riÐ PORT of vancouver Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities Corporation 108-12300 Horseshoe Way Richmond, BC V7A4ZL Dear Mr. McCaskill: Vancouver Fraser Port Authority ProJect Permlt No. 15-104 - Extension FSM Project Management obo Vancouver Airport Fuel Facilities Corporation Vancouver Airport Fuel DeliverY On behalf of the Vancouver Fraser Port Authority (VFPA), I am pleased to advise that the Completion Ðate for this Project Permit for the above-noted work has been extended. This perm¡t is now valid until February 28, 2A22. Failure to complete the works by this date may result in the need to apply for a new Project Permit. Vancouver Airport Fuel Facilities Corporation is responsible for carrying out the works according to the subject conditions contained in the Permit. Please ensure that those involved in undertaking the approved works are aware of these conditions and that a copy of the Permit is maintained on site during the project. Please submit all documents required to satisfy the conditions listed in the Project Permit to Per@Pgftyðncouve . Thank you for your cooperation throughout our review. Should you have any questions regarding this approval, please contact Tim Blair at 604-665-9378 or Ti m. Blai r(ô portvancouver, com, Yours trult' Peter Xotta Vice President, Planning and Operations Tim Blair, Planning Supervisor, VFPA Spencer Chaisson, Environmental Coordinator, VFPA cc encl (1) Project Permit No. 15-104 C-anaü COPY

Upload: others

Post on 12-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

riÐ PORT ofvancouver

Re:

November 1, 2018

Mr. Mark McCaskillFSM Management Group Inc.Obo Vancouver Airport Fuel Facilities Corporation108-12300 Horseshoe WayRichmond, BC V7A4ZL

Dear Mr. McCaskill:

Vancouver Fraser Port Authority ProJect Permlt No. 15-104 - ExtensionFSM Project Management obo Vancouver Airport Fuel Facilities CorporationVancouver Airport Fuel DeliverY

On behalf of the Vancouver Fraser Port Authority (VFPA), I am pleased to advise that theCompletion Ðate for this Project Permit for the above-noted work has been extended. Thisperm¡t is now valid until February 28, 2A22. Failure to complete the works by this date mayresult in the need to apply for a new Project Permit.

Vancouver Airport Fuel Facilities Corporation is responsible for carrying out the worksaccording to the subject conditions contained in the Permit. Please ensure that thoseinvolved in undertaking the approved works are aware of these conditions and that a copyof the Permit is maintained on site during the project.

Please submit all documents required to satisfy the conditions listed in the Project Permit toPer@Pgftyðncouve .

Thank you for your cooperation throughout our review. Should you have any questionsregarding this approval, please contact Tim Blair at 604-665-9378 orTi m. Blai r(ô portvancouver, com,

Yours trult'

Peter XottaVice President, Planning and Operations

Tim Blair, Planning Supervisor, VFPASpencer Chaisson, Environmental Coordinator, VFPA

cc

encl (1) Project Permit No. 15-104

C-anaü

COPY

kbell
Typewritten Text
Original Signed
Page 2: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

('ÐPORT MET'RO

vancouver

February 24,20t6PER# 15-104

VIA E-¡,IAIL

Mr. Adrian PollardFSM Management Group Inc.Obo Vancouver Airport Fuel Facilities Corporation108-12300 Horseshoe WayRichmond, BC V7A 4Zl

Dear Mr. Pollard,

Re: VFPA Project Permit #15-104FSM Project Management obo Vancouver Airport Fuel Facilities Corporation -Vancouver AirpoÉ Fuel Delivery

On behalf of the Vancouver Fraser Port Authority (VFPA) doing business as Port MetroVancouver, I am pleased to advise that your application for a Project Permit for the above-noted work has been approved. VFPA Permit 15-104 is valid until February 28,20L9.These approvals are based on the application submitted on August 10, 2015 and are subjectto the conditions listed in the Permit.

Vancouver AirpoÉ Fuel Facilities Corporation is responsible for carrying out the works in themanner described in your application and according to the subject conditions. Pleaseensure that those involved in undertak¡ng the approved works are aware of these conditionsand that a copy of the Permit is maintained on site during the project.

Upon completion of your project, VFPA will require record drawings in AutoCAD format toensure an accurate record of all site improvements. These drawings may be sent by e-maildirectly to PER@pgrtmetrovancouver,com. Upon receipt of satisfactory drawings, VFPA willbe in a position to refund your documentation deposit.

I would like to thank you for your cooperation throughout our review. Should you have anyquestions regarding this approval, please contact me at 604-665-9378.

Sincerely,

PORT METRO VANCOUVER

Tim Blair,Senior Planner

Encls. Project Permit # 15-104

Greg Yeomans, Dlrector, Planning & Development, VFPAJennifer Natland, Manager, Planning & Development Strategies, VFPAAndrea MacLeod, Environmental Programs, VFPAJeff Burton, Real Estate, VFPA

100 The Pointe, 999 Canada Place, Vancouver, B.C. Canada V6C 3T4 portmetrova ncouver. com

Cc.

100 The Pointe, 999 Canada Place, Vancouver, C.-8. Canada V6C 3T4

Cana&

COPY

kbell
Typewritten Text
Original Signed
Page 3: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

('Ð i;ä'*t*;:v*r VANCOUVER FRASER PORT AUTHORTTY (VFPA)PROJECT AND ENVTRONMENTAL REVIEW PROJECT PERMIT

PER No.: 1 5- 104

Tenant: Vancouver Airport Fuel Facilities Corporation

Project: Vancouver Airport Fuel Delivery

Project Location: East foot of Williams Road, Richmond BC

VFPA SID No.: Rrc 356

Land Use Designation: Port Terminal

Applicant(s): FSM Management Group Inc. on behalf of Vancouver Airpoft FuelFacil ities Corporation

Applicant Address: 108 - 12300 Horseshoe Way Richmond BCVTA 4ZL

Category of Review: Legacy

Date of Approval: February 24,2Ot6Date of Expiry: February 28,20t9

PROJECT DESCRIPTION

Forthe purposes of this project permit "the Permit", the "Project" is understood to include thefollowing works on Vancouver Fraser Port Authority (VFPA) property:

General DescriptionProject components proposed under this application include the following:

. Construction and operation of a new aviation fuel storage facility (iet fuel tanks)

. The construction of associated office, utilities, and landscaping

. Sections of new transfer and delivery pipelines and related equipment

Detailed works in phases are described as follows:

Early eaÉhworks (phase 1). Removal of surface soils and vegetation clearing

Site preparation (phase 2). Over-excavation and removal of spoil material (up to approximately 150,000 m3). Soil replacement by filling the site with dredged river sand as quality backfill. Ground densification using stone columns or a combination of other methods to achieve a

seismic performance target of L:2,475 year event

Storage Tanks & Operations Facilities (phase 3). A fuel receiving facility consisting of 6 above ground vertical carbon steel single wall tanks.

Each has a diameter of approximately 35 m (115 ft,), a height of 14.6 m (48 ft.) and auseable storage capacity of 13.3 million litres, with a combined capacity of 80 million litres

. A one-storey operations building approximately 64 tz 1689 ft2) to house offices, a controlroom for the facilities, first aid facilities and washrooms

. A one-storey water treatment building of approximately 64 ¡¡z ($$9 ft2)

. An electrical motor control centre building of approximately 64 ¡¡z (689 ftz)o A containment basin and lift station as part of oil/water separator system. A filtration system and three transfer pumps. A fire protection system and perimeter fire hydrants around the facility

C¿nad?lPage 1 of 8

PER No. 15-104

COPY

Page 4: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

VANCOUVER FRASER PORT AUTHORITY I Project and Environmental Review Project Permit

C¿nad?lPage 2 of 8

. A foam storage and incident command centre(s) of approximately 60 m2 (646 ft2)

. A backup generator capable of running core functions and firefighting systems

. Spill containment infrastructure¡ A storm water detention basin. A section of the 600 mm jet fuel pipeline used to transfer fuel from the marine terminal to

the proposed fuel receiving facility¡ A section of the 350 mm jet fuel pipeline used to transfer fuel from the proposed fuel

receiving facility to Vancouver International Airport. Utilities including storm water, sewer, water, communications, and electricity. Two driveway access points (main access from Williams Road, and emergency access from

Dyke Road)r Eight employee parking spaces. Removal of rear downstream range light currently located on the site. Perimeter security fencing, site lighting, and landscaping

PROJECT AND ENVIRONMENTAL CONDITIONS

The Vancouver Fraser Poft Authority (VFPA), a federal port authority doing business as Port MetroVancouver (VFPA), has undertaken and completed a review of the Project in accordance with theCanada Marine Act and Section 5 of the Port Authorities Operations Regulations.

If at any time the Applicant fails to comply with any of the project and environmental conditions setout in the Permit below, or if VFPA determines that the Applicant has provided any incomplete,incorrect or misleading information in relation to the Project, VFPA may, in its sole and absolutediscretion, cancel its authorization for the Project or change the project and environmentalconditions to which such authorization is subject.

Pursuant to Section 29 of the Port Authorities Operations Regulations, VFPA may also cancel itsauthorization for the Project, or change the project and environmental conditions to which suchauthorization is subject, if new information is made available to VFPA at any time in relation to thepotential adverse environmental and other effects of the Project.

The following are the project and environmental conditions that must be followed by theApplicant to mitigate potential or foreseeable adverse environmental and other effects.

No. GENERAL CONDITIONS

1 This Permit is conditional on a valid tenure agreement with respect to the subject premisesbeing in place. No construction or any other physical activities may commence in theabsence of a valid tenure agreement.

2 This Permit is granted subject to the fulfillment of all other requirements of VFPA, relating tothe Project, Furthermore, prior to commencing construction or any other physical activities theApplicant shall ensure that it has complied with all other necessary legal requirements andthat all necessary regulatory approvals have been obtained.

3 This Permit in no way endorses or warrants the design, engineering, or construction of theProject and no person may rely upon this Permit for any purpose other than the fact that VFPAhas permitted the construction of the Project, in accordance with the terms and conditions ofthis Permit.

PER No. 15-104

COPY

Page 5: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

4 In consideration of the granting of this Permit by VFPA the Applicant agrees to indemnify andsave harmless VFPA against any and all actions, claims, loss, damages or other expenses inany way arising orfollowing from or caused by the granting of this Permit orthe constructionor operation of the Project as contemplated by this Permit.

5 The Applicant is responsible for locating all existing site services and utilities including anylocated underground and to employ best practices and meet applicable code requirementswith respect to protection of existing site services and clearance between existing andproposed site services. The Applicant is responsible for repair or replacement of any damageto existing site services and utilities, to the satisfaction of VFPA, that result from constructionand operation of the Project.

6 The Applicant shall undertake and deliver the Project to total completion in a professional,timely and diligent manner in accordance with the Application submitted by the Applicant andthe applicable standards and specifications set out in the sections above entitled ProjectDescription and Information Sources, including the attached plans and drawings numberedPER No. 15-1O4-A to K. The Applicant shall not carry out any other physical activities unlessexpressly authorized by VFPA.

7 The Applicant shall adhere to the specific mitigations designed into the Project as identified inthe Environmental Assessment Certificate Application for the Vancouver Airport Fuel DeliveryProject (the Application), the Certified Project Description and the Vancouver Airpoft FuelDelivery Project Assessment Report and Screening Report (the EAR), relevant conditions ofthe Environmental Assessment Certificate No. E13-02(http://a100.gov.bc.ca/appsdata/epic/html/deploy/epic_document_346_36636.htm1), and allof the General Conditions listed in Attachment 1 of the Vancouver Airport Fuel Delivery ProjectEnvironmental Assessment Decision Statement.

I The Applicant shall be solely responsible for reviewing DFO's Projects Near Water website(http://www.pac.dfo-mpo.gc.calhabitat/know-savoir-eng.htm) to assess whether the Projectrequires DFO's involvement. The Applicant is solely responsible for submitting any necessaryinformation through DFO's Project Review Process.

9 The Applicant shall cooperate fully with VFPA in respect of any review by VFPA of theApplicant's compliance with these conditions including, without limitation, providing anyinformation or documentation required by VFPA.

10 The Applicant shall make a copy of this Permit available to all employees, agents, contractors,licensees and invitees prior to commencing any physical activities. The Applicant shall be solelyresponsible for ensuring that all such employees, agents, contractors, licensees and inviteescomply with these conditions.

11 The Applicant shall make available upon request by any regulatory authority (such as aFishery Officer) a copy of this Permit.

T2 No in-waterworks below the high water level shall be conducted in the Fraser River as part ofthe Project.

13 Unless otherwise noted, the Applicant shall submit all documents required for VFPA approval toemail : per@portmetrova ncouver. com; fax: 1-866 -284-427 L and referencing PER No. 1 5-to4.

VANCOUVER FRASER PORT AUTHORITY I Project and Environmental Review Project Permit

C¿nad?lPage 3 of 8

PER No. 15-104

COPY

Page 6: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

No.CONDITIONS . PRIOR TO COMMENCING CONSTRUCTION ORPHYSICAL ACTIVITIES

SUBMTSSIONTIMING

lbusiness davsì

L4 The Applicant shall submit signed and sealed drawings for proposedworks approved for construction by a professional engineer licensed topractice in the Province of British Columbia.

At least 5 daysprior to

commencingconstruction of

each phase

15. The Applicant shall submit a Construction Communications Planindicating construction communications during each phase of the works,for VFPA review and approval,

Prior tocommencing

construction orany physical

activities

16 For structures and proposed interior changes that are reviewable underthe 2010 National Building Code and 2010 National Fire Code, theApplicant shall apply for a VFPA Building Permit.

At least 40 daysprior to

commencingconstruction -

phase 3

T7 The Applicant shall provide an updated Landscape Plan indicating acomparable landscape design as shown in the Landscape Plan dated July24,20L5 but with all proposed landscaping wholly installed within thesite boundaries, for VFPA review and approval.

At least 20 daysprior to

commencing sitepreparation

construction -phase 2

1B The Applicant shall submit an updated Construction EnvironmentalManagement Plan, written in accordance with the guidelines on the porta uth ority website ( http : //www. po rtmetrova nco uver. com/worki n g-with -us/perm itting/project-a nd-environ menta l-reviews/tech n ica l-g uidelines/)and to the satisfaction of VFPA, and which includes the generalconditions listed in Attachment 1 of the VFPA Project EnvironmentalAssessment Decision Statement and all relevant conditions of theEnvironmental Assessment Ceftificate No. El3-02.

At least 20 daysprior to

commencing sitepreparation

construction -phase 2

19. The Applicant shall submit an updated Construction EnvironmentalManagement Plan, written in accordance with the guidelines on the porta uth ority website ( http : //www. portmetrova ncouver. com/worki n g-with -us/perm itting/project-a nd-environ menta l-reviews/tech n ical-g uidelines/)and to the satisfaction of VFPA, and which includes the generalconditions listed in Attachment 1 of the VFPA Project EnvironmentalAssessment Decision Statement and all relevant conditions of theEnvironmental Assessment Certificate No. E13-02.

At least 20 daysprior to

commencing FuelReceiving Tankconstruction -

phase 3

VANCOUVER FRASER PORT AUTHORITY I Project and Environmental Review Project Permit

C"anadïlPage 4 of 8

PER No. 15-104

COPY

Page 7: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

20 The Applicant shall prepare a Storm Water Pollution Prevention Plan forthe proposed operations in accordance with the guidelines "DevelopingYour Stormwater Pollution Prevention Plan" on the port authority website( h ttp : //www. po rtm et rova n co uve r, co m/wo rki n g -w i th -us/perm itting/project-and-environ menta l-reviews/tech n ical-guidelines/)and to the satisfaction of VFPA. The plan must detail the quality andvolumes of storm water that may need to be discharged from the siteand proposed treatment processes.

At least 20 daysprior to

commencing FuelReceiving Tankconstruction -

phase 3

2L The Applicant shall submit an updated Overall Site Plan and Grading Planprior to commencing phase 2 of the works for VFPA review and approval.

At least 20 daysprior to

commencing sitepreparation

construction -phase 2

No. CONDITIONS - DURING CONSTRUCTION OR ANY PHYSICAL ACTIVITIES

22 The Applicant shall notify VFPA upon commencement of construction of each phase of theProject.

23 All general construction and physical activities related to the Project shall be conductedbetween Mondays to Saturday between the hours of 7:OOam to 8:OOpm. No constructionand physical activities shall occur during Sundays or holidays, These hours shall not bemodified without prior approval from VFPA.

24 In the event that evidence of what is suspected to be an archaeological resource isencountered, the Applicant shall:

a) Immediately stop any activities that might disturb the archaeological resource or the sitein which it is contained ("Site").

b) Not move or otherwise disturb the artifacts or other remains present at the Site.

c) Stake or flag off the Site to prevent additional disturbances.

d) Immediately notify VFPA.

25 The Applicant may place temporary construction trailers on site while this permit remains ineffect, provided that the Applicant shall not connect such trailers to any underground utilitieswithout the prior written consent of VFPA which may include, without limitation and at VFPA'sdiscretion, a VFPA Building Permit.

26 The Applicant shall ensure that debris and waste material resulting from the Project arecontained, collected, and disposed of at suitable upland locations using standards, practices,methods and procedures to a good commercial standard, conforming to applicable law andusing that degree of skill and care, diligence, prudence and foresight which would bereasonably and ordinarily expected from a qualified, skilled and experienced person engagedin a similar type of undertaking under the same or similar circumstances,

27 The Applicant shall provide VFPA a copy of the consent of the Provincial Inspector of Dikeswith respect to the construction and operation of the facility prior to commencement of Phase2 site preparation construct¡on.

VANCOUVER FRASER PORT AUTHORITY I Project and Environmental Review Project Permit

C¿nadTlPage 5 of 8

PER No. 15-104

COPY

Page 8: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

28. The environmental monitor (an appropriately qualified environmental professional) shallprovide monitoring reports to VFPA on a monthly basis or more frequently if circumstanceswarrant, In addition, annual summary reports shall be provided atthe end of each calendaryear, and a summary report for the whole monitoring period shall be forwarded to the VFPAwithin six weeks of the conclusion of the monitoring period. The VFPA reserves the right torule on the adequacy of the monitoring and the content of the reports.

29. Invasive plants, including English ivy and Japanese knotweed, shall be handled in a mannerthat will prevent their spread and shall be appropriately contained, collected and disposed of.

30. Where Project specifics permit, the Applicant shall replant disturbed areas with appropriatenative species as soon as practical and prior to operations, in a manner that maximizes thelikely success of the plantings.

31 Should contaminated materials be encountered, the Applicant shall ensure that allcontaminated materials, including contaminated drill cuttings and equipment wash water, areremoved, contained, and disposed of at appropriate off-site facilities using standards,practices, methods and procedures to a good commercial standard, conforming to ApplicableLaw and using that degree of skill and care, diligence, prudence and foresight which would bereasonably and ordinarily expected from a qualified, skilled and experienced person engagedin a similar type of undertaking under the same or similar circumstances. Suspect materialsshould be treated as contaminated or stockpiled until their environmental quality has beendetermined.

32. During construction activities, the Applicant shall position equipment associated with theProject in such a manner so as not to obstruct line of sight to navigational aids or markers

33 The Applicant shall conduct the following:

¡ Finalize sector light specifications with Canada Coast Guard Aids to Navigation (CCG).

. Purchase and install a sector light in cooperation with CCG.

. Operate the sector light for a defined period together with existing lights, as directedby CCG.

. Obscure existing light and operate only sector light for a defined trial period, asdirected by CCG.

. If operation is to the satisfaction of CCG, remove rear light once the defined trial periodhas expired.

¡ Reinstall rear light or equivalent, post-construction, as directed by CCG.

No. CONDITIONS - PRIOR TO OPERATION

34 The Applicant shall develop a comprehensive Operations Environmental Management Plan,including accidents and malfunctions at all facilities, to the satisfaction of VFPA. The plan mustbe submitted to VFPA for review 30 business days prior to operations commencing.

VANCOUVER FRASER PORT AUTHORITY I Project and Environmental Review Project Permit

C.'anadTlPage 6 of 8

PER No. 15-104

COPY

Page 9: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

35 The Applicant shall prepare a Fire Safety Plan, to the satisfaction of VFPA and in consultationwith Richmond Fire Rescue, that applies the recommendations of American PetroleumInstitute 202L, which will assist operators and third party responders with responseprocedures, including operation of the fire pump units, The Fire Safety Plan shall also addresspost-seismic event operations of fire suppression equipment and include an inspectionschedule of the fire detection and suppression equipment.

36. The Applicant shall provide an Oil Pollution Emergency Plan that will cover spill scenarios,response techniques for on-water spills to the satisfaction of VFPA. The plan must besubmitted to VFPA for review 30 business days priorto operations commencing.

37 The Applicant shall provide an Emergency Response Plan for on-land emergencies, includingspills, to the satisfaction of VFPA. The plan must be submitted to VFPA for review 30 businessdays prior to operations commencing.

3B The Applicant shall provide VFPA with a copy of an agreement with the City of Richmond toconstruct an emergency access from Dyke Road and to locate a portion of the Williams Roaddriveway within Lot K. Should the Applicant not obtain such agreement with the City, theApplicant shall provide a written summary of their efforts to do so along with a description oftheir alternate proposal to the satisfaction of VFPA.

39 The Applicant shall provide VFPA with a copy of the CN Rail Track Specifications and DesignProposal forthe adjacent Ewen extension alignment, and provide written confirmation to VFPAthat CN Rail is satisfied with the Williams Road driveway arrangement.

40 The Applicant shall provide to VFPA a copy of the final Servicing Agreement with the City ofRichmond prior to the commencement of operations.

No. CONDITIONS . UPON COMPLETIONSUBMISSION

TIMINGlbusiness davsl

4t. The Applicant shall notify VFPA upon completion of the Project. Within 10 days ofcompletion

42 The Applicant shall provide record drawings, in both AutoCAD and Adobe(PDF) format to VFPA.

Within 40 days ofcompletion

VFPA reserves the right to rescind or revise these conditions at any time that newinformation warranting this action is made available to VFPA.

LENGTH OF PERMIT VALIDITY

The construction of the Project must commence by February 28t 2Ot7 (the "CommencementDate") and be complete no later than February 28,2O19 (the "Expiry Date").

VANCOUVER FRASER PORT AUTHORITY I Project and Environmental Review Project Permit

C,anadäPage 7 of 8

PER No. 15-104

COPY

Page 10: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

VANCOUVER FRASER PORT AUTHORITY I Proiect and Environmental Review Project Permit

AMENDMENTS

¡ Details of any mater¡al proposed changes to the ProJect, including days and hours whencçnstruction and any physical activities will be conducted, must be submltted to VFPA forconsideratlon of an amendment to this Permlt,

r For an extension to the Commencement Date, the Appllcant must apply in writing to VFPA inwriting no later than 30 days prlor to that date.

r For an extens¡on to the Expiry Date, the Applicant must apply ln writlng to VFPA no later than30 days prior to that date.

Failure to apply for an extenslon as required may, at thc sole dlscrctlon of VFPA, resultln termination of thls Permlt.

PRO¡ECT AND ENVIRONMENTAL REVIEW DECISION

PRO¡ECÏ,FERMIT PER No.I5.1O4IS APPROVED BY:

Peter Xotta,Vlcc Presldcnt, Plannlng end Opêratlons,Chair of Profcct and Envlronmental Rcvlew Commltteê

DATE OF APPROVAT

CONTACT INFORMATION;

Vancouver Fraser Port Authority UñPA)Pott Metro Vancouver (VFPA)100 The Pointe, 999 Canada Place,Vancouver, BC, Canada, V6C 3T4

PrcJect & Environmental ReviewTel.: 604-665-9047Fax: 1-866-284-427LEmail : [email protected] : www. portmetrova ncouver.com

CanadäPage E of E

PER No. 15-104

COPY

kbell
Typewritten Text
Original Signed
Page 11: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No. 15-1O4-A6

ó

^(h,6õõ

3b

:Etó

¡!3i

fË5Ê

¡Ë:tå6

e3

;5

FþÞ;e3,"tq:

q;

:¡ãr9€

ÞE:¡9:Eç

t5;ã

c

D

AARGE

SfACINCUYDOWN AREA

ILOT 1

SIAGING AREA

IEXIST1NG DREDGE PPE

FENCE ANDBOUNDARY

=qÉ

I

IEMPORARY RECEIVING

EXCÀVATION(rF0)

ROUTE

\PRIVAÍÊ UND(EcowASTE)

6

PRVATE UND

"-"*þ8(e

¡.s

^a"=olqECÔWASIE ENIRANCE(NOt lo BE USÊD) A VANCOUVER FRASER PORT AUTI"IORTTY

This drawing ha5 been reviewed bV theVâncouver Fraser Port Author;ty solely for theourpose of VFPA's issuañce of a P'oject Permit.Thìs periÌìit;¡ no way denotes design,

engineering or structural approval orendorsement.

VAFFC OWNED

LOTK_CryOF RICHMONDOWNED

WOCKERS A\D GEIERAL BULDING VATERIALS

HAUL ROUTE (CONCRETE, ASPHALI, ETC.)

.å fi trrcrruceTtxrr

- (FRE accEss sNE)

I NEW ACCESS IO MARINE SIIE

@A v

F

H&W MAIERIALS AND GRANU4R HAUL ROUIE

ANIICIPAIE DELIVERYOf GRANUUR FILLSTO EXSTING DOCK

MARINE FACILITY PROJECT LOCATION(NOT FOR PMV PROJECT PERMIT)

040&læ&trttrF=-:¡a

ACCESS HAUL ROUTE &LAYDOWN AREA

G-101

ñ{rgn^sENGN'ER]ÑC PúNNNC ] MÀNA6EM€NT

ARGUS CONSULTING, INC.r:g<=

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEIVING FACILITY (TF-O)

PERMIT PACKAGE

VANCOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRITISH COLUMBIA

Fuel Focilit¡es Corpordion

r*J

F

tulfLtoILot!fU)U)

Pdhdr y:\côññ\wR - vôôcô,'â.\isooa vaF0Þ\D*9r\J2-rF0\¡7Á - Prñ(\cin\cr.o!.dre o^ 02/19/16 ot r2:2t PV by DAN rsinq Â4ß.rbCOPY

Page 12: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No. 15-1O4-B

ELÊVATION VIÊW

cs-104

ñ{rgusEÑGINEERING I PUÑNINC I ßNAô'M'M

ARGUS CONSULTING, INC.

,"t Íi.È ".Ì. :'i \i1:- / t

e'{g+:

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEIVTNG FAGTLTTY (TF-o)

PERMIT PACKAGE

VANCOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRITISH COLUMBIAcl3-H#,ffiî'\lJ trm*-

(sEE SHEeiEL.TOP

DYKE BERM 'IOP

EL. 6.53M

WATERTREÂIMENlBUILOING (SEESHEñ A-JOI)TOP EL, A8,7M

EIECTRICALCENEilTOR

loP EL. t7.7M

GROUNDEL. 4.7SM

PUMP AND FILTilTIONEQUIPMENICÔNÎAINMENT PÆ10P EL. r4.5U

+++o

GROUND

TOP OF TANX SHELLEL.19.150üÈLECÍRICAL MCC

EU|DINO (SEEsHEfl A-301)TOP EL I8.7M

DYKE AERMloP EL. 5.740M

010?0ssfrFE|E|=F=F:€)lr*A[rø-

WAÎER TRATMEMBUILDINGTOP EL. T8.7M

DYKE BERMTOP EL. 5.740M

TOP OF RAILINGEL. 20.200M

IOP OF IANK SHELLEt. 19.150M

IANK FOUNDAIIONT.O.C_ Et. 4-520M

PUMP AND FILTRAIIONEQUIPVEÑCOMAINMENT PADTOP EL. t4-5M

ELECTRICAL MCCBUILDINCTOP EL. *8.7M

PROPOSEDflNISHED GRADÊ

PREWUFACTUREOOFFICE IRAILERTOP EL. I9.2M

VANCOUVER FRASER PORÎ AUII{ORITY

Th¡s dÊwing has been cv¡ewed by theVancouver FÊser PortAuthority solelv forthepurposê of VFPA'S issuãnce of a Pþjed Permit.Th¡s perm¡t in no waydenotes de9¡gn,

engineêdñg ôr structunl appronl orendorsement

PERIMTER 1.83MHIGH FENCE

PROPOSEDFINISHED GRADE

Ër5ó

Id

^ñ6ö

t-

tIJJÀÉ.oLL

oulfU)Ø

Proffd: Y:\66ñ\wi - voicoer\'soo¿ vaÐÞ\tue!\r?-F0\p^ - Prñf\cil\rsæ4,p^-cs-104d*9 .n 02/19/16.1 1r:36 tu b, N udñg ÂreusslbCOPY

Page 13: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

t PER 15-104-C6ßß17

oct)

t-'-

ÉulÈÉoILouJfU)U)

o

OVËRALL SITE PLAN

c;s-101

rgusENG N'ER]Ñ6 PúNN NC MÀNAC'VTNI

ARGUS CONSULTING, INC.

oTHERS)

FUTURE ROADcoñNFcllôN(BY^J5.05ñ DlA. x 14.6JmHIGH 13.J MILLION LTERJIT FUEL STORAGETANK (frP 0F 6)

T4NK

5TANK

4TANK

VAFFC LEASE EOUNDARY

SECUR!ry FENCE

oa)

FENCE

LOT 1

6.5m PERMflER ACCESSAND FIRE ROAD

PROPOSEDtL.4.5M

FOAM S]ORAGÊ ANDDISTRIBUTION SUILDIÑG(SEE SNEET A_301)

PROPOSEOEL.6.OM

DES]GNATED F REWÁIER SYSÍEM

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEtVtNG FACtLtTY (TF-o)Fuel Foc¡llt¡es Corpod¡oñ

| ;Tj.ff:iî?î-- 2 ffi'iiru",".. RICHMOND, BRITISH COLUMBIA

PERI\¡IT PACKAGE

AIRPORT FUEL FACILITIES CORPORATION

VANCOUVER ÊRA5ER PORT AUTHORITY

This dråwinE has been revìewed bVtheVãncouver Fraser Port Authority solely for thepurpose of VFPA's issu¿nce of a Prcject Permit.This permit in no way denotes design.

engíneering or structuEl approvâl orendorseñent.

\6.5m FIRE ACCESS UNE rN

ACCORDANCE WIH NAIONALEUILDIÑG CODF ^

^PRIVAIE UÑD

(ECOWASTE) )

7 J.5m MMPROÁD INTO DYKE

,//'

' ^ 16.1m x 4.3mFr FCIRTCAI ùOÌOR aôNtROl

CENIER (MCC) (SrE SHEEr a-J01)

10m x 4.3mWATER TREATMENT EUILÐ]NC

(SEE SHEEÍ A_301)IRANSFORMIR

GTNERAIOR

SECURIÌY FENCE

VAFFC LilSE AOUNDARY

SIORM WAIERDTIENIION ilSIN

600ññ PIPELINE FROMMARINI FACILIry AND OUIBOUND

350ñm P]PELINE A RPORI

ÂPROPOSÊDET 45M

6 5ñ PRIMARY FAC I lryENIRANCE/EXIT

4 6.5m FIRE ACCESS

CONIA NMENIBAS N

oILIWAIERSEPARÀIOR

ÊX SIINGRANGE L1GBI

COMPLEIE NDICAIED BUILDING SZES MA o 15 \o 45 7hINCREASE OR DECREASE AS THE DESIGN ITçf¡T='=:EfFoCl PROCPESSES. r:5r \

Þfl:Þ&l .-_4f :Rræ?h:(WORK OUISIDE

NOT INCLUDED INBOUNDARY

PROJECT

PROPERñ

VAFFC LEASE BOUNDARY

SECURIÌ IENCE

ullL¡TtEs rolFRoM MARTNE FACtLtñ _RANGE LIGHI EASÊMENIEXISIING NAV GAIION

AUNDSCAPING

SEE SHEfl L 10]

NOTE:DEIALED DESIGN EFFORIS ARE NOI

SERVICE IRUCKCONfA NMENi PAD

r5.850ñ x 4.267m-OPERAI ONS

IRAILER (SÊE

r10ñ FIRECRASH GATE

^VEFICLE PARKINC

7- SPACES @ 3.2ñ2-HANDICAP SPACE @ 3.2m

9 SPACES ÍOTAL

sHEfl A 302)\l

J

Þbr.d: Y:\coññ\wR - vorcd,f\rsoo¿ vÀrDÞ\Dwqç\r7-rF0\rrÀ - Frñi\cir\csr 0i dvq * ô)/1e/1Ê ot '2:2s

ÞM hy DÀñ un¡e Àrqùs.srbCOPY

Page 14: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No. 15-1O4-D1 5 e

o

NAVIGATION RANGE LIGHTPLAN

cs-102

VANCOUVER FRASER PORT AUTHORITY

lhis drawing has been rev¡ewêd bylheVancouver Fraser Port Auihority solelyfor thepurpose ofVFPA's issuance of a Prcject Permit-

This pêrmit in no way denotes design,

engineerìng or çruct!ral epproval o.eñdorsement.

ARGUS CONSULTING, INC.

CLEAR OFTANK LOCATIONS)

ALIERNATE. lF IHE COAST GUARDÀND THE R]VER PILOTS WISH TOCONTINUE TtsE USE OF THESECTOR LICHT. tr WILL CONVERI IOA PERMANENT INSTATUTION. F

NOTE:

4ã*

IIGHf

* ;.

RANGE LIGHÍS DO NOl

REOUIRED IO BE REINSTALLED, IHEEACK RANGE REMAINS OUTSIDE OFEL€CIRICAL CUSS I ZONE 2 AR€AAROUND SHELL OF IANK NO. ].

CONSTRUCTION ACTIVITIES,- CONTRACTOR WILL RE NSTAIE IHE* FIFJi'-f,f3i+Ì"[^i3'-ê*^'4K

. ..- IO ALLOW GROUND IMPROVEMENTSAND ÍANK ERECTION. FOLLOUNG

REOUIRE RELOCATION WITH THECURRÉNI IANK ARRANGEMENT POSTCONSIRUCIION; HOWùER, l0 AIDIN CONSTRUCTION ACIIVII]ES ANDTO ENSURE LINE OF SGNÎ FORNAVGAIION AI ALL TIMES DURINGCONSTRUCIION. A TEMPORARYSECTOR LIGNI WILL BE INSTAILEDON IH€ ÊRONT RANGE TOWER.IHE EXISTING FRONT RANGE LIGtsIWILL BE REMOVED AND IHE MCKRANGE TOWER WILL BE REMOVED

Þ

TANK

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEIVING FACILITY (TF{)PERMIT PACKAGË

VANCOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRIT¡SH COLUMBIA

,i{l:.ri'r:'.

TILBURY RANGE)LIGHT LOCAÍIONsEcroR

EXISTING LOCATION OFNAVIGAIION FRONÎ RANGE UARKTR

^å.Y-Fuel Foc¡lhies Corpod¡on

l/f.,'-:...l:;ntrfrî.î:.',7 fflkr_*."

(11552 - TILBURY RANCE)TO 8E REMOVED DURING CONSIRUCÍION AND AflER

COMMISSIONING OF IEMPORAtr SECTOR LIGHT AI FRONTRANGE TOWER

OF MCK RANGE

t

ó

É

^ñotÐ

I¿,t!

!ê9É

:H

F

É.UJfrÉ.oILôullU)(/)

J

Pbil*: Y:\côñm\wR - v.i¿ô'*r\]soo¿ vÀ.Dt\Dwqç\32-rF0\324 - ÞlrÕil\cvì\csr 02.dpe a^ o?/1s/16 dCOPY

Page 15: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

5-104-EPER No! 12

B

c

SOIL PREPARATION

cs-103

rgusENGIN'ÊR NC ÞúNNING MÀNÂG€VENI

ARGUS CONSULTING, INC-

: lt " ';r

.ao*å.-t -

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEtVtNG FACtLtTY (ïF-o)PERMIT PACKAGE

VANCOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRITISH COLUMBIA

\rîFuel Foc¡lhies Corpordion

I

NOTÉS:

1. OWNER IMENDS IO SEEK PERMISSIONSFROM AilACENT UNO ilNER(S) IOENEND ilCAVATIONS BTOND THEOWNEre LffiEHOLD IO ACCOMPLISHDEEP REMWAL OF SOIL U1ERN ANOPUCEMENT OF ENGINEERED FILL

a

I

IMPRWEMEMS WTHIN THE TANX DWEAND EQUIPUEM PÆ ARæ WNHOfrSHEET PILING IS REÍRIfrM ARffi IFPOSSIALE. IF ÍHIS IS NOT POSSIBLE,IIPRWEVEMS WILL BE ACCOUPLISHEDil ÕTHER MÊqNS SUCH AS PILING,UGGINC OR OTHER CMODS.

AR€AS UIHIN fBE ÍANK OYKE NDEOUIPilENT PAD FOOFRINIS WILL BEIMPRWED WITH ENGINEERED F¡LL NDIN_StrU STONE COLUMNS. fHE ENCIDAMfrER, DENH AND NUMBER OFCOLUUNS IS Yfl TO BE DSERMINEÐ,

2.

VANCOUVER FRASER PORT AUTHORIÍY

fhis drawing hâs been reviewed by theVancouver Frâser Poft Aulhority solely forthepurpose of VFPA's issuance cf a Projecì Permit.This perm¡t in no way denoies dêsign,

engineering or structural åpproval orendorsement-

LOl K

@SHEEÍ PILE ANO

sHoRrNG (m.) ArPrcPEffi LIifS

TOP OF SLOPE

FENCE ANDMUNDAñ

Lorl-\ 'ã--r{,.#i

148.3Om

DYKE BERM

o,P)

TOP OF SLOPE l5.OOmTOP OF

SLOPEEXtSTNCGROUND

I

1-1

lOE OF SLOP¿ TOE OF SLOPE

15.00mSEÊ NOIÈ 2

1 18.30m

/î\ sEcTtoN\r/ re

/E-\ SECTION\y*

TANK (ñP)

EQUIPMEM

^ñöatl

i85É

Þd

¿t-

ffi5t

lããÌ398îE39$ÞE

e;

EE

!ã9!

ìa.3Fåå

i:t-é

!g*s¡ã

F

Éulo_

tolroul=U)U)

pbr.d: y:\coilñvR vord!.^rsoo¿ vÀFDÞ\D,es\rr-ÌF0\r7^ - %,1r\cii\csr.or.d*q .. a7/\e/1c.1COPY

Page 16: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER ilo. 15-1O4-F5 6 7

SITE UlILIllES

cu-101

ñ{rgrr"ENôNÊ'RING J ÚÑNING I MAMCEMEÑI

ARGUS CONSULTING, INC.ts cd6¡ êoubd. sliÈ m

TAIü4

..,:¡Ji.;,.

ì ;,. ;- '

îeËËRtr

VAFFC LASE BOUNUil

FIRE HYDRAM (TP.)

SECURIfr FENCE

FOÄV PIPINO

@0r020stuFE|E---

'#F

FOAM SIORAGE ANDDISÌRIAUTþN BUILDING

TAÑK 2

CONTROL

CENTER (MCC)

TANk 1

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECETVTNG FACTLTTY (TF{)PERMIT PACKAGE

VANCOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRITISH COLUMBIAîfr" inäffimî'w7 trk_*

VANCOUVER FRASER ÞORT AUTHORIÎY

Th¡s dÊwing has been reviered bytheVañcouver Fraser Port Authority solely forthepurpose ofVFPA'5 issuance ofa Prcject Permit.Th¡s pemit ¡n no wav denotes des¡gn,

eng¡neering or struduGl approEl orendoßement-

A350ñn JÉT FUEL TO AIRPORT

(WORK OUTSIDE OF PROPEñBOUNDARY NOT INCLUDED IN PWPROJECT PERMT)

NEW ELECTRICI SEMCE

ADIA. 4.63m

UÎUTIES TO AND FROM MARINE

FACTLTÌ (WORX OUß|DE OFPROPEffi BOUNDAÙ NOT

SANtrAilHOLDING

TANKÍNSFORMER

HIGH 1J-3 MILLION LITERJÍ FUÊL STOilGE

\¡ANK oF õ)

CUF_INCLUDED IN PW PRÙECT PERMII)

COMM.DUCI BANKOPEilTIONS

fMILER

DESIGNAÎED FIRE

¿

..1

^ E[fRrc sEwrcÈ

EXISINC WATER UIN

EXISIING OVERHEAD POWER

COMAINMÊNÎ&SIN

50mm POfABf WAÍERSERVICE CONNECÍION TOEXISTNC 45Omñ WATER MAIN

NORMAL FLOW = 751lMlN.

s€ilrcE tRUcKCONIAINUEM PAD

¡relE

5 *FtePj6.P-r6r$F

@@ @ !e $4úå@

" r-r@ P-iG pril roF

,rratMù

12 ¡hô&@FrttukPl@&ùr¡krffiq&

DESIGMÎED FIRE WAIER

nss,r* 4Smm WATER UIN

3.0 ¡

'-, afiî.d *ñi"

úIß5

I¿6a(D

F-

ú.ul(!É.olLolUf(nU)

Þbfd; y\cônñ\wR - voñ.ow.^1s@ vÀÊDÞ\DrF\rr-rFo\3ra - p.,ñil\ctri\cu1.o1.dwe è. ó?/1e/16 otCOPY

Page 17: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

c

3 4

DRAINAGE PLAN

cu-102

ENC1NEERINC I PUNNNG I MÀNACEVENI

ARGUS CONSULTING, INC.

, ,il ::::: ..

r**å

TAÀ¡K

LIfi SAÌON

otL,/wAlERSEPAilTOR

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

PERMIT PACKAGE

VANCOUVER AIRPORT FUEL FACITITIES CORPORATION

RICHMOND, BRITISH COLUMBIA

FUEL RECEIVING FACILITY (TF-O)

î: .'-,.J

v1Fuêl Focillt¡es

rcWIYffiMffiMW ûffi'[email protected]ÆAIffituN

Egqm6NEMLAruME.¡sMffi@NW (wMM

DæilNIre NE W WLOÐEM1. ÙE þ ÛE Æú5 N¡Im 6É, A RUW trMEM 6 0.95 AD 15 YINW ÌME G @rcEMU WÆ 6ED fG

ffilMffimruuums.2. È PfiMNl:M rcA E@S CMR OFÆþXMEIY æ' dûE $RFÆE¡M &M.M

PP@ME ¡mffi M I Ü[ EËME ruW 6 A IÆMUS SURFrcE. N ¡@NCE Wfr W W 6æHnD NW Fm A !ffi N SEW W mf mEDff $rL @NomS (SruMTED 916), $SæEIüTMU

'U E IM NO IHEE ru 4 MEilIE OIEd RUW M fw A H6HLY PEMUS $RFæE.

IT WR þ * MAM. ÈE W fuW @EruEÚ tr 0,95 IÆ US Ffr MÐMOilEE MN.A ilÉU W ø S w/HR W MilNEO ÑI M Cß 6 rcH¡ND'S M ClM FR M 15 INW IME dffiM i.lOWmilNQUlw.rosw sW PE 92re rÆ ffi8rED Æfrmo ro tnE mMrc FWU w BE Fo[wrc sums:t, ,¡rsu um/ffiffio sLoPE É 0,03t2. UMrc'S MS (ffi|ff F6 (NRm ãE: n-0.0t55. U PIE (:ffiS TEE USÐ.

1VANCOUVER FRÆER PORT AUTHORIfl

lhìs drawing has been reviewed by!heVãncouver Êrãs€r Pod Authori¡r'solelV for thepurposê of VFPAT ìssuance of å Prcject PermitThis permit in no wey deñotes des gn,

englneering or str!ctur¿l approvàl or4.5

rE u Ems F&w Æ A rcrA Æa 6 ffixMELy..7 ¡Eq ffi (M). M Ox DE &W rcÐ NFþNS, nEü ¡tffi Èd rQ m ffi AD 6 ffiL@tr ß millEo tO AE 0.372 YrlS ñ ßE mÐ ffix Þl* sftÐRAMÐ[OFñÆWD*S0Ut.ffiR. tE 4.7 U tMW ffiS d @ú MME OF 2.4 U ÀN0

^ U¡€0 æMANEú mA ANo Cl@ EOU|ÞIIM

PÆ ø 1,9 n w @D sil wE rs ót¡trD m¡ BE mm ffioN 0F ßE sG, u ^

ma strÍ AW ûEmM d ffi wñÉú ME fo

^ m Ðú

^1 ÎE sM flo ø ûE ffi. E B( R(Jw RW fOR ry

l:|l::|¡|l::mEM trRWD MW ts mmED JO W 0.222 ß/5.

I IfrWAÉ 'M

M ÑED ffANIffi ME ÆA AO CUGO E@Iffi PD TII MN U MUÑO FW þ qrcHNN, ÉÐ

'O A trRæ CNÀNÍEÚ NI MIE NE ME ÆA AD ruH A ruBU-{& CNæGD, M&ING

oT,/WAER æRId (M) ffi 'O

MreE fO ffE DffiÚþN rc¡ù ùE tr WU BE 9æO FOR ¡HE MIÞ^ED [il MEAD frE CM¡NW N ru ¡Jd F* FLtfuffi N P4 FLd ilß-

COMAINSENI ryKE

ruEV& w[, 25 L/S ELW. 6.0ruP (0.6 É/S rur[).

ÈE trWAB tSrc ru 8E INX re ^rc SU æ cmuo ÈruH Èq USE ç æt rNorqu qt V&E ONæX PAR 6INß. ÛSE VALW WU AE ffiruY E6ED AD ÆR US& Ilffi(:M 6 NE ffiE ¡M C@ IAER NE REIND ¡MO ffE CNM CÑÀNÍEM aM ND BM¡ M ffi. A gOR OP8Þ qE VEW S SUAED

dMDPIPÛI ÈCBã

NLm m@ lo ûE mcm wdEM NN,

ffþruEÚ ñÆ ilÈ

ff o.222

æ[rcuD @E FL4 ru CN NW Æq OF 06 S/S

ft ôs}ffi Ê$UED o.2r2ß/s, oq 13tM¡AWME OÊflEreæMMW

DMLæEÙ CNDfuE.@vN ruEL Írc tÆrwEs NUZES

LOI 1

SORM WATER ELry. 4.5

fO ANO FROM DFIENTION

UR|NE F CrUry (WORX

-OTSIDE OF PROPEffiMUNDAfr NOT INCLUDED

IN PW PRilECT PERCT)

x,

ELW. 4.5

CONTAINMEININ

CMSH MfE

-FÈi

-

PiT - -4-- P\--.¿r.ëvt+-P[r:-Pñ

4r-:Þr.- -015s¡57hFEF--Eæ

SOUIH ARM FRASËR RIVER

PER No.

òÐaÐ

E

!¿n4:tgË

¡i!

;:63

¿È

åa8i

eP

9;

!5f;å

E*

!;i

HÉH

gÉã

F

É.ul(LÉoILot!fU)U)

Þbilâd Y\coñm\wR - vôôc.dr\rsoo1 vaFDÞ\n*q.\rr-rF0\r7a - Prñil\cir\cur.or.d,q at t)/1e/16 otCOPY

Page 18: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No. 15-1O4-H4 5

RElmEo 45omm W fER ßN W ECæASIE

fiMS TO AND AOV ffiINEMSIE OF

NOT INCLUüD

i\VÑCOUVER FRASER rcfr AWHORIN

Ûß drawìn8 hâs bèen rev¡ewêd bythehncouver FEser Po( Authority solely forthepuposeofVFPA3 ksuànce cfa Prcject Permit.Thb permit in nowåydenotes desigñ,êngi¡êering or *rucuÊl ãpprov¡l or

N M PROJECT ÆRtrT) REMOE 360 D€G.rczLE/UOilToR

GNR) R.o.w

A

q

H

FIRE HYDüM (FH)

Foil,/w rER(ioNrToR 3)

NWUONtrM

FIRE WATER PLAN

cuF-131

ñ4.rgn"ARGUS CONSULTING. INC.

,'':; t::i:''.

,.tt.-.11',r't, .,l

æ

TANK

FIRÊ F'DilM (FH) \

NNU[

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECE|V|NG FACtLITY (TF-o)

PERMIT PACKAGE

VANCOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRITISH COLUMBIA

%/{þ\"tll

Fuel Fodllt¡* Corpod¡m

\PRIURY

\-F^Clß X

,/ 1\þe

MCE,/EXF

\EXISNG

5oñm POTÆLE WAIER'SEfuCE CONNÊCÎON TO

EXSre 450ñm WAIER HN

,4\ nmor: 3æ DEG. FoaM,¿w^TER.- nozzLE/uorrm (MoNroR 6)FIRE }ùDilffi (FB)

A VAFFC trE EOUNOARY

uxu[ FuM,/wAlERMONtrOR(MONTORS 4 ANÐ 5)

ÊüV/NRE WAER OEND

.qìt SÆ PERIVMR

NFPA il - DESIGN FOR FUI SURFACE NRE N N OUTDOOR CWEREDMOF TNK. PER TASLE 5.2.5.2.2 ÎHÉ PPUUTION ilE SruL AE 4.1

TNK Dn - S,oSmAREA - H/4 (35,o$)'- 964.4m'UTNTMUM RAÎE = (964.4m') (4.1 Lpñ/mr) = 39s4 þh

FLOAÎING 4Smm WA'TER wÂtER (lYP. OF 6 TNKS)

ìàar*, ilE roraL FoAx ^PPLT.A'N

* .r" = .,.à*.01020S60mFEIE---PER 5.4.2.J,J SPftEYENTARY PROECTil $ALL B€ IN ACCORDÂNCE üD SECll$ S.9

PER TÂBLE 5.9.2.2 A MIXITUV OF IIVO SPPLEÍffIAL FOAS HOS€ SNEAMS ¡S REOUIRED

^1 ^N APPUc^nil RAIE # 189 þm PER HoSE SnE^u FoR

^ ToIAL 0F 376 þm.

A 1r SOi-UroN, FOAM ^PPL|CAIoN

tSlS 4.288 þh (1.1J3 USPI).

R^ÎE gA[ BE 3954þm (fi,6 USCPM) OF FOAM AND WAlER DEMÂND

F

tulÈÉot!oullU)U)

J

Pbr.d: Y:\cômñ\wR - võmd,ù\rsm¿ !^mÞ\0,q.\3r-r0\¡2^ - Piñr\cri\clrr.Í.dve ó¡ or/te/t6 ntCOPY

Page 19: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No. 15-1O4-IËIBþf

ÍÀña(D

LANDSCAPE PLAN

L-101

ñ{rgnsENGINEERIrc I PUNNINC I MAÑÀGEMENI

ARGUS CONSULTING, INC.

'".;itr:3,'.'t il':l' ' '

sg-È.

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEIVING FACILITY (TF.O)

PERMIT PACKAGE

AIRPORT FUEL FACILITIES CORPORATION

Fuêl Fddlltiês Côrporot¡m

4i-'.^,Y-

¡f#5 ftffëtxî-\-#d/ ä*Tffi** RICHMOND, BRITISH COLUMBIA

LE

VAFFC LEASI BOUNDAtr

4

-'-/

7' FABRTC W/ 1'-3STRANDS BARB WIRESECURIfr FENCE

^

_ _ - _D_ù1(E ROAD

,-,._.::¡:,t -. È ':;:: -.r -:-,;, -

-;.: -

-,r-r- r-:,,- --:-:: :-:: ,-:.- --_r:

A SIORM OIICHUNDSCAPINGTREE AND SHRUB PUN1ING

ØSOUTH ARM FRASER RIVER

^

NOTE: UNoSCAPE PUN TO BEFUffiHER DEVELOPED INDETAILED DESICN fO

VANCOUVER FRASER PORT AUTHORITY

This drawing has been rev¡ewed by theVancouver Fraser Port Authority solely forthepuryose of VFPI(S issuance ofa Prcject Permit.Th¡s permit in no waydenotes des¡gn,

engineerìng or structural êpprcvãl or

PROVIDE ÌPÊ OF SPECIES,EIC. OF SCH PUNIING.

01020ssÆtEtE--:F-

ÉlrJÈÉoTL

oTUfU)U)

J

Þrdtdl Y\comñ\wR - voñcodÍ\rsæ¡ vÀFDP\D*s\3r-rF0\12^ - Pr'ñr\cùil\1.1,01d'9 ôn 0?/19/18 ot 12.8 PM by DÀN usiñg ^qus,slbCOPY

Page 20: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No, 15-104-,9 ú

BUILDING ELEVATIONS

A-301

ARGUS CONSULTING, INC,

Ji."í '.t--f'a. .::

VANCOUVER AIRPORT FUEL DELIVERY PROJECT

FUEL RECETVTNG FACTLTTY (TF-o)

PERMIT PACKAGE

VANGOUVER AIRPORT FUEL FACILITIES CORPORATION

RICHMOND, BRITISH COLUMBIA/_m\,*ëJ

Fuol Fddltti.s Corporúld

EXTERIOR LIGHT r5000 4300

f,6" WIDE MUBLE DMR

Lr6[swÍcH

IIESIELryAlON SOUIH AND NORIH ILEVATIOÑ EAST ELEVAIION

1 0000WIDE DOOR

PANEL

LIGfr

LIGHIstrcH

WEST ËLËVATION 5SU_.IH_!!EyA1A\l EAST ELEVATION VANCOUVER FRÆÊR PORÎ AUTHORTV

fhls dråwing hes beeñ Þvlewed bvtheVancouver FGser Pod Authority solely fo¡ the

À This permìt;ñ ñoMy denot6 design,

engineering or srudu€l êpprdãl or150æ 4000

WDE DOOR

SOUTH ELEVAfION EASf ELEVAÍION

NOTES: Â1- THE THREE Nil ÍRUCTURES SHALI BE

PREMAÑUFACTURED EUILDINGS Æ MANUFACTUREDil INTERCONTINENTAL TRUCK BODY OR EOUAL.

2. STRUCTURES ARE TO BE PORTÆLE; HOWMRTHEY ULL BE ANCHOREO 10 fHE FOUNDAÎION ASRECOMMENDED ry MANUFACTURER,

û

fr----{

PANELS

9

¿(tro(Ð

bÉul0-ÉoTL

ouJlU'U)

J

Þroffd: YÀcôñ6\M - v6ncow.r\'5æ¿ v ñÞ\or$\12-îo\YA - PüóilWh\^-3otd\|s oã o2/1e/16 ûl 12s Þ! ry üN diñg ^@,dbCOPY

Page 21: riÐ PORT vancouverof COPY Original Signed · 11/1/2018  · riÐ PORT vancouverof Re: November 1, 2018 Mr. Mark McCaskill FSM Management Group Inc. Obo Vancouver Airport Fuel Facilities

PER No. 15-1O4-K

VANCOWER FRASER PORT AUTÌiORIÎY

Th¡s drawìng has been rev¡ewed bytheVan@uver FÊserPortAuthor¡tysolelyforthepurpose ofVFPl(s ¡ssuance of a Projed Pemit.Th¡s permit ¡n no way denotes des¡8n,

engineering or struduEl approval orendorsemenL

MAXIUUM FUEL HÊIGM. SEE NOTE 1.

VOLUIE IN CONEMNOM CALCUUTEDAS 281,821 LrRES

IANK HãGÍ{ÍATOLUME CALCULAIIONS

t¡pt¡lsEOUAI|ONS

NOTES:THE API TANK CAPACñ MSED UÐN frE TANK35.O5OM DhMETER ND SHELL HEIGffi OF 16.430MIS üLCUHED AS ]4.] MILLION LITRES. WHILETHIS IS THE TANK CAPACIry. THE ACTUAL US&BLEVOLUME IS LESS DUE 10 THE R€OUIREDFREEBOARD IN THE TAÑK FOR THE INTERML TANKilfrER IRUCfURE. lHE INTERML TANK FüM FIREPROIECIION PIPING. AND IHE INDEPENDENT HIGHLML SHUTOFF DilCES. AS SUCH, IBE MAXIMUMHIGH LÙEL IN THE TANK WLL BË LMTED TO15.530M WHTCH EQUATES TO 13.333,¡33 LtrRESPER TÁNK OR A TOÍAL FUÊL RECÉVING FACILIryuPrctry oF ao,mo,mo Lìn€s.

h otæ3241.&l

I 3¡51 ,5r 2.42

W bumlet k i9s

Eì-

CENIER SUMP

TANK DlA. - 35050

x

æs,@6

1333.S

s¡5

x

D

aktudïrks

T.úDhñ:

TANK ELEVATION

MS-301

ñ4.rgusEÑGIÑEERING I PUNNINC I MAMGEüENT

ARGUS CONSULTING, INC.6Ù øb. edd.d, turà ñ*1i;HL.l*,i;li3***

VANCOWER AIRPORT FUEL DELIVERY PROJECT

FUEL RECEIVING FACILITY (TF{)Fuêl Fodlld6 Coçorûtlù

PERMIT PACKAGE

AIRPORT FUEL FACILIÏIES CORPORATIONl^E:gffiî'çJ7trk*- RICHMOND, BRITISH COLUMBIA

Í¡û\6õ

c

D

E

o

H

t-

tlrJÀtoILouJlCJ)U)

J

Md:Y:\có6b\wR-v.rcoMÀ1@vÀÐÞ\D*s\rr-r0\rÀ-Prñil\u.ch\us-srraN(ELwloN.ùq. o2/te/1â.1 1r@PMryuNùiiñeaqu...rbCOPY