road no.1 sha’ar hagay - jerusalem
DESCRIPTION
Road No.1 Sha’ar Hagay - Jerusalem. September 2011. Regional Map. Tel - Aviv. Sha’ar Hagay. Jerusalem. General description and project’s goals. General - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/1.jpg)
1
Road No.1Road No.1 Sha’ar Hagay- JerusalemSha’ar Hagay- Jerusalem
September 2011September 2011
![Page 2: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/2.jpg)
2JerusalemJerusalem
Sha’ar Sha’ar Hagay Hagay
Tel - Tel - AvivAviv
Regional Map
![Page 3: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/3.jpg)
3
GeneralGeneral description and project’s goalsdescription and project’s goals
General
Road no. 1 serves as the central artery and access gate to Jerusalem. This road is defined in the regional zoning plan as a “highway”, but in practice does not meet the current functional criteria that define a highway.
The section from Sha’ar Hagay to Jerusalem is comprised of 2 lanes in each direction, and is already incapable of supporting the traffic volumes presently using this section.
The road includes a narrow median, is bordered by narrow shoulders and by safety guardrails that do not comply with the new, currently accepted standards.
![Page 4: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/4.jpg)
4
GeneralGeneral description and project’s goalsdescription and project’s goals
General (cont.)
Long sections of the road are inclined, and the road also includes sharp and dangerous curves.
Delays in the traffic flow in this section are routine, even in non-peak hours, and sometimes even in the late evening hours and at night.
![Page 5: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/5.jpg)
5
GeneralGeneral description and project’s goalsdescription and project’s goals
Project goals:
Upgrading and expanding road no. 1 in the section from the Sha’ar Hagay interchange to the Motza interchange in the Arazim valley area – a total of about 16 Km.
Transforming the national road to Jerusalem into a 3-lane, bi-directional road, with a design speed of 90 KPH, modifying the road to meet safety guidelines, and turning it into an environmentally friendly and scenic road, properly corresponding to its transport importance as the gateway to Israel’s capital city.
![Page 6: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/6.jpg)
6
GeneralGeneral description and project’s goalsdescription and project’s goals
Project goal:•Increasing the design speed to 90 KPH (driving speed of 90 KPH).•Increasing the road’s affective capacity.•Shortening driving times.•Improving driving comfort.•Reducing the incidents of queues or irregularity in the traffic flow.•Safety improvements aimed at reducing the number of road accidents.•Upgrading of lighting and drainage systems, conducting scenic restoration work and treating slopes, quarrying & filling.
![Page 7: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/7.jpg)
7
The basic cross section width for the road will be 35 meters, and will include: 3 lanes in each direction, a median at a reduced width of 4 meters, and 3 meter wide shoulders on each side. The grade will reach a maximum of 8%.
Typical basic cross-sectionTypical basic cross-section
![Page 8: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/8.jpg)
8
GeneralGeneral description and project’s goalsdescription and project’s goals
Major elements:•Construction of 3 interchanges: Kiryat Yearim, Hemmed and Harrel
•Construction of 2 tunnels, each 650 meters long (Harrel Tunnels)
•Construction of 2 bridges, each 800 meters long (Motza Bridges)
•Building of retaining walls, including temporary walls during construction stages
•Building underground agricultural crossings
•Building a 90 meter long ecological bridge
•Executing paving and infrastructure work on a total of 16 km. along road no. 1
•Executing scenic landscaping work, including restoration of slopes
![Page 9: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/9.jpg)
9
Sha’ar Hagay – Shoresh section
![Page 10: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/10.jpg)
10
Sha’ar Hagay – Shoresh section
![Page 11: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/11.jpg)
11
Typical low fill sectionTypical low fill section
1.301.30 10.80 10.80 3.003.00 2.002.00 רוחבפעיל
רוחבפעיל שולייםשוליים מסעהמסעה מפרדה
ע.ת. מתוכנן
ע.ת. מתוכנן
0.70
H 2מעקה בטון לרמת בלימה
![Page 12: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/12.jpg)
12
1.301.30 10.80 10.80 3.003.00 2.002.00
רוחבפעיל
רוחבפעיל שולייםשוליים מסעהמסעה מפרדה
ע.ת. מתוכנן H 2מעקה בטון לרמת בלימה
ע.ת. מתוכנן
Typical high fill sectionTypical high fill section
![Page 13: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/13.jpg)
13
10.80 10.802.00 רוחבפעיל
רוחבפעיל
שולייםשוליים מסעהמסעה מפרדה
0.702.003.00 3.00 1.301.30
ע.ת. מתוכנן
ע.ת. מתוכנן
תעלת בטון מלבנית לניקוז
H 2מעקה בטון לרמת בלימה
Typical cut sectionTypical cut section
![Page 14: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/14.jpg)
14
23,40
21,40
1.01.0 1.01.03.63.63.6 3.6 1.2 1.2
0.6
רוחברוחבפעיל
פעיל
שולייםזמניים
שולייםזמניים
מיסעהזמנית
מיסעהזמנית
מיסעהזמנית
מיסעהזמנית
מפרדהזמנית
Minimal section for execution stagesMinimal section for execution stages
![Page 15: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/15.jpg)
15
מילוי
Typical section for execution stage 1
![Page 16: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/16.jpg)
16
מילוי
קיר תומך זמני
Typical section for execution stage 2
![Page 17: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/17.jpg)
17
מילוי
קיר תומך זמני
Typical section for execution stage 3
![Page 18: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/18.jpg)
18
מילוי
Typical section for execution stage 4
![Page 19: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/19.jpg)
19
מחלף קרית יעריםמחלף שורש
שואבה
לתל אביבקרית יערים/טלזסטון
לירושלים
Shoresh – Kiryat Yearim section
![Page 20: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/20.jpg)
20
לתל אביב
מחלף קרית יעריםלירושלים
מחלף חמד
Kiryat Yearim – Hemmed section
![Page 21: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/21.jpg)
21
Typical cut sectionTypical cut section
![Page 22: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/22.jpg)
22
מחלף חמדמחלף הראל
מנהרת הראלגשר מוצא
ואדי ארזה
Hemmed – Motza section
![Page 23: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/23.jpg)
23
Hemmed Interchange Hemmed Interchange
![Page 24: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/24.jpg)
24
Hemmed Interchange – Long section Hemmed Interchange – Long section
![Page 25: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/25.jpg)
25
Hemmed-Harrel – Long section Hemmed-Harrel – Long section
![Page 26: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/26.jpg)
26
Typical section for execution stage 1
![Page 27: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/27.jpg)
27
Typical section for execution stage 2
![Page 28: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/28.jpg)
28
Typical section for execution stage 3
![Page 29: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/29.jpg)
29
Typical section for execution stage 4
![Page 30: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/30.jpg)
30
Typical section for execution stage 5
![Page 31: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/31.jpg)
31
Final typical section
![Page 32: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/32.jpg)
32
Harrel Tunnels & Interchange Harrel Tunnels & Interchange
Two tunnels, each 650 meters long
![Page 33: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/33.jpg)
33
'מ 15 – 18 'מ15.5 'מ15.5
Harrel Tunnels – Typical section Harrel Tunnels – Typical section
![Page 34: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/34.jpg)
34
Harrel Tunnels – Typical section Harrel Tunnels – Typical section
![Page 35: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/35.jpg)
35
Harrel Tunnel
Motza bridge
Arza Wadi
Arza Wadi
![Page 36: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/36.jpg)
36
Arza Wadi – Typical section for flow drainage
![Page 37: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/37.jpg)
37
Arza Wadi – Quantities, earthworks and filter
![Page 38: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/38.jpg)
38
Motza Bridge - General LayoutMotza Bridge - General Layout
Two tunnels, each 800 meters long
![Page 39: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/39.jpg)
39
Motza Bridge – relocating power lines Motza Bridge – relocating power lines
![Page 40: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/40.jpg)
40
Motza Bridge – Long section Motza Bridge – Long section
![Page 41: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/41.jpg)
41
Motza Bridge –Typical section Motza Bridge –Typical section
![Page 42: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/42.jpg)
42
General ScheduleGeneral Schedule
![Page 43: Road No.1 Sha’ar Hagay - Jerusalem](https://reader035.vdocuments.site/reader035/viewer/2022062301/5681513a550346895dbf53e8/html5/thumbnails/43.jpg)
43
Thank You