roadway impact fees

28
Roadway Impact Fees Roadway Impact Fees Council Workshop #6 Council Workshop #6 October 13, 2016 October 13, 2016

Upload: city-of-college-station

Post on 12-Feb-2017

681 views

Category:

Government & Nonprofit


0 download

TRANSCRIPT

Page 1: Roadway Impact Fees

Roadway Impact Fees Roadway Impact Fees Council Workshop #6Council Workshop #6October 13, 2016October 13, 2016

Page 2: Roadway Impact Fees

Presentation OverviewPresentation Overview1.1. Roadway BackgroundRoadway Background

Land Use AssumptionsLand Use AssumptionsCapital Improvements Plan Capital Improvements Plan – Maximum Calculated Fees w/ Detailed FinancialsMaximum Calculated Fees w/ Detailed Financials

2.2. Roadway Fees by Land UseRoadway Fees by Land Use– Comparison Cities’ FeesComparison Cities’ Fees– Staff Recommended Fees Staff Recommended Fees

3.3. Fee & Credit ExamplesFee & Credit Examples4.4. IFAC Written CommentsIFAC Written Comments5.5. Discussion & DirectionDiscussion & Direction

Page 3: Roadway Impact Fees

Roadway Needs (CIP)Roadway Needs (CIP) Full Build-Out T-Plan (City)Full Build-Out T-Plan (City) = $290M= $290M 10-yr Needs10-yr Needs = $217M= $217M Attributable 10-yr Growth Attributable 10-yr Growth = $143M= $143M

(66%)(66%) Eligible Recovery 10-yr Eligible Recovery 10-yr = $134M= $134M (94%)(94%)

City will continue to look to new and City will continue to look to new and increased funding sources: increased funding sources: – Council Directed Roadway Impact Fees be studied Council Directed Roadway Impact Fees be studied

and initiated this formal process as one sourceand initiated this formal process as one source– Otherwise, Roads will not be built, LOS decreasesOtherwise, Roads will not be built, LOS decreases

Page 4: Roadway Impact Fees

Roadway Impact Fee – CIP

Page 5: Roadway Impact Fees

Maximum Calculated Maximum Calculated FeesFees

Roads ARoads A $4,244/SF House$4,244/SF House ($1,061/Veh-Mile) ($1,061/Veh-Mile)

Roads BRoads B $4,288/SF House$4,288/SF House ($1,072/Veh-Mile) ($1,072/Veh-Mile)

Roads CRoads C $10,224/SF House$10,224/SF House ($2,556/Veh-Mile) ($2,556/Veh-Mile)

Roads DRoads D $16,148/SF House$16,148/SF House ($4,037/Veh-Mile) ($4,037/Veh-Mile)

Page 6: Roadway Impact Fees

Recommended Recommended Roadway Impact Roadway Impact FeesFees

““Flat” across all four areas for equityFlat” across all four areas for equity Residential Fees 15% of Max Residential Fees 15% of Max (Area C)(Area C)

– $1500 Single Family House$1500 Single Family House Non-Residential Fees 3% of Max Non-Residential Fees 3% of Max (Area C)(Area C)

– Actual Fees Vary by Land Use/Business TypeActual Fees Vary by Land Use/Business Type Staff believes the Market can bear the Staff believes the Market can bear the

Recommended FeesRecommended Fees– Council could adjust the % in future if neededCouncil could adjust the % in future if needed

Page 7: Roadway Impact Fees

Recommended FeesRecommended Fees% of Max Fees by Area% of Max Fees by Area

Service Areas

Recommended Residential

$375/VM

RecommendedNon-Residential

$80/VM

A 35% 7.5%

B 35% 7.5%

C 15% 3%

D 9% 2%

Page 8: Roadway Impact Fees

Roadway Costs and Roadway Costs and FeesFees

Full Build-Out T-Plan (City)Full Build-Out T-Plan (City) = $290M= $290M 10-yr Needs10-yr Needs = $217M= $217M Attributable 10-yr Growth Attributable 10-yr Growth = $143M= $143M Eligible Recovery 10-yr Eligible Recovery 10-yr = $134M= $134M

10-yr Collection Amount:10-yr Collection Amount: ““Max” Fees Max” Fees = $134M= $134M ““Recommended” Fees Recommended” Fees = $14M= $14M (10%)(10%)

Page 9: Roadway Impact Fees

Roadway Fees by Land Roadway Fees by Land UseUse

Page 10: Roadway Impact Fees

Comparison Cities Comparison Cities for Roadway Impact for Roadway Impact FeesFees

DentonDenton Mansfield Mansfield FriscoFrisco Fort WorthFort Worth New BraunfelsNew Braunfels

Page 11: Roadway Impact Fees

Comparison Cities Comparison Cities Roadway Impact FeesRoadway Impact Fees

City Max Fee Unit*($/Vehicle

Mile)

Adopted Residential($/Vehicle

Mile)

Adopted Non-Residential($/Vehicle

Mile)College Station

(Recommended)$2,182 / VM $375 / VM

($1,500 SF Home)

$80 / VM

New Braunfels $1,056 / VM $375 / VM($1,875 SF

Home)

$102 / VM

Denton $2,002 / VM $408.16 / VM($2,000 SF

Home)

$306.12 / VM

Mansfield $904 / VM $550 / VM($2,200 SF

Home)

$300 / VM

Frisco $1,060 / VM $636 / VM($3,816 SF

Home)

$636 / VM

Fort Worth $1,866 / VM $500 / VM($3,000 SF

Home)

$375 / VM

* Average Max Fee Unit

Page 12: Roadway Impact Fees

Comparison Cities’ Comparison Cities’ Example Example DevelopmentsDevelopments

Page 13: Roadway Impact Fees

Fees & CreditsFees & Credits Developments receive credit toward Developments receive credit toward

Roadway Impact Fees for construction of Roadway Impact Fees for construction of Major Collectors and aboveMajor Collectors and above

System Improvements receive credit System Improvements receive credit (Public – i.e. Major Collector, Signal, etc.)(Public – i.e. Major Collector, Signal, etc.)

Site Improvements do Site Improvements do notnot receive credit receive credit (Private – i.e. Driveways, DW Decel Lanes, (Private – i.e. Driveways, DW Decel Lanes, etc.)etc.)

May not owe any feeMay not owe any fee Lowe’s / Lakeway Dr ExampleLowe’s / Lakeway Dr Example

Page 14: Roadway Impact Fees

IFAC Written IFAC Written CommentsComments

Provided in Council PacketProvided in Council Packet IFAC Representative IFAC Representative

– Commissioner Jerome RektorikCommissioner Jerome Rektorik

Page 15: Roadway Impact Fees

Discussion and DirectionDiscussion and Directionto Staff for Ord Preparationto Staff for Ord Preparation

1.1. Adopt FeesAdopt Fees??– Staff Recommended FeesStaff Recommended Fees– OtherOther

2.2. Absolute Fee CapsAbsolute Fee Caps??– All or Specific Land UsesAll or Specific Land Uses

3.3. ExemptionsExemptions??– Specific Land UsesSpecific Land Uses

4.4. PhasedPhased??– 2 Year 2 Year

5.5. Discussion & DirectionDiscussion & Direction

Page 16: Roadway Impact Fees
Page 17: Roadway Impact Fees

Impact Fee Calculations

LUE = Living Unit Equivalent (connection for a single family home)

Eligible CIP Cost = 10-year capital cost (2016 – 2026)

Rate Credit = Chapter 395 requirements: reduce the eligible CIP cost by 50% [or] perform a credit analysis to determine the percent of utility bill used for growth CIP

Service Unit Growth = Derived from land use assumptions for 10-year growth in LUEs

Eligible CIP Cost – Rate Credit Impact Fee Per LUE = Service Unit Growth

Impact Fee Equation:

Page 18: Roadway Impact Fees

Maximum Maximum Calculated Calculated

FeesFeesWater Water $2,917/SF House$2,917/SF House $500/SF House $500/SF HouseSewerSewer $5,519/SF House$5,519/SF House $3,000/SF House $3,000/SF HouseRoads ARoads A $4,244/SF House$4,244/SF House $1,500/SF House $1,500/SF HouseRoads BRoads B $4,288/SF House$4,288/SF House $1,500/SF House $1,500/SF HouseRoads CRoads C $10,224/SF House$10,224/SF House $1,500/SF House $1,500/SF HouseRoads DRoads D $16,148/SF House$16,148/SF House $1,500/SF House $1,500/SF House

TotalsTotals $12K-$24K/SF House $5K/SF House $12K-$24K/SF House $5K/SF House

Staff Staff RecommendeRecommende

ddFeesFees

Page 19: Roadway Impact Fees

Maximum Roadway Maximum Roadway Example Impact FeesExample Impact Fees

Page 20: Roadway Impact Fees
Page 21: Roadway Impact Fees

Real World Example 1Real World Example 1

Land Use Intensity/Units Impact FeeFree Standing Discount Superstore 114,768 ft2 $433,823.04

Shopping Center 29,760 ft2 $88,052.40High-Turnover Sit-Down Restaurant 19,600 ft2 $98,931.00

Gasoline/Service Station

18 Fueling Positions $32,535.00

Total $653,341.44

Constructed 2-lanes and made intersection improvements

100% Credit

Forsythe, Brandon
Could not figure out how to get plat information. Used 8/24 as plat date and 8/25 as permit date. SA C
Forsythe, Brandon
287 to Shire Meadow connection:Was a bit foggy on this but threw it in
Page 22: Roadway Impact Fees

Real World Example 2Real World Example 2Developer constructed 2 lane divided facility. Paid no Impact Fee.

Developer constructed 4 lane divided facility. Paid no Impact Fee.

1Developer constructed roundabouts. Paid no Impact Fee.

City participation

Forsythe, Brandon
Looked liked theres only 1 RAB according to the aerial but you said there were 2. Assumed the one in the Fritchen Tract study was actually carried out.
Page 23: Roadway Impact Fees

Maximum Calculated Maximum Calculated FeesFees

Land Use Assumptions Land Use Assumptions (adopted)(adopted) Capital Improvement Plan Capital Improvement Plan (adopted)(adopted) Detailed Financial AnalysisDetailed Financial Analysis

– Financing CostsFinancing Costs– Interest EarningsInterest Earnings– CreditsCredits

W/WW – Utility RatesW/WW – Utility Rates Roadway – Ad Valorem TaxesRoadway – Ad Valorem Taxes

Page 24: Roadway Impact Fees

50% W/WW50% W/WWExample Impact FeesExample Impact Fees

Page 25: Roadway Impact Fees

IFACs Discussion & Q/AIFACs Discussion & Q/A

Dr. James Gaines, TAMU Real Estate Dr. James Gaines, TAMU Real Estate OfficeOffice

Richard Weatherly, Freese and NicholsRichard Weatherly, Freese and Nichols Jeff Whitaker, Kimley HornJeff Whitaker, Kimley Horn City StaffCity Staff

Page 26: Roadway Impact Fees

IFACs’ Comments IFACs’ Comments RecordedRecorded on Staff Recommended Fees on Staff Recommended Fees

Water/Wastewater IFACWater/Wastewater IFAC– WaterWater $500/SF House $500/SF House– WastewaterWastewater$3,000/SF House$3,000/SF House

Roadway IFACRoadway IFAC– Roads Roads $1,500/SF House$1,500/SF House

Page 27: Roadway Impact Fees

Other CitiesOther Cities 2012 Duncan National I.F. Study2012 Duncan National I.F. Study

– 28 States with Impact Fees, 271 jurisdictions28 States with Impact Fees, 271 jurisdictions– 2012 National Averages per Single Family2012 National Averages per Single Family

Roads $3,228 Roads $3,228 Water $3,863Water $3,863 Sanitary $3,725Sanitary $3,725

– 8 Texas Cities averages lower than National8 Texas Cities averages lower than National 2014 KHA Metroplex Survey2014 KHA Metroplex Survey

– 35 Metroplex Cities with Roadway Impact Fees35 Metroplex Cities with Roadway Impact Fees– Average Roadway IF per Single Family ~$2,200Average Roadway IF per Single Family ~$2,200

Page 28: Roadway Impact Fees

Prior CS Impact Fee Prior CS Impact Fee StudiesStudies 2010 Roadway Impact Fees2010 Roadway Impact Fees

– Based on Average $3,000 per SF HouseBased on Average $3,000 per SF House– If adopted in 2012, fees ~ $7.0 MIf adopted in 2012, fees ~ $7.0 M

2011 Citywide Utility Impact 2011 Citywide Utility Impact FeesFees– Based on Water $1,480 per SF HouseBased on Water $1,480 per SF House– Based on Sanitary $1,578 per SF HouseBased on Sanitary $1,578 per SF House– If adopted in 2012, fees ~ $7.7 MIf adopted in 2012, fees ~ $7.7 M