River Road Area River Road Area Sewer Improvements Sewer Improvements Public Meeting March 10, 2005

Upload: harttwi

Post on 22-May-2015

296 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: River Road Meeting 3-10-05

River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements

Public Meeting

March 10, 2005

Page 2: River Road Meeting 3-10-05

Today’s MeetingToday’s Meeting

• Program Overview

• River Road Projects• EQ Basin/Pump Station – River Road Park• Sewer installation• Force main installation

• Next Meeting

Page 3: River Road Meeting 3-10-05

Program OverviewProgram Overview

• 4 sanitary sewer overflows in River Road area

• Must be eliminated by November of 2006• Stiff penalties for missed deadlines

Page 4: River Road Meeting 3-10-05

IntroductionsIntroductions

• Councilman Ludeman• Toledo Waterways Initiative Director – Bob

Williams• Utilities Administrator – Scott Sibley• Construction Engineer – Frank Mortali, P.E.• Construction Engineer – Christy Soncrant, P.E.• Contractors

• E.S. Wagner• Anderzack Pitzen

Page 5: River Road Meeting 3-10-05

River Road River Road Area ProjectsArea Projects• Underground Equalization Basin – River Road

Park

• Underground Pump Stations – River Road Park

and Brookford west of the Trail

• New Force Main Sewer – Brookford Drive

• New Relief Sewer– Beverly and River Road

• New Water Line – River Road

Page 6: River Road Meeting 3-10-05

Project SchedulesProject Schedules

• Projects will be built concurrently

• Construction contracts being finalized

• River Road sewer and water line

• Start in next two weeks

• Completed by fall

• Basin and pump station and Brookford sewer

• Begin in April

• Completed by Fall 2006

Page 7: River Road Meeting 3-10-05

Equalization BasinEqualization Basin

• Underground facility

• 3 million gallon storage capacity

• 120 ft. x 240 ft.

• 17 ft. deep

• To be located at River Road Park ball diamond site• Tanks from old Toledo Water Plant currently

located there

Page 8: River Road Meeting 3-10-05

Equalization BasinEqualization Basin

Page 9: River Road Meeting 3-10-05

Equalization Basin Equalization Basin Issues & DiscussionIssues & Discussion• Construction Access Road

• From River Road to site (between playgrounds)• Access off River Road would have less impact on

traffic• Some construction staging off Brookford in park

• Grading• From water and sewer installation

• Fill to shift baseball diamond to west

Page 10: River Road Meeting 3-10-05

Issues and DiscussionIssues and DiscussionContinuedContinued• Baseball diamond

• Will be lost for two seasons due to construction• Will be replaced to west and re-oriented

Page 11: River Road Meeting 3-10-05

River Road Park River Road Park Pump StationPump Station• Located next to

equalization basin• Bulk of facility

underground• Electrical panel above

ground

Page 12: River Road Meeting 3-10-05

Force Main SewerForce Main Sewer

• New shallow pressure sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the equalization basin

• To be located on south side of Brookford• Located off of street – except for crossings at OLPH

and Island Avenue• Traffic maintained except for two crossings to be done

in summer• Will work with neighborhood to minimize disruption

Page 13: River Road Meeting 3-10-05

New Relief SewersNew Relief Sewers

• Deep sanitary sewers• Wide trenches

• Large equipment

• Slower progress

• On Beverly from Brookford to Medford• On River Road from Brookford to Midland• Both relief sewer lines should help reduce basement

flooding and eliminate overflows in area• Traffic control

Page 14: River Road Meeting 3-10-05

New Relief Sewers/New Relief Sewers/Water Line on River RoadWater Line on River Road• From Brookford at River Road south to

Midland• Will start soon• New water line will be installed first

• Water main will be done by June

• Will cause temporary disruption of water service• Should help improve water pressure and main breaks in

the area

• Sewer line installed after water line• Final restoration late summer, early fall

Page 15: River Road Meeting 3-10-05

River Road Issues & River Road Issues & DiscussionDiscussion• Rolling closures – block-by-block will be

necessary• Access for residents only

• Road re-opened at end of each workday

• Will be times driveways/side streets will be blocked

• Contractor will notify residents in advance

Page 16: River Road Meeting 3-10-05

Beverly Pump StationBeverly Pump Station

• Underground – with electrical panel(s) above ground

• Will pump waste from Beverly sewer to new EQ basin

Page 17: River Road Meeting 3-10-05

CommentsComments

• Questions

• Discussion

Page 18: River Road Meeting 3-10-05

Future MeetingsFuture Meetings

• Next meeting date?

• Best time and location?