River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements
Public Meeting
March 10, 2005
Today’s MeetingToday’s Meeting
• Program Overview
• River Road Projects• EQ Basin/Pump Station – River Road Park• Sewer installation• Force main installation
• Next Meeting
Program OverviewProgram Overview
• 4 sanitary sewer overflows in River Road area
• Must be eliminated by November of 2006• Stiff penalties for missed deadlines
IntroductionsIntroductions
• Councilman Ludeman• Toledo Waterways Initiative Director – Bob
Williams• Utilities Administrator – Scott Sibley• Construction Engineer – Frank Mortali, P.E.• Construction Engineer – Christy Soncrant, P.E.• Contractors
• E.S. Wagner• Anderzack Pitzen
River Road River Road Area ProjectsArea Projects• Underground Equalization Basin – River Road
Park
• Underground Pump Stations – River Road Park
and Brookford west of the Trail
• New Force Main Sewer – Brookford Drive
• New Relief Sewer– Beverly and River Road
• New Water Line – River Road
Project SchedulesProject Schedules
• Projects will be built concurrently
• Construction contracts being finalized
• River Road sewer and water line
• Start in next two weeks
• Completed by fall
• Basin and pump station and Brookford sewer
• Begin in April
• Completed by Fall 2006
Equalization BasinEqualization Basin
• Underground facility
• 3 million gallon storage capacity
• 120 ft. x 240 ft.
• 17 ft. deep
• To be located at River Road Park ball diamond site• Tanks from old Toledo Water Plant currently
located there
Equalization BasinEqualization Basin
Equalization Basin Equalization Basin Issues & DiscussionIssues & Discussion• Construction Access Road
• From River Road to site (between playgrounds)• Access off River Road would have less impact on
traffic• Some construction staging off Brookford in park
• Grading• From water and sewer installation
• Fill to shift baseball diamond to west
Issues and DiscussionIssues and DiscussionContinuedContinued• Baseball diamond
• Will be lost for two seasons due to construction• Will be replaced to west and re-oriented
River Road Park River Road Park Pump StationPump Station• Located next to
equalization basin• Bulk of facility
underground• Electrical panel above
ground
Force Main SewerForce Main Sewer
• New shallow pressure sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the equalization basin
• To be located on south side of Brookford• Located off of street – except for crossings at OLPH
and Island Avenue• Traffic maintained except for two crossings to be done
in summer• Will work with neighborhood to minimize disruption
New Relief SewersNew Relief Sewers
• Deep sanitary sewers• Wide trenches
• Large equipment
• Slower progress
• On Beverly from Brookford to Medford• On River Road from Brookford to Midland• Both relief sewer lines should help reduce basement
flooding and eliminate overflows in area• Traffic control
New Relief Sewers/New Relief Sewers/Water Line on River RoadWater Line on River Road• From Brookford at River Road south to
Midland• Will start soon• New water line will be installed first
• Water main will be done by June
• Will cause temporary disruption of water service• Should help improve water pressure and main breaks in
the area
• Sewer line installed after water line• Final restoration late summer, early fall
River Road Issues & River Road Issues & DiscussionDiscussion• Rolling closures – block-by-block will be
necessary• Access for residents only
• Road re-opened at end of each workday
• Will be times driveways/side streets will be blocked
• Contractor will notify residents in advance
Beverly Pump StationBeverly Pump Station
• Underground – with electrical panel(s) above ground
• Will pump waste from Beverly sewer to new EQ basin
CommentsComments
• Questions
• Discussion
Future MeetingsFuture Meetings
• Next meeting date?
• Best time and location?