Provide an integrated road network in the State with the following broad objectives:

To make road connectivity as the engine of economic growth of Karnataka.

To facilitate easy, quick effective and seamless mobility for both passenger and

freight.

To provide an integrated road network comprising of core, feeder & village

connectivity.

To connect existing and potential economic growth centers

3

Core Road

– State highways, Major district roads

- Total length of Core Road - 10,000

km

Village Roads

– Roads from villages joining to the

Core Road

- 30% length of Core Road

- Total length of Village Road 3,000 km

Road Details

4

Salient Features

Project to be developed on a Build – Operate – Transfer basis

Upgrading single and intermediate lane to two lane, two lane to four lane and four

lane to six lane (wherever required)

Concessionaire responsible for design, financing, construction, operation and maintenance

of the Core Road and the Village Road.

Concessionaire to levy and retain User Charges.

Collection of User Charges as per the Karnataka Tolling Policy.

User Charges collected only from the users of the Core Road.

Construction Period : 2 years

5

Shimoga-Honnalli to Harihar

6

Project Brief Project road starts at Shimoga and terminates at Harihar, in Shimoga & Davangere

Districts in the State of Karnataka

Project road is a part of SH No.25 and connects with NH-206

Project road passes through Holalur, Honnalli and Malabennur

Project cost : Rs. 133.96 crores

Specifications

Total length of road stretch - 77.5 Kms

Reconstruction of existing 2 - lane road - Strengthening and reconstruction of CD

structures, comprehensive junction improvement, road geometries, drainage and

enhancement of the road safety

Proposed paved carriageway for rural section - 7.0 m

2 A

7

ComponentsParameter Details

Length 77.50 Kms

Carriageway Two lane with 2.5m earthen shoulder

Traffic (PCUs) Gondichettinahalli – 4,880Holalur -5,934Honnalli – 6,023Malabennur - 8,312Harihar – 11,465

No of Toll Plazas 2 Nos

Major Road Junctions 4 Nos

Major Bridges 2 Nos

Minor Bridges 13 Nos

Culverts 180 Nos

Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka

2 A

8

Road from NH-63 near Ginigere-Gangavathi to Sindhanoor

9

Project Brief Road stretch starts at Sindhanur and traverses thorough Hanchinal Camp, Karatagi, Nava

Nagar, Jangamara Kalgudi, Gangavathi Town, Mukkumpa, Budukumba, Gudhahalli, andits ending at Ginigera Provides interstate connectivity between Andhra Pradesh and Karnataka Major passenger vehicles consist of tourist vehicles Serves as linkage road for the traffic destined/originating between Raichur, Bijapur,

Koppal and Bagalkot districts Improvement to project road sections provides a better level of service for the

commuting passengers and commercial traffic Total Project Cost : Rs. 131.23 crores

Specifications Total length of road stretch – 83.0 Kms Involves improvements to widening and strengthening of 2 lane with 2.5 m earthen

shoulder on either side Development of CD structures, comprehensive junction improvement, road

geometries, drainage and enhancement of the road safety Includes construction of underpasses and Truck lay bye

38 A

10

ComponentsParameters Details

Length 83.0 Kms

Carriageway Two lane with 2.5m earthen shoulder

Traffic (PCUs) Hanchinal Camp – 13,748Nava Nagar - 9,047Jangamarakalgudi – 13,575Mukkumba – 8,971Gudhahalli – 6,820

No of Toll Plazas 3 Nos

Major Road Junctions 6 No

Major Bridges 1 Nos

Minor Bridges 7 Nos

Culverts 13 Nos

Truck lay byes 8 Nos

Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka

38 A

11

Road from SH-58 near Chintamani - Tadgal Cross - AP Border and Tadgal Cross -Govinapalli – AP

12

Details Starts from SH-58, near Chintamani to Tadgal Cross to AP Border and from SH-82,

Tadgal Cross to Givinapalli to AP Border

Project road is a part of SH No.82 and 99 - Chikballapur District in the State of

Karnataka.

Total Project Cost : Rs. 114.49 crores

Specifications

Total length of road stretch – 57.5 Kms

Reconstruction of existing 2-lane road

Strengthening and reconstruction of CD structures, comprehensive junction

improvement, road geometries, drainage and enhancement of the road safety

Proposed paved carriageway for rural section - 7.0 m and 10.0 m in village limits

8 B

13

ComponentsParameters Details

Length 57.50 Kms

Carriageway Two lane with 2.5m earthen shoulder

Traffic (PCUs) From SH-58 near Chintamani to Tadagal Cross– 6,143From Tadagal Cross to AP Border-5,117From SH-82 to Tadagal Cross to Govinapalli to AP Border– 2,527

No of Toll Plazas 1 No

Major Road Junctions 3 Nos

Major Bridges NIL

Minor Bridges 10 Nos

Culverts 53 Nos

Truck lay byes 18 Nos

Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka

8 B

14

Road from (SH-20) from Lingsugur- Kalmala to Raichur

15

Project Brief Project road starts from Lingsugur –Kalmala to Raichur (SH-20)’ lies in north-eastern part

of Karnataka and traverses through Raichur and Koppal districts Provides vital inter taluk connectivity - Raichur with Lingsugur, Yeragera, and AP

Border apart from interlinking various State Highways : SH-13, SH-19, SH-20, SH-23 and SH-129

Project road is a part of SH-20 (Raichur-Bachi Road) Provides the interstate connectivity between Andhra Pradesh and Karnataka Improvement to project road sections provides a better level of service for the commuting

passengers and commercial traffic Total Project Cost : Rs. 145.88 crores Specifications

Total length of road stretch – 86.0 Kms Widening to 2/4-lane road Strengthening and reconstruction of road & CD structures, comprehensive junction

improvement, road geometrics, drainage and enhancement of the road safety

34 A

16

ComponentsParameters Details

Length 86.00 Kms

Carriageway Two lane with 2.5m earthen shoulder

Traffic (PCUs) Asthihala – 11,105Athnur – 4,865Sirvara – 6,053Kavithal - 3461

No of Toll Plazas 1 No

Major Road Junctions 11 Nos

Major Bridges 2 Nos

Minor Bridges 32 Nos

Culverts 111 Nos

Truck lay byes 1 No

Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka

34 A

17

Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge.

18

Project Brief Project road starts from AP Border near Devsugur - Chikkasugur – Raichur - Yergera to

Mantralaya Bridge (SH-13) Lies in the north-eastern part of Karnataka Provides vital linkages between Raichur with Lingsugur, Bellary, Yeragera, Manthralayam

and AP Border Provides inter-linkages various State Highways SH-20 and SH-127 Provides the interstate connectivity between Andhra Pradesh and Karnataka Major passenger vehicles consist of tourist vehicles Serves as linkage road for the traffic destined/originating between Raichur, Bijapur and

Bagalkot districts Improvement to project road sections provides a better level of service for the commuting

passengers and commercial traffic Total Project Cost : Rs. 117.68 crores Specifications

Total length of road stretch – 47.5 Kms Widening to 2-lane road Strengthening and reconstruction of road & CD structures, comprehensive junction

improvement, road geometrics, drainage and enhancement of the road safety

34 B

19

ComponentsParameters Details

Length 47.50 Kms

Carriageway Two lane with 2.5m earthen shoulder

Traffic (PCUs) Near Yeramarase – 12,749Near NET Medical college – 4,793 Nos

No of Toll Plazas 2 No

Major Road Junctions 9 Nos

Major Bridges 2 Nos

Minor Bridges 7 Nos

Culverts 89 Nos

Truck lay byes 1 No

Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka

34 B

20

Project Costs

Particulars Length(km)

Project Cost(Rs. crores)

Development of road from Shimoga – Honnalli to Harihara. 77.50 133.96

Development of road from NH-63 nearGinigere-Gangavathito Sindhanoor.

83.00 133.01

Development of road from SH-58 near Chintamani -Tadgalcross to AP Border and Tadgal cross- Govinapalli to APBorder.

57.50 114.49

Development of road (SH-20) from Lingsugur- Kalmala to Raichur.

86.00 145.88

Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge.

47.50 117.68

351.50 645.02

21

Traffic Estimates

Particulars Maximum PCU

Development of road from Shimoga – Honnalli to Harihara. 10824

Development of road from NH-63 nearGinigere-Gangavathi to Sindhanoor.

12241

Development of road from SH-58 near Chintamani -Tadgal cross to APBorder and Tadgal cross- Govinapalli to AP Border.

7039

Development of road (SH-20) from Lingsugur- Kalmala to Raichur. 20308

Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge.

20917

22

Toll Rates

Type of VehicleBasic Toll rate

(Rs. Per km and per trip)

2 Lane 4 Lane

Car, Jeep, Van or Light Motor Vehicles 0.50 0.65

Light Commercial Vehicle, Light Goods Vehicle or Mini Buses

0.75 1.05

Bus or Truck 1.50 2.20

Heavy Construction Machinery or Earth Moving Equipment or Multi Axle Vehicle

2.25 3.45

Oversized Vehicle 3.0 4.2

As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated:26th May, 2009) issued by Government of Karnataka

23

Bid Process

Two stage process to be adopted - In accordance with the guidelines set out by Planning

Commission, Government of India

Stage 1 : Request for Qualification – technical qualification

Stage 2 : Request for Proposal – financial proposal

Tender documents comprise

Request for qualification Document – Common for all 5 packages

Request for Proposal Document – Common for all 5 packages

Concession Agreement – Separate for each package

24

Salient Features

25

Condition Precedent

CP to be satisfied by Authority

Procure the Right of Way to the Site

Issue the Fee Notification

Procure approval of the Railway authorities, if required ; and

Procured all Applicable Permits relating to environmental protection and

conservation of the Site

CP to be satisfied by the Concessionaire

Provide Performance Security to the Authority

Execute and procure execution of Escrow Agreement

To execute and procure execution of the Substitution Agreement

Procured all the Applicable Permits sought to be procured by him under the

Agreement

Execute the Financing Agreements

26

Obligation of the Concessionaire

Concessionaire responsible for design, financing, construction, operation and maintenance

of the Core Road and the Project Road

Concessionaire shall comply with all Applicable Laws and Applicable Permits

Concessionaire to levy and retain User Charges

Collection of User Charges as per the Karnataka Tolling Policy

User Charges collected only from the users of the Core Road

Transfer the Project Road to the Authority, upon termination of the agreement

27

Obligation of the Authority Provide reasonable assistance in obtaining access to all necessary infrastructure facilities

and utilities, including water and electricity

Ensure that no barriers are erected or placed on or about the Project Highway by any

Government Instrumentality

Appoint an Independent Engineer who shall be responsible for monitoring the

implementation of the Project by the Concessionaire.

Make best endeavours to procure that no local Tax, toll or charge is levied or imposed on

the use of whole or any part of the Project Highway

Not to do or omit to do any act, deed or thing which may in any manner be violative of

any of the provisions of the Agreement

28

Key events of Default By the Concessionaire

Failure to provide fresh performance security, where performance security provided

has been encashed and appropriated as per the Agreement

Failure to achieve project completion date within the period specified in the

Agreement

Concessionaire abandons or manifests intention to abandon the construction or

operation of the Project Highway

Breach of any of project agreements by Concessionaire causing a material adverse

effect

By the Authority

Failure to make any payment to the Concessionaire within the period specified in

the Agreement

Repudiates the Agreement or otherwise takes any action that amounts to or

manifests an irrevocable intention not to be bound by the Agreement

29

Thank You

30

Road Map - Package 2A - Shimoga-Honnalli to Harihar

31

Road Map - Package 38A - Road from NH-63 near Ginigere-Gangavathi to Sindhanoor

32

Road Map - Package 8B - Road from SH-58 near Chintamani -Tadgal Cross - AP Border and Tadgal Cross - Govinapalli – AP

33

Road Map - Package 34 A - Road from (SH-20) from Lingsugur- Kalmala to Raichur

34

Road Map - Package 34 B - Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge