Larry J. Ringer Library Expansion
City Council Workshop December 10, 2015
![Page 2: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/2.jpg)
Ringer Library Expansion
• 2008 General Obligation Bonds• Total Project Budget – $8,385,000• Existing – 16,000 sf• Proposed – Addition of 12,000 sf• Existing Parking – 78 spaces (66 front, 12 back)• Proposed Parking – 145 spaces (111 front, 34
back)
![Page 3: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/3.jpg)
Ringer Library Expansion
• September 2, 2015 – Presented conceptual plan to Library Advisory Board and Friends of the Library
• September 2, 2015 – Presented conceptual plan to the public
• Conceptual plan was completed with input from library staff, public comments, Library Audit Report and architect
![Page 4: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/4.jpg)
Conceptual Site Plan
![Page 5: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/5.jpg)
Conceptual Site Plan
![Page 6: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/6.jpg)
Conceptual Floor Plan
![Page 7: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/7.jpg)
Conceptual Design
![Page 8: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/8.jpg)
Conceptual Design
![Page 9: Ringer Library Expansion](https://reader036.vdocuments.site/reader036/viewer/2022081604/5882cc3e1a28abf8388b4ce5/html5/thumbnails/9.jpg)
Recommendation
• We recommend moving forward with final design based on conceptual plans presented