risk assessment form - asmi
TRANSCRIPT
Association of Singapore Marine Industries Page 1 of 2
RISK ASSESSMENT FORM Company
Task
Renew Main Mast Equipment: a) Navigation Light
Conducted By (Date) Group 1 (13/09/06)
Approved By (Date)
Next Review Date
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1 Inspect faulty navigation light
Falling from height
Fatal -VSCC -Staging / Scaffold -Use body harness and anchor at hard point
5 1 M Monitor workers to be equipped with proper PPE (body harness)
Supervisor & Safety
2
Remove existing navigation light
-Live wire Electric shock Electrocution Fatal
-Isolate power supply with lock out / tag out --VSCC
5 1 M -Counter check by multi-meter
Supervisor & Safety
3
Bring down existing navigation light and bring up new light
Falling hazard Bodily injury -Qualified Signaler/Rigger -Valid inspection tag for lifting appliances -Barricade affected area
3 2 M -Provide lifting containers / casing
Lifting Supervisor
4
Install new navigation light
-Falling hazard -Slip, tripping hazard
-Bodily injury -Hand and finger injury
-Staging -PPE (Hand gloves, body harness)
3 2 M -Use line yard for tools
Supervisor
Association of Singapore Marine Industries Page 2 of 2
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
5
Testing and Commissioning
Live wire Electric shock Electrocution Fatal
-Permit to work system and -Authorized person to conduct test -VSCC meeting
5 1 M -Conduct toolbox meeting
Commissioning Engineer/ Supervisor
Association of Singapore Marine Industries Page 1 of 2
RISK ASSESSMENT FORM Company
Group 2
Task
Load Test Generator with Load Bank
Conducted By (Date) Arasu, Joleen, Yen, Sheng, Thein, Manir Ram, Aye Min, Kelvin and Ramkumar
Approved By (Date)
13/09/2006 Next Review Date 12/09/2009
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Work Area Assessment
Slip, Trip and Fall
-Slip & fall due to slippery surface or -Trip & fall due to wires and cables on floor -Minor injury
-Keep the area clear / dry -Use cable hanger to hang cable -Use of PPE
2 2 L Nil Supervisor
2
Transport of load bank / cables to work site using fork lift
-Moving vehicle -Falling object
-Collision, topple of forklift -Fatality -Overload of forklift
-Ensure only trained & licensed forklift driver operates -Ensure the path of forklift is free from obstruction -Ensure not to overload -Secure the load
5 2
1 2
M L
-Warning siren during operation -Nil
Supervisor Operation of forklift or checklist
3
Laying of cable from load bank to switchboard using shore crane
-Hand / Finger injury -Falling object
-Cut injury while pulling cable (minor injury) -Cable falling while lifting (minor injury)
-Ensure using of hand gloves -Ensure area is barricaded -Ensure lifting belt is certified and fit for use -Ensure trained signalmen is present
2 2
2 2
L L
Nil Supervisor Inspection record for lift gear
4
Isolation of power in switch board
Live voltage -Electric Shock -Electrocution (fatal)
-Highlight in VSCC meeting -Ensure skilled electrician is used -Lock out / Tag out at main switch board
5 1 M Supervisor
Association of Singapore Marine Industries Page 2 of 2
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
5
Termination of load bank cable in switch board
-Live voltage -Hand & finger injury
-Electric shock -Electrocution (fatal) -Cut injury during connection (minor injury)
-Ensure that line test is carried out -Ensure using of hand gloves
5 2
1 2
M L
-Briefing by Supervisor -Ensure no presence of electricity
Supervisor
6
Load test of generator
Live voltage
-Electric shock -Electrocution (fatal)
-Ensure the switchboard & load bank are properly barricade -Ensure that physical check on the cable
5 1 M Operation of warning light Use walkie-talkie to communicate
Supervisor
7
Disconnect of cable & removal of load bank after testing
Live voltage -Electric shock -Electrocution (fatal)
-Ensure load bank is shut off -Ensure generator is switched off & stopped -Ensure the main switch board is isolated
5 1 M Ensure no presence of electricity Use walkie-talkie to communicate
Supervisor
Association of Singapore Marine Industries Page 1 of 2
RISK ASSESSMENT FORM Company
ABC Group 3
Task
Remove Alternator from Vessel and Overhaul in WS
Conducted By (Date)
Approved By (Date)
Machinery HOD 13/09/06 Next Review Date 13/09/09
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Inspect alternator located in E/RM
- Unknown condition -Trip, slip and fall
-Lack of oxygen -Toxic fumes -Bodily injury or fatal
-Entry permit for confine space -Gas check -Forced ventilation &general lighting -Housekeeping -Adequate PPE
5 5
1 1
M
M
-Portable gas monitor per working group
Supervisor HSE Officer
2
Dismantle the alternator cable
Live power supply terminals
-Electric shock and electrocution -Bodily injury
-VSCC Meeting -Isolate the circuit breaker -Lock out & Tag Out -Use correct tool
5 1 M -Check to ensure there is no presence of electricity
Supervisor
3
Remove of corroded mounting bolts
Fire and explosion -Spark or molten generated from gas cutting, may cause flame -Bodily injury/ fatal
-Hot work permit -PPE -Fire watch
5 1 M Brief worker before work commences
Supervisor
4
Lifting the alternator
Falling object -Hit by falling object -Bodily injury / fatal
-Trained rigger / signalmen -Check SWL & condition of wire sling or lifting belt -Use bucket container to lift from onboard to shore
3 1 L Supervisor Inspection record for lifting gear
Association of Singapore Marine Industries Page 2 of 2
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
5
Transportation of alternator from dock to workshop and vice versa
Moving vehicle -Collision, topple, over capacity -Bodily injury/ fatal -Damage property
-Ensure proper lashing -Use low bed trailer for over site alternator -Keep road clear of obstruction
3 1 L Supervisor Ensure checklist for forklift
6
Dismantle / assemble of alternator
-Hand caught in between -Strike by tool -Strike by hose -Hit by parts
-Finger injury -Noise (NID) -Bodily injury
-PPE -Proper tools -Correct WPs -Avoid/minimize hand contact and over extension
2 2 L Supervisor
7
Chemical cleaning -Toxicity -Fluid spill
-Burn -Allergic
-Appropriate PPE -MSDS -Permit for cleaning
2 2 L Supervisor Know the stated 1st-aid recommended in MSDS
8 Baking Caught by hot equipment
Burn Train personnel using the hot / oven room
2 2 L Supervisor
9 Testing Live power supply terminal
-Bodily injury -Electric shock & electrocution
-Trained personnel -Test protocol
5 1 M Ensure no contact while testing in progress/ Display warning signboard
Supervisor
Association of Singapore Marine Industries Page 1 of 2
RISK ASSESSMENT FORM Company
Group 4
Task
Test and Commission Main Switch Board
Conducted By (Date) Group 4
Approved By (Date)
Next Review Date
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Main switch board cleaning
Chemical exposure to skin and body parts
-Skin itch -Eye irritation
-Highlight in VSCC -PPE (eye protection, hand gloves) -Continuous ventilation -Temporary light and ventilation -Display warning sign
2 1 L Supervisor/ Charge hand
MSDS
2
MSB Bus Bar Insulation test and check
Electric hazard Finger injury -PPE (hand gloves) -Calibrated and tested equipment -Skilled electrician -Rubber Mat
2 1 L Supervisor/ Charge hand
3
MSB Control Circuit check
Electric hazard Finger injury -PPE - Calibrated and tested equipment -Skilled electrician
2 1 L Supervisor Charge hand
4
Bus Bar Torque & Breaker Termination check
-Slip -Sharp edges
-Hand injury -Body injury -Cut/hand and body injury
-Use appropriate tools -PPE -Skilled electrician
2 2 L Supervisor/ Charge hand
Association of Singapore Marine Industries Page 2 of 2
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
5
Energize the main switch board
-Short circuit -Explosion
-Death -Body injury -Burn
(Steps before this step) -Sign boards -Barricade -Insulation mat -Standby FFA -PPE -Skilled electrician
5 1 M -Permit highlight in VSCC -Briefing all personnel
Commissioning Engineer/ Supervisor
6
Function test main switch board
Short circuit -Electrical shock -Body injury
-SWP checklist -Skilled electrician
3 1 L Commissioning Engineer/ Supervisor/ Chargehand
Association of Singapore Marine Industries Page 1 of 1
RISK ASSESSMENT FORM Company
Group 5
Task
Renewal of Echo Sounder and Speed Log
Conducted By (Date)
Approved By (Date)
Next Review Date
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Inspection of echo sounder and speed log
-Lack of O2 -Falling hazards
-Asphyxiation -Body injury
-Entry permit -Force ventilation -General lighting -Lifeline rope -Body harness/ safety belt
5 5
1 1
M M
-portable gas meter -Torchlight -Tank cleaning
Supervisor
2
Disconnect sounder and speed log
Electric Shock Electrocution Fatality
-Workers briefed during Take 5 -Work highlighted in VSCC -Isolate power supply -LOTO
5 1 M -Discharge residual voltage -Test with meter
Supervisor and Individual Electrician
3
Hotwork Fire and explosion Burns Fatality
-Workers briefed -Work highlighted in VSCC -Permit to work -Proper PPE -Proper tool -Fire watchman
5 1 M -Pressurized Fire line
Supervisor and Hot worker
4
Work at height Falling hazard Fractures Fatality
-Workers briefed -Work highlighted in VSCC -Permit to work -Safety harness
5 1 M Supervisor and Individual Electrician
Association of Singapore Marine Industries Page 1 of 2
RISK ASSESSMENT FORM Company
Group 6
Task
Test Commission Main Distribution Board (DB)
Conducted By (Date) Group 6 (13/09/2006)
Approved By (Date)
13/09/2006 Next Review Date 13/09/2009
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Identify the location of the whole loop according to the one-line diagram and P&ID layout drawing
-Live power supply -Falling from height -Unknown gas condition
-Electrical shock -Fatal bodily injury -Lack of oxygen -Gas of explosion
-Tag-Out and Lock-Out all the equipments relate to this loop -PPE, -Check the staging “OK” -Tag and use harness -Apply entry permit and use vent-fan
5
5
5
1
1
1
M
M
M
Use walkie-talkie or mobile talk to communicate
Supervisor Officer
2
Visual check the grounding cable and cleaning for the panel
Live power supply Electrical shock -Tag-Out and Lock-Out power supply unit for the panel -PPE -Use proper tool
5 1 M Use walkie-talkie or mobile talk to communicate
Supervisor Officer
3
Disconnect all the cables to do the continuous check and merger test
Live power supply Electrical shock -PPE -Tag-Out and Lock-Out power supply unit for the panel -Make sure use proper tools and the tools all in good condition -Line check by skilled electrician
5 1 M Use walkie-talkie or mobile talk to communicate
Supervisor Officer
Association of Singapore Marine Industries Page 2 of 2
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
4
Connect back all the cables and make sure its exactly following the connection diagram
Live power supply Electrical shock -PPE -Tag-Out and Lock-Out power supply unit for the panel - Ensure all termination must be tightened. -Out-going must be secured -Line check by skilled electrician
5 1 M Use walkie-talkie or mobile talk to communicate
Supervisor Officer
5
Power On Live power supply Electrical shock -Put warning symbol of energized -First quickly ON-OFF one or two times
5 1 M Barricade work area
Supervisor Officer
Association of Singapore Marine Industries Page 1 of 1
RISK ASSESSMENT FORM Company
Group 7
Task
Test and Commissioning of High Tension Switchboard
Conducted By (Date) Group 7 (13/09/06)
Approved By (Date)
Next Review Date 13/09/09
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Cleaning of switchboard
-Fumes, vapor, chemical and dust -Present of live power
-Inhalation of harmful chemical -Electrocution
-VSCC meeting -Wear mask -Hand Glove -LOTO
3 5
1 1
L M
-Respirator -Temporary earthing of Bus Bar
Supervisor MSDS -HSE Manual
2 Line check from MSB to source of supply and internal wiring
Live terminal Electrocution -Isolate external source -LOTO external source --Use proper tool/ measuring device -Rudder mat -Deploy skilled electrician
5 1 M Barricade & display warning sign
Supervisor
3
High pot and megger test
Present of live power
Electrocution --Deploy skilled electrician -Do it at night (silent hour) --Use proper tool/ measuring device -Rubber Mat
5 1 M Discharge residue power
Supervisor
4
Torque Wrench Test
Present of live power
Electrocution -LOTO
5 1 M Temporary earthing of Bus Bar
Supervisor
5
Power up Present of live power
Electrocution -VSCC meeting -Permit to work -Isolate all outgoing breaker -LOTO at breaker
5 1 M Communicate thru walkie-talkie Display warning sign
Supervisor
Association of Singapore Marine Industries Page 1 of 1
RISK ASSESSMENT FORM Company
Group 8
Task
Rewiring of Power System in Engine Room
Conducted By (Date) 13/09/06
Approved By (Date)
Next Review Date 12/09/09
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Assessment of area of work
-Greasy/Oily floor -Lack of ventilation and lighting
Tripping and Slipping Body injury
-Housekeeping -Proper lighting and ventilation
2
2
3
2
M
L
Clean and dry environment
Safety Assessor and Supervisor
2
Isolation of power Live power supply -Electrocution
-VSCC meeting -Isolate the circuit breaker -Lock/Tag Out
5 1 M Check and ensure no presence electricity
Supervisor
3
Disconnection and removal of existing wires
Ergonomics Hand and body injury
-PPE -Use long sleeves overalls
2 3 M Wear anti-slip gloves
Supervisor
4
Cable Pulling & Strapping
-Height -Ergonomics
-Body injury (back sprain/strain) -Falling (fatality)
-Harness to wear and anchor at strong point -Ladder/Staging to be provided with OK tags
5 1 M -Men evenly spaced out while working on staging
Staging Supv & Supervisor
5
Termination Slippage of tools and over tightening
Hand, finger and eye injury
-PPE -Proper tools
2 3 M Wear anti-slip gloves
Supervisor
Page 1 of 2
RISK ASSESSMENT FORM Company
Group 9
Task
Maintanance of Existing MSB
Conducted By (Date) Electrical Supervisor - Mr R. Rama (10/09/06)
Approved By (Date)
Mr Lim - Manager (13/09/06)
Next Review Date 11/09/09
1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Disconnect the main supply
Live wire -Electric shock/ Electrocution
-VSCC & Production meeting -Isolate power -LOTO system -Supply of temp lighting -Ensure only skill electrician operate at MSB -Warning sign boards -Rubber mat
5 1 M Line check and communicate by walkie-talkie
Supervisor
2
Cleaning breaker and tightening bolt and nut (air blow and hand cleaning)
-Slipping of tools -Dust
-Finger / hand injury -Respiratory illness
-PPE esp; hand gloves -Dust Mask -Proper tools
2 1 L Supervisor
3
Check breakers -Slipping of breakers -Limited space
-Damage to property -Finger / hand injury
-Proper tools -PPE esp; hand gloves
2 1 L Supervisor
4
Megger the cables
Live conductors Electric shock -Gloves -Ensure megger discharge to earth -Use proper tool -Rubber mat -Deploy Skilled electrician
3 1 L Supervisor
Page 2 of 2
1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference No. Task Step Hazard Possible
Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
5
Turn on power to MSB
Live wire Electric shock -Ensure main cable properly terminated -Make sure all the tolls remove from MSB -Isolate all outgoing breaker -LOTO breaker
5 1 M Barricade work site n display warning sign
Supervisor
Association of Singapore Marine Industries Page 1 of 2
RISK ASSESSMENT FORM Company
Group 10
Task
Replacement of Batteries in Emergency Generator Room
Conducted By (Date) Group 10
Approved By (Date)
13/09/06 by Group 10 Next Review Date 15/09/9
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/III Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer Follow-up Date)
Document for Reference
1
Access the location of the emergency generator room (Location Identification)
Falling / Tripping Bodily injury -Housekeeping -Ventilation and lighting
2 2 L Torchlight Supervisor
2
Switch off the battery charger and check the cable
Live power supply terminals Fire & Explosion
-Electric shock -Electrocution Bodily injury
-PPE -Rubber glove -Correct tools -VSCC Meeting -Deploy skilled electrician -Prevent tool from falling onto the battery -Cover the battery with wooden plank
2
5
3
1
M
M
Barricade work area n display warning sign Brief worker on the procedure
Supervisor
3
Disconnect the link and cable with a correct size spanner (Correct tools)
Improper tools
Hand injury
-PPE -Insulation of the tools -Face mask -Proper tools
1
1
L
Supervisor
4
Take out the battery from the battery box manually and clean the box
Manual lifting -Back injury -Hand injury
-Require two persons to lift -Correct posture -PPE -Manual lifting procedure
2 2 L Supervisor
Association of Singapore Marine Industries Page 2 of 2
1. Hazard Identification
2. Risk Evaluation 3. Risk Control Reference
No. Task Step Hazard Possible Accident/ Ill Health & Persons-at-risk
Existing Risk Control Severity
Likelihood
Risk Level
Additional Risk Control Measure
Action Officer (Follow-up Date)
Document for Reference
5
Replace new battery into the battery box
Manual lifting Back injury - Require two persons to lift -Correct posture -PPE -Manual lifting procedure
2 2 L Supervisor
6
Reconnect back the battery link and cable
Live terminal -Electric shock -Use correct tool -PPE --Insulation of the tools
3 1 L Supervisor