LINK-A TECHNOLOGIES LTDArchitects, Civil/Structural engineersP.O Box 24868 KampalaE-mail- [email protected] +256-772-846 511 + 256-702-098 979
2,075 3,000 3,000 3,000 3,000
1,2
00
2,8
75
2,8
75
2,075 3,000 3,000 3,000 1,000 2,000
1,2
00
2,8
75
2,8
75
20
03,7
50
20
02,8
00
20
0
20
01,0
00
20
05,5
50
20
0
3,1
00
3,1
00
3,1
00
3,1
00
3,1
00
3,1
00
3,1
00
3,1
00
20
010
0
Ground LevelGround Level
Pad/footings to Detail
1 2 3 4 5 6
A
B
D
LINK-A 001
M.E.N
reproduced without permission
M.E.N
6. Block Work: All load bearing block walls to be constructed from solidblock of 5.0N/mm MIN.with B.S 5628 Part 1 Structural use ofUnreinforced Masonry. Mortar to conform to Mortar designation (III) ofTable 1 BS 5628 Part 1.
Date
Issue Type
Copyright c 2013
Architects:
4. Reinforcement a)Y....denotes High yeild bars to be square twisted cold formed bars to B.S.4461. b)R ...denotes Mild steel to be round bars to B.S.4449. c)Mesh requirements to comply with the requirements of B.S. 4483.
NOTES
7. Joints: Movement joints to be amaximum 9.0mcentres.joint positions as indicated onDrawings.Joint inslab to be carried through walls to underside of ringbeam.
2.Staircase Concrete is of Fcu 30N/Sq.MM. and Ring Beam of Fcu 35N/Sq.MM after 28 days.
1:100,75,50 Nov, 2013
3. Concrete Mixes: a) Mass concrete to have a minimum works cube strength of 15N/mm2 at 28 days with 40 mm Maximum aggregate size.
b)Reinforced concrete to have a minimum works cube strength of 25 N/mm2 at 28 days with 20 mm maximum Aggregate size.
Designed by
GENERAL STAIR CASES' NOTES
5. Minimum cover to all steel in foundations,ground beams and stubcolumns to be 40 mm unless shown otherwise.
1.Foundations shall generally be taken down 1300 mm below existingground level and all excavations to be approved first by the engineerbefore concrete blinding is laid.
Drawn by
4.All Structural Concrete to be Tested for CompressiveStrength by Central Materials .Labaratory.
Drawing NO.
Link-A Tech. Ltd and must not be
3.Site Engineer to Prepare Trial Mixes forApproval by Engineer.
This Drawing is the copyright of
DESCRIPTION
Project Title
5.Concrete to recieve full time curing preferably surfacecuring or equal and approved by the Engineer.
Scale
The moral right of the author
CLIENT
is hereby asserted
CONSTRUCTION
2.Weak Pockets of bearing strata to be dug out and filled with 1:2 all in concrete mix.
6.Stairs are to comprise:►175mm Waist,►150mm Risers and►300mm Treads►and/or inclined angle of30.963 Degrees to the Horizontal.
Paint one shop coat of red oxide primer prior to dispatch, touch upon site (for any scratches); apply second coat of red oxide primerafter erection and gloss paint as directed by Architect
14)
13) THE QUALITY OF ALL MATERIALS AND WORKMANSHIP SHALLCOMPLY WITH THE REQUIREMENTS OF THE RELEVANT BRITISHSTANDARDS AND CODES OF PRACTICE
12)All dimensions to be checked and verified on site before fabricationcommences
11) All steel surfaces shall be thoroughly power wire brushed andcleaned with approved solvent and coated of red oxide primer type 'A'to B.S. 2523. All scratches to be repainted
10)Structural steelwork to be grade 43 to B.S. 449
9)
Contractor must submit shop drawings to engineer for approval priorto fabrication of structural steelwork
All welds to be 6mm fillet welds
8)
All dimensions must be checked and verified on site beforecommencing any works. Descrepancies to be brought tothe attention of the Engineer immediately.
7)
All dimensions must be verified on site before cutting anyreinforcement
6)
100mm thick s
olid slab reinforced on top with wire
mesh ref. No. A2
52 with
min. cover of 50mm
C
1 2 3 4 5 6
A
B
D
C
IPE 200 I-section
305x165x40 U
B
305x165x40 U
B
305x165x40 U
B
305x165x40 U
B
305x165x40 U
B
305x165x40 U
B
IPE 200 I-section
IPE 200 I-section
IPE 200 I-section
IPE 200 I-section
IPE 200 I-section
IPE 200
IPE 200
IPE 200
IPE 200
IPE 200
FOUNDATION LAYOUT TYPICAL MEZZANINE FLOOR LAYOUT
SECTION B-B
SECTION A-A
Parapet Wall To Detail
Stong Room wall To Detail
100mm thick s
olid slab seated on Guage 24 galvan
ised Iron sheets,
reinforced with Y12
@200m
m c/c bothway
s
![Page 2: Riffle Tower](https://reader035.vdocuments.site/reader035/viewer/2022080220/55cf98d7550346d03399fd4e/html5/thumbnails/2.jpg)
LINK-A TECHNOLOGIES LTDArchitects, Civil/Structural engineersP.O Box 24868 KampalaE-mail- [email protected] +256-772-846 511 + 256-702-098 979
1,400 1,400
1,4
01
1,8
00
1,8
00
152
1,4
00
6,5
53
2,802
6,5
53
2,801
1,98
1
03
03
FFL
300
4Y12
4Y16
6Y12@150
50mm CONCRETE BLINDING
9R8@150
DE
PT
H U
P T
O 1
000m
m
6Y12@150
9R8@150
40
0
50
1000
COLUMN BASE F2 R.C DETAILSSCALE 1:25
Y12
Y12
Y12
Y12Y16 Y16
Y16Y16
1000
10
00
TYPICAL FOOTING F2 PLAN DETAILS SCALE 1:25
6Y12@150
6Y
12
@150
STUB COLUMN CONNECTION DETAIL(17Nos)
SCALE 1:4
IPE 200 I-section
26
25
50
50
125
124
25 25
50 50124124
Section 3 - 3
125
300
300
300
125
6/20 diameter H.D Bolts with nutsand flat round washers, 450mm long(STD/HD20/450)
25
100x6mm th.,100mm longanchor plates
75
6
45
0
36
9
25M
M G
RO
UT
50 O/D removable castingtemplate
100 square x 25mm th. non-shrinksand/cement levelling pad provided atthe same level by the civil contractorprior to erection of steel columns
25mm Grout
250x250mmx16mm th. base platewith 6 holes 22mm diameter
Plan
is hereby asserted
2.Weak Pockets of bearing strata to be dug out and filled with 1:2 all in concrete mix.
CONSTRUCTION
6.Stairs are to comprise:►175mm Waist,►150mm Risers and►300mm Treads►and/or inclined angle of30.963 Degrees to the Horizontal.
DESCRIPTION
The moral right of the author
5.Concrete to recieve full time curing preferably surfacecuring or equal and approved by the Engineer.
3.Site Engineer to Prepare Trial Mixes forApproval by Engineer.
Project Title
CLIENT
Scale
This Drawing is the copyright of
1.Foundations shall generally be taken down 1300 mm below existingground level and all excavations to be approved first by the engineerbefore concrete blinding is laid.
Drawing NO.
GENERAL STAIR CASES' NOTES
Drawn by
Link-A Tech. Ltd and must not be
5. Minimum cover to all steel in foundations,ground beams and stubcolumns to be 40 mm unless shown otherwise.
4.All Structural Concrete to be Tested for CompressiveStrength by Central Materials .Labaratory.
NOTES
3. Concrete Mixes: a) Mass concrete to have a minimum works cube strength of 15N/mm2 at 28 days with 40 mm Maximum aggregate size.
b)Reinforced concrete to have a minimum works cube strength of 25 N/mm2 at 28 days with 20 mm maximum Aggregate size.
1:100,75,50
Architects:
7. Joints: Movement joints to be amaximum 9.0mcentres.joint positions as indicated onDrawings.Joint inslab to be carried through walls to underside of ringbeam.
Designed by
Nov, 2013
4. Reinforcement a)Y....denotes High yeild bars to be square twisted cold formed bars to B.S.4461. b)R ...denotes Mild steel to be round bars to B.S.4449. c)Mesh requirements to comply with the requirements of B.S. 4483.
2.Staircase Concrete is of Fcu 30N/Sq.MM. and Ring Beam of Fcu 35N/Sq.MM after 28 days.
Issue Type
6. Block Work: All load bearing block walls to be constructed from solidblock of 5.0N/mm MIN.with B.S 5628 Part 1 Structural use ofUnreinforced Masonry. Mortar to conform to Mortar designation (III) ofTable 1 BS 5628 Part 1.
Copyright c 2013
Date
reproduced without permission
M.E.NM.E.N
LINK-A 002
Paint one shop coat of red oxide primer prior to dispatch, touch upon site (for any scratches); apply second coat of red oxide primerafter erection and gloss paint as directed by Architect
14)
13) THE QUALITY OF ALL MATERIALS AND WORKMANSHIP SHALLCOMPLY WITH THE REQUIREMENTS OF THE RELEVANT BRITISHSTANDARDS AND CODES OF PRACTICE
12)All dimensions to be checked and verified on site before fabricationcommences
11) All steel surfaces shall be thoroughly power wire brushed andcleaned with approved solvent and coated of red oxide primer type 'A'to B.S. 2523. All scratches to be repainted
10)Structural steelwork to be grade 43 to B.S. 449
9)
Contractor must submit shop drawings to engineer for approval priorto fabrication of structural steelwork
All welds to be 6mm fillet welds
8)
All dimensions must be checked and verified on site beforecommencing any works. Descrepancies to be brought tothe attention of the Engineer immediately.
7)
All dimensions must be verified on site before cutting anyreinforcement
6)
100mm THICK SOLID
SLAB
GAUGE 24
PREPAINTED
IRON SHEET
DECK
IPE 200
I-SECTION
BEAM
IPE 200
I-SECTION
BEAM
1P-200
BEAM
SECTION A-A THROUGH MEZANINE FLOOR SLAB
SCALE 1:4
Y12@200MM C/C Bothways
M14 BOLTS
TRUSS T1
TRUSS T1
TRUSS T1
TRUSS T1
TRU
SS
T2 TRUSS T2
TRUSS T2 TRU
SS
T2