvements at various locations in San Mateo County.

Project Name:Description:

San Mateo CCAGSponsor: San Mateo CCAGImplementing Agency:

SM-070002TIP ID: County: San Mateo Local RoadSystem: 17-06-0006RTP ID: 2060000392CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

VRFENV $ 100$ 100RIPPSE $ 240$ 240

RIPCON $ 4,058$ 4,058

VRFCON $ 917$ 917

$ 1,157 $ 4,058 $ 5,315$ 100Total Programmed Funding:

2019 TIP September 26, 2018161S4 -

Page 90: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

ITS Improvements in San Mateo County Northern CitiSan Mateo County: Along the US 101 corridor from Smart Corridors Ph 1 limits to the SF County line, and on I-280 from I-380to the San Francisco County Line: Implement ITS Improvements in San Mateo northern cities including Daly City, Brisbane,and Colma

Project Name:Description:

San Mateo CCAGSponsor: San Mateo CCAGImplementing Agency:

SM-170046TIP ID: County: San Mateo Local RoadSystem: 17-06-0006RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 600$ 600

VRFENV $ 2$ 2

RIP $ 1,000PSE $ 1,000

VRF $ 2PSE $ 2

VRFROW $ 21$ 21

RIPCON $ 6,900$ 6,900

VRFCON $ 2,432$ 2,432

$ 602 $ 21 $ 1,002 $ 9,332 $ 10,957Total Programmed Funding:

Canada Road and Edgewood Road ResurfacingSan Mateo County: Edgewood Rd between 0.17 mi west of Crestview Dr to Cervantes Rd and Canada Rd between the NBand SB 280 off- and on-ramps: Resurface pavement including overlay, pavement striping and markings, curb rampinstallation, and other misc work

Project Name:Description:

San Mateo CountySponsor: San Mateo CountyImplementing Agency:

SM-170012TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 14$ 14STPPE $ 90$ 90OTHER LOCALCON $ 120$ 120

STPCON $ 802$ 802

$ 922 $ 1,026$ 104Total Programmed Funding:

San Mateo Countywide Pavement MaintenanceSan Mateo County: Various streets and roads county-wide: Pavement maintenance

Project Name:Description:

San Mateo CountySponsor: San Mateo CountyImplementing Agency:

SM-170014TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 14$ 14

STPPE $ 107$ 107

OTHER LOCALCON $ 126$ 126

STPCON $ 965$ 965

$ 121 $ 1,091 $ 1,212Total Programmed Funding:

SSF Pavement RehabilitationSouth San Francisco: Various locations: Pavement Rehabilitation

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-170036TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation82Route: Post Mile From: Post Mile To: Toll $ 117,797

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 134$ 134STPCON $ 1,027$ 1,027

$ 1,027 $ 1,161$ 134Total Programmed Funding:

2019 TIP September 26, 2018162S4 -

Page 91: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

Woodside Road RehabilitationWoodside: Mountain Home Road from Woodside Road to Portola Road: Pavement rehabilitation

Project Name:Description:

WoodsideSponsor: WoodsideImplementing Agency:

SM-170037TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 32$ 32

OTHER LOCALCON $ 201$ 201

STPCON $ 242$ 242

$ 32 $ 443 $ 475Total Programmed Funding:

End of section

2019 TIP September 26, 2018163S4 -

Page 92: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018164S4 -

Page 93: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

SSF Grand Blvd Chestnut to ArroyoSSF: El Camino Real between Chestnut Ave/Westborough Blvd to Arroyo Ave: Design and construct improved pedestriancrossings with corner bulbouts, median refuges, expanded bus stop areas and new landscaped medians. Coord. w/ STIPProj. SM-130030

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-130013TIP ID: County: San Mateo StateSystem: 17-06-0003RTP ID: 2060000558CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities82Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 150$ 150OTHER LOCALPE $ 20$ 20CMAQCON $ 850$ 850OTHER LOCALCON $ 111$ 111

$ 1,131$ 1,131Total Programmed Funding:

Woodside School Safety Pathway Phase 3Woodside: Along SR-84 from Woodside Elementary to west of the intersection with Canada Rd: Create a pathway, pavedshoulders for bikes and extend the current multi-use pathway improvements; near Woodside Elementary: implement bike/pedsafety improvements

Project Name:Description:

WoodsideSponsor: WoodsideImplementing Agency:

SM-170009TIP ID: County: San Mateo StateSystem: 17-06-0001RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities84 20.5 20.73Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 23$ 23OTHER LOCALPSE $ 63$ 63ATP-REGCON $ 528$ 528

CMAQCON $ 136$ 136

OTHER LOCALROW- $ 5$ 5

$ 664 $ 755$ 91Total Programmed Funding:

Atherton - Middlefield Road Class II Bike LanesAtherton: On Middlefield Rd between San Mateo County and City of Menlo Park: Widen pavement to include striping for classII bike path

Project Name:Description:

AthertonSponsor: AthertonImplementing Agency:

SM-170018TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 215$ 215CMAQCON $ 251$ 251

OTHER LOCALCON $ 1,049$ 1,049

$ 1,300 $ 1,515$ 215Total Programmed Funding:

Ralston Avenue Corridor Bike-Ped ImpsBelmont: Ralston Ave from South Rd to Alameda de las Pulgas: Implement bicycle and pedestrian improvements

Project Name:Description:

BelmontSponsor: BelmontImplementing Agency:

SM-170042TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200

CMAQCON $ 1,000$ 1,000

OTHER LOCALCON $ 300$ 300

$ 200 $ 1,300 $ 1,500Total Programmed Funding:

2019 TIP September 26, 2018165S4 -

Page 94: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

Crocker Trail Commuter Connectivity UpgradesBrisbane: On Crocker Trail bounded by Bayshore Blvd, S Hill Dr, W Hill Dr and Mission Blue Dr: Resurface trail

Project Name:Description:

BrisbaneSponsor: BrisbaneImplementing Agency:

SM-170041TIP ID: County: San Mateo PublicSystem: 17-06-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 150$ 150OTHER LOCAL $ 115CON $ 115

STP $ 885CON $ 885

$ 1,000 $ 1,150$ 150Total Programmed Funding:

Burlingame: Broadway PDA Lighting ImprovementsBurlingame: Along the Broadway corridor within the business district: Replace aging pedestrian street lighting with new, safer,brighter lighting

Project Name:Description:

BurlingameSponsor: BurlingameImplementing Agency:

SM-170020TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 1.18 - EXEMPT (40 CFR 93.126) - Lighting improvements101 16.58 17.95Route: Post Mile From: Post Mile To: Toll $ 82,584

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 180$ 180CMAQCON $ 720$ 720

$ 720 $ 900$ 180Total Programmed Funding:

Colma - Mission Road Bike/Ped ImprovementsColma: Mission Rd between El Camino Real and Lawndale Blvd: Implement safety related improvements for pedestrians,bicyclists and vehicles

Project Name:Description:

ColmaSponsor: ColmaImplementing Agency:

SM-170022TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200CMAQCON $ 625$ 625

OTHER LOCALCON $ 550$ 550

SB1CON $ 8$ 8

VRFCON $ 200$ 200

$ 1,384 $ 1,584$ 200Total Programmed Funding:

Daly City Central Corridor Bike/Ped Safety ImprmntIn Daly City: On Junipero Serra Blvd and Eastmoor Ave/San Pedro Rd/E Market St/Guad Cyn Pkwy: Install bike and pedimprovements; In Daly City/Uninc San Mateo County: On west side of Mission St/El Camino Real (State Route 82): install newsidewalk

Project Name:Description:

Daly CitySponsor: Daly CityImplementing Agency:

SM-150012TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000602CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities82 023.7 023.509Route: Post Mile From: Post Mile To: Toll $ 231,579

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STPSE $ 300$ 300ATP-STCON $ 1,719$ 1,719

OTHER LOCALCON $ 103$ 103

TDACON $ 154$ 154

$ 1,976 $ 2,276$ 300Total Programmed Funding:

2019 TIP September 26, 2018166S4 -

Page 95: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

Bay Rd Bicycle/Ped Improvements Phase II & IIIE. Palo Alto: On Bay Rd btw Clarke/Illinois & Tara Rd (Ph II) & btw Tara Rd & Bay Trail (Ph. III);Improvements includingresurface, streetscape, bike lanes, & other improvements.HPP #706 (remainder programmed in SM050019)

Project Name:Description:

East Palo AltoSponsor: East Palo AltoImplementing Agency:

SM-070004TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 2060000392CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 111$ 111PROPERTY TAXENV $ 22$ 22EARMARKPE $ 953$ 953PROPERTY TAXPE $ 191$ 191EARMARKPSE $ 870$ 870PROPERTY TAXPSE $ 192$ 192EARMARKROW $ 77$ 77PROPERTY TAXROW $ 19$ 19CMAQCON $ 1,000$ 1,000EARMARKCON $ 7,492$ 7,492OTHER LOCALCON $ 1,698$ 1,698PROPERTY TAXCON $ 330$ 330

$ 12,956$ 12,956Total Programmed Funding:

US 101 University Ave Interchange ImprovementsE. Palo Alto: On University Ave across US 101 btw Woodland Ave and Donahoe St: Construct Bike Lane, modify NB and SBoff-ramps and intersections with overcrossing with no new lanes for off-ramps. HPP #3769.

Project Name:Description:

East Palo AltoSponsor: East Palo AltoImplementing Agency:

SM-070006TIP ID: County: San Mateo Local RoadSystem: 17-06-0005RTP ID: 2060000392CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 60$ 60EARMARKPE $ 60$ 60OTHER LOCALPE $ 16$ 16EARMARKPSE $ 740$ 740OTHER LOCALPSE $ 174$ 174SALESTAX-MEASUREPSE $ 25$ 25EARMARKROW $ 50$ 50

SALESTAX-MEASUREROW $ 12$ 12

EARMARKCON $ 977$ 977

SALESTAX-MEASURECON $ 4,892$ 4,892

$ 62 $ 5,870 $ 7,007$ 1,075Total Programmed Funding:

US-101 Pedestrian/Bicycle OvercrossingEast Palo Alto: Between Clarke Avenue and Newell Road: Install a Pedestrian/Bicycle Overcrossing of US-101 to connect thewest-side with the east-side of East Palo Alto for safe pedestrian/bicycle access.

Project Name:Description:

East Palo AltoSponsor: East Palo AltoImplementing Agency:

SM-130028TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000581CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll $ 986,420

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 50$ 50SALESTAX-MEASUREENV $ 50$ 50OTHER LOCALPE $ 50$ 50SALESTAX-MEASUREPE $ 100$ 100OTHER LOCALPSE $ 200$ 200SALESTAX-MEASUREPSE $ 150$ 150ATP-STCON $ 8,600$ 8,600

$ 9,200$ 9,200Total Programmed Funding:

2019 TIP September 26, 2018167S4 -

Page 96: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

Half Moon Bay - Poplar Complete StreetsHalf Moon Bay: On Poplar St from Main St to Railroad Ave: Implement complete street improvements

Project Name:Description:

Half Moon BaySponsor: Half Moon BayImplementing Agency:

SM-170013TIP ID: County: San Mateo Local RoadSystem: 240086RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 137,869

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 156$ 156CMAQCON $ 1,202$ 1,202

$ 1,202 $ 1,358$ 156Total Programmed Funding:

US 101 Millbrae Ave Bike/Ped BridgeMillbrae: Across US 101 north of and adjacent to the existing Millbrae Avenue bridge; Construct a new 10-ft wide Class 1mixed-use bike/ped overcrossing.

Project Name:Description:

MillbraeSponsor: MillbraeImplementing Agency:

SM-050053TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000392CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101 17.9Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,062$ 1,062RTP-LRPCON $ 8,000$ 8,000

$ 8,000 $ 9,062$ 1,062Total Programmed Funding:

Pacifica - Palmetto Sidewalk ExtensionPacifica: Along the coastal west side of Palmetto Ave from Westline Dr. to 1,400 feet south: Construct new concrete sidewalk.

Project Name:Description:

PacificaSponsor: PacificaImplementing Agency:

SM-170029TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 40$ 40CMAQCON $ 330$ 330

OTHER LOCALCON $ 43$ 43

$ 373 $ 413$ 40Total Programmed Funding:

Pacifica Citywide Curb RampsPacifica: At various locations throughout the city: Install new curb ramps

Project Name:Description:

PacificaSponsor: PacificaImplementing Agency:

SM-170030TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 40$ 40OTHER LOCALCON $ 52$ 52

STPCON $ 400$ 400

$ 452 $ 492$ 40Total Programmed Funding:

Middlefield Rd and Woodside Rd Intersection ImprovIn Redwood City: At the intersection of Middlefield Rd and Woodside Rd: modify intersection to provide pedestrian facilities.

Project Name:Description:

Redwood CitySponsor: Redwood CityImplementing Agency:

SM-110065TIP ID: County: San Mateo Local RoadSystem: 17-06-0005RTP ID: 2060000549CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 85$ 85CMAQCON $ 340$ 340OTHER LOCALCON $ 85$ 85

$ 510$ 510Total Programmed Funding:

2019 TIP September 26, 2018168S4 -

Page 97: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

Middlefield Road Bicycle / Ped ImprovementsIn Redwood City: on Middlefield Road between Main Street and Woodside Road: Modify roadway and utilities as needed towiden sidewalks and improve bike and pedestrian amenities. No vehicle travel lanes will be removed as part of this project.

Project Name:Description:

Redwood CitySponsor: Redwood CityImplementing Agency:

SM-130022TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 2060000561CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 540$ 540CMAQCON $ 1,752$ 1,752OTHER LOCALCON $ 4,358$ 4,358

$ 6,650$ 6,650Total Programmed Funding:

US 101/Woodside Road Class 1 BikewayRedwood City: East of Union Pacific Railroad between the intersections of Chestnut St/Veterans Blvd and BlomquistSt/Seaport Blvd: Construct approximately 1,800 linear feet of new Class 1 path

Project Name:Description:

Redwood CitySponsor: Redwood CityImplementing Agency:

SM-170045TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 161$ 161CMAQCON $ 948$ 948

OTHER LOCALCON $ 123$ 123

$ 1,071 $ 1,232$ 161Total Programmed Funding:

San Bruno Ave Street Medians ImprovementsSan Bruno: San Bruno Ave from Elm Ave to I-280: Implement pedestrian improvement including curb ramps, speed radardisplay signs, demolish existing landscape and replace and replace existing spray irrigation system with a new drip system

Project Name:Description:

San BrunoSponsor: San BrunoImplementing Agency:

SM-130019TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000566CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 30$ 30CMAQCON $ 735$ 735OTHER LOCALCON $ 95$ 95

$ 860$ 860Total Programmed Funding:

Huntington Transit Corridor Bike/Ped ImprovementsSan Bruno: On Huntington Ave from San Bruno Ave to the entrance of the Centennial Way Trail: Implement pavementpreservation and bike/ped facilities including converting the rightmost lane on northbound Huntington Ave to a two-way cycletrack

Project Name:Description:

San BrunoSponsor: San BrunoImplementing Agency:

SM-170017TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 122$ 122

OTHER LOCALPE $ 33$ 33

CMAQCON $ 792$ 792

OTHER LOCALCON $ 210$ 210

$ 155 $ 1,002 $ 1,157Total Programmed Funding:

2019 TIP September 26, 2018169S4 -

Page 98: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

Ped Enhancements Arroyo/Cedar & Hemlock/OrangeSan Carlos: At the intersections of Arroyo Ave and Cedar St and Hemlock St and Orange Ave and the Postman Walkway:Implement safety improvements

Project Name:Description:

San CarlosSponsor: San CarlosImplementing Agency:

SM-170034TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000639CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 65$ 65CMAQCON $ 500$ 500

OTHER LOCALCON $ 165$ 165

$ 665 $ 730$ 65Total Programmed Funding:

Southern Skyline Blvd. Ridge Trail ExtensionSan Mateo County: On the east side of SR-35 "Upper Skyline Blvd" between the intersection of Hwy 92 and Hwy 35southward approximately 6 miles to the SFPUC Peninsula Watershed: Construct Southern Skyline Blvd. Ridge Trail Extension

Project Name:Description:

San Francisco City/CountySponsor: San Francisco City/CountyImplementing Agency:

SM-130031TIP ID: County: San Mateo PublicSystem: 17-06-0001RTP ID: 2060000583CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities0 0Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 2,800$ 2,800OTHER LOCALCON $ 2,000$ 2,000

RTP-LRPCON $ 8,900$ 8,900

STPCON $ 1,000$ 1,000

$ 3,000 $ 8,900 $ 14,700$ 2,800Total Programmed Funding:

San Mateo Citywide Crosswalk ImprovementsCity of San Mateo: Various locations citywide: Install new high visibility crosswalks or upgrade existing crosswalks

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-130020TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000561CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 42,210

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 65$ 65CMAQCON $ 368$ 368

$ 433$ 433Total Programmed Funding:

City of San Mateo SR2S ProgramCity of San Mateo: Within a 0.1 to 0.5 mile radius around each of the 15 elementary and middle schools in the City: Developand Implement a Safe Routes to School Program

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-150002TIP ID: County: San Mateo Local RoadSystem: 17-06-0002RTP ID: 2060000586CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 197,284

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGPSE $ 405$ 405ATP-REGCON $ 2,110$ 2,110

$ 2,515$ 2,515Total Programmed Funding:

2019 TIP September 26, 2018170S4 -

Page 99: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

East Hillsdale Boulevard Ped/Bike OvercrossingCity of San Mateo: Over US 101 at the US 101/Hillsdale Boulevard Interchange: Construct pedestrian and bicycleovercrossing

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-170006TIP ID: County: San Mateo PublicSystem: 17-06-0001RTP ID: 2060000614CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 295$ 295RTP-LRPPE $ 1,500$ 1,500

SALESTAX-MEASUREPE $ 1,355$ 1,355RTP-LRPROW $ 8,200$ 8,200

RTP-LRPCON $ 19,500$ 19,500

$ 29,200 $ 30,850$ 1,650Total Programmed Funding:

North San Mateo Drive Sustainable StreetsSan Mateo: on San Mateo Dr from Peninsula Ave to Baldwin Ave: Install Class II bike lanes, curb extensions, enhancedstriping & signage, upgraded traffic signals with ped countdown, ped scale lighting, and green infrastructure. Related to SM-150016.

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-170038TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 15$ 15OTHER LOCALPSE $ 389$ 389OTHER LOCALCON $ 3,560$ 2,690 $ 870

$ 870 $ 3,964$ 3,094Total Programmed Funding:

Laurie Meadows Ped/Bike Safety ImprovementsSan Mateo: Various locations in the Laurie Meadows neighborhood: Implement bike/ped safety improvements; On LaurieMeadows Dr from near Pacific Blvd to Woodbridge Circle: Implement road diet

Project Name:Description:

San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:

SM-170039TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 113,209

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 128$ 128CMAQCON $ 987$ 987

$ 987 $ 1,115$ 128Total Programmed Funding:

San Mateo County SR2S ProgramSan Mateo County: Countywide: Provide modularized safe routes to school programs and projects that focuses on education,encouragement, evaluation and enforcement components to all interested schools.

Project Name:Description:

San Mateo CCAGSponsor: San Mateo CCAGImplementing Agency:

SM-110022TIP ID: County: San Mateo Local RoadSystem: 17-06-0002RTP ID: 2060000498CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 5,906$ 5,906OTHER LOCALCON $ 1,646$ 1,646STPCON $ 522$ 522

$ 8,074$ 8,074Total Programmed Funding:

2019 TIP September 26, 2018171S4 -

Page 100: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

Midcoast Multi-Modal TrailSan Mateo County: On Highway 1 from Mirada Road in Miramar to Coronado Street in El Granada: Construct 4,537 feet ofmulti-use trail.

Project Name:Description:

San Mateo CountySponsor: San Mateo CountyImplementing Agency:

SM-130032TIP ID: County: San Mateo PublicSystem: 17-06-0001RTP ID: 2060000583CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 102$ 102OTHER LOCALPE $ 290$ 290OTHER LOCALPSE $ 422$ 422RTP-LRPCON $ 3,700$ 3,700

$ 3,700 $ 4,514$ 814Total Programmed Funding:

RWC 2020 Sustainable Transportation EncouragementSan Mateo County: In and around Redwood City: Safe Routes to School walk and bike audits, encouragement and educationprograms and community-wide transportation mode share change evaluation. Toll credits will be used in lieu of match

Project Name:Description:

San Mateo CountySponsor: San Mateo CountyImplementing Agency:

SM-150013TIP ID: County: San Mateo Local RoadSystem: 17-06-0002RTP ID: 2060000602CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 110,800

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STCON $ 966$ 966$ 966$ 966Total Programmed Funding:

Safe Routes to School for Health and WellnessSan Mateo County: Countywide: Implement a non-infrastructure educational program to increase the number of children whobike and walk to school with a focus on long term sustainability. Other State funds are Office of Traffic Safety Ped/Bike Safetygrant

Project Name:Description:

San Mateo County Office of EducationSponsor: San Mateo County Office ofImplementing Agency:

SM-150014TIP ID: County: San Mateo Local RoadSystem: 17-06-0002RTP ID: 2060000603CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STCON $ 900$ 900OTHER LOCALCON $ 25$ 25OTHER STATECON $ 120$ 120

$ 1,045$ 1,045Total Programmed Funding:

SSF Citywide Sidewalk Gap Closure ProjectSouth San Francisco: Various Streets: closes gaps in the existing pedestrian infrastructure

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-130003TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000556CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities82Route: Post Mile From: Post Mile To: Toll $ 40,948

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 47$ 47CMAQCON $ 357$ 357

$ 404$ 404Total Programmed Funding:

2019 TIP September 26, 2018172S4 -

Page 101: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

SSF Linden/Spruce Ave Traffic Calming ImprovementsIn South San Francisco: On Linden Avenue from California Ave to Miller Avenue and on Spruce Ave from Maple Ave to LuxAve: install pedestrian/bicycling safety improvements including a class 3 bikeway.

Project Name:Description:

South San FranciscoSponsor: South San FranciscoImplementing Agency:

SM-150015TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 2060000604CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 17,779

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 45$ 45ATP-STPSE $ 155$ 155ATP-STCON $ 713$ 713

OTHER LOCALCON $ 125$ 125

$ 838 $ 1,038$ 200Total Programmed Funding:

End of section

2019 TIP September 26, 2018173S4 -

Page 102: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

San Mateo CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018174S4 -

Page 103: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

SR 17 Corridor Congestion Relief in Los GatosLos Gatos: On both directions of SR 17 from Lark Ave to south of SR 9 IC: Construct aux lanes including modifications to on-ramps and off-ramps to improve operations and relieve congestion; Along SR-17 corridor in area: traffic signal and ITSimprovements

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190014TIP ID: County: Santa Clara StateSystem: 17-07-0067RTP ID: 2060000653CTIPS

Air Quality Exempt Code: NON-EXEMPT17 6.10 9.35Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 4,000$ 4,000

SALESTAX-MEASUREPE $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 4,000$ 4,000

SALESTAX-MEASUREROW $ 500$ 500

SALESTAX-MEASURECON $ 20,500$ 20,500

$ 4,000 $ 4,500 $ 20,500 $ 30,000$ 1,000Total Programmed Funding:

SR 85 Express LanesIn Santa Clara County: On SR 85 carpool lane from US 101 in San Jose to US 101 in Mountain View including the US 101/SR85 HOV direct connectors and approaches: Install ETS and implement roadway pricing

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL090030TIP ID: County: Santa Clara StateSystem: 17-07-0074RTP ID: 2060000429CTIPS

Air Quality Exempt Code: NON-EXEMPT85 0 24.059Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 1,500$ 1,500OTHER LOCALPE $ 9,300$ 9,300ST-STPPE $ 3,300$ 3,300RIPPSE $ 8,600$ 8,600

RTP-LRPPSE $ 15,200$ 15,200

RIPROW $ 600$ 600

RTP-LRPROW $ 1,000$ 1,000

RIPCON $ 2,300$ 2,300

RTP-LRPCON $ 145,700$ 145,700

$ 600 $ 10,900 $ 161,900 $ 187,500$ 14,100Total Programmed Funding:

US 101/Blossom Hill Interchange ImprovementsSan Jose: At US101/Blossom Hill I/C: Reconstruct I/C including the widening of Blossom Hill Rd, signal upgrades and othermodifications to eliminate congestion caused by merge and weave problems and accommodate bicyclists and pedestrians

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL030006TIP ID: County: Santa Clara StateSystem: 17-07-0038RTP ID: 2060000235CTIPS

Air Quality Exempt Code: NON-EXEMPT101 28.4 29.4Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 2,000$ 2,000OTHER LOCALPSE $ 3,000$ 3,000OTHER LOCALROW $ 500$ 500RTP-LRPCON $ 18,914$ 18,914

$ 18,914 $ 24,414$ 5,500Total Programmed Funding:

US 101 / Mabury New InterchangeSan Jose: US 101/Mabury interchange at the location of the existing Talyor St overpass: Construct full interchange.

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL070004TIP ID: County: Santa Clara StateSystem: 17-07-0027RTP ID: 2060000387CTIPS

Air Quality Exempt Code: NON-EXEMPT101 36.9Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500OTHER LOCALROW $ 1,000$ 1,000RTP-LRPCON $ 19,250$ 19,250

$ 19,250 $ 20,750$ 1,500Total Programmed Funding:

2019 TIP September 26, 2018175S4 -

Page 104: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

Santa Clara County - US 101 Express LanesIn Santa Clara County: From Cochrane Rd. in Morgan Hill to San Mateo County line in Palo Alto: Implement roadway pricingon US 101 carpool lane

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL110002TIP ID: County: Santa Clara StateSystem: 17-07-0075RTP ID: 2060000476CTIPS

Air Quality Exempt Code: NON-EXEMPT101 52.55 16.006Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 8,500$ 8,500OTHER LOCALPSE $ 4,500$ 4,500RIPPSE $ 20,777$ 10,589 $ 10,188

RTP-LRPPSE $ 42,100$ 42,100

RIPROW $ 368$ 368

RTP-LRPROW $ 6,100$ 6,100

RIPCON $ 13,900$ 13,900

RTP-LRPCON $ 336,600$ 336,600

SB1CON $ 33,200$ 33,200

$ 44,157 $ 24,088 $ 384,800 $ 466,045$ 13,000Total Programmed Funding:

Double Lane Southbound US 101 off-ramp to SB SR 87Santa Clara: Southbound US 101 to Southbound Route 87: Widen the existing connector ramp to add one additional trafficlane and construct and install Traffic Monitoring Station (TMC)

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190006TIP ID: County: Santa Clara StateSystem: 17-07-0044RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT101 39.9 40.2Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASURECON $ 2,500$ 2,500$ 2,500$ 2,500Total Programmed Funding:

US 101/De L Cruz Blvd - Trimble Road I/C ImpSanta Clara: At the US101/De La Cruz Blvd/Trimble Rd IC: Modify interchange into a partial cloverleaf.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190008TIP ID: County: Santa Clara StateSystem: 17-07-0031RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT101 40.0 41.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 900$ 900SALESTAX-MEASUREPSE $ 6,500$ 6,500SALESTAX-MEASUREROW $ 5,500$ 5,500

SALESTAX-MEASURECON $ 40,100$ 40,100

$ 5,500 $ 40,100 $ 53,000$ 7,400Total Programmed Funding:

US 101/Buena Vista Avenue Interchange ImprovementGilroy: At Buena Vista Ave. overcrossing at US 101: Construct a complete interchange by widening the overcrossingstructure and adding new northbound and southbound on and off ramps.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190010TIP ID: County: Santa Clara StateSystem: 17-07-0035RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT101 9.6 10.6Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 4,000$ 4,000

SALESTAX-MEASUREPE $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 4,000$ 4,000

SALESTAX-MEASUREROW $ 4,000$ 4,000

SALESTAX-MEASURECON $ 27,000$ 27,000

$ 4,000 $ 8,000 $ 27,000 $ 40,000$ 1,000Total Programmed Funding:

2019 TIP September 26, 2018176S4 -

Page 105: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

US 101/San Antonio Rd/Charleston/Rengstorff IC ImpMountain View and Palo Alto: US 101 interchanges at San Antonio and Charleston Road/Rengstorff Avenue: Constructinterchange improvements include adding new auxiliary lane.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190012TIP ID: County: Santa Clara StateSystem: 17-07-0034RTP ID: 2060000652CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects101 49.5 51.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 5,000$ 5,000

SALESTAX-MEASUREPE $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 5,000$ 5,000

SALESTAX-MEASUREROW $ 3,000$ 3,000

SALESTAX-MEASURECON $ 26,000$ 26,000

$ 5,000 $ 8,000 $ 26,000 $ 40,000$ 1,000Total Programmed Funding:

US 101/SR 25 Interchange - Phase 1Santa Clara County: US 101 and SR 25 Interchange: Phase 1 Reconfigure a portion of the overall interchange re-construction, focusing on improving the movement from southbound US 101 to southbound SR 25

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190013TIP ID: County: Santa Clara StateSystem: 17-07-0069RTP ID: 2060000652CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects101 2.8 3.7Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 1,800$ 1,800

SB1PSE $ 4,200$ 4,200

RTP-LRPROW $ 4,200$ 4,200

SALESTAX-MEASUREROW $ 1,800$ 1,800

RTP-LRPCON $ 36,400$ 36,400

SALESTAX-MEASURECON $ 15,600$ 15,600

$ 6,000 $ 1,800 $ 15,600 $ 40,600 $ 65,000$ 1,000Total Programmed Funding:

SR 152 New AlignmentSanta Clara/ San Benito counties: SR152 between US101 and SR156: Complete PA&ED for new alignment the highway.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL090016TIP ID: County: Santa Clara StateSystem: 17-07-0022RTP ID: 2060000427CTIPS

Air Quality Exempt Code: NON-EXEMPT152 9.9 35.2Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

IIPENV $ 5,000$ 5,000RTP-LRPENV $ 25,000$ 25,000

$ 25,000 $ 30,000$ 5,000Total Programmed Funding:

SR 237 Express Lanes: North 1st St to Mathilda AveIn Santa Clara County: On SR-237 from Mathilda Ave to North 1st St.: Implement roadway pricing carpool lane; On SR-237from I-880 to Mathilda Avenue: Operational Improvements in terms of restriping and signage.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL110008TIP ID: County: Santa Clara StateSystem: 17-07-0070RTP ID: 2060000461CTIPS

Air Quality Exempt Code: NON-EXEMPT237 2.3 8.4Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,234$ 1,234VPPPENV $ 1,600$ 1,600OTHER LOCALPSE $ 14,489$ 14,489OTHER LOCALCON $ 25,242$ 25,242

$ 42,565$ 42,565Total Programmed Funding:

2019 TIP September 26, 2018177S4 -

Page 106: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

SR 237 WB Auxiliary Lane fr McCarthy to North 1stSanta Clara County: SR 237 between McCarthy Boulevard and North First Street: Add westbound auxiliary lane

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190005TIP ID: County: Santa Clara StateSystem: 17-07-0068RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT237 6.10 9.36Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 3,500$ 3,500

SALESTAX-MEASUREPSE $ 4,300$ 4,300

SALESTAX-MEASURE $ 16,000ROW $ 16,000

SALESTAX-MEASURECON $ 28,200$ 28,200

$ 3,500 $ 4,300 $ 16,000 $ 28,200 $ 52,000Total Programmed Funding:

Calaveras Boulevard WideningMilpitas: Calaveras Blvd. overpass at UPRR tracks from Abel St to Town Center Blvd: Widen from 4 to 6 lanes and modifysigning, striping and signals

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190009TIP ID: County: Santa Clara StateSystem: 17-07-0051RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT237 9.4 11Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 5,000$ 5,000

SALESTAX-MEASUREPE $ 1,000$ 1,000

SALESTAX-MEASUREPSE $ 6,000$ 6,000

SALESTAX-MEASUREROW $ 10,000$ 10,000

SALESTAX-MEASURECON $ 63,000$ 63,000

$ 6,000 $ 16,000 $ 63,000 $ 85,000Total Programmed Funding:

I-280/Winchester Blvd Interchange ImprovementSan Jose: I-280/Winchester Interchange: Construct improvements at the Winchester Blvd. interchange and I-280/I-880/SR 17freeway connectors including the addition of ramps and a fly-over and the widening of ramps and connectors

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL150014TIP ID: County: Santa Clara StateSystem: 17-07-0025RTP ID: 2060000594CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280 4.5 6.0Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500SALESTAX-MEASUREPE $ 11,000$ 5,000 $ 6,000

STPPE $ 500$ 500SALESTAX-MEASUREROW $ 10,000$ 10,000

SALESTAX-MEASURE $ 78,000CON $ 78,000

$ 16,000 $ 78,000 $ 100,000$ 6,000Total Programmed Funding:

I-280/Foothill Expressway Off Ramp ImprovementSanta Clara County: NB I-280/Foothill Expressway interchange: Widen off ramp to add one additional lane

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190002TIP ID: County: Santa Clara StateSystem: 17-07-0079RTP ID: 2060000651CTIPS

Air Quality Exempt Code: NON-EXEMPT280 11.2 11.5Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPSE $ 1,500$ 1,500SALESTAX-MEASURECON $ 1,500$ 1,500

$ 1,500 $ 3,000$ 1,500Total Programmed Funding:

2019 TIP September 26, 2018178S4 -

Page 107: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

I-280 HOV - San Mateo County line to Magdalena AveSanta Clara County: On I-280 in both directions from Magdalena Avenue in Los Altos Hills to the San Mateo County Line:Construct new HOV lane

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190004TIP ID: County: Santa Clara StateSystem: 17-07-0028RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT280 13.60 20.63Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 6,000$ 6,000

SALESTAX-MEASUREPE $ 1,500$ 1,500

SALESTAX-MEASUREPSE $ 6,500$ 6,500

SALESTAX-MEASUREROW $ 4,000$ 4,000

SALESTAX-MEASURECON $ 36,000$ 36,000

$ 1,500 $ 6,000 $ 46,500 $ 54,000Total Programmed Funding:

I-280/Wolfe Road Interchange ImprovementCupertino: I-280/Wolfe Road Interchange: Modify to relieve congestion and improve local circulation.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190011TIP ID: County: Santa Clara StateSystem: 17-07-0026RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT280 8.1 8.6Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,160$ 1,160SALESTAX-MEASUREENV $ 3,300$ 3,300OTHER LOCALPE $ 800$ 800OTHER LOCALPSE $ 10,000$ 10,000

SALESTAX-MEASUREROW $ 15,000$ 15,000

SALESTAX-MEASURE $ 66,740CON $ 66,740

$ 25,000 $ 66,740 $ 97,000$ 5,260Total Programmed Funding:

I-280/Saratoga Avenue Interchange ImprovementSan Jose: I-280/ Saratoga Ave Interchange: Modify interchange to relieve congestion and improve local circulation

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190015TIP ID: County: Santa Clara StateSystem: 17-07-0029RTP ID: 2060000653CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280 4.57 7.1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 4,000$ 4,000

SALESTAX-MEASUREPE $ 1,500$ 1,500

SALESTAX-MEASURE $ 5,500PSE $ 5,500

SALESTAX-MEASUREROW $ 3,200$ 3,200

SALESTAX-MEASURECON $ 45,800$ 45,800

$ 1,500 $ 4,000 $ 5,500 $ 49,000 $ 60,000Total Programmed Funding:

I-280 NB Braided Ramps btw Foothill Expwy & SR 85Santa Clara County: On northbound I-280 between Foothill Expressway and Route 85: Improve braided ramps

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190016TIP ID: County: Santa Clara StateSystem: 17-07-0030RTP ID: 2060000653CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280 0 1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 5,400$ 5,400

SALESTAX-MEASUREPE $ 2,700$ 2,700

SALESTAX-MEASUREPSE $ 8,100$ 8,100

SALESTAX-MEASURE $ 2,700ROW $ 2,700

SALESTAX-MEASURECON $ 35,100$ 35,100

$ 8,100 $ 8,100 $ 2,700 $ 35,100 $ 54,000Total Programmed Funding:

2019 TIP September 26, 2018179S4 -

Page 108: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

I-680 Soundwalls - Capitol Expwy to Mueller AveIn San Jose: On I-680 between Capitol Expressway and Mueller Avenue: Construct soundwalls

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL150001TIP ID: County: Santa Clara StateSystem: 17-07-0064RTP ID: 2060000582CTIPS

Air Quality Exempt Code: 4.06 - EXEMPT (40 CFR 93.126) - Noise attenuation680 1.4 2.3Route: Post Mile From: Post Mile To: Toll $ 511,105

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 95$ 95VRFPE $ 727$ 727RIPPSE $ 731$ 731

RIPROW $ 355$ 355

VRFROW $ 275$ 275

RIPCON $ 3,275$ 3,275

$ 731 $ 630 $ 3,275 $ 5,458$ 822Total Programmed Funding:

I-680/ Alum Rock/ McKee Road Interchange ImpSan Jose: At the I-680/ Alum Rock and I-680/ McKee Road interchanges: Reconfigure interchanges, improve access for allmodes of transportation, improve traffic operations and relieve congestion; In the median of I-680: construct Express BusStation

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190017TIP ID: County: Santa Clara StateSystem: 17-07-0032RTP ID: 2060000653CTIPS

Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects680 1.4 4Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 4,700$ 4,700

SALESTAX-MEASUREPE $ 2,350$ 2,350

SALESTAX-MEASURE $ 7,050PSE $ 7,050

SALESTAX-MEASUREROW $ 2,350$ 2,350

SALESTAX-MEASURECON $ 30,550$ 30,550

$ 2,350 $ 4,700 $ 7,050 $ 32,900 $ 47,000Total Programmed Funding:

I-880 Stevens Creek LandscapingSan Jose: at the I-880/Stevens Creek interchange: Provide landscaping.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL130044TIP ID: County: Santa Clara StateSystem: 17-10-0025RTP ID: 2060000582CTIPS

Air Quality Exempt Code: 4.09 - EXEMPT (40 CFR 93.126) - Plantings, landscaping, etc880 0.0 0.1Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 696$ 696OTHER LOCALPE $ 175$ 175EARMARKCON $ 1,355$ 1,355OTHER LOCALCON $ 1,579$ 1,579

$ 3,805$ 3,805Total Programmed Funding:

I-280 Soundwalls - Bird Avenue to Los Gatos CreekIn San Jose: Along I-280 on both sides between Bird Avenue and Los Gatos Creek Bridge: Construct new soundwalls.Modifying the existing irrigation system, landscaping, and traffic control will be required for this project.

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL170064TIP ID: County: Santa Clara StateSystem: 17-07-0064RTP ID: 2060000650CTIPS

Air Quality Exempt Code: 4.06 - EXEMPT (40 CFR 93.126) - Noise attenuationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 833$ 833

RIPPSE $ 929$ 929

RIP $ 456ROW $ 456

RIPCON $ 4,782$ 4,782

$ 833 $ 929 $ 456 $ 4,782 $ 7,000Total Programmed Funding:

2019 TIP September 26, 2018180S4 -

Page 109: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

Hwy. Transp Operations System/FPI Phase 1 & 2Santa Clara County: At various locations: Implement Transportation Operations System/Freeway Performance Initiativeprojects

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190003TIP ID: County: Santa Clara StateSystem: 17-07-0010RTP ID: 2060000651CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RTP-LRPENV $ 1,500$ 1,500

SALESTAX-MEASUREENV $ 500$ 500

RTP-LRPPE $ 750$ 750

SALESTAX-MEASUREPE $ 250$ 250

RTP-LRPPSE $ 2,250$ 2,250

SALESTAX-MEASUREPSE $ 750$ 750

RTP-LRPROW $ 750$ 750

SALESTAX-MEASURE $ 250ROW $ 250

RTP-LRPCON $ 9,750$ 9,750

SALESTAX-MEASURECON $ 3,250$ 3,250

$ 250 $ 500 $ 750 $ 250 $ 18,250 $ 20,000Total Programmed Funding:

End of section

2019 TIP September 26, 2018181S4 -

Page 110: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyState Highway Projects

The page left Intentionally blank

2019 TIP September 26, 2018182S4 -

Page 111: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

Campbell - Winchester Blvd OverlayCampbell: On Winchester Blvd from northern city limit near Rosemary Ln to southern city limit at Knowles Dr and CampbellAve from Jeffers Way to Winchester Blvd: Install asphalt concrete overlay

Project Name:Description:

CampbellSponsor: CampbellImplementing Agency:

SCL170035TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 5$ 5

OTHER LOCALPSE $ 220$ 220

OTHER LOCALCON $ 3,406$ 3,406

SALESTAX-MEASURECON $ 1,594$ 1,594

STPCON $ 554$ 554

OTHER LOCALCON-CE $ 500$ 500

$ 225 $ 6,054 $ 6,279Total Programmed Funding:

Cupertino Pavement Maintenance Phase 2Cupertino: Various Locations: Rehabilitate pavement

Project Name:Description:

CupertinoSponsor: CupertinoImplementing Agency:

SCL170037TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 5$ 5

OTHER LOCALCON $ 100$ 100

STPCON $ 769$ 769

OTHER LOCALCON-CE $ 5$ 5

$ 5 $ 874 $ 879Total Programmed Funding:

Downtown Monterey Road RehabilitationGilroy: Monterey Road between 1st Street and 8th Street: Pavement preservation including rehabilitation, resurfacing,roadway reconstruction, and/or spot reconstruction

Project Name:Description:

GilroySponsor: GilroyImplementing Agency:

SCL170058TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation0 0Route: Post Mile From: Post Mile To: Toll $ 117,912

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 308$ 308

STPCON $ 1,028$ 1,028

$ 1,336 $ 1,336Total Programmed Funding:

Los Altos: Fremont Ave Pavement PreservationLos Altos: Fremont Ave between Grant Rd and Stevens Creek (City Limit): Rehabilitate roadway

Project Name:Description:

Los AltosSponsor: Los AltosImplementing Agency:

SCL170038TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 60$ 60OTHER LOCALCON $ 119$ 119

STPCON $ 336$ 336

$ 455 $ 515$ 60Total Programmed Funding:

2019 TIP September 26, 2018183S4 -

Page 112: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

Regional Planning Activities and PPM - Santa ClaraSanta Clara: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL170001TIP ID: County: Santa Clara Local RoadSystem: 17-10-0023RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 912ENV $ 4,444$ 1,837 $ 912$ 783

OTHER LOCALPE $ 787$ 787STPPE $ 12,100$ 6,078 $ 6,022

$ 6,805 $ 912 $ 912 $ 17,331$ 8,702Total Programmed Funding:

Milpitas Street ResurfacingMilpitas: Various streets and roads: Rehabilitate roadway and upgrade ADA and bicycle facilities

Project Name:Description:

MilpitasSponsor: MilpitasImplementing Agency:

SCL170039TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 100$ 100

OTHER LOCALCON $ 208$ 208

STPCON $ 1,609$ 1,609

OTHER LOCALCON-CE $ 50$ 50

$ 100 $ 1,867 $ 1,967Total Programmed Funding:

Dunne Avenue Pavement RehabilitationMorgan Hill: E Dunne Ave between lower Thomas Grade and Flaming Oaks Dr and between upper Thomas Grade andHoliday Dr, and Holiday Drive from E Dunne Ave to 2,500 linear feet east toward Anderson lake: Pavement Rehabilitation

Project Name:Description:

Morgan HillSponsor: Morgan HillImplementing Agency:

SCL170063TIP ID: County: Santa Clara Local RoadSystem: 17-07-0004RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 30$ 30OTHER LOCALPSE $ 65$ 65

OTHER LOCAL $ 300CON $ 300

STP $ 857CON $ 857

$ 65 $ 1,157 $ 1,252$ 30Total Programmed Funding:

West Middlefield Road ImprovementsMountain View: W. Middlefield Rd between Rengstorff Ave and N. Shoreline Blvd: Resurface roadway and reconstruct themedian island

Project Name:Description:

Mountain ViewSponsor: Mountain ViewImplementing Agency:

SCL170040TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 130,299

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 414$ 414

STPCON $ 1,136$ 1,136

$ 414 $ 1,136 $ 1,550Total Programmed Funding:

2019 TIP September 26, 2018184S4 -

Page 113: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

Palo Alto: Bay Area Fair Value CommutingMoDSandboxIn Palo Alto: Reduce Bay Area SOV commute share by using Fair Share Commuting (FVC), consisting of: EnterpriseCommute Trip Reduction (ECTR) software; Mobility Aggregation (MobAg); parking feebate; Gapfilling; and otherimprovements

Project Name:Description:

Palo AltoSponsor: Palo AltoImplementing Agency:

SCL170003TIP ID: County: Santa Clara Local RoadSystem: 17-10-0015RTP ID: 2060000614CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER FEDERALCON $ 1,085$ 1,085

OTHER LOCALCON $ 271$ 271

$ 1,356 $ 1,356Total Programmed Funding:

North Ventura Coordinated Area PlanPalo Alto: In proximity to the California Avenue Caltrain station, the California Avenue business district, El Camino Real andthe Stanford Research Park: Develop a comprehensive planning document similar to a specific plan for a mixed-useneighborhood

Project Name:Description:

Palo AltoSponsor: Palo AltoImplementing Agency:

SCL170021TIP ID: County: Santa Clara Local RoadSystem: 17-10-0021RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 112$ 112

STPCON $ 638$ 638

$ 750 $ 750Total Programmed Funding:

Palo Alto Street ResurfacingIn Palo Alto: Various streets and roads: Resurface roadways

Project Name:Description:

Palo AltoSponsor: Palo AltoImplementing Agency:

SCL170041TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 30$ 30

OTHER LOCALCON $ 140$ 140

STPCON $ 1,009$ 1,009

$ 30 $ 1,149 $ 1,179Total Programmed Funding:

San Jose - Autumn Street ExtensionIn San Jose: Autumn St between Julian Street and San Carlos Street: Widen, partially realign, and extend Autumn Street toadequately accommodate projected traffic demand.

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL110006TIP ID: County: Santa Clara Local RoadSystem: 17-07-0005RTP ID: 2060000460CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 974$ 974PRIVATEPE $ 326$ 326

RTP-LRPPE $ 4,000$ 4,000

PRIVATECON $ 7,000$ 7,000

RTP-LRPCON $ 5,000$ 5,000

$ 16,326 $ 17,300$ 974Total Programmed Funding:

2019 TIP September 26, 2018185S4 -

Page 114: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

San Jose: Road Rehab and Ped. FacilitiesIn San Jose: On various streets: Rehabilitate roadway and construct pedestrian facilities.

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL110107TIP ID: County: Santa Clara Local RoadSystem: 17-07-0004RTP ID: 2060000524CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 400$ 400OTHER LOCALCON $ 1,611$ 1,611ST-STPCON $ 12,410$ 12,410

$ 14,421$ 14,421Total Programmed Funding:

San Jose Pavement MaintenanceSan Jose: Various streets and roads: Pavement maintenance and rehabilitation and build pedestrian facilities

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170044TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000642CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,649$ 1,649OTHER LOCAL $ 1,891CON $ 2,155$ 264

STP $ 14,597CON $ 16,642$ 2,045

$ 2,309 $ 16,488 $ 20,446$ 1,649Total Programmed Funding:

US 101/Old Oakland Road Interchange improvementsOakland Rd - Commercial St to US 101: Widen to 8 lanes; Commercial St - Oakland Rd to Berryessa Rd: Add turn lanes;Commercial St - Berryessa Rd to Mabury Rd: Extend roadway: US 101 ramps: Widen to 3 lanes; Various locations in area:modify signals

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL190001TIP ID: County: Santa Clara Local RoadSystem: 17-07-0039RTP ID: 2060000651CTIPS

Air Quality Exempt Code: NON-EXEMPT101 37.73 37.73Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 3,000$ 3,000OTHER LOCAL $ 3,000PSE $ 3,000

RTP-LRPCON $ 19,000$ 19,000

$ 3,000 $ 19,000 $ 25,000$ 3,000Total Programmed Funding:

Santa Clara Streets and Roads PreservationSanta Clara: Various streets and roads: Rehabilitate and reconstruct pavement

Project Name:Description:

Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:

SCL170042TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000642CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 200$ 200

OTHER LOCALCON $ 857$ 857

STPCON $ 2,356$ 2,356

$ 200 $ 3,213 $ 3,413Total Programmed Funding:

2019 TIP September 26, 2018186S4 -

Page 115: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

Montague Expwy Widening - Trade Zone-I-680Santa Clara County: Montague Expressway between Trade Zone and I-680: Widen roadway to 8 lanes

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL090017TIP ID: County: Santa Clara Local RoadSystem: 17-07-0005RTP ID: 2060000429CTIPS

Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

PRIVATEPE $ 1,000$ 1,000PRIVATEROW $ 1,000$ 1,000PRIVATECON $ 9,000$ 7,000$ 2,000

RTP-LRPCON $ 4,540$ 4,540

$ 2,000 $ 11,540 $ 15,540$ 2,000Total Programmed Funding:

San Tomas Expressway WideningSanta Clara County: San Tomas Expressway between El Camino Real and Homestead Road: Phase I widening; San TomasExpressway between Homestead Road and Stevens Creek Blvd: Phase II widening

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL110007TIP ID: County: Santa Clara Local RoadSystem: 17-07-0078RTP ID: 2060000460CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

PRIVATEPE $ 1,100$ 1,100RTP-LRPPE $ 7,640$ 7,640

PRIVATEROW $ 1,700$ 1,700OTHER LOCALCON $ 9,900$ 9,900RTP-LRPCON $ 41,000$ 41,000

$ 48,640 $ 61,340$ 12,700Total Programmed Funding:

Isabel Bridge Replacement (37C0089)In Santa Clara County: Isabel Bridge (Bridge No. 37C0089) on San Antonio Valley Road, 8.3 miles east of Kincaid Rd:Replace existing one lane bridge with a two-lane bridge

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL110108TIP ID: County: Santa Clara Local RoadSystem: 17-10-0024RTP ID: 2060000523CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 822,704

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 1,100$ 1,100HBPROW $ 30$ 30HBPCON $ 6,043$ 6,043

$ 7,173$ 7,173Total Programmed Funding:

Capitol Expressway ITS and Bike/Ped ImprovementsIn San Jose: Capitol Expressway: Upgrade traffic signals and ITS infrastructure and install pedestrian sensors and bikedetection at all intersections to allow traffic responsive and adaptive signal timing and fill in sidewalk gaps.

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL130037TIP ID: County: Santa Clara Local RoadSystem: 17-07-0078RTP ID: 2060000563CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 1,269$ 1,269OTHER LOCALPE $ 165$ 165CMAQCON $ 4,816$ 4,816OTHER LOCALCON $ 1,734$ 1,734STPCON $ 2,201$ 2,201

$ 10,185$ 10,185Total Programmed Funding:

2019 TIP September 26, 2018187S4 -

Page 116: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

Uvas Road Pavement RehabilitationSanta Clara County: On the County maintained portions of Uvas Rd: Pavement rehabilitation

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL170019TIP ID: County: Santa Clara Local RoadSystem: 17-07-0004RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 18$ 18

STPPE $ 140$ 140

OTHER LOCALCON $ 202$ 202

STPCON $ 1,561$ 1,561

$ 158 $ 1,763 $ 1,921Total Programmed Funding:

McKean Rd Pavement RehabilitationSanta Clara County: On the County maintained portions of McKean Road: Pavement rehabilitation

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL170032TIP ID: County: Santa Clara Local RoadSystem: 17-07-0004RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 17$ 17

STPPE $ 130$ 130

OTHER LOCALCON $ 132$ 132

STPCON $ 1,021$ 1,021

$ 147 $ 1,153 $ 1,300Total Programmed Funding:

Capitol Expressway Pavement RehabilitationSanta Clara County: Capitol Expressway between Copperfeild Ave to McLaughlin Avenue: Pavement rehabilitation

Project Name:Description:

Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:

SCL170033TIP ID: County: Santa Clara Local RoadSystem: 17-07-0004RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 26$ 26

STPPE $ 200$ 200

OTHER LOCALCON $ 622$ 622

STPCON $ 4,800$ 4,800

$ 226 $ 5,422 $ 5,648Total Programmed Funding:

Local PDA Planning - Santa ClaraSanta Clara County: Various Agencies: Planning assistance pass through to local jurisdictions to supporttransportationinvestments and improve their performance in Priority Development Areas (PDAs).

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Metropolitan TransportationImplementing Agency:

SCL110125TIP ID: County: Santa Clara Local RoadSystem: 17-10-0021RTP ID: 2060000551CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 568$ 568STPPE $ 4,387$ 4,387

$ 4,956$ 4,956Total Programmed Funding:

2019 TIP September 26, 2018188S4 -

Page 117: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

SR 237/US 101/Mathilda Interchange ModificationsIn Sunnyvale: US 101/Mathilda and SR 237/Mathilda interchanges: Modify interchanges to relieve congestion and improvetraffic operations for all modes

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL130001TIP ID: County: Santa Clara Local RoadSystem: 17-07-0033RTP ID: 2060000552CTIPS

Air Quality Exempt Code: NON-EXEMPT101 45.2 45.8Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 4,000$ 4,000OTHER LOCALPSE $ 3,200$ 3,200OTHER LOCALROW $ 800$ 800SALESTAX-MEASURECON $ 17,000$ 17,000

SB1CON $ 17,000$ 17,000

$ 34,000 $ 42,000$ 8,000Total Programmed Funding:

IDEA Cat 2: Valley Transportation AuthorityPalo Alto: At the Vetrans Administration Hospital: Implement an automated micro-transit feeder pilot project

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Metropolitan TransportationImplementing Agency:

SCL170065TIP ID: County: Santa Clara Local RoadSystem: 17-10-0033RTP ID: 2060000653CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 150$ 150

STPCON $ 830$ 830

$ 980 $ 1,080$ 100Total Programmed Funding:

US 101/Zanker Road-Skyport Drive-N. Fourth St. ImpSan Jose: US101 at Zanker Rd/Skyport Dr./N. 4th St: Construct a new overcrossing over US 101 connecting Zanker Rd toSkyport Dr-N. Fourth St to create a new north-south corridor parallel to N. First St and modify existing US 101 on and off-ramps

Project Name:Description:

Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:

SCL190007TIP ID: County: Santa Clara Local RoadSystem: 17-07-0023RTP ID: 2060000652CTIPS

Air Quality Exempt Code: NON-EXEMPT101 38.4 39.3Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 2,600$ 2,600SALESTAX-MEASUREENV $ 3,000$ 3,000OTHER LOCALPE $ 1,500$ 1,500OTHER LOCALPSE $ 6,900$ 6,900

SALESTAX-MEASUREPSE $ 5,300$ 5,300

SALESTAX-MEASUREROW $ 70,000$ 70,000

RTP-LRPCON $ 12,000$ 12,000

SALESTAX-MEASURECON $ 59,700$ 59,700

$ 12,200 $ 129,700 $ 12,000 $ 161,000$ 7,100Total Programmed Funding:

Prospect Rd Complete StreetsSaratoga: Prospect Road between Saratoga/Sunnyvale Rd and Lawrence Expressway and on Saratoga Ave betweenHighway 85 to the City Limits to the north (Lawrence Expressway): Reduce roads width to calm traffic and install bike/pedenhancement.

Project Name:Description:

SaratogaSponsor: SaratogaImplementing Agency:

SCL130026TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000557CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 482,314

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 260$ 260OTHER LOCALROW $ 5$ 5CMAQCON $ 5,275$ 4,205 $ 1,070

OTHER LOCALCON $ 434$ 295 $ 139

$ 1,209 $ 5,974$ 4,765Total Programmed Funding:

2019 TIP September 26, 2018189S4 -

Page 118: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyLocal Road Projects

Sunnyvale Traffic Signal Upgrades/ReplacementsSunnyvale: Various intersections: Upgrade traffic signals and intersections to have pedestrian-friendly designs and improvedbicycle detection for the traffic signals.

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170027TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll $ 271,380

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 333$ 333

STPPE $ 200$ 200

STPCON $ 2,366$ 2,366

$ 533 $ 2,366 $ 2,899Total Programmed Funding:

End of section

2019 TIP September 26, 2018190S4 -

Page 119: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

Adobe Creek/ Highway 101 Bicycle Pedestrian BridgePalo Alto: Where US 101 crosses Adobe Creek: Construct Bike/Ped Bridge. Project is phased.

Project Name:Description:

Palo AltoSponsor: Palo AltoImplementing Agency:

SCL130041TIP ID: County: Santa Clara StateSystem: 17-07-0001RTP ID: 2060000571CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 2,500$ 2,500CMAQCON $ 4,350$ 4,350

OTHER LOCALCON $ 4,000$ 4,000

RTP-LRPCON $ 3,150$ 3,150

$ 8,350 $ 3,150 $ 14,000$ 2,500Total Programmed Funding:

Eden Avenue Sidewalk ImprovementsCampbell: On Eden Avenue between Hamilton Avenue and north city limits: Install sidewalk, curb, gutter, curb ramps, flashingbeacon system, storm drain inlet, pipes, striping, signs and other improvements

Project Name:Description:

CampbellSponsor: CampbellImplementing Agency:

SCL170036TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000641CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 75$ 75CMAQCON $ 555$ 555

OTHER LOCALCON $ 72$ 72

$ 627 $ 702$ 75Total Programmed Funding:

Los Altos: Miramonte Ave Bike and Ped Access ImpsIn Los Altos: Miramonte Ave from City Limit (Covington) to Berry: Install new sidewalk and buffered Class II bike lanes, alongwith improving crosswalks and rechannelize traffic. Project is phased.

Project Name:Description:

Los AltosSponsor: Los AltosImplementing Agency:

SCL170034TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 331$ 331CMAQCON $ 1,000$ 1,000

OTHER LOCALCON $ 250$ 250

RTP-LRPCON $ 2,500$ 2,500

$ 1,250 $ 2,500 $ 4,081$ 331Total Programmed Funding:

Los Gatos Creek Trail to Hwy 9 Trailhead ConnectorIn Los Gatos: The Los Gatos Creek Trail to the north and south sides of Highway 9 between the Highway 17 interchange andUniversity Ave: Construct bike and pedestrian connector

Project Name:Description:

Los GatosSponsor: Los GatosImplementing Agency:

SCL170028TIP ID: County: Santa Clara PublicSystem: 17-07-0001RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities9Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 343$ 343

OTHER LOCALPE $ 44$ 44

RTP-LRPCON $ 4,000$ 4,000

$ 387 $ 4,000 $ 4,387Total Programmed Funding:

2019 TIP September 26, 2018191S4 -

Page 120: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

Palo Alto-El Camino Real Ped Safety & StreetscapeIn Palo Alto: On El Camino Real between Stanford Ave and Grant Ave: Install complete streets improvements focused onpedestrian safety, enhanced bus operations, and new urban design amenities.

Project Name:Description:

Palo AltoSponsor: Palo AltoImplementing Agency:

SCL170051TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

82Route: Post Mile From: Post Mile To: Toll $ 533,929

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 10$ 10

OTHER LOCALPE $ 64$ 64

OTHER LOCALPSE $ 635$ 635

CMAQCON $ 4,655$ 4,655

$ 709 $ 4,655 $ 5,364Total Programmed Funding:

Waverley, E. Meadow & Fabian Enhanced BikewaysPalo Alto: Waverley Multi-Use Path: Widen and upgrade path; E Meadow Dr from Alma to Fabian: Protected bike facility;Fabian Way from East Meadow Dr to E Charleston: Reconfigures roadway with a travel lane reduction to add protectedbicycle facilities

Project Name:Description:

Palo AltoSponsor: Palo AltoImplementing Agency:

SCL170053TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 105,409

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 15$ 15

OTHER LOCALPE $ 280$ 280

OTHER LOCALPSE $ 185$ 185

CMAQCON $ 919$ 919

$ 480 $ 919 $ 1,399Total Programmed Funding:

Bay Trail Reach 9 & 9BIn San Jose: Near Gold Street to the existing San Tomas Aquino Creek Trail; Design and construct 1.2 miles ofcommuter/transportation trail, pedestrian bridge, and underpasses with safety and enhancement improvements. HPP # 2084

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL050082TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000386CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 545$ 545OTHER LOCALPE $ 270$ 270EARMARKROW $ 50$ 50

OTHER LOCALROW $ 13$ 13

EARMARKCON $ 80$ 80

OTHER LOCALCON $ 20$ 20

RTP-LRPCON $ 7,560$ 7,560

$ 63 $ 100 $ 7,560 $ 8,538$ 815Total Programmed Funding:

2019 TIP September 26, 2018192S4 -

Page 121: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

Coyote Creek Trail (Hwy 237-Story Rd)In San Jose: from Highway 237 to Story Road; Master plan entire system, design and construction of the trail.

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL050083TIP ID: County: Santa Clara PublicSystem: 17-07-0001RTP ID: 2060000386CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 457$ 457OTHER LOCALENV $ 115$ 115OTHER LOCALPE $ 92$ 92STPPE $ 713$ 713ATP-REGPSE $ 1,210$ 1,210EARMARKPSE $ 861$ 861OTHER LOCALPSE $ 430$ 430ATP-REGCON $ 4,046$ 4,046

EARMARKCON $ 2,356$ 2,356OTHER LOCALCON $ 10,403$ 589 $ 714 $ 9,100

RTP-LRPCON $ 20,900$ 20,900

$ 4,760 $ 9,100 $ 20,900 $ 41,583$ 6,823Total Programmed Funding:

Almaden Ave & Vine St Safety ImprovementsIn San Jose: Almaden Ave and Vine St: Construct pedestrian safety improvements.

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL090004TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000429CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 465$ 465OTHER LOCALPE $ 98$ 98CMAQCON $ 1,035$ 1,035OTHER LOCALCON $ 217$ 217

$ 1,815$ 1,815Total Programmed Funding:

San Jose: Los Gatos Creek Reach 5 UnderpassIn San Jose: Los Gatos Creek Trail between Auzerais Ave and Montgomery/Bird Ave: Construct Los Gatos Creek Trail(Reach 5b/c).

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL110029TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000495CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 1,200$ 1,200OTHER LOCALPE $ 250$ 250OTHER LOCALROW $ 100$ 100OTHER LOCALCON $ 1,000$ 1,000RTP-LRPCON $ 2,500$ 2,500

$ 2,500 $ 5,050$ 2,550Total Programmed Funding:

San Jose - Better BikewaysSan Jose: Various locations in downtown: Implement a network of bikeways

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL130004TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000565CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 375$ 375CMAQCON $ 1,150$ 1,150

OTHER LOCALCON $ 149$ 149

$ 1,299 $ 1,674$ 375Total Programmed Funding:

2019 TIP September 26, 2018193S4 -

Page 122: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

East San Jose BikewaysEast San Jose: Various locations: make improvements to the bikeway network including the installation of new bikeways,traffic calming features, bike-friendly signal detection and pavement markings. Toll credits used in lieu of match for CON.

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL130016TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000558CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 229,400

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 457$ 457OTHER LOCALROW $ 75$ 75CMAQCON $ 2,000$ 2,000

$ 2,000 $ 2,532$ 532Total Programmed Funding:

Tully Road Safety ImprovementsIn San Jose: Tully Road between Monterey Road and Capital Expressway: Implement safety elements

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170029TIP ID: County: Santa Clara Local RoadSystem: 17-07-0064RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 2,838$ 2,838

OTHER LOCALPE $ 776$ 776

CMAQCON $ 4,761$ 4,761

OTHER LOCALCON $ 1,575$ 1,575

STPCON $ 1,000$ 1,000

$ 3,614 $ 7,336 $ 10,950Total Programmed Funding:

McKee Road Safety ImprovementsSan Jose: On McKee Road between Route 101 and Toyon Ave: Implement safety improvements

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170030TIP ID: County: Santa Clara Local RoadSystem: 17-07-0064RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 778$ 778

STPPE $ 2,846$ 2,846

OTHER LOCALCON $ 1,579$ 1,579

STPCON $ 5,777$ 5,777

$ 3,624 $ 7,356 $ 10,980Total Programmed Funding:

Mt Pleasant Ped & Bike Traffic Safety ImprovementsSan Jose: Various locations in the Mount Pleasant Area: Implement traffic safety improvements to serve student populationsof seven schools

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170031TIP ID: County: Santa Clara Local RoadSystem: 17-07-0064RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 400$ 400

OTHER LOCALPE $ 100$ 100

CMAQCON $ 600$ 600

OTHER LOCALCON $ 160$ 160

$ 500 $ 760 $ 1,260Total Programmed Funding:

2019 TIP September 26, 2018194S4 -

Page 123: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

DTSJ Mobility Streetscape and Public Life PlanSan Jose: Downtown PDA/Frame: Develop PDA implementation plan

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170060TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studies87Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 144$ 144STPPE $ 813$ 813

$ 957$ 957Total Programmed Funding:

W San Carlos Urban Village Streets ImprovementsSan Jose: West San Carlos St between I-880 and McEvoy St: Implement safety improvements

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170061TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 2,618$ 2,618

OTHER LOCALPE $ 715$ 715

CMAQ $ 964CON $ 964

OTHER LOCAL $ 1,453CON $ 1,453

RIP $ 4,350CON $ 4,350

$ 3,333 $ 6,767 $ 10,100Total Programmed Funding:

East Side Alum Rock (East of 680) Urban VillageSan Jose: On Alum Rock between I-680 and King Road: Develop multi-modal transportation implementation plan

Project Name:Description:

San JoseSponsor: San JoseImplementing Agency:

SCL170062TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studies680Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 46$ 46

STPPE $ 400$ 400

$ 446 $ 446Total Programmed Funding:

Saratoga Creek Trail Phase 1Santa Clara: Saratoga Creek Trail between Homeridge Park and Central Park: Build a class I bicycle and pedestrian trail

Project Name:Description:

Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:

SCL170045TIP ID: County: Santa Clara PublicSystem: 17-07-0001RTP ID: 2060000642CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 120$ 120OTHER LOCALPSE $ 450$ 450CMAQCON $ 3,735$ 3,735

OTHER LOCALCON $ 1,021$ 1,021

$ 4,756 $ 5,326$ 570Total Programmed Funding:

2019 TIP September 26, 2018195S4 -

Page 124: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

San Tomas Aquino Creek Trail UnderpassIn Santa Clara: San Tomas Aquino Creek Trail between Tasman Dr and 1/4 mile south of Tasman Dr: Construct bike/pedunderpass.

Project Name:Description:

Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:

SCL170052TIP ID: County: Santa Clara PublicSystem: 17-07-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 155$ 155

OTHER LOCALPSE $ 465$ 465

CMAQ $ 2,449CON $ 2,449

OTHER LOCAL $ 651CON $ 651

$ 155 $ 465 $ 3,100 $ 3,720Total Programmed Funding:

Hetch-Hetchy Trail Phase 1Santa Clara: On the Hetch-Hetchy right-of-way from Stars and Stripes Dr to San Tomas Aquino Creek and along the eastbank of San Tomas Aquino Creek from Hetch-Hetchy right-of-way to Agnew Rd: Build Class I bicycle and pedestrian facility

Project Name:Description:

Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:

SCL170055TIP ID: County: Santa Clara PublicSystem: 17-07-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 100$ 100

OTHER LOCALPSE $ 150$ 150

CMAQCON $ 790$ 790

OTHER LOCALCON $ 210$ 210

$ 250 $ 1,000 $ 1,250Total Programmed Funding:

Santa Clara School Access ImprovementsSanta Clara: Various locations around Santa Clara Schools: Implement bicycle and pedestrian access improvements

Project Name:Description:

Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:

SCL170056TIP ID: County: Santa Clara PublicSystem: 17-07-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 200$ 200

CMAQCON $ 1,146$ 1,146

OTHER LOCALCON $ 304$ 304

$ 200 $ 1,450 $ 1,650Total Programmed Funding:

Saratoga Village Crosswalks and Sidewalk RehabIn Saratoga: Along Big Basin Way between 6th street and Hwy 9: Install curb bulbouts and crosswalk and rehabilitatesidewalk.

Project Name:Description:

SaratogaSponsor: SaratogaImplementing Agency:

SCL170054TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000646CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities9 7.1 7.4Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 10$ 10OTHER LOCALPE $ 30$ 30OTHER LOCAL $ 44CON $ 44

STP $ 338CON $ 338

$ 382 $ 422$ 40Total Programmed Funding:

2019 TIP September 26, 2018196S4 -

Page 125: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

Sunnyvale SNAIL Neighborhood ImprovementsIn Sunnyvale: Various locations: Implement bike/ped improvements, close slip lanes, add bulbouts, install detection systems,ADA compliant ped signals, enhance existing bike lanes to include green bike lanes, create new bike lanes and bikeboulevards.

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170017TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 72$ 72

OTHER LOCALENV $ 18$ 18

ATP-STPSE $ 780$ 780

OTHER LOCALPSE $ 195$ 195

ATP-STCON $ 3,982$ 3,982

OTHER LOCALCON $ 996$ 996

ATP-STCON-CE $ 13$ 13

OTHER LOCALCON-CE $ 3$ 3

$ 1,081 $ 4,978 $ 6,059Total Programmed Funding:

Bernardo Avenue Bicycle UnderpassSunnyvale: Between North and South Bernardo Avenue under the Caltrain tracks: Construct bicycle underpass

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170020TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 500$ 500

OTHER LOCALPE $ 633$ 633

RTP-LRPCON $ 8,700$ 8,700

$ 1,133 $ 8,700 $ 9,833Total Programmed Funding:

Java Dr Road Diet and Bike LanesSunnyvale: On Java Dr from Mathilda to Crossman: Construct approximately 5,000 linear feet of Class II bike lanes each sidevia a road diet

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170022TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 214$ 214

OTHER LOCALPE $ 57$ 57

CMAQCON $ 286$ 286

OTHER LOCALCON $ 76$ 76

$ 271 $ 362 $ 633Total Programmed Funding:

Peery Park "Sense of Place" ImprovementsSunnyvale: Various locations in the Peery Park Specific Area: Implement bike, pedestrian, and transit improvements

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170023TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPSE $ 1,151$ 1,151

OTHER LOCALPSE $ 306$ 306

CMAQCON $ 1,535$ 1,535

OTHER LOCALCON $ 408$ 408

$ 1,457 $ 1,943 $ 3,400Total Programmed Funding:

2019 TIP September 26, 2018197S4 -

Page 126: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

East Sunnyvale Area "Sense of Place"Sunnyvale: Various locations in the East Sunnyvale Sense of Place Plan Area: Implement bike, pedestrian and transit accessimprovements

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170024TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 1,306$ 1,306

OTHER LOCALPE $ 347$ 347

CMAQCON $ 1,741$ 1,741

OTHER LOCALCON $ 463$ 463

$ 1,653 $ 2,204 $ 3,857Total Programmed Funding:

Fair Oaks Avenue Bikeway - Phase 2Sunnyvale: Fair Oaks Ave from SR237 to Reed Ave: Reconfigure to install Bikeway/routes enhancements and close bikewaygaps

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170025TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 335$ 335

OTHER LOCALPE $ 89$ 89

CMAQCON $ 447$ 447

OTHER LOCALCON $ 119$ 119

$ 424 $ 566 $ 990Total Programmed Funding:

Lawerence Station Area Sidewalks & Bike FacilitiesSunnyvale: In the general area of the Lawrence Station Area Plan: Install bike and pedestrian improvements

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170026TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000635CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 214$ 214

OTHER LOCALPE $ 57$ 57

CMAQCON $ 286$ 286

OTHER LOCALCON $ 76$ 76

$ 271 $ 362 $ 633Total Programmed Funding:

Homestead Rd at Homestead High School ImprovementsSunnyvale: Various locations on Homestead Rd near Homestead HS: Install safety improvements and upgrade signals; OnHomestead Rd from McKenzie Dr to Mary Ave (south side) and from Mary Ave to Kennewick Dr (north side): Install greenbuffered bike lanes

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170043TIP ID: County: Santa Clara Local RoadSystem: 17-01-0001RTP ID: 2060000642CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 114,700

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 265$ 265CMAQCON $ 1,000$ 1,000

$ 1,000 $ 1,265$ 265Total Programmed Funding:

2019 TIP September 26, 2018198S4 -

Page 127: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

Sunnyvale Ped and Bike Infrastructure ImprovementsSunnyvale: At various locations city-wide: Add improvements to Bike/Ped infrastructure including enhancing and/or installingsigns, striping, ADA compliant curb ramps and crossing safety treatments

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170057TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 105,409

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 244$ 244CMAQCON $ 919$ 919

$ 919 $ 1,163$ 244Total Programmed Funding:

Sunnyvale Safe Routes to School ImprovementsSunnyvale: In the vicinity of Bishop Elementary School: Install bike lanes, high visibility crosswalks, raised crosswalks, andcurb extensions; Provide bicycle and pedestrian education and encouragement programs

Project Name:Description:

SunnyvaleSponsor: SunnyvaleImplementing Agency:

SCL170059TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-STENV $ 56$ 56

OTHER LOCALENV $ 14$ 14ATP-STPSE $ 318$ 318

OTHER LOCALPSE $ 80$ 80

ATP-STCON $ 1,515$ 6 $ 1,509

OTHER LOCALCON $ 379$ 379

$ 460 $ 1,888 $ 2,362$ 14Total Programmed Funding:

End of section

2019 TIP September 26, 2018199S4 -

Page 128: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Santa Clara CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018200S4 -

Page 129: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyState Highway Projects

Sonoma Boulevard Improvements HSIP5-04-031Vallejo: Sonoma Blvd. between York St. and Kentucky St: Implement road diet-reduce travel lanes from 4 to 2, add a two-wayleft turn lane or median, and add bike lanes.

Project Name:Description:

VallejoSponsor: VallejoImplementing Agency:

SOL110037TIP ID: County: Solano StateSystem: 17-08-0004RTP ID: 2060000547CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

29Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HSIPPE $ 52$ 52OTHER LOCALPE $ 7$ 7HSIPCON $ 313$ 313OTHER LOCALCON $ 41$ 41

$ 412$ 412Total Programmed Funding:

I-80/I-680/SR 12 Interchange ProjectFairfield: I-80/I-680/Route 12 IC: Ph-1 Improve IC, including connecting I-80 to SR 12 W, I-680 NB to SR 12W (JamesonCanyon), I-80 to I-680 (+ Express Lane Direct connectors), build local IC and build new connecting local roads to SR 12/RedTop IC.Phased

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: Solano Transportation AuthorityImplementing Agency:

SOL070020TIP ID: County: Solano StateSystem: 17-08-0009RTP ID: 2060000406CTIPS

Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll $ 114,700

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AB1171-AB144ENV $ 15,500$ 15,500BTENV $ 13,500$ 13,500TCRPENV $ 9,000$ 9,000AB1171-AB144PSE $ 7,225$ 7,225BTPSE $ 263$ 263RIPPSE $ 9,000$ 9,000

AB1171-AB144ROW $ 27,433$ 27,433BTROW $ 15,500$ 15,500AB1171-AB144CON $ 26,259$ 26,259ACCON $ 8,500$ 8,500PROPCON $ 15,500$ 15,500RIPCON $ 11,412$ 11,412RTP-LRPCON $ 500,925$ 500,925

STPCON $ 1,000$ 1,000

$ 9,000 $ 500,925 $ 661,017$ 151,092Total Programmed Funding:

Redwood-Fairgrounds Dr Interchange ImpsSolano County: I-80 Redwood St. I/C and SR-37/Fairgrounds Dr. I/C: Implement I/C and safety improvements; FairgroundsDr. from Redwood St. to SR-37: Remove left turn lane and widen to add one lane in each direction and add bike lanes; transitimprovements

Project Name:Description:

Solano CountySponsor: Solano CountyImplementing Agency:

SOL090015TIP ID: County: Solano StateSystem: 17-08-0010RTP ID: 2060000455CTIPS

Air Quality Exempt Code: NON-EXEMPT80 4.0 4.9Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 94$ 94

EARMARKPE $ 1,264$ 1,264OTHER LOCALPE $ 439$ 427 $ 12

RTP-LRPPSE $ 5,000$ 5,000

RTP-LRPROW $ 26,000$ 26,000

OTHER LOCALCON $ 397$ 397RTP-LRPCON $ 63,282$ 63,282

$ 106 $ 94,282 $ 96,476$ 2,088Total Programmed Funding:

2019 TIP September 26, 2018201S4 -

Page 130: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyState Highway Projects

I-80 Express Lanes - Fairfield & Vacaville Ph I&III-80 in Solano County from Red Top Rd to I-505: Convert existing HOV to HOT & Construct new HOT lanes from Air BaseParkway to I-505. Project also references RTP ID 230660

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Solano Transportation AuthorityImplementing Agency:

SOL110001TIP ID: County: Solano StateSystem: 17-10-0044RTP ID: 2060000464CTIPS

Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 10,900$ 10,900BTPSE $ 14,600$ 14,600BTROW $ 1,100$ 1,100BTCON $ 78,500$ 78,500SB1CON $ 123,000$ 123,000

$ 228,100$ 228,100Total Programmed Funding:

SR12/Church Rd Intersection ImprovementsRio Vista: At SR12/Church Rd. Intersection: Add Standard Shoulders, EB Left Turn Lane, WB Acceleration Lane (720 ft) andDeceleration Lane (300 ft), Remove Trees in Clear Recovery Zone

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: Solano Transportation AuthorityImplementing Agency:

SOL150003TIP ID: County: Solano StateSystem: 17-08-0005RTP ID: 2060000600CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 1,110$ 1,110OTHER LOCALROW $ 70$ 70

OTHER LOCALCON $ 1,681$ 1,681

RIPCON $ 1,377$ 1,377

RIPCON-CE $ 562$ 562

$ 3,690 $ 4,800$ 1,110Total Programmed Funding:

End of section

2019 TIP September 26, 2018202S4 -

Page 131: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyLocal Road Projects

Benicia - Park Road ImprovementsBenicia: Park Road between I-780 and Bayshore Road: Resurface roadway and construct Class II/IV bicycle lane facilitiesand storm drain improvements

Project Name:Description:

BeniciaSponsor: BeniciaImplementing Agency:

SOL170011TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 2060000644CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation780Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 500$ 500CMAQCON $ 2,000$ 2,000

OTHER LOCALCON $ 2,627$ 2,627

STPCON $ 731$ 731

$ 5,358 $ 5,858$ 500Total Programmed Funding:

Parkway Blvd/UPRR Grade SeparationIn Dixon: Parkway Blvd from Valley Glen Dr. to Pitt School Rd: Construct new 4 lane roadway and overcrossing of UPRR &Porter Rd; Pitt School Rd from south of Hillview Drive to Porter Rd: widen shoulders and reconstruct roadway

Project Name:Description:

DixonSponsor: DixonImplementing Agency:

SOL050009TIP ID: County: Solano Local RoadSystem: 17-08-0007RTP ID: 2060000334CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 480$ 480EARMARKPE $ 580$ 580OTHER LOCALPE $ 490$ 490OTHER LOCALROW $ 2,289$ 2,289RTP-LRPCON $ 12,000$ 12,000

$ 12,000 $ 15,839$ 3,839Total Programmed Funding:

Regional Planning Activities and PPM - SolanoSolano County: County-wide: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Solano Transportation AuthorityImplementing Agency:

SOL170001TIP ID: County: Solano Local RoadSystem: 17-10-0023RTP ID: 2060000609CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 159ENV $ 1,158$ 159$ 477 $ 159$ 204

OTHER LOCALPE $ 889$ 495 $ 394

STPPE $ 6,861$ 3,822 $ 3,039

$ 3,637 $ 159 $ 159 $ 159 $ 8,908$ 4,794Total Programmed Funding:

Solano County Roadway PreservationSolano County: On Midway Road from I80 to HWY 113: Apply Asphalt Rubber Chip Seal and Micro Surface treatment

Project Name:Description:

Solano CountySponsor: Solano CountyImplementing Agency:

SOL170015TIP ID: County: Solano Local RoadSystem: 17-10-0022RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 45$ 45OTHER LOCALCON $ 66$ 66

STPCON $ 506$ 506

$ 572 $ 617$ 45Total Programmed Funding:

2019 TIP September 26, 2018203S4 -

Page 132: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyLocal Road Projects

Jepson: Walters Rd Ext - Peabody Rd WideningSolano County: Jepson Parkway segment: Walters Road Extension, Peabody Widening.

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: Solano Transportation AuthorityImplementing Agency:

SOL110004TIP ID: County: Solano Local RoadSystem: 17-08-0012RTP ID: 2060000476CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIPENV $ 630$ 630OTHER LOCALPE $ 824$ 824RTP-LRPROW $ 1,304$ 1,304

RTP-LRPCON $ 10,673$ 10,673

$ 11,977 $ 13,431$ 1,454Total Programmed Funding:

Jepson: Leisure Town Road from Vanden to CommerceJepson Parkway segment: Leisure Town Road from Vanden Road to Commerce. Project is phased

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: VacavilleImplementing Agency:

SOL110005TIP ID: County: Solano Local RoadSystem: 17-08-0012RTP ID: 2060000476CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll $ 2,222,542

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 793$ 793OTHER LOCALPE $ 103$ 103RIPPE $ 491$ 491OTHER LOCALPSE $ 539$ 539OTHER LOCALROW $ 1,016$ 1,016HBPCON $ 3,381$ 3,381OTHER LOCALCON $ 2,503$ 2,503RIPCON $ 19,377$ 19,377

$ 28,202$ 28,202Total Programmed Funding:

Jepson: Leisure Town Road Phase 1B and 1CVacaville: (Phase 1B) Leisure Town Rd from Elmira Rd to Sequoia and (Phase 1C) from Sequoia Dr to Horse Creek: Widen to4 lanes with multiuse sidewalk and safety improvements

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: VacavilleImplementing Agency:

SOL110006TIP ID: County: Solano Local RoadSystem: 17-08-0012RTP ID: 2060000476CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll $ 1,073,592

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 185$ 185OTHER LOCALPE $ 3,546$ 46 $ 3,500

RIPPE $ 200$ 200OTHER LOCALPSE $ 564$ 564OTHER LOCALROW $ 893$ 893CMAQCON $ 1,407$ 1,407

OTHER LOCALCON $ 5,762$ 891 $ 4,871

RIPCON $ 9,296$ 9,296

$ 3,500 $ 15,574 $ 21,853$ 2,779Total Programmed Funding:

New Railroad Avenue Pavement RehabilitationIn Suisun City: On the eastbound lanes on New Railroad Avenue from Village Drive to Sunset Avenue: Rehabilitate roadwayincluding striping for Class 2 bikeway.

Project Name:Description:

Suisun CitySponsor: Suisun CityImplementing Agency:

SOL170014TIP ID: County: Solano Local RoadSystem: 17-10-0022RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 56,318

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 64$ 64STP $ 491CON $ 491

$ 491 $ 555$ 64Total Programmed Funding:

2019 TIP September 26, 2018204S4 -

Page 133: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyLocal Road Projects

Vacaville - Pavement PreservationVacaville: Various streets and roads: edge grind, overlay, perform curb ramp replacements and striping

Project Name:Description:

VacavilleSponsor: VacavilleImplementing Agency:

SOL170012TIP ID: County: Solano Local RoadSystem: 17-10-0022RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CDBGPSE $ 40$ 40OTHER LOCALPSE $ 60$ 60CDBGCON $ 260$ 260

OTHER LOCALCON $ 767$ 767

STPCON $ 1,193$ 1,193

$ 2,220 $ 2,320$ 100Total Programmed Funding:

Vaca Valley/I505 Multimodal ImprovementsVacaville: On Vaca Valley Parkway at E Monte Vista Ave and I-505 ramps: Install roundabouts and constructbicycle/pedestrian facilities over I-505 connecting to existing facilities and ADA improvements

Project Name:Description:

VacavilleSponsor: VacavilleImplementing Agency:

SOL170013TIP ID: County: Solano Local RoadSystem: 17-08-0008RTP ID: 2060000647CTIPS

Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,000$ 1,000OTHER LOCALPSE $ 2,000$ 2,000

OTHER LOCALROW $ 50$ 50

CMAQCON $ 1,907$ 1,907

OTHER LOCALCON $ 1,000$ 1,000

RTP-LRPCON $ 8,000$ 8,000

$ 2,000 $ 50 $ 2,907 $ 8,000 $ 13,957$ 1,000Total Programmed Funding:

End of section

2019 TIP September 26, 2018205S4 -

Page 134: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018206S4 -

Page 135: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyBike/Pedestrian Projects

East Tabor Tolenas SR2S Sidewalk Gap ClosureIn Fairfield: On East Tabor Avenue (north side); Construct sidewalk across the railroad tracks including slight roadwaywidening. On Tolenas Avenue (east side); widen the existing sidewalk.

Project Name:Description:

FairfieldSponsor: FairfieldImplementing Agency:

SOL170006TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 2060000626CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 194,990

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 120$ 120ATP-STPSE $ 122$ 122

OTHER LOCALPSE $ 11$ 11

ATP-STROW $ 138$ 138

OTHER LOCALROW $ 12$ 12

ATP-STCON $ 1,440$ 1,440

OTHER LOCALCON $ 126$ 126

$ 1,723 $ 126 $ 1,969$ 120Total Programmed Funding:

Grange Middle School Safe Routes to SchoolIn Fairfield: On East Tabor Avenue, at the intersections of Falcon Drive and blossom Avenue: enhance bicycle and pedestriansafety mobility.

Project Name:Description:

FairfieldSponsor: FairfieldImplementing Agency:

SOL170010TIP ID: County: Solano Local RoadSystem: 17-08-0004RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 29,822

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 260$ 260

$ 260 $ 260Total Programmed Funding:

Cordelia Hills Sky ValleySolano County: Cordelia Hill: Transportation enhancements including upgrade of pedestrian and bicycle corridors includingopen space acquisition along Cordelia Hill Sky Valley and McGary Road. Project is predominantly ROW acquisition

Project Name:Description:

Solano CountySponsor: Solano CountyImplementing Agency:

SOL070012TIP ID: County: Solano Local RoadSystem: 17-08-0005RTP ID: 2060000395CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities80Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPE $ 140$ 140OTHER LOCALPE $ 35$ 35EARMARKROW $ 2,020$ 2,020OTHER LOCALROW $ 505$ 505OTHER LOCALCON $ 50$ 50

$ 2,750$ 2,750Total Programmed Funding:

Suisun Vallley Bicycle and Pedestrian ImpsSolano County: At Mankas Corner: Construct staging area with bicycle and pedestrian improvements; At Various Locations inSolano County: Add a Class II bike lane to enhance bike access to areas identified for agri-tourism in the Suisun Valley area

Project Name:Description:

Solano CountySponsor: Solano CountyImplementing Agency:

SOL130007TIP ID: County: Solano Local RoadSystem: 17-08-0001RTP ID: 2060000569CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 282$ 32 $ 250

STPPE $ 248$ 248OTHER LOCALCON $ 120$ 120RTP-LRPCON $ 6,000$ 6,000

STPCON $ 927$ 927

$ 250 $ 6,000 $ 7,577$ 1,327Total Programmed Funding:

2019 TIP September 26, 2018207S4 -

Page 136: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyBike/Pedestrian Projects

Solano County Farm to Market Phase 3Solano County: Various locations in Suisun Valley: Construct a total of 4.6 miles of 6-foot class II bike lanes

Project Name:Description:

Solano CountySponsor: Solano CountyImplementing Agency:

SOL170016TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 2060000649CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 18$ 18

STPPE $ 132$ 132

OTHER LOCAL $ 249CON $ 379$ 130

STP $ 1,918CON $ 2,918$ 1,000

$ 1,280 $ 2,167 $ 3,447Total Programmed Funding:

Solano Safe Routes to School ProgramIn Solano County: Countywide: Implement Countywide Solano Safe Routes to School Program, including Planning,Education, and Encouragement events and materials.

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: Solano CountyImplementing Agency:

SOL110019TIP ID: County: Solano Local RoadSystem: 17-08-0004RTP ID: 2060000497CTIPS

Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)

Route: Post Mile From: Post Mile To: Toll $ 318,751

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 3,755$ 2,546 $ 1,209

OTHER LOCALCON $ 61$ 61STPCON $ 35$ 35

$ 1,209 $ 3,851$ 2,642Total Programmed Funding:

STA SR2S Infrastructure & Non-infrastructureSolano County: At 7 schools: Implement pedestrian infrastructure improvements; At 26 schools throughout the Cities ofBenicia, Rio Vista & Vallejo: Providing education outreach

Project Name:Description:

Solano Transportation Authority (STA)Sponsor: VallejoImplementing Agency:

SOL150004TIP ID: County: Solano Local RoadSystem: 17-08-0004RTP ID: 2060000602CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 305,905

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGPSE $ 125$ 125OTHER LOCALPSE $ 297$ 297OTHER LOCALROW $ 18$ 18ATP-REGCON $ 2,942$ 2,942

TDACON $ 85$ 85

$ 3,027 $ 3,467$ 440Total Programmed Funding:

McCoy Creek Trail - Phase 2In Suisun City: Along the west bank of the McCoy Creek canal and the north bank of the Laurel Creek canal between PintailDr and Worley Rd: Construct a Class I concrete pedestrian/bicycle trail with a bridge over Laurel Creek canal

Project Name:Description:

Suisun CitySponsor: Suisun CityImplementing Agency:

SOL170007TIP ID: County: Solano PublicSystem: 17-08-0002RTP ID: 2060000627CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities12Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 150$ 150ATP-REGPSE $ 650$ 650

ATP-REGCON $ 3,487$ 3,487

$ 650 $ 3,487 $ 4,287$ 150Total Programmed Funding:

2019 TIP September 26, 2018208S4 -

Page 137: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyBike/Pedestrian Projects

Vallejo Downtown StreetscapeVallejo: Various streets in the downtown area: Pedestrian enhancements including traffic calming, restriping, parking, signs,brick pavers, street furniture and art. Project is phased

Project Name:Description:

VallejoSponsor: VallejoImplementing Agency:

SOL110035TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 2060000545CTIPS

Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 233$ 233CMAQCON $ 784$ 784FED-DISCCON $ 1,150$ 1,150OTHER LOCALCON $ 666$ 666STPCON $ 1,656$ 1,656

$ 4,489$ 4,489Total Programmed Funding:

Vallejo Bay Trail / Vine Trail Gap ClosureIn Vallejo: Between the existing Bay Trail to the south and the Bay Trail and Napa Vine Trail in American Canyon: Build multi-use path to close the gap between the existing trail segments

Project Name:Description:

VallejoSponsor: VallejoImplementing Agency:

SOL170008TIP ID: County: Solano PublicSystem: 17-08-0002RTP ID: 2060000627CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities37Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 239$ 239OTHER LOCALPSE $ 527$ 527

ATP-REGCON $ 4,216$ 4,216

OTHER LOCALCON $ 146$ 146

$ 527 $ 4,362 $ 5,128$ 239Total Programmed Funding:

End of section

2019 TIP September 26, 2018209S4 -

Page 138: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Solano CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018210S4 -

Page 139: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyState Highway Projects

US 101 Marin/Sonoma Narrows (Sonoma)Marin and Sonoma Counties (Sonoma County Portion): From SR37 in Novato to Old Redwood Highway in Petaluma: convertexpressway to freeway; Between Lakeville Highway and East Washigton Street: Construct NB auxillary lane, and widen to 6lanes for HOV lanes.

Project Name:Description:

Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:

SON070004TIP ID: County: Sonoma StateSystem: 17-09-0006RTP ID: 2060000397CTIPS

Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll $ 1,828,501

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKENV $ 3,024$ 3,024IIPENV $ 4,500$ 4,500EARMARKPSE $ 2,642$ 2,642OTHER LOCALPSE $ 110$ 110SALESTAX-MEASUREPSE $ 16,167$ 16,167TCRPPSE $ 1,220$ 1,220EARMARKROW-CT $ 20$ 20SALESTAX-MEASUREROW-CT $ 2,850$ 2,850RIPROW $ 15,463$ 15,463SALESTAX-MEASUREROW $ 2,191$ 2,191OTHER LOCALCON-CT $ 4,200$ 4,200PROPCON-CT $ 11,042$ 11,042SALESTAX-MEASURECON-CT $ 1,148$ 1,148ACCON $ 9,000$ 9,000EARMARKCON $ 10,308$ 10,308OTHER LOCALCON $ 27,140$ 26,699 $ 441

PROPCON $ 66,540$ 66,540RIPCON $ 7,395$ 7,395RTP-LRPCON $ 65,787$ 65,787

SALESTAX-MEASURECON $ 9,265$ 9,265STPCON $ 16,400$ 13,000 $ 3,400

ACCON-CE $ 6,000$ 6,000EARMARKCON-CE $ 6,000$ 6,000OTHER LOCALCON-CE $ 115$ 115SB1CON-CE $ 85,000$ 85,000

$ 88,841 $ 65,787 $ 373,527$ 218,899Total Programmed Funding:

US 101 Hearn Ave InterchangeSanta Rosa: US 101/Hearn Avenue over-crossing/interchange: Replace the US 101/Hearn Avenue over-crossing/interchangewith a new over crossing/interchange including bike lanes, sidewalks, and re-aligned ramps to US 101.

Project Name:Description:

Santa RosaSponsor: Santa RosaImplementing Agency:

SON150006TIP ID: County: Sonoma StateSystem: 17-09-0010RTP ID: 2060000590CTIPS

Air Quality Exempt Code: NON-EXEMPT101 17.9 18.6Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 1,150$ 1,150SALESTAX-MEASUREENV $ 1,150$ 1,150SALESTAX-MEASUREPSE $ 1,800$ 1,800OTHER LOCALROW $ 800$ 800SALESTAX-MEASUREROW $ 800$ 800RTP-LRPCON $ 25,500$ 25,500

SALESTAX-MEASURECON $ 3,450$ 3,450

$ 3,450 $ 25,500 $ 34,650$ 5,700Total Programmed Funding:

2019 TIP September 26, 2018211S4 -

Page 140: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyState Highway Projects

Highway 116/121 Intersection Improvement ProjectSonoma County: Southwest of the City of Sonoma at the intersection of State Routes 116, and 121, and Bonneau Road:Improve intersection

Project Name:Description:

Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:

SON150009TIP ID: County: Sonoma StateSystem: 17-09-0005RTP ID: 2060000592CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersections116 46.0 46.7Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 150$ 150SALESTAX-MEASUREENV $ 1,950$ 1,950SALESTAX-MEASUREPSE $ 2,000$ 2,000

RTP-LRPROW $ 4,343$ 4,343

SALESTAX-MEASUREROW $ 457$ 457RTP-LRPCON $ 10,640$ 10,640

RTP-LRPCON-CE $ 1,600$ 1,600

SALESTAX-MEASUREROW- $ 440$ 440

$ 2,000 $ 16,583 $ 21,580$ 2,997Total Programmed Funding:

End of section

2019 TIP September 26, 2018212S4 -

Page 141: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyLocal Road Projects

E. Cotati Avenue Street Rehabilitation ProjectCotati: E. Cotati Avenue from the railroad tracks east to the City limits: Repave street, landscape the median, update trafficsigns, and repair and restore sidewalks to ADA compliance

Project Name:Description:

CotatiSponsor: CotatiImplementing Agency:

SON170015TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 77,423

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPSE $ 88$ 88STPCON $ 675$ 675

$ 675 $ 763$ 88Total Programmed Funding:

Healdsburg Avenue Complete Streets ImprovementsHealdsburg: On Healdsburg Ave from Powell Ave to Passalaqua Rd: Implement complete streets improvements for all modesof travel including reducing travel lanes from 5 to 3

Project Name:Description:

HealdsburgSponsor: HealdsburgImplementing Agency:

SON170024TIP ID: County: Sonoma Local RoadSystem: 17-09-0005RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

0.00 1.73Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 200$ 200OTHER LOCALPSE $ 50$ 50

OTHER LOCAL $ 400CON $ 400

STP $ 600CON $ 600

$ 50 $ 1,000 $ 1,250$ 200Total Programmed Funding:

Regional Planning Activities and PPM - SonomaSonoma County: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Sonoma County TransportationImplementing Agency:

SON170002TIP ID: County: Sonoma Local RoadSystem: 17-10-0023RTP ID: 2060000609CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 197ENV $ 1,438$ 197$ 847 $ 197

OTHER LOCALPE $ 648$ 495 $ 153

STPPE $ 5,000$ 3,822 $ 1,178

$ 1,331 $ 197 $ 197 $ 197 $ 7,086$ 5,164Total Programmed Funding:

Petaluma Blvd South Road Diet at E StreetPetaluma: Petaluma Blvd from E St to Crystal Ln: Rehabilitate pavement, reconfigure lanes for smoother traffic flow, and addclass 2 bike lanes: Petaluma Blvd from E St to Mountain View Ave: Reduce lanes from 4 to 2

Project Name:Description:

PetalumaSponsor: PetalumaImplementing Agency:

SON170011TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000636CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 37$ 37

STPPE $ 286$ 286

OTHER LOCALCON $ 342$ 342

STPCON $ 2,630$ 2,630

$ 323 $ 2,972 $ 3,295Total Programmed Funding:

2019 TIP September 26, 2018213S4 -

Page 142: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyLocal Road Projects

Rohnert Park Various Streets RehabilitationRohnert Park: On State Farm Drive from Rohnert Park Expressway to approximately 200 feet north of Professional CenterDrive: Rehabilitate roadway

Project Name:Description:

Rohnert ParkSponsor: Rohnert ParkImplementing Agency:

SON170016TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000640CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 206$ 206OTHER LOCALPSE $ 270$ 270OTHER LOCALCON $ 180$ 180

STPCON $ 1,035$ 1,035

OTHER LOCALCON-CE $ 135$ 135

$ 135 $ 1,215 $ 1,826$ 476Total Programmed Funding:

Santa Rosa Pavement Rehab of Various StreetsIn Santa Rosa: Various locations: Pavement rehabilitation; Various locations: Restripe roadways to add Class II bike lanes

Project Name:Description:

Santa RosaSponsor: Santa RosaImplementing Agency:

SON170023TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation101Route: Post Mile From: Post Mile To: Toll $ 189,829

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 180$ 180OTHER LOCAL $ 214CON $ 214

STP $ 1,655CON $ 1,655

$ 1,869 $ 2,049$ 180Total Programmed Funding:

Rehab King Ridge Bridge over Austin Crk 20C0433In Sonoma County: On King Ridge Road, 2.3mi North of Fort Ross Road; rehabilitate one-lane bridge to 2 lanes and scourcountermeasure

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON070026TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 2060000423CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 497,844

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 878$ 878HBPROW $ 150$ 150

HBPCON $ 3,312$ 3,312

$ 150 $ 3,312 $ 4,340$ 878Total Programmed Funding:

Replace Geysers Rd Bridge over Sulpher Crk 20C0005In Sonoma County: On Geysers Road at Sulfur Creek: Replace single lane bridge with two lane bridge (Geysers Road Bridge20C0005)

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON090001TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 2060000433CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 910,345

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 1,070$ 1,070OTHER LOCALPE $ 139$ 139HBPROW $ 100$ 100

HBPCON $ 6,767$ 6,767

$ 100 $ 6,767 $ 8,075$ 1,208Total Programmed Funding:

2019 TIP September 26, 2018214S4 -

Page 143: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyLocal Road Projects

Replace Chalk Hill Bridge over Maacama Crk 20C0242In Sonoma County: Bridge no. 20C0242, on Chalk Hill Rd, Over Maacama Creek, 1 Mi S of HWY: Replace existing spandrelarch bridge with approach spans with new bridge

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON090025TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 2060000456CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 772,066

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 981$ 981HBRRPE $ 42$ 42HBPROW $ 200$ 200

HBPCON $ 6,000$ 6,000

$ 200 $ 6,000 $ 7,223$ 1,023Total Programmed Funding:

Replace Lambert Bridge over Dry Creek 20C0248HBP: In Sonoma: Replace existing through truss bridge (Bridge No. 20C0248, Lambert Bridge Road, Over Dry Creek,0.4 MiW of Dry Creek Rd.), that is in poor condition and has sesimic deficiencies with new bridge.

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON090026TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 2060000456CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 837,741

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 1,069$ 1,069HBRRPE $ 100$ 100HBPROW $ 250$ 250

HBPCON $ 5,985$ 5,985

$ 250 $ 5,985 $ 7,404$ 1,169Total Programmed Funding:

Replace W Dry Creek Rd Bridge over Pena Ck 20C0407Sonoma County: On West Dry Creek Road, at Pena Creek: Replace existing one-lane bridge (Bridge No. 20C0407) with newtwo-lane bridge.

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON090027TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 2060000456CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 583,823

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 840$ 840HBPROW $ 250$ 250

HBPCON $ 4,000$ 4,000

$ 250 $ 4,000 $ 5,090$ 840Total Programmed Funding:

Replace Freestone Flat Bridge over Salmon 20C0440In Sonoma: Bridge No.20C0440,Freestone Flat Road Bridge over Salmon Creek, 0.2 Mi E. Bohemian Way: Replace existingone-lane bridge with a new two-lane bridge

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON110026TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 2060000508CTIPS

Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature

Route: Post Mile From: Post Mile To: Toll $ 471,704

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HBPPE $ 762$ 762HBPROW $ 200$ 200

HBPCON $ 3,150$ 3,150

$ 200 $ 3,150 $ 4,112$ 762Total Programmed Funding:

2019 TIP September 26, 2018215S4 -

Page 144: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyLocal Road Projects

Sonoma County Various Streets & Roads PreservationSonoma County: Various locations: Rehabilitate pavement

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON130010TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000567CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 387,342

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 438$ 438STPCON $ 3,377$ 3,377

$ 3,815$ 3,815Total Programmed Funding:

Bodega Highway Pavement RehabilitationBodega Hwy: Beginning at the intersection of Sexton Lane and ending at the Sebastopol City Limits: The Project length isapproximately 2 miles. The scope of work will includes pavement rehabilitation, replacement of traffic markings.

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON130015TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000566CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation17.2 20.0Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 60$ 60OTHER LOCALCON $ 130$ 130STPCON $ 1,000$ 1,000

$ 1,190$ 1,190Total Programmed Funding:

Sonoma SRTS High School PilotIn Sonoma County: Countywide: Safe routes to school high school pilot program to shift mode away from single familyvehicular trips to bicycle/pedestrian/carpooling/bussing.

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON150011TIP ID: County: Sonoma Local RoadSystem: 17-10-0015RTP ID: 2060000595CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 100,018

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ATP-REGCON $ 872$ 872$ 872$ 872Total Programmed Funding:

Sonoma County - River Road Pavement RehabSonoma County: River Rd from Trenton-Healdsburg Rd to just west of the SMART right-of-way (PM 19.77 to 24.60):Rehabilitation of pavement and striping for bike lanes

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON170010TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000634CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 13$ 13

STPPE $ 100$ 100

OTHER LOCALCON $ 410$ 410

STPCON $ 3,164$ 3,164

$ 113 $ 3,574 $ 3,687Total Programmed Funding:

2019 TIP September 26, 2018216S4 -

Page 145: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyLocal Road Projects

Rehabilitaiton of Various Roads in Sonoma CountySonoma County: Various streets and roads: Preserve and rehabilitate pavement and improve pedestrian and bike access

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON170013TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 30$ 30

STPPE $ 260$ 260

OTHER LOCALCON $ 299$ 299

STPCON $ 2,340$ 2,340

$ 290 $ 2,639 $ 2,929Total Programmed Funding:

Santa Rosa Car ShareSanta Rosa: Various locations: Establish nine car share vehicles at four pods.

Project Name:Description:

Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:

SON150010TIP ID: County: Sonoma Local RoadSystem: 17-10-0015RTP ID: 2060000592CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll $ 19,514

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER STATEPE $ 220$ 220CMAQCON $ 170$ 170

$ 390$ 390Total Programmed Funding:

Windsor River Road/Windsor Road Intersection ImpsWindsor: At the Windsor River Road/Windsor Road/SMART intersection: Construct rail crossing safety improvements, multi-use path, pedestrian and vehicle traffic improvements.

Project Name:Description:

WindsorSponsor: WindsorImplementing Agency:

SON170001TIP ID: County: Sonoma Local RoadSystem: 17-09-0018RTP ID: 2060000608CTIPS

Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 800$ 800OTHER LOCALCON $ 2,000$ 2,000

STPCON $ 3,000$ 3,000

$ 5,000 $ 5,800$ 800Total Programmed Funding:

End of section

2019 TIP September 26, 2018217S4 -

Page 146: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018218S4 -

Page 147: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyBike/Pedestrian Projects

Cloverdale - Safe Routes to School Phase 2Cloverdale: Various Locations: Construct sidewalks and add Class II bike lanes

Project Name:Description:

CloverdaleSponsor: CloverdaleImplementing Agency:

SON130016TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000567CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 25,578

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREPE $ 66$ 66SALESTAX-MEASUREROW $ 101$ 101STPCON $ 100$ 100

$ 100 $ 267$ 167Total Programmed Funding:

Jennings Ave Bike & Ped RR Crossing CorridorIn Santa Rosa: At Jennings Ave and SMART railroad tracks: Construct a bicycle and pedestrian crossing and develop a SafeRoutes to School service program focusing on education and awareness for the Helen Lehman Elementary School

Project Name:Description:

Santa RosaSponsor: Santa RosaImplementing Agency:

SON150003TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000586CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 183$ 183OTHER LOCALCON $ 1,578$ 1,578

$ 1,761$ 1,761Total Programmed Funding:

Highway 101 Bicycle and Pedestrian BridgeSanta Rosa: Over Highway 101 in the vicinity of the Santa Rosa Junior College and the Coddingtown Mall: Construct a ClassI shared-use ADA accessible bicycle and pedestrian bridge

Project Name:Description:

Santa RosaSponsor: Santa RosaImplementing Agency:

SON170012TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 1,782$ 1,782

TDAPE $ 231$ 231

RTP-LRPROW $ 1,325$ 1,325

RTP-LRPCON $ 12,190$ 12,190

$ 2,013 $ 13,515 $ 15,528Total Programmed Funding:

Bodega Avenue Bike Lanes and Pavement RehabSebastopol: Bodega Ave from Pleasant Hill Ave to High St: Rehabilitate pavement, fill in sidewalk gaps, widen pavement, addbike lanes, and implement pedestrian safety improvements

Project Name:Description:

SebastopolSponsor: SebastopolImplementing Agency:

SON170021TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 216$ 216OTHER LOCALCON $ 1,246$ 1,246

STPCON $ 1,195$ 1,195

$ 2,441 $ 2,657$ 216Total Programmed Funding:

2019 TIP September 26, 2018219S4 -

Page 148: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyBike/Pedestrian Projects

Fryer Creek Pedestrian and Bicycle BridgeSonoma: At Newcomb Street over Fryer Creek: Construct a new bicycle and pedestrian bridge and path as well as circulationand accessibility improvements to Newcomb Street and Fryer Creek Drive.

Project Name:Description:

Sonoma (City)Sponsor: Sonoma (City)Implementing Agency:

SON170022TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000645CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALENV $ 65$ 65OTHER LOCALPSE $ 53$ 53OTHER LOCALROW $ 41$ 41

CMAQCON $ 501$ 501

OTHER LOCALCON $ 65$ 65

$ 41 $ 566 $ 725$ 118Total Programmed Funding:

Crocker Bridge Bike and Pedestrian PassageSonoma County: On existing north piers of Crocker Bridge: Construct a Class 1 bicycle and ped facility

Project Name:Description:

Sonoma CountySponsor: Sonoma CountyImplementing Agency:

SON170014TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 664$ 664

OTHER LOCALPE $ 86$ 86

CMAQ $ 1,145CON $ 1,145

OTHER LOCAL $ 316CON $ 316

RTP-LRPCON $ 1,280$ 1,280

$ 750 $ 1,461 $ 1,280 $ 3,491Total Programmed Funding:

Central Sonoma Valley TrailIn the unincorporated area of Sonoma County: Near City of Sonoma from Larson Park to Flowery Elementary School andalong Verano Avenue from Sonoma Creek to Main Street: construct 0.42 miles of a Class I bike trail.

Project Name:Description:

Sonoma County Regional ParksSponsor: Sonoma County Regional ParksImplementing Agency:

SON110050TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000546CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQPE $ 160$ 160OTHER LOCALPE $ 40$ 40CMAQCON $ 340$ 340OTHER LOCALCON $ 85$ 85

$ 625$ 625Total Programmed Funding:

Joe Rodota Trail Bridge ReplacementSonoma County: On the Joe Rodota Trail near the City of Sebastopol: Remove and replace two deteriorating bicycle andpedestrian bridges

Project Name:Description:

Sonoma County Regional ParksSponsor: Sonoma County Regional ParksImplementing Agency:

SON170025TIP ID: County: Sonoma PublicSystem: 17-09-0001RTP ID: 2060000648CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 31$ 31

STPPE $ 241$ 241

OTHER LOCALCON $ 69$ 69

STPCON $ 529$ 529

$ 272 $ 598 $ 870Total Programmed Funding:

2019 TIP September 26, 2018220S4 -

Page 149: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyBike/Pedestrian Projects

Sonoma County - County-Wide SRTS ProgramSonoma County: Countywide: Safe Routes to Schools Education Program in schools, while encouraging schools to lead theirown ongoing programs, with a goal of increasing active or shared modes of transportation to school.

Project Name:Description:

Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:

SON170009TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000625CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 235,136

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SALESTAX-MEASUREENV $ 260$ 260CMAQCON $ 2,000$ 2,000STPCON $ 50$ 50

$ 2,310$ 2,310Total Programmed Funding:

Conde Ln/Johnson St Pedestrian ImprovementsIn Town of Windsor: At the intersection of Conde Lane and Johnson Street: Realign intersection to eliminate stop signs onConde Lane. Johnson Street becomes right in and right out only. Add RRFB crossing on Conde Lane to improve pedestriansafety.

Project Name:Description:

WindsorSponsor: WindsorImplementing Agency:

SON130012TIP ID: County: Sonoma Local RoadSystem: 17-09-0005RTP ID: 2060000561CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 83$ 83CMAQCON $ 432$ 432OTHER LOCALCON $ 90$ 90

$ 605$ 605Total Programmed Funding:

Bell Rd/Market St/Windsor River Rd Ped ImprovementIn Windsor: At the intersection of Bell Road-Market Street and Windsor River Road: Install a traffic signal and installpedestrian and bicycle signal equipment.

Project Name:Description:

WindsorSponsor: WindsorImplementing Agency:

SON130013TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 2060000565CTIPS

Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 83$ 83CMAQCON $ 410$ 410OTHER LOCALCON $ 222$ 222

$ 716$ 716Total Programmed Funding:

End of section

2019 TIP September 26, 2018221S4 -

Page 150: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Sonoma CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018222S4 -

Page 151: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyState Highway Projects

Freeway Performance Program: SR-84Alameda & San Mateo Counties; SR-84 from I-880 to US-101; Deliver operational strategies including adaptive rampmetering, advanced technologies, arterial/transit priority signal upgrades, & higher vehicle occupancy strategies

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

VAR170023TIP ID: County: Various StateSystem: 17-10-0033RTP ID: 2060000629CTIPS

Air Quality Exempt Code: NON-EXEMPT84Route: Post Mile From: Post Mile To: Toll $ 573,500

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPPE $ 1,000$ 1,000STPCON $ 4,000$ 4,000

$ 4,000 $ 5,000$ 1,000Total Programmed Funding:

Freeway Performance Program: I-880 CorridorAlameda & Santa Clara Counties: I-880 from I-280 to I-80: Deliver operational strategies including adaptive ramp metering,advanced tech, arterial/transit priority signal upgrades & higher vehicle occupancy strategies

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

VAR170021TIP ID: County: Various StateSystem: 17-10-0033RTP ID: 2060000628CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll $ 344,100

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 3,000$ 1,000 $ 2,000

$ 2,000 $ 3,000$ 1,000Total Programmed Funding:

GL: Highway Safety Improvement ProgramGL: Safety Imprv - Highway Safety Improvement Program: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2and Table 3 categories.

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170002TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000607CTIPS

Air Quality Exempt Code: 1.06 - EXEMPT (40 CFR 93.126) - Highway Safety Improvement Program implementationRoute: Post Mile From: Post Mile To: Toll $ 287,369

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

HSIP $ 9,549CON $ 45,761$ 2,442 $ 7,108$ 10,108 $ 16,554

OTHER LOCAL $ 777CON $ 5,755$ 381 $ 582$ 865 $ 3,150

$ 10,973 $ 19,703 $ 7,690 $ 10,326 $ 51,516$ 2,823Total Programmed Funding:

GL: Pavement Resurfacing/Rehab SHS - Highway MaintGL: Pavement Resurf/Rehab State Highway System - Highway Maintenance. Projects are consistent with 40 CFR Part93.126 Exempt Tables 2 and Table 3 categories - Pavement resurfacing and/or rehabilitation.

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170004TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 1,726,694

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

SHACON $ 30,204$ 30,204$ 30,204$ 30,204Total Programmed Funding:

GL: Safety Improvements - SHOPP Mobility ProgramSF Bay Area: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170005TIP ID: County: Various StateSystem: 17-10-0013RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AC $ 86,125CON $ 224,873$ 73,613 $ 2,591$ 10,277 $ 52,267

$ 10,277 $ 52,267 $ 2,591 $ 86,125 $ 224,873$ 73,613Total Programmed Funding:

2019 TIP September 26, 2018223S4 -

Page 152: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyState Highway Projects

GL: Pavement Resurf./Rehab - SHOPP Roadway Presv.Regionwide: Various Locations: Projects consistent with 40CFR93.126 Exempt Tables 2 categories - Pavement resurfacingand/or rehabilitation, Emergency relief (23 U.S.C. 125), Widening narrow pavements or reconstructing bridges (no additionaltravel lanes)

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170006TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll $ 71,240,973

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AC $ 340,208CON $ 1,058,345$ 355,010 $ 36,040$ 174,891 $ 152,196

RTP-LRPCON $ 253,600$ 253,600

$ 174,891 $ 152,196 $ 36,040 $ 340,208 $ 253,600 $ 1,311,945$ 355,010Total Programmed Funding:

GL: Safety Imprv. - SHOPP Collision ReductionRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170007TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 1.09 - EXEMPT (40 CFR 93.126) - Guardrails, median barriers, crash cushionsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AC $ 156,095CON $ 762,281$ 274,971 $ 33,264$ 107,054 $ 190,897

$ 107,054 $ 190,897 $ 33,264 $ 156,095 $ 762,281$ 274,971Total Programmed Funding:

GL: Emergency Repair - SHOPP Emergency ResponseRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170008TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 4.13 - EXEMPT (40 CFR 93.126) - Repair of damage caused by natural disasters, civil unrest, or terrorist acts,except projects involving substantial functional, locational or capacity changes

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AC $ 1,492CON $ 500,905$ 459,204 $ 20,877$ 13,008 $ 6,324

$ 13,008 $ 6,324 $ 20,877 $ 1,492 $ 500,905$ 459,204Total Programmed Funding:

GL: Safety Improvements - SHOPP MandatesRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170009TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 7,144,549

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AC $ 34,339CON $ 120,752$ 33,104 $ 9,901$ 22,753 $ 20,655

$ 22,753 $ 20,655 $ 9,901 $ 34,339 $ 120,752$ 33,104Total Programmed Funding:

GL: Bridge Rehab and Reconstruction - SHOPPRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Wideningnarrow pavements or reconstructing bridges (no additional travel lanes).

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170010TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll $ 52,976,489

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

AC $ 147,397CON $ 750,060$ 262,481 $ 45,284$ 158,822 $ 136,076

$ 158,822 $ 136,076 $ 45,284 $ 147,397 $ 750,060$ 262,481Total Programmed Funding:

2019 TIP September 26, 2018224S4 -

Page 153: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyState Highway Projects

GL: Shoulder Imprv - SHOPP Roadside PreservationRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories -Fencing,Safety roadside rest areas

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170011TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 4.09 - EXEMPT (40 CFR 93.126) - Plantings, landscaping, etcRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ACCON $ 13,302$ 5,600 $ 5,694$ 975 $ 1,033

$ 975 $ 1,033 $ 5,694 $ 13,302$ 5,600Total Programmed Funding:

Bay Bridge Forward - Casual CarpoolSan Francisco and the East Bay: Along I-80 corridor: Establish and improve casual carpool pick-up locations at key locationsin San Francisco and along I-80 and in East Bay.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

VAR170013TIP ID: County: Various StateSystem: 17-10-0033RTP ID: 2060000612CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 250$ 79 $ 171

BTPSE $ 100$ 100

BTCON $ 650$ 650

$ 921 $ 1,000$ 79Total Programmed Funding:

Bay Bridge Forward - Integrated Bridge CorridorAlameda County: Deploy ITS that integrate with SFOBB toll bridge metering lights system and Smart I-80 to improve trafficflow and information dissemination for users of the I-80, I-580, and I-880 bridge approaches to the SFOBB.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

VAR170014TIP ID: County: Various StateSystem: 17-10-0033RTP ID: 2060000612CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 250$ 250

BTPSE $ 300$ 300

BTCON $ 2,450$ 2,450

$ 3,000 $ 3,000Total Programmed Funding:

GL: Railroad-Highway CrossingGL: Railroad/Highway Crossings. Projects are consistent with 40 CFR 93.126 Exempt Tables 2 categories - Railroad/highwaycrossing

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170017TIP ID: County: Various StateSystem: 17-10-0025RTP ID: 2060000623CTIPS

Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll $ 1,500,690

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER FEDERALCON $ 13,084$ 13,084$ 13,084$ 13,084Total Programmed Funding:

End of section

2019 TIP September 26, 2018225S4 -

Page 154: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyState Highway Projects

The page left Intentionally blank

2019 TIP September 26, 2018226S4 -

Page 155: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyLocal Road Projects

GL: Bridge Rehab/Recon. - Local Hwy Bridge ProgramGL: Local Bridge Rehab/Recon. - Local Highway Bridge Program(HBP) or Highway Bridge Replacement and Rehabilitation(HBRR). Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories.

Project Name:Description:

CaltransSponsor: CaltransImplementing Agency:

VAR170012TIP ID: County: Various Local RoadSystem: 17-10-0024RTP ID: 2060000610CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll $ 15,323,692

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

ACCON $ 95,234$ 29,172 $ 66,062

BR-SEISMIC $ 1,642CON $ 6,353$ 3,161$ 1,183 $ 338$ 29

HBP $ 32,063CON $ 590,348$ 374,382$ 93,199 $ 41,598$ 24,047 $ 25,058

OTHER LOCAL $ 2,193CON $ 50,841$ 23,108$ 11,986 $ 1,372$ 11,526 $ 657

$ 101,634 $ 25,744 $ 43,309 $ 35,898 $ 400,651 $ 742,776$ 135,540Total Programmed Funding:

End of section

2019 TIP September 26, 2018227S4 -

Page 156: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyLocal Road Projects

The page left Intentionally blank

2019 TIP September 26, 2018228S4 -

Page 157: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyBike/Pedestrian Projects

Bike Share Capital ProgramFremont, Richmond, and Marin and Sonoma Counties, along the SMART Corridor: Various Locations: Implement bike /bicycle sharing

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Various AgenciesImplementing Agency:

VAR170024TIP ID: County: Various Local RoadSystem: 17-01-0001RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll $ 8,603

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 75$ 75

MTCCON $ 1,850$ 1,850

OTHER LOCALCON $ 659$ 659

$ 2,584 $ 2,584Total Programmed Funding:

End of section

2019 TIP September 26, 2018229S4 -

Page 158: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Various CountyBike/Pedestrian Projects

The page left Intentionally blank

2019 TIP September 26, 2018230S4 -

Page 159: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Multiple CountiesState Highway Projects

Transportation Management SystemsSF Bay Area: Regionwide: Implement a collective approach to freeway operations and management, including field devices,response to incidents, and traffic management systems and software; Along the I-880 corridor: enhance communicationinfrastructure

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170002TIP ID: County: Regional StateSystem: 17-10-0013RTP ID: 2060000609CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll $ 2,179,300

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPPE $ 4,340$ 2,500 $ 1,840

BTCON $ 90$ 90STP $ 5,000CON $ 14,660$ 4,060 $ 5,600

$ 5,600 $ 1,840 $ 5,000 $ 19,090$ 6,650Total Programmed Funding:

511 Carpool and Vanpool ProgramsSF Bay Area: Regionwide: Operate Carpool and Vanpool Programs. Toll credits applied in lieu of match; non-federal fundsare non-participating

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170003TIP ID: County: Regional StateSystem: 17-10-0029RTP ID: 2060000611CTIPS

Air Quality Exempt Code: 3.01 - EXEMPT (40 CFR 93.126) - Continuation of ride-sharing and van-pooling promotion activities at currentlevels

Route: Post Mile From: Post Mile To: Toll $ 1,147,000

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 10,000$ 10,000OTHER LOCALCON $ 2,570$ 1,220 $ 1,350

RTP-LRPCON $ 3,150$ 3,150

TFCACON $ 1,870$ 1,120 $ 750

$ 1,970 $ 1,350 $ 3,150 $ 17,590$ 11,120Total Programmed Funding:

Bay Bridge Forward - Flexible On-Demand TransitSF Bay Area: Region-Wide: Provide on-demand transit services between East Bay and San Francisco, including relatedsupportive transportation demand management strategies.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170005TIP ID: County: Regional StateSystem: 17-10-0033RTP ID: 2060000613CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 1,000$ 1,000$ 1,000$ 1,000Total Programmed Funding:

Incident Management ProgramSF Bay Area: Regionwide: Manage congestion by implementing strategies to enhance mobility and safety, and reduce theimpacts of traffic incidents, including advanced transportation management technologies and systems

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170007TIP ID: County: Regional StateSystem: 17-10-0013RTP ID: 2060000614CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll $ 536,452

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 4,677$ 4,677$ 4,677$ 4,677Total Programmed Funding:

2019 TIP September 26, 2018231S4 -

Page 160: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Multiple CountiesState Highway Projects

Connected & Automated VehiclesSF Bay Area: Regionwide: Deploy demonstration CV/AV technologies to prepare the region for future connected andautomated vehicles and support strategies, including technical assistance. Toll credits used in lieu of match

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170018TIP ID: County: Regional StateSystem: 17-10-0033RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 286,750

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 2,500$ 2,500

$ 2,500 $ 2,500Total Programmed Funding:

End of section

2019 TIP September 26, 2018232S4 -

Page 161: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Multiple CountiesLocal Road Projects

Regional Streets and Roads ProgramSF Bay Area: Regionwide: Regional Streets and Roads Program including providing assistance to Bay Area agencies toimplement & maintain computerized pavement management system (PMS), implementing PTAP, updating regional needs

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG090039TIP ID: County: Regional Local RoadSystem: 17-10-0022RTP ID: 2060000446CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 3,834$ 3,084 $ 750

STPCON $ 24,100$ 21,100 $ 3,000

$ 3,750 $ 27,934$ 24,184Total Programmed Funding:

Bay Area Housing InitiativesSF Bay Area: Regionwide: Establish land acquisition and land banking financing fund and Bay Area Preservation Pilot tomaximize the production and preservation of affordable housing near transit stations; reinvest funds for second cycle of TOAH2.0

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG130005TIP ID: County: Regional Local RoadSystem: 17-10-0011RTP ID: 2060000575CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

MTCCON $ 30,000$ 30,000$ 30,000$ 30,000Total Programmed Funding:

Regional Planning Activities and PPM - MTCRegional: Regional Planning Activities and Planning, Programming and Monitoring (PPM)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170001TIP ID: County: Regional Local RoadSystem: 17-10-0023RTP ID: 2060000609CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

RIP $ 750ENV $ 4,210$ 776$ 1,285 $ 723$ 676

OTHER LOCALPE $ 1,238$ 1,238STPPE $ 9,555$ 9,555

$ 676 $ 723 $ 750 $ 776 $ 15,003$ 12,078Total Programmed Funding:

Reg. Prog. for Arterial System SynchronizationSF Bay Area: Regionwide: Develop plans to guide arterial system integration and operations investments, and provide projectmanagement and traffic engineering/tech assistance (including procuring traffic signal & comm. equipment andhardware/firmware)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170010TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 2060000627CTIPS

Air Quality Exempt Code: 5.07 - EXEMPT (40 CFR 93.128) - Traffic signal synchronization projectsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 5,000$ 5,000OTHER LOCALCON $ 650$ 650

$ 5,650$ 5,650Total Programmed Funding:

Innovative Deployments to Enhance Arterials: Cat 2SF Bay Area: Regionwide: Deploy advanced technologies along arterials to enhance mobility and safety across all modes,with a focus on Connected/Automated vehicles, including demonstration/pilot queue jump lanes no longer than one quartermile

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170011TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 2060000627CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 513$ 513

STPCON $ 3,940$ 3,940

$ 4,453 $ 4,453Total Programmed Funding:

2019 TIP September 26, 2018233S4 -

Page 162: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Roadway Projects

Multiple CountiesLocal Road Projects

Shared Use MobilitySF Bay Area: Regionwide: Implement innovative projects & initiatives that promote shared forms of technology-basedtransportation options, may include pilot microtransit programs of no more than five vehicles. Toll credits are used in lieu ofmatch

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170012TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 2060000628CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll $ 286,750

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 2,500$ 2,500

$ 2,500 $ 2,500Total Programmed Funding:

Innovative Deployments to Enhance Arterials: Cat 1SF Bay Area: Region-wide: Deploy advanced technologies along arterial to enhance mobility and safety across all modes,including demonstration/pilot queue jump lanes no longer than one quarter mile

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170015TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 2060000628CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALPE $ 200$ 200STPPE $ 1,547$ 1,547

OTHER LOCALCON $ 974$ 130 $ 350 $ 494

STPCON $ 7,513$ 1,000 $ 3,000 $ 3,513

$ 3,350 $ 4,007 $ 1,547 $ 10,234$ 1,330Total Programmed Funding:

End of section

2019 TIP September 26, 2018234S4 -

Page 163: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Regional Transportation Network Projects

Multiple Counties

511 Traveler InformationSF Bay Area: Regionwide: Provides multimodal, accurate, reliable, and accessible traveler information on multipledissemination platforms, serves as the go-to source during major disruptions and emergencies, and supports MTC andpartner initiatives.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG090042TIP ID: County: Regional RegionalSystem: 17-10-0029RTP ID: 2060000449CTIPS

Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll $ 1,003,625

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 24,070$ 24,070OTHER LOCALCON $ 14,100$ 14,100STPCON $ 67,950$ 67,950

$ 106,120$ 106,120Total Programmed Funding:

Bay Bridge Forward - Commuter Parking InitiativeAlbany and Oakland: At I-80/Buchanan Ave, I-880/High St, I-880/Fruitvale: Establish commuter parking in East Bay includingparking management technologies, to encourage carpool and express bus ridership.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170004TIP ID: County: Regional RegionalSystem: 17-10-0033RTP ID: 2060000612CTIPS

Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 1,023$ 1,023OTHER LOCALENV $ 114$ 114BTPSE $ 585$ 585STA-POPPSE $ 10$ 10BTCON $ 880$ 880MTCCON $ 3,900$ 3,900OTHER LOCALCON $ 5,488$ 5,488

$ 12,000$ 12,000Total Programmed Funding:

Spare the Air YouthRegional: Education and Outreach: Program designed to reduce greenhouse gas emissions and vehicle miles traveledthrough education and encouragement programs for youth and families.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170006TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 2060000613CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 282,507

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 2,463$ 2,463$ 2,463$ 2,463Total Programmed Funding:

511 Next GenSF Bay Area: Regionwide: Provide free multi-modal traveler information via multiple platforms. Given the public's increasingreliance on private sector services, 511 will focus on being a data provider to increase dissemination of traffic and transit data

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170013TIP ID: County: Regional RegionalSystem: 17-10-0029RTP ID: 2060000628CTIPS

Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll $ 2,905,006

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 33,598$ 11,226 $ 5,372$ 17,000

$ 17,000 $ 5,372 $ 33,598$ 11,226Total Programmed Funding:

2019 TIP September 26, 2018235S4 -

Page 164: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Regional Transportation Network Projects

Multiple Counties

Active Operations ManagementSF Bay Area: Regionwide: Planning and design assessments of various multi-modal operational projects and policies.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170014TIP ID: County: Regional RegionalSystem: 17-10-0033RTP ID: 2060000628CTIPS

Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects

Route: Post Mile From: Post Mile To: Toll $ 2,745,574

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STP $ 9,500CON $ 23,937$ 4,250 $ 4,737$ 5,450

$ 5,450 $ 4,737 $ 9,500 $ 23,937$ 4,250Total Programmed Funding:

Regional Planning - PDA ImplementationSF Bay Area: Regionwide: Planning Assistance to support transportation investments and improve their performance inpriority development areas.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170016TIP ID: County: Regional RegionalSystem: 17-10-0021RTP ID: 2060000629CTIPS

Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll $ 57,350

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

OTHER LOCALCON $ 2,417$ 1,108 $ 1,309

STPCON $ 18,650$ 8,550 $ 10,100

$ 11,409 $ 21,067$ 9,658Total Programmed Funding:

Spare the AirSan Francisco Bay Area: Region-wide: Spare the Air Campaign - Inform/educate the public about ozone problems, notifywhen Spare the Air days are called and encourage use of transit, ridesharing, etc

Project Name:Description:

Bay Area Air Quality Management District (BAAQMD)Sponsor: Bay Area Air Quality ManagementImplementing Agency:

REG170019TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 2060000637CTIPS

Air Quality Exempt Code: 2.01 - EXEMPT (40 CFR 93.126) - Operating assistance to transit agenciesRoute: Post Mile From: Post Mile To: Toll $ 573,500

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 5,000$ 5,000

$ 5,000 $ 5,000Total Programmed Funding:

Electric Vehicle Programs and OutreachSan Francisco Bay Area: Inform/educate the public about electric vehicles, infrastructure and purchasing programs.

Project Name:Description:

Bay Area Air Quality Management District (BAAQMD)Sponsor: Bay Area Air Quality ManagementImplementing Agency:

REG170020TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 573,500

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 5,000$ 5,000

$ 5,000 $ 5,000Total Programmed Funding:

Electric Vehicle Infrastructure/Vehicle BuybackSF Bay Area: Regionwide: Install EV charging stations along transportation corridors, at workplaces, MUDs and park and ridelots. Scrap operable 1994 and older vehicles and provide funding for EV purchases.

Project Name:Description:

Bay Area Air Quality Management District (BAAQMD)Sponsor: Bay Area Air Quality ManagementImplementing Agency:

REG170021TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 2060000638CTIPS

Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CARBCON $ 3,000$ 3,000

TFCACON $ 7,000$ 7,000

$ 10,000 $ 10,000Total Programmed Funding:

2019 TIP September 26, 2018236S4 -

Page 165: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Regional Transportation Network Projects

Multiple Counties

Bay Bridge Forward-Commuter Parking Initiative O&MAlbany and Oakland: I-80/Buchanan Ave, I-880/High St, and I-880/Fruitvale: operations and maintenance of commuterparking facilities

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170024TIP ID: County: Regional RegionalSystem: 17-10-0033RTP ID: 2060000650CTIPS

Air Quality Exempt Code: 3.01 - EXEMPT (40 CFR 93.126) - Continuation of ride-sharing and van-pooling promotion activities at currentlevels

Route: Post Mile From: Post Mile To: Toll $ 286,750

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 2,500$ 1,000 $ 1,500

$ 1,500 $ 2,500$ 1,000Total Programmed Funding:

Community Based Transportation PlanningSF Bay Area: Regionwide: Develop and/or update locally-led plans to address the mobility needs of low-income household'sin the region's 35 Communities of Concern (CBTP)

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170025TIP ID: County: Regional RegionalSystem: 17-10-0011RTP ID: 2060000650CTIPS

Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studiesRoute: Post Mile From: Post Mile To: Toll $ 168,036

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

STPCON $ 1,500$ 1,500

$ 1,500 $ 1,500Total Programmed Funding:

Targeted Transportation AlternativesSF Bay Area: Region-wide: Implement a digitally-based personalized travel assistance program that provides targetedaudiences with travel information to shift from solo driving to sustainable forms of transportation.

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170027TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 2060000651CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 37,278

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 325$ 325

$ 325 $ 325Total Programmed Funding:

Regional Car SharingSF Bay Area: Region-wide: Implement strategies to grow carsharing in the Bay Area including developing policies andregulations, increasing the number of carshare vehicles, developing incentives and integration into trip planning maps andapps

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG170028TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 2060000651CTIPS

Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll $ 137,687

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

CMAQCON $ 1,200$ 1,200

$ 1,200 $ 1,200Total Programmed Funding:

End of section

2019 TIP September 26, 2018237S4 -

Page 166: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Regional Transportation Network Projects

Multiple Counties

The page left Intentionally blank

2019 TIP September 26, 2018238S4 -

Page 167: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Bay Area State-Owned Toll Bridges

Toll Bridge MaintenanceRegion-wide: Seven state-owned toll bridges: routine maintenance of bridge facilities

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG130001TIP ID: County: Regional TollwaySystem: 17-10-0024RTP ID: 2060000536CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BT $ 21,000CON $ 135,000$ 66,000 $ 21,000$ 6,000 $ 21,000

$ 6,000 $ 21,000 $ 21,000 $ 21,000 $ 135,000$ 66,000Total Programmed Funding:

Toll Bridge Rehabilitation ProgramBay Area: On 7 state-owned toll bridges: Rehabilitation program

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

REG130002TIP ID: County: Regional TollwaySystem: 17-10-0024RTP ID: 2060000531CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BT $ 76,000CON $ 1,108,092$ 805,092 $ 79,000$ 76,000 $ 72,000

$ 76,000 $ 72,000 $ 79,000 $ 76,000 $ 1,108,092$ 805,092Total Programmed Funding:

End of section

2019 TIP September 26, 2018239S4 -

Page 168: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Bay Area State-Owned Toll Bridges

The page left Intentionally blank

2019 TIP September 26, 2018240S4 -

Page 169: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Golden Gate Bridge

Golden Gate Bridge Seismic Retrofit, Phase 3BSF/Marin County: Golden Gate Bridge; Seismic retrofit of the Golden Gate Bridge - construction of suspension span, southpier and fender.

Project Name:Description:

Golden Gate Bridge, Highway and Transit DistrictSponsor: Golden Gate Bridge, Highway andImplementing Agency:

MRN050018TIP ID: County: Marin TollwaySystem: 17-10-0009RTP ID: 2060000340CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

EARMARKPSE $ 29,319$ 29,319OTHER LOCALPSE $ 2,357$ 2,357ACCON $ 21,561$ 21,561

EARMARKCON $ 3,885$ 3,885

HBPCON $ 51,061$ 9,500 $ 20,000 $ 21,561

$ 20,000 $ 47,007 $ 108,183$ 41,176Total Programmed Funding:

Golden Gate Bridge-Suicide Deterrent SafetyBarrierGolden Gate Bridge: Build suicide deterrent system. Including design & Environmental analysis, plus analysis of alternatives &wind tunnel tests to ensure the feasibility of designs and build deterrent system. Project will be constructed in phases.

Project Name:Description:

Golden Gate Bridge, Highway and Transit DistrictSponsor: Golden Gate Bridge, Highway andImplementing Agency:

MRN050019TIP ID: County: Marin TollwaySystem: 17-10-0009RTP ID: 2060000353CTIPS

Air Quality Exempt Code: 1.03 - EXEMPT (40 CFR 93.126) - Safer non-Federal-aid system roadsRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

MTCENV $ 1,850$ 1,850OTHER LOCALENV $ 143$ 143OTHER LOCALPSE $ 5,543$ 5,543ACCON $ 137,000$ 137,000HBPCON $ 70,000$ 25,000 $ 15,000$ 15,000 $ 15,000

OTHER LOCALCON $ 204$ 204OTHER STATECON $ 7,000$ 7,000STP $ 40,000CON $ 67,000$ 12,000 $ 15,000

TOLLSCON $ 60,000$ 60,000

$ 15,000 $ 30,000 $ 15,000 $ 40,000 $ 348,740$ 248,740Total Programmed Funding:

Golden Gate Bridge Seismic Retrofit, Ph: 1-3ASan Francisco /Marin Counties: Golden Gate Bridge; Seismic retrofit of the Golden Gate Bridge - construction on north andsouth approach viaducts, and Ft. Point Arch.

Project Name:Description:

Golden Gate Bridge, Highway and Transit DistrictSponsor: Golden Gate Bridge, Highway andImplementing Agency:

MRN970016TIP ID: County: Marin TollwaySystem: 17-10-0009RTP ID: 2060000034CTIPS

Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)

Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

DBRPSE $ 4,610$ 4,610EARMARKPSE $ 1,176$ 1,176DBRCON $ 73,975$ 73,975EARMARKCON $ 46,096$ 46,096HBRRCON $ 145,939$ 145,939OTHER LOCALCON $ 78,967$ 72,184 $ 6,783

RIPCON $ 26,000$ 26,000TCRPCON $ 5,000$ 5,000

$ 6,783 $ 381,762$ 374,979Total Programmed Funding:

End of section

2019 TIP September 26, 2018241S4 -

Page 170: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Golden Gate Bridge

The page left Intentionally blank

2019 TIP September 26, 2018242S4 -

Page 171: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Regional Express Lane Network

ALA-880 Express LanesIn Alameda/Santa Clara Counties: On I-880 from Hegenberger to Dixon Landing (Southbound) and Dixon Landing toLewelling (Northbound): Convert HOV lanes to express lanes. Project also references RTP ID 240741

Project Name:Description:

Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Bay Area Infrastructure FinancingImplementing Agency:

ALA170006TIP ID: County: Alameda TollwaySystem: 17-10-0052RTP ID: 2060000608CTIPS

Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

TOLLSENV $ 6,600$ 6,600TOLLSPE $ 13,200$ 13,200TOLLSROW $ 300$ 300TOLLSCON $ 112,400$ 112,400

$ 132,500$ 132,500Total Programmed Funding:

CC-680 Northern Segment Express Lane - SouthboundContra Costa County: On I-680 Southbound from Benicia-Martinez Toll Plaza to El Cerro: Convert HOV to express lanes andadd/modify express lane elements. Project also references RTP ID 17-10-0054

Project Name:Description:

Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Contra Costa TransportationImplementing Agency:

CC-170002TIP ID: County: Contra Costa TollwaySystem: 17-10-0048RTP ID: 2060000607CTIPS

Air Quality Exempt Code: NON-EXEMPT680 25.0 8.0Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 5,574$ 5,574TOLLSPE $ 3,161$ 3,161TOLLSROW $ 87$ 87OTHER LOCALCON $ 1,876$ 1,876TOLLSCON $ 42,900$ 42,900

$ 53,598$ 53,598Total Programmed Funding:

Regional Express Lane NetworkSF Bay Area: Regionwide: Program-level project costs to support the Regional Express Lane Network deployment includingprogram (planning, coordination, & management), centralized toll system, capitalized start-up operations and maintenancecosts

Project Name:Description:

Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Bay Area Infrastructure FinancingImplementing Agency:

REG130004TIP ID: County: Regional TollwaySystem: 17-10-0054RTP ID: 2060000572CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

TOLLSPE $ 28,437$ 28,437TOLLSCON $ 49,574$ 49,574

$ 78,011$ 78,011Total Programmed Funding:

ALA/CC-80 and Bay Bridge Approach Express LanesIn Alameda/Contra Costa counties: On I-80 from the Carquinez Bridge to Powell and the Bay Bridge Approaches: ConvertHOV lanes to express lanes. Project also references RTP ID 17-10-0045.

Project Name:Description:

Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Bay Area Infrastructure FinancingImplementing Agency:

VAR170003TIP ID: County: Various TollwaySystem: 17-10-0053RTP ID: 2060000608CTIPS

Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTENV $ 5,000$ 5,000RTP-LRPENV $ 4,800$ 4,800

RTP-LRPPE $ 9,800$ 9,800

RTP-LRPROW $ 3,000$ 3,000

RTP-LRPCON $ 75,700$ 75,700

$ 93,300 $ 98,300$ 5,000Total Programmed Funding:

End of section

2019 TIP September 26, 2018243S4 -

Page 172: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Regional Express Lane Network

The page left Intentionally blank

2019 TIP September 26, 2018244S4 -

Page 173: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Richmond-San Rafael Bridge

Richmond-San Rafael Bridge Access ImprovementsIn Contra Costa and Marin Counties: On I-580/Richmond-San Rafael Bridge: Convert existing shoulders to an automobiletravel lane (EB) and a bike/ped path, construct bike/ped path in Contra Costa County and constructed bike/ped pathconnections to bridge

Project Name:Description:

Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:

MRN150009TIP ID: County: Marin TollwaySystem: 17-10-0036RTP ID: 2060000596CTIPS

Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll

Phase Fund Source Prior Years FY 2018/19 FY 2019/20 FY 2020/21 FY 2021/22 Future Years Total ProgrammedAll funding in thousands of dollars

BTPE $ 8,740$ 8,740BTROW $ 1,344$ 1,344BTCON $ 78,110$ 72,110 $ 6,000

BTCON-CE $ 1,090$ 1,090

$ 6,000 $ 89,284$ 83,284Total Programmed Funding:

End of section

2019 TIP September 26, 2018245S4 -

Page 174: Roadway Projects Alameda County · Alameda County State Highway Projects I-80 Gilman Interchange Improvements Berkeley: ... ENV SALESTAX-MEASURE $ 6,000 $ 6,000 PSE RTP-LRP $ 25,000

Tollway Projects

Richmond-San Rafael Bridge

The page left Intentionally blank

2019 TIP September 26, 2018246S4 -