Risk analysis – FMEA Workshops

Upload: gabriel-casey

Post on 22-Dec-2015

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk

Risk analysis – FMEA

Workshops

Page 2: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk

FMEA 1

• Simple risk assessment process!!

Identifying risk

Simple method for grading risk

Determines appropriate risk reduction options

Ultimately assesses risk to patient

• Applications

– Equipment, facilities, products and processes

• Targets areas of concern

Page 3: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk

FMEA 2

1. Severity of Impact Negligible, minor, major, critical

2. Occurrence of problem Frequency Highly unlikely, unlikely, likely, high likely

3. Detection of problem Easy, can be detected, difficult to detect,

undetectable

Page 4: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk

FMEA 3

RPN (Risk Priority Number) calculatedRPN – numeric value to risk potential1. Severity

1-4 (1 is negligible)

2. Occurrence 1-4 (1 is highly unlikely)

3. Detection 1-4 (1 is easily detected)

RPN = S x O x D (1-48)1 – lowest risk to patient / highest GMP compliance

Page 5: Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk

FMEA 4 – Risk acceptance

RPN Description Actions required to control process

>35 Intolerable risk Process re-engineeringAdditional testing required

20-34 Unacceptable risk Must be validatedAdditional inspections

5-19 Tolerable risk Justifications requiredEvaluate additional tests

<5 Negligible risk Verification vs validationNo additional requirements