rising project presentation - trimis · •project end: 31 january 2012 key facts 09/02/2010 1st...

22
The RISING Project 1 st Advisory Committee Meeting, Brussels Arne Gehlhaar, ISL 09/02/2010

Upload: others

Post on 11-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

The RISING Project1st Advisory Committee Meeting, BrusselsArne Gehlhaar, ISL

09/02/2010

Page 2: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Agenda

page 109/02/2010 1st Advisory Committee Meeting

• Background

• The RISING Project

• RISING at Work

• Summary & Outlook

Page 3: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Agenda

page 209/02/2010 1st Advisory Committee Meeting

• Background

– River Information Services in Europe

– Future Development

– RIS Services

– RIS Road Map

• The RISING Project

• RISING at Work

• Summary & Outlook

Page 4: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

• Introduced by the EU (RIS Directive 2005/44/EC)

• Today focuses on traffic & safety

• Typical users– Authorities

– Calamity centres

– Skippers

• Use of ICT to– Improve reliability &

efficiency

– Increase safety

– Optimise economic capabilities

in Europe

09/02/2010 page 31st Advisory Committee Meeting

Page 5: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

• Increase exploitation of RIS services for logistics purposes

• Extend types of users

– Fleet Managers

– Ports & Terminals

– Logistic Service Providers

• Enhance existing services

• Develop new services

Future Development

09/02/2010 page 41st Advisory Committee Meeting

Page 6: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Systems, Applications, Services

and FunctionsRelevant RIS standards(Project standards)

Vessel Tracking & Tracing (Inland) AIS Standard

Electronic Navigation Charts (Inland) ECDIS Standard

Electronic Reporting ERI Standard

Notices to Skippers NtS Standard

Fairway Information (FIS) (ECDIS, NtS)

International data exchange Int. RIS data exchange

Traffic management, i.e. lock management (AIS, RAINWAT, ERI)

Transport management, i.e. calculation of ETA (AIS, ERI, NtS)

Services

09/02/2010 page 51st Advisory Committee Meeting

Page 7: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

EU RIS

Directive

(2005/44/EC)

“what”• Applicability

• Responsibilities of Member States

• Minimum requirements for RIS

• Services to be provided

• Technical specifications to be applied

Commission Regulation 415/2007

concerning the technical specifications for

vessel tracking & tracing system (Inland AIS)

Commission Regulation

414/2007

concerning the technical guidelines

for the planning, implementation

and operational use of RIS

(RIS Guidelines)

Draft Commission Regulation

defining the technical specifications for

Inland ECDIS

Commission Regulation 416/2007

concerning the technical specifications

for Notices to Skippers (NtS)

Published

2005 - 2007

“how” “who”

Expert Group

Notices to Skippers

Expert Group

Tracking & Tracing

Expert Group

Electronic Reporting

International

Expert Group

Inland ECDIS

RIS Road Map

page 709/02/2010 1st Advisory Committee Meeting

Draft Commission Regulation

defining the technical specifications for

electronic ship reporting (ERI)

Page 8: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Agenda

page 809/02/2010 1st Advisory Committee Meeting

• Background

• The RISING Project

– Key Facts

– Project Mission

– Project Scope

– Project Partners

• RISING at Work

• Summary & Outlook

Page 9: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

• Project acronym: RISING

• Name: RIS Services for Improving the Integration ofInland Waterway Transport into Intermodal Chains

• EU-Programme: FP7-2007

• Project budget: approx. 7.5 MEUR

• EC grants: approx. 5.3 MEUR

• Project duration: 36 months

• Project start: 1 February 2009

• Project end: 31 January 2012

Key Facts

09/02/2010 page 91st Advisory Committee Meeting

Page 10: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Project Mission

09/02/2010 page 101st Advisory Committee Meeting

The use of traffic information for transport-related services is of utmost importance and has the potential to streamline IWT processes and multimodal transport chains.

Page 11: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Project Partners

page 1209/02/2010 1st Advisory Committee Meeting

Page 12: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

The RISING partners are:

→ Transport operators

→ Logistics service providers

→ Port and terminal operators

→ Port information service providers

→ RIS providers

→ Research institutions

→ Software developers

→ Promotion agencies

Partner Background

09/02/2010 page 131st Advisory Committee Meeting

Page 13: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Agenda

page 1409/02/2010 1st Advisory Committee Meeting

• Background

• The RISING Project

• RISING at Work

– Work Packages• Event Management

• Voyage Planning

• RIS-Transport-Logistics Services

– Demonstration Cases

– Users & Stakeholders

• Summary & Outlook

Page 14: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

WP Lead

WP0 ISL (DE)

WP1 ISL (DE)

WP2 ISL (DE)

WP3 CETLE (NL)

WP4 VIA DONAU(AT)

WP5 MARLO (NOR)

WP6 MOBYCON (NL)

WP7 PBV (BE)

WP8 MARLO (NOR)

Work Packages

09/02/2010 page 151st Advisory Committee Meeting

WP1: Requirement Analysis

WP2: Devel. Event Management

WP3: Devel. Voyage Plan

WP4: Devel. RIS-TLS

WP5: Demonstration

WP6: Evaluation & Validation

WP8: Exploitation

WP

0: M

anag

emen

t

WP

7: D

isse

min

atio

n

Page 15: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Three types of services will be developed within RISING

Workpackage Results

09/02/2010 page 161st Advisory Committee Meeting

Page 16: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

• Elbe / Weser

• Danube

• Rhine / Scheldt

Geographical areas

page 1709/02/2010 1st Advisory Committee Meeting

Page 17: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Area Operator Commodity Objectives

Elbe / Weser

DBR High & Heavy Improved transport quality through better monitoring

NWL Container Improved planning andmonitoring processes

Danube ILL Steel products Improvement of the process performance

Helogistics [several] Better transport chaintransparency

Rhine / Scheldt

Portbase Container Improved terminal planning

Sabic Petrochemical Voyage planning & fleetmanagement

CTS Container Improved berth planning

Demonstration cases

page 1809/02/2010 1st Advisory Committee Meeting

Page 18: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Users and Stakeholders

page 2609/02/2010 1st Advisory Committee Meeting

Page 19: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Agenda

page 2709/02/2010 1st Advisory Committee Meeting

• Background

• The RISING Project

• RISING at Work

• Summary & Outlook

Page 20: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

• Spread the benefits of RIS into the transport & logistics world

• Increase reliability and accountability of IWT

• Close existing information gaps

• Remove barriers hindering the integration of IWT in intermodal transport chains

Summary & Outlook

09/02/2010 page 281st Advisory Committee Meeting

Page 21: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Project website:

www.rising.eu

Project coordinator:

Institute of Shipping Economics and Logistics (ISL)

Project manager: Mr. Arne GehlhaarPhone: +49.421.22096-49

Email: [email protected]

Contact Details

09/02/2010 page 291st Advisory Committee Meeting

Page 22: RISING Project presentation - TRIMIS · •Project end: 31 January 2012 Key Facts 09/02/2010 1st Advisory Committee Meeting page 9. Project Mission 09/02/2010 1st Advisory Committee

Thank you for your attentionThank you for your attention

09/02/2010 page 301st Advisory Committee Meeting

Arne Gehlhaar

Institute of Shipping Economics and LogisticsUniversitätsallee 11-13

D-28359 Bremen

[email protected]