2
Road Development Projects in Karnataka
Provide an integrated road network in the State with the following broad objectives:
To make road connectivity as the engine of economic growth of Karnataka.
To facilitate easy, quick effective and seamless mobility for both passenger and
freight.
To provide an integrated road network comprising of core, feeder & village
connectivity.
To connect existing and potential economic growth centers
3
Core Road
– State highways, Major district roads
- Total length of Core Road - 10,000
km
Village Roads
– Roads from villages joining to the
Core Road
- 30% length of Core Road
- Total length of Village Road 3,000 km
Road Details
4
Salient Features
Project to be developed on a Build – Operate – Transfer basis
Upgrading single and intermediate lane to two lane, two lane to four lane and four
lane to six lane (wherever required)
Concessionaire responsible for design, financing, construction, operation and maintenance
of the Core Road and the Village Road.
Concessionaire to levy and retain User Charges.
Collection of User Charges as per the Karnataka Tolling Policy.
User Charges collected only from the users of the Core Road.
Construction Period : 2 years
6
Project Brief Project road starts at Shimoga and terminates at Harihar, in Shimoga & Davangere
Districts in the State of Karnataka
Project road is a part of SH No.25 and connects with NH-206
Project road passes through Holalur, Honnalli and Malabennur
Project cost : Rs. 133.96 crores
Specifications
Total length of road stretch - 77.5 Kms
Reconstruction of existing 2 - lane road - Strengthening and reconstruction of CD
structures, comprehensive junction improvement, road geometries, drainage and
enhancement of the road safety
Proposed paved carriageway for rural section - 7.0 m
2 A
7
ComponentsParameter Details
Length 77.50 Kms
Carriageway Two lane with 2.5m earthen shoulder
Traffic (PCUs) Gondichettinahalli – 4,880Holalur -5,934Honnalli – 6,023Malabennur - 8,312Harihar – 11,465
No of Toll Plazas 2 Nos
Major Road Junctions 4 Nos
Major Bridges 2 Nos
Minor Bridges 13 Nos
Culverts 180 Nos
Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka
2 A
9
Project Brief Road stretch starts at Sindhanur and traverses thorough Hanchinal Camp, Karatagi, Nava
Nagar, Jangamara Kalgudi, Gangavathi Town, Mukkumpa, Budukumba, Gudhahalli, andits ending at Ginigera Provides interstate connectivity between Andhra Pradesh and Karnataka Major passenger vehicles consist of tourist vehicles Serves as linkage road for the traffic destined/originating between Raichur, Bijapur,
Koppal and Bagalkot districts Improvement to project road sections provides a better level of service for the
commuting passengers and commercial traffic Total Project Cost : Rs. 131.23 crores
Specifications Total length of road stretch – 83.0 Kms Involves improvements to widening and strengthening of 2 lane with 2.5 m earthen
shoulder on either side Development of CD structures, comprehensive junction improvement, road
geometries, drainage and enhancement of the road safety Includes construction of underpasses and Truck lay bye
38 A
10
ComponentsParameters Details
Length 83.0 Kms
Carriageway Two lane with 2.5m earthen shoulder
Traffic (PCUs) Hanchinal Camp – 13,748Nava Nagar - 9,047Jangamarakalgudi – 13,575Mukkumba – 8,971Gudhahalli – 6,820
No of Toll Plazas 3 Nos
Major Road Junctions 6 No
Major Bridges 1 Nos
Minor Bridges 7 Nos
Culverts 13 Nos
Truck lay byes 8 Nos
Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka
38 A
12
Details Starts from SH-58, near Chintamani to Tadgal Cross to AP Border and from SH-82,
Tadgal Cross to Givinapalli to AP Border
Project road is a part of SH No.82 and 99 - Chikballapur District in the State of
Karnataka.
Total Project Cost : Rs. 114.49 crores
Specifications
Total length of road stretch – 57.5 Kms
Reconstruction of existing 2-lane road
Strengthening and reconstruction of CD structures, comprehensive junction
improvement, road geometries, drainage and enhancement of the road safety
Proposed paved carriageway for rural section - 7.0 m and 10.0 m in village limits
8 B
13
ComponentsParameters Details
Length 57.50 Kms
Carriageway Two lane with 2.5m earthen shoulder
Traffic (PCUs) From SH-58 near Chintamani to Tadagal Cross– 6,143From Tadagal Cross to AP Border-5,117From SH-82 to Tadagal Cross to Govinapalli to AP Border– 2,527
No of Toll Plazas 1 No
Major Road Junctions 3 Nos
Major Bridges NIL
Minor Bridges 10 Nos
Culverts 53 Nos
Truck lay byes 18 Nos
Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka
8 B
15
Project Brief Project road starts from Lingsugur –Kalmala to Raichur (SH-20)’ lies in north-eastern part
of Karnataka and traverses through Raichur and Koppal districts Provides vital inter taluk connectivity - Raichur with Lingsugur, Yeragera, and AP
Border apart from interlinking various State Highways : SH-13, SH-19, SH-20, SH-23 and SH-129
Project road is a part of SH-20 (Raichur-Bachi Road) Provides the interstate connectivity between Andhra Pradesh and Karnataka Improvement to project road sections provides a better level of service for the commuting
passengers and commercial traffic Total Project Cost : Rs. 145.88 crores Specifications
Total length of road stretch – 86.0 Kms Widening to 2/4-lane road Strengthening and reconstruction of road & CD structures, comprehensive junction
improvement, road geometrics, drainage and enhancement of the road safety
34 A
16
ComponentsParameters Details
Length 86.00 Kms
Carriageway Two lane with 2.5m earthen shoulder
Traffic (PCUs) Asthihala – 11,105Athnur – 4,865Sirvara – 6,053Kavithal - 3461
No of Toll Plazas 1 No
Major Road Junctions 11 Nos
Major Bridges 2 Nos
Minor Bridges 32 Nos
Culverts 111 Nos
Truck lay byes 1 No
Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka
34 A
17
Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge.
18
Project Brief Project road starts from AP Border near Devsugur - Chikkasugur – Raichur - Yergera to
Mantralaya Bridge (SH-13) Lies in the north-eastern part of Karnataka Provides vital linkages between Raichur with Lingsugur, Bellary, Yeragera, Manthralayam
and AP Border Provides inter-linkages various State Highways SH-20 and SH-127 Provides the interstate connectivity between Andhra Pradesh and Karnataka Major passenger vehicles consist of tourist vehicles Serves as linkage road for the traffic destined/originating between Raichur, Bijapur and
Bagalkot districts Improvement to project road sections provides a better level of service for the commuting
passengers and commercial traffic Total Project Cost : Rs. 117.68 crores Specifications
Total length of road stretch – 47.5 Kms Widening to 2-lane road Strengthening and reconstruction of road & CD structures, comprehensive junction
improvement, road geometrics, drainage and enhancement of the road safety
34 B
19
ComponentsParameters Details
Length 47.50 Kms
Carriageway Two lane with 2.5m earthen shoulder
Traffic (PCUs) Near Yeramarase – 12,749Near NET Medical college – 4,793 Nos
No of Toll Plazas 2 No
Major Road Junctions 9 Nos
Major Bridges 2 Nos
Minor Bridges 7 Nos
Culverts 89 Nos
Truck lay byes 1 No
Toll Rate As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated: 26th May, 2009) issued by Government of Karnataka
34 B
20
Project Costs
Particulars Length(km)
Project Cost(Rs. crores)
Development of road from Shimoga – Honnalli to Harihara. 77.50 133.96
Development of road from NH-63 nearGinigere-Gangavathito Sindhanoor.
83.00 133.01
Development of road from SH-58 near Chintamani -Tadgalcross to AP Border and Tadgal cross- Govinapalli to APBorder.
57.50 114.49
Development of road (SH-20) from Lingsugur- Kalmala to Raichur.
86.00 145.88
Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge.
47.50 117.68
351.50 645.02
21
Traffic Estimates
Particulars Maximum PCU
Development of road from Shimoga – Honnalli to Harihara. 10824
Development of road from NH-63 nearGinigere-Gangavathi to Sindhanoor.
12241
Development of road from SH-58 near Chintamani -Tadgal cross to APBorder and Tadgal cross- Govinapalli to AP Border.
7039
Development of road (SH-20) from Lingsugur- Kalmala to Raichur. 20308
Development of road (SH-13) from AP Border near Devsugur-Chikkasugur-Raichur-Yergera to Mantralaya bridge.
20917
22
Toll Rates
Type of VehicleBasic Toll rate
(Rs. Per km and per trip)
2 Lane 4 Lane
Car, Jeep, Van or Light Motor Vehicles 0.50 0.65
Light Commercial Vehicle, Light Goods Vehicle or Mini Buses
0.75 1.05
Bus or Truck 1.50 2.20
Heavy Construction Machinery or Earth Moving Equipment or Multi Axle Vehicle
2.25 3.45
Oversized Vehicle 3.0 4.2
As per the Toll / User Fee Notification (No. PWD 18 EAP 2009 (P1) Bangalore, dated:26th May, 2009) issued by Government of Karnataka
23
Bid Process
Two stage process to be adopted - In accordance with the guidelines set out by Planning
Commission, Government of India
Stage 1 : Request for Qualification – technical qualification
Stage 2 : Request for Proposal – financial proposal
Tender documents comprise
Request for qualification Document – Common for all 5 packages
Request for Proposal Document – Common for all 5 packages
Concession Agreement – Separate for each package
25
Condition Precedent
CP to be satisfied by Authority
Procure the Right of Way to the Site
Issue the Fee Notification
Procure approval of the Railway authorities, if required ; and
Procured all Applicable Permits relating to environmental protection and
conservation of the Site
CP to be satisfied by the Concessionaire
Provide Performance Security to the Authority
Execute and procure execution of Escrow Agreement
To execute and procure execution of the Substitution Agreement
Procured all the Applicable Permits sought to be procured by him under the
Agreement
Execute the Financing Agreements
26
Obligation of the Concessionaire
Concessionaire responsible for design, financing, construction, operation and maintenance
of the Core Road and the Project Road
Concessionaire shall comply with all Applicable Laws and Applicable Permits
Concessionaire to levy and retain User Charges
Collection of User Charges as per the Karnataka Tolling Policy
User Charges collected only from the users of the Core Road
Transfer the Project Road to the Authority, upon termination of the agreement
27
Obligation of the Authority Provide reasonable assistance in obtaining access to all necessary infrastructure facilities
and utilities, including water and electricity
Ensure that no barriers are erected or placed on or about the Project Highway by any
Government Instrumentality
Appoint an Independent Engineer who shall be responsible for monitoring the
implementation of the Project by the Concessionaire.
Make best endeavours to procure that no local Tax, toll or charge is levied or imposed on
the use of whole or any part of the Project Highway
Not to do or omit to do any act, deed or thing which may in any manner be violative of
any of the provisions of the Agreement
28
Key events of Default By the Concessionaire
Failure to provide fresh performance security, where performance security provided
has been encashed and appropriated as per the Agreement
Failure to achieve project completion date within the period specified in the
Agreement
Concessionaire abandons or manifests intention to abandon the construction or
operation of the Project Highway
Breach of any of project agreements by Concessionaire causing a material adverse
effect
By the Authority
Failure to make any payment to the Concessionaire within the period specified in
the Agreement
Repudiates the Agreement or otherwise takes any action that amounts to or
manifests an irrevocable intention not to be bound by the Agreement
32
Road Map - Package 8B - Road from SH-58 near Chintamani -Tadgal Cross - AP Border and Tadgal Cross - Govinapalli – AP