RISING RISING CONSTRUCTION CONSTRUCTION MANAGER CONFERENCE MANAGER CONFERENCE Washington DC ‘11 November 5-6 Grand Hyatt CMAA Student Chapter Presentation WENTWORTH INSTITUTE OF TECHNOLOGY Associated Schools of Construction Annual Student Competition Commercial Building Division PRESENTED BY AUSTIN CHAFFEE

Upload: catherine-beeson

Post on 16-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

CMAA Student Chapter Presentation

WENTWORTH INSTITUTE OF TECHNOLOGY

Associated Schools of Construction Annual Student

Competition Commercial Building Division

PRESENTED BY AUSTIN CHAFFEE

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

UNIQUE OPPORTUNITY

• COMPETE AGAINST OTHER TOP SCHOOLS IN CONSTRUCTION

• COMPETITION RELIES ON OUR KNOWLEDGE, EXPERIENCES, AND PREPAREDNESS

• 3 DIVISIONS– COMMERCIAL BUILDING– DESIGN BUILD– HEAVY CIVIL

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

THE CHALLENGE

• SUBMIT A PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES– COMPANY BACKGROUND – FULL ESTIMATE AND GMP– PROJECT APPROACH AND LOGISTICS– CPM SCHEDULE– PRESENT TO THE “OWNER”

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

THE CHALLENGE

• PROJECT IS REVEALED THE MORNING OF THE COMPETITION

• WE THEN HAVE 14 HOURS• NO OUTSIDE ASSISTANCE– NO INTERNET

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

WHAT WE’RE GIVEN BEFOREHAND

The project involves construction of a new multi use facility located within Region 1 of the United States. The program will

include educational and training facilities, food preparation, spaces for demonstration and assembly and the creation of an environment conducive to the inhabitants, administration, and

staff. Systems include structural steel framing, extensive Mechanical and Electrical systems, specialized finishes and the possibility of extensive upgrades. There are particular site logistics issues to

be solved such as UXO (ordinance), government finance regulations, etc.

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

RESULTS AND REWARDS

Our Team with Representatives from Last Year’s Sponsors, KBE Building Corporation

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

THIS IS EXCITING STUFF• I AM LOOKING FORWARD TO THIS

YEAR’S COMPETITION– ITS EXCITING– JUST LIKE A REAL BID

• WE HAVE PREPARED ALL SUMMER FOR THESE TWO DAYS

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

THE COMPETITION

RISING CONSTRUCTION RISING CONSTRUCTION MANAGER CONFERENCEMANAGER CONFERENCE

Washington DC ‘11November 5-6 Grand Hyatt

QUESTIONS

WE WOULD BE HAPPY TO ANSWER AS MANY QUESTIONS

AS WE CAN.