Donald Ballantyne – Commercial Director Paradigm Flow Services Ltd
Riser & Flowline Intervention Using New Composite Coil Tubing Technology
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
MAN COUNT:
4 Two Binders, crew of two on each
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
MAN COUNT:
12 Four following each binder making sheeves into Stooks
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
MAN COUNT:
18 2 Tractors transporting stooks to farm, crew of 3 each
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
MAN COUNT:
22 2 men building each stack, two crews
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
MAN COUNT:
1 1 man with one of these…
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
MAN COUNT:
1 …and one of these
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
DSV
Around 120 People
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
PRESENTATION SUMMARY
• Paradigm Flow Services specialise in the supply of innovative technical solutions to solve issues with blockages or restrictions to process or utility flow.
• We have successfully deployed our services at a number of international locations. To date our services have been used in upstream offshore O&G, but are now involved in midstream.
• Development of our own patented technology has underpinned our success and market position. We will continue to develop and improve our technology.
• Flexi Coil is miniature coil tubing that has been specifically design for live intervention to risers, flowlines & pipelines. The presentation uses a case study to demonstrate the application and unique ability of the technology.
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLEXI-COIL
Sand removal from FPSO riser – West Africa
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
ESTIMATED COST SAVINGS
A West African O&G company operates a deepwater >500m FPSO in the Gulf of Guinea. A subsea tie back oilwell was a known sand producer. An increase in production was achieved, followed by a complete loss of surface pressure and zero flow. IT was suspected that a blockage due to sand accumulation was the root cause.
The initial proposals to locate and clear the blockage were at least 5x more expensive than Flexi-Coil solution deployed, but never fully costed due to:
1. Cost escalation.
2. The need to shutdown FPSO with a loss of 35,000 barrels per day for a a number of weeks possibly months
3. The finding of Flexi-Coil as a potential solution.
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
EXAMPLE OF EXISTING TECHNOLOGY COIL TUBING FOR FPSO DEPLOYMENT
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
STANDARD COIL SPREAD
Standard coil tubing is used extensively in the downhole and well intervention market. It uses steel coil and is designed for deep vertical depth and pressures.
Steel coil reel >12T load
Coil run and gooseneck
Coil Injector & Pressure Control
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
PREVIOUS FPSO COIL TUBING – FPSO P43
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
W. AFRICA FPSO – SAND PLUGGED RISER
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
250m
300m
350m
400m
450m
500m
550m 600m 650m 700m 750m
-580.0
-480.0
-380.0
-280.0
-180.0
-80.0
20.0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0
Dept
h of
Ris
er (m
)
Distance from Vessel (m)
200m
EXTEND OF BLOCKAGE IN RISER
SEA BED 549m
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
REMOTE PRESSURE CONTROL WITH FLEXIBLE LUBRICATOR
CRANE AND
LAYDOWN RISER
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLEXI-COIL EQUIPMENT
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLEXI-COIL EQUIPMENT
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLEXI-COIL EQUIPMENT
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
CONNECTION TO RISER
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FPSO DECK
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLEXI-COIL
250m
300m
350m
400m
450m
500m
550m 600m 650m 700m 750m
-580.0
-480.0
-380.0
-280.0
-180.0
-80.0
20.0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0
Dept
h of
Ris
er (m
)
Distance from Vessel (m)
200m
[video removed for pdf]
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
8M3 OF SAND REMOVED
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
8M3 OF SAND REMOVED
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
SAND REMOVAL
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
SUCCESS!
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
LESSONS LEARNED
• The power of Capstan Friction
• Its all about the pipe
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
THE POWER OF CAPSTAN FRICTION
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
WHERE DO WE GET CAPSTAN FRICTION ?
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
THE PROBLEM WITH CAPSTAN FRICTION
Pull Force
For steel pipe 1km into pipeline in North Sea Pull force = 49,000kg For composite pipe 1km into pipeline in North Sea
Pull force = 2570kg
x e = Hanging Tension Co-efficient of Friction X Angle
150m
1000m
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
ABRASIVE WEAR DUE TO STEEL COIL
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
HIGH FRICTION
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
LOWER FRICTION
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
BEND STIFFNESS TOO LOW (COMPRESSIVE FAILURE)
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
TOO FLEXIBLE (COMPRESSIVE FAILURE)
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
TOO HEAVY (TENSILE FAILURE)
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
KEY LESSONS LEARNT
SELECTION OF THE RIGHT COIL FOR THE PROJECT
Too Stiff & Heavy
Too
Flexible
Too Heavy &
Low Tensile strength
Very Nice
Getting There!
Just Right!
4-6kg/m 2.1kg/m 0.6kg/m
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
REVOLUTION MOTOR
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
REVOLUTION MOTOR
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
THE REVOLUTION MOTOR
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
REMOVING SAND, WAX AND ASPHALTENE
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLOWLINE DE-COMMISSIONING UKCS 2015
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLOWLINE DE-COMMISSIONING UKCS 2015
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLOWLINE DE-COMMISSIONING UKCS 2015
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLOWLINE DE-COMMISSIONING UKCS 2015
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
FLOWLINE DE-COMMISSIONING UKCS 2015
Tie-in Point At
Hot Tap
Pulling weight from 855m and over 360° of bends
Less than 250kg
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
DE-OILING
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
SO TO SUM UP
• Using the Revolution Motor to reach deep into Flowline.
• Using the right pipe to avoid large equipment and abrasive wear.
• Helps us overcome capstan friction problem.
• Allowing us to set up pressurised intervention equipment where it wasn’t possible before.
• Reduce need for Vessel/Rig Intervention reducing costs of pipeline blockages, restrictions and de-commissioning.
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
SO TO SUM UP
www.paradigm.eu ©2014 Paradigm Group B.V. All rights reserved.
IT’S TIME FOR A PARADIGM SHIFT IN FLOWLINE INTERVENTION