SLR Consulting (Africa) (Pty) Ltd 1
INTRODUCTION
Rhino Oil and Gas Exploration South Africa (Pty) Ltd intends to lodge an application for an exploration right with the Petroleum
Agency South Africa (PASA) in terms of section 79 of the
Minerals and Petroleum Resources Development Act, 28 of
2002 (MPRDA). The application will be made over the area
where Rhino Oil & Gas currently holds a Technical Co-operation
Permit (108 TCP). Minerals included in the application are oil,
gas, condensate, coal bed methane, helium and biogenic gas.
The exploration area is broad and encompasses large parts of
northern KwaZulu-Natal (see Figure 1).
In this application Rhino Oil & Gas will only apply for approval to
undertake early-phase exploration for oil and gas which might
be located within suitable geological strata. The purpose of the
work would be solely to determine the presence of any possible
petroleum resource which could be investigated further. The 3-
year exploration work programme will be restricted to non-
invasive techniques, as well as seismic surveys and the drilling
of less than 10 core boreholes.
ENVIRONMENTAL AUTHORISATION PROCESS
Prior to the granting of an Exploration Right for the proposed
project an environmental assessment process must be
conducted and approved by PASA in terms of the National
Environmental Management Act, 107 of 1998 (NEMA). Rhino
Oil & Gas will make an application to PASA for environmental
authorisation. The 2014 Environmental Impact Assessment
Regulations (GN R982 promulgated in terms of NEMA) are
applicable as the need for an exploration right triggers activity
18 in Listing Notice 2 (GN R984). The EIA Regulations define the
assessment process which includes: a scoping phase,
environmental impact assessment (EIA) phase and an
environmental management programme (EMPr). Public
participation is a key component of the environmental
assessment process.
SLR Consulting (Pty) Ltd (SLR), an independent firm of
environmental consultants, has been appointed by Rhino Oil &
Gas to manage the environmental assessment process. This
document has been prepared by SLR to inform you about:
∗ the application and proposed project activities;
∗ the environmental assessment process to be followed; and
∗ how you can have input into the environmental assessment.
The primary objective of the scoping process is to identify the
key issues that need to be addressed in the assessment phase
that will follow.
FRACKING or NOT?
No hydraulic fracturing (fracking) is included in
the 3-year exploration programme proposed.
Rhino Oil & Gas have stated that there is not
currently enough information to determine
what techniques might be required for future
gas extraction.
If a resource was identified and subsequently
proven to be commercial, then hydraulic
fracturing could be one of the potential
techniques for gas production. However, a lot
of investigation, multiple environmental
assessments and authority approvals would be
required before reaching that point. This
includes:
1. Complete the early phase exploration as
proposed and approved through this
application.
2. If the early-phase exploration were to
confirm the presence of a potential resource,
then Rhino Oil & Gas would seek further
approval from PASA for the additional
exploration work required to investigate this.
Any further approval would be subject to an
additional environmental assessment process
with further public consultation. Approvals are
also likely to be required under other
legislation.
3. Undertake the detailed phases of exploration
as approved.
4. If the detailed exploration led to the
discovery of a commercial resource suitable for
development then Rhino Oil & Gas would need
to secure a production right from PASA. Any
application for a production right has to be
subject to an environmental assessment
process with further public consultation.
Approvals are also likely to be required under
other legislation.
5 Develop the production project.
All future exploration or production activities
that may arise if resources are discovered are
therefore beyond the scope of the current
scoping and EIA process.
Rhino Oil and Gas Exploration South Africa (Pty) Ltd
BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION
ON VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP)
February 2016
HOW TO RESPOND
Responses to this document can be submitted by means of the attached comments sheet, by direct submission
and/or through communication with SLR.
WHO TO CONTACT: Matthew Hemming or Ntsako Baloyi (011) 467 0945 (Tel) or (011) 467 0978 (Fax) or
SLR Consulting (Africa) (Pty) Ltd 2
108 TCP
SLR Consulting (Africa) (Pty) Ltd 3
BRIEF OVERVIEW OF PROPOSED EXPLORATION
APPLICATION
Once an application for an exploration right is lodged by
Rhino Oil and Gas, it may be accepted by the Petroleum
Agency South Africa. Acceptance of the application by PASA
only permits the applicant to continue with the necessary
process and does not constitute authorisation.
An application for environmental authorisation in terms of
the National Environmental Management Act, 1998 will then
be required by PASA. The scoping and EIA process will be
subject to the timeframes prescribed in the Environmental
Impact Assessment Regulations 2014.
GENERAL
The 3-year exploration work programme proposed by Rhino
Oil and Gas is aimed at determining if there is an oil or gas
resource in the area that would warrant further exploration.
Year 1: the evaluation of geological data through a
comprehensive desk-top study. Much of this data is only
available to parities whom hold exploration rights. Sub-
surface structural features and stratigraphy will be mapped.
Data on source-rock geochemistry will be acquired. Geological models may be developed.
Year 2: further geochemical data analysis as well as the
possible use of apatite fission track analysis and full tensor
gradiometry gravity (FTG) surveys.
Year 3: purchase and/or undertaking seismic surveys. The
final exploration activity would be the drilling of core
boreholes at target sites identified from the earlier work.
No pressure testing, hydraulic fracturing or water abstraction
is included in the proposed exploration work.
LOCATION
In broad terms the exploration right application extends
from Newcastle/Utrecht in the north west across to Vryheid
and to Pongola in the north east. In the south east the area
includes Melmoth and is inland of the N2 highway. The
southern boundary is contiguous with the boundary of the
other Rhino application (291 ER). It includes nearly 5 500
farms over an area of just less than 2 000 000 ha. (see
attached Figure and list of farms).
Physical, on-the-ground exploration activities will only be
undertaken at a limited number of sites. The exact location
of the target sites can only be determined once Rhino has
completed the initial phases of exploration and examined
the available data.
The application area excludes all properties where the
granting of an exploration right is prohibited by Section 48
of the MPRDA. All other properties are included, even where
a constraint may restrict exploration activity. Rhino Oil & Gas
will ensure that their activities are only undertaken at sites
where it is lawful and environmentally responsible to do so.
FTG SURVEYS
Full tensor gradiometry gravity (FTG) surveys will be
undertaken to image subsurface geology in order to aid
exploration. Such surveys will be flown in fixed wing aircraft
and require no access to farms.
DRILLING
A maximum of 10 core holes are planned across the
exploration area. These are stratigraphic wells with no
purpose beyond exploration. Core holes would be drilled by
a truck or trailer mounted, mobile drilling rig very similar in
size to a water borehole rig. Drill sites will be accessed using
existing roads and farm tracks. The drill rig will be
accompanied by supporting equipment (vehicles, trailers,
compressors, water tanks, pumps, caravan etc). A typical
exploration rig and equipment requires an operating area of
approximately 1 000 m2. See photos below.
Rock core will be extracted from the target strata and
removed to a laboratory. Samples will be examined,
described and tested for gas related properties.
Once drilling is completed the rig, all associated equipment
and waste products will be removed from site. The core hole
will be capped pending further investigation or sealed with
cement if not required further.
SEISMIC SURVEYS
Rhino will purchase seismic data where available and may
commission seismic surveys to image subsurface geology.
During a survey low frequency acoustic waves are generated
and the reflected waves recorded. Analysis of the return
waves provides information about rock types and possible
gases or fluids in rock formations.
Rhino is planning up to 125 km of two-dimensional (2D)
surveys. Survey teams generate controlled acoustic energy
(using explosives, air gun or seismic vibrator) and record the
return waves in geophones laid at set spacing in a linear
alignment.
Survey teams require short-term access to farms to place
survey equipment and record the data. Survey lines will
follow existing access roads and disturbances with due
consideration of environmental constraints.
STAFF AND HOUSING
Early phase exploration will create relatively few job
opportunities as most work is contracted to specialist service
providers. The company will recruit locally as far as possible.
A seismic survey team comprises about 2o staff. A drill-rig is
normally manned by a crew of up to 5 persons. No on site
housing facilities are planned. Staff will be accommodated
in nearby towns or at locations agreed with land owners.
TIMING
The exploration work programme is planned over a 3 year
period. The programme is divided in phases with successful
completion of one phase informing the next.
FTG surveys are completed in a matter of hours. Seismic
surveys are undertaken over a period of months but the
personnel and equipment are on site for short periods.
Drilling at each site can take 1 to 3 months to complete.
ENVIRONMENTAL MANAGEMENT
An environmental management programme will be written
to prescribe commitments needed to ensure
SLR Consulting (Africa) (Pty) Ltd 4
environmentally responsible operations. A key aspect will be
the restriction or prohibition of exploration activities at sites
which have been identified to be incompatible with
exploration.
The establishment, management and rehabilitation of all
exploration sites will be done in consultation with land
owners. The process of managing the operations, the
impacts thereof and rehabilitating the exploration sites will
be conducted in terms of the EMPr approved by PASA.
LAND ACCESS
It is likely that access will be required to only a few of the
properties within the exploration area and then for a short
period. Private property will only ever be accessed with prior
consent of the landowner and then in terms of a written
agreement.
The locality of exploration sites is largely flexible and can be
adapted to minimise disturbance to land owners, occupiers,
agriculture and the environment.
MOTIVATION FOR THE PROPOSED PROJECT
Petroleum products remain a vital source of energy. Natural
gas comprises mostly methane and is a relatively clean,
environmentally friendly form of energy. It can be used to
generate electricity or provide heat for domestic and
industrial purposes. Once extracted gas can be easily
contained, transported and safely used in many applications.
The type of downstream use is entirely dependent on the
commercial scale of the resource.
FUTURE EXPLORATION OR PRODUCTION
The current application is only to authorise the work as
described above (and in detail in the Scoping Report). Any
further exploration work to evaluate an identified resource or
a future production would require further approval from
PASA in terms of the MPRDA & NEMA. Such approvals will
be subject to the relevant legal requirements which include
further public consultation and environmental assessment.
Rhino maintains that is not useful to speculate on the
possible future direction of the project as the range of
options is vast and the available information very limited.
PHOTOS
Typical FTG Survey plane
Schematic of seismic survey
Example of drilling operations
Rock core recovered for analysis
SLR Consulting (Africa) (Pty) Ltd 5
PUBLIC RESPONSE TO DATE
Rhino Oil & Gas is currently in progress with 4 other
exploration right applications similar to this one,
including one in the adjacent area of central KwaZulu-
Natal (KZN 291 ER).
See:http://www.rhinoresourcesltd.com/areas or http://www.petroleumagencysa.com/index.php/maps
Consultation in those areas has elicited significant
response to the applications. Overall the public
response is very much opposed to the exploration
right application. The issues that have been raised are
too numerous to elaborate on here but are detailed in
the reports for those projects. Various key issues arose
and SLR consulted with PASA on the issues that were
material to the overall application and the EIA process.
A summary of each issue and an extract of the response
from PASA are provided below:
Issue 1: Most persons participating in the EIA process
stated their opposition or lodged an objection. Many of
the objections were made with reasons relating to
production and fracking. It is clear that the EIA process
will not be able to resolve such objections. What
mechanisms exist for these objections to be addressed?
PASA: “There is no mechanism under NEMA to address
objections, however as part of the EIA process the EAP
must consider issues raised and engage with respective
parties to resolve or provide clarity on issues raised.
Section 10 of the MPRDA provides for the Regional
Mining Development and Environmental Committee to
consider and advise the Minister on objections received in
respect of applications.”
Issue 2: Most IAPs have demanded that the current EIA
process present details on production and undertake an
assessment of potential production (including fracking)
related impacts, even though the current application
does not cover further exploration or production. What
is PASA’s instruction with regards the scope of the
current EIA?
PASA: “The current EIA is aligned with the proposed
exploration work programme submitted with the
application for an exploration right. If the applicant
wanted to pursue any activities beyond the scope of the
proposed work programme then environmental
authorisation for such activities would have to be
obtained. This process provides for further engagement
with IAPs and in-depth assessment of the associated
issues.”
Issue 3: Many IAPs have asked why the current Karoo
Strategic Environmental Assessment (SEA) on Shale
Gas Development is not applicable to all areas of South
Africa. Moreover, the IAPs have demanded that all
exploration right applications and related EIA processes
be stopped until the SEA is complete. What is PASA’s
response in this regard?
PASA: “The scope and terms of reference for the SEA are
finalised and the assessment has commenced. Queries on
the SEA should be directed to the Department of
Environmental Affairs as the driver of that process.”
Issue 4: IAPs have raised the concern that many
properties/sites within the application areas are either
protected outright or incompatible with exploration
and/or the production of oil and gas. In some instances
legislation prevents exploration work from taking place
in these areas. The question has been asked “why
undertake an EIA to obtain exploration rights in areas
where any gas, if it were to be found, would not be able
to be extracted because of the restrictions imposed by
protected area legislation and Regulation 122 of the
Petroleum Regulations (GN R 466 of 2015) relating to
the location of wells?”. The demand is that the
application be stopped, all of the future non-
compatible/unlawful areas removed and then a new EIA
be commenced for the revised area. What is PASA’s
response in this regard?
PASA: “The EAP has the responsibility to identify
environmental attributes; to assess the risks and impacts
and provide appropriate mitigation measures. In doing so
the EAP has the obligation to consider and apply the
provisions of the relevant environmental legislation.
PASA, as the regulator, has no authority to direct the
EAP or applicant to stop the EIA to remove incompatible
areas. The application will be evaluated in line with the
provisions of NEMA and other relevant legislation. The
Agency will make recommendations that will be aligned
with the relevant provisions to ensure that specified
environment receives the necessary protection.”
The application and the scoping and EIA process for this
project will be undertaken in accordance with the
guidance from PASA.
PUBLIC MEETINGS
The following public scoping meetings have been
arranged, the details are as follows:
Date and Time Venue
Wednesday 2 March
14h00
Ulundi, Multi-Purpose Hall,
Cnr King Zwelethini & King
Mpande Streets
Thursday 3 March at
14h00
Dundee High School, Cnr
Tatham & Oxborrow
Streets,
Monday 7 March at
14h00
Pongola, Thokoza Hall,
adjacent to TSB Sugar Mill
Tuesday 8 March at 14h00
Melmoth Town Hall, Reinhold Street,
Wednesday 9 March at
14h00
Vryheid, Cecil Emmett Hall at Eeufees Sports Centre, Utrecht Road
Thursday 10 March at
14h00
Newcastle, Richview Civic
Hall, off Boundary Street
Friday 11 March at 14h00
Dannhauser, Annieville
Community Hall, Annieville
Road
You are invited to attend.
SLR Consulting (Africa) (Pty) Ltd 6
POTENTIAL ENVIRONMENTAL IMPACTS
Relevant issues identified during scoping will be
investigated as part of the EIA process. The following
issues and impacts are examples of concerns related to
exploration. Their inclusion in this list is no relation to
the probability of occurrence nor an indication of
possible significance.
Farm Safety – Access by unknown persons to farms has
the potential to influence security on farms. Operating
heavy vehicles and equipment may pose safety risks.
Run away fires may present a potential safety risks for
both people and livestock.
Farm Infrastructure – farms roads, gates and fences
may be damaged during exploration activity. Soil and land capability– activities at the seismic and
drill sites may affect soils and land capability if poorly
regulated and not rehabilitated. Biodiversity – activities at the seismic and drill sites
have the potential to disturb and/or destroy vegetation,
habitat units and related ecosystem functionality,
including the disturbance of protected species. Surface water – The proposed activities at the seismic
and drill sites has the potential to pollute surface water
resources through consumptive use and the discharge
of contaminants. Groundwater – the proposed drilling has the potential
to consume and contaminate groundwater resources
which could impact availability to other groundwater
users and the ecosystem. Air – The proposed project has the potential to
contribute to air pollution, particularly through dust
emissions from vehicles on gravel roads and the release
of gas from boreholes. Noise and vibrations – The proposed project has the
potential to cause noise pollution during drilling
activities. Seismic surveys may cause damage to
structures and disturb livestock and wildlife. Visual – the placement of seismic and drilling
equipment has the potential to create short-term visual
impacts. Heritage resources – the proposed project has limited
potential to damage heritage resources. Land use –The seismic and drill sites may conflict with
land use for the duration. Socio-economic – Positive impacts include limited job
creation and stimulation of the local and regional
economy. Potential negative socio-economic impacts
include potential for increased crime, spread of disease
and pressure on support services provision.
Cumulative and future impacts – although the current
work may have limited impacts, a concern is that
approval of this work could open the way for future,
larger-scale projects in the area. There is concern that
these may have much greater impact. Approval might
be difficult to stop if investment has been made.
ENVIRONMENTAL ASSESSMENT
The assessment process will aim to:
• provide information on the project & alternatives
• provide information on the potentially affected
environment;
• provide an assessment of the significance of the
identified impacts;
• report on management measures required to
mitigate impacts to an acceptable level; and
• allow for informed, transparent and accountable
decision-making by the relevant authorities.
STEPS IN THE ASSESSMENT PROCESS Pre Application phase (January to April 2016)
Identify and inform IAPs & regulatory authorities of the proposed project (via direct consultation, newspaper
advertisements, site notices, this document) Receive issues and responses from IAPs. Submit application to PASA (ito NEMA)
Scoping phase (April 2016 to June 2016) Continued consultation and receipt of responses.
Identify issues that need to be addressed. Define outstanding issues and terms of reference for
work to address potential impacts Compile scoping report
Make draft scoping report available for review by IAPs and other regulatory authorities.
Collect IAP comments, update Scoping Report and forward to decision making Authorities (by 20 April).
EIA and EMP phase( July to December 2016) Undertake any specialist investigations.
Assess impacts of proposed project and compile EIA and EMP report.
Make this available to IAPs and regulatory authorities for review.
Host possible public-feedback meetings. Collect IAP comments, update EIA and EMPr and
forward to decision making Authorities. Decision and Appeal
PASA to review EIA and EMPr and make a decision. Notify IAPs and regulatory authorities.
Appeal process in terms of Appeal Regulations
REGISTER AND COMMENT
All stakeholders are invited to register as Interested &
Affected Parties (IAP). You must register as an IAP if
you would like more information or wish to participate
in the environmental assessment of the project.
To register, or to raise any environmental issues or
concerns regarding the project, please complete the
Response Form and return it to SLR at your earliest
convenience. IAPs registered on the project’s database
will receive notification of further meetings, report
review periods and the decision.
SLR Consulting (Pty) Ltd
Rhino Oil and Gas Exploration South Africa (Pty) Ltd
BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION ON
VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP)
REGISTRATION AND RESPONSE FORM FOR INTERESTED AND AFFECTED PARTIES
NAME
FARM/PROPERTY or
ORGANISATION
STREET OR POSTAL
ADDRESS
POSTAL CODE
WORK/ DAY TELEPHONE
NUMBER
FAX NUMBER
CELL PHONE NUMBER E-MAIL
PREFERRED CORRESPONDENCE (circle) POST FAX EMAIL SMS
DATE Signature
DETAILS OF OTHER PEOPLE WHO OWN LAND IN THE AREA OR YOU FEEL SHOULD BE INFORMED:
PLEASE IDENTIFY YOUR INTEREST IN THE PROPOSED PROJECT:
PLEASE WRITE YOUR COMMENTS AND QUESTIONS HERE:
(use additional pages if required)
Please return completed forms to:
Matthew Hemming or Ntsako Baloyi
(011) 467 0978 (Fax) or Po Box 1596, Cramerview 2060
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
Farm Name & Number
Registration Division: GT
WASBANK 1076
UITHOEK 1078
VERMAAKS KRAAL 1124
SOM'S HOEK 1151
KLEINE WATERVAL 1152
ASYN KRAAL 1158
RUIGTE FONTEIN 1179
GELEGENFONTEIN 1204
UITVAL 1244
KLEIN FONTEIN 1262
BOSCH HOEK 1312
UITHOEK 1335
ZONDAGRIVIERSPOORT 1361
FITTY PARK 1364
KROMME-ELLEM-
BOOG
1365
UITKYK 1366
OPMERKZAAMHEID 1394
KUICK VLEI 1396
BUFFELS HOEK 1931
HOLLYWOOD 2028
KROM POORT 2155
UITKYK 2156
KLIP BERG 2158
GOWRIE 2248
BEAUVALE 2249
WHITE BANK 2251
CINDERFORD 2252
VALKOP 2253
MCHJEAANE 2254
CRAIGSIDE 2272
COALFIELD 2273
STRATFORD 2367
KILBURNIE 2390
LYELL 2393
LENNOX 2395
LANGE FONTEIN 2397
MOOI SPRUIT 2398
DEWAAR 2400
BEITH 2401
TENTEN'S KRAAL 2405
KELVIN 2407
STANMORE 2412
DALRY 2413
OUTFALL 2414
PRESTWICK 2415
MAYBOLE 2419
LINKS OF BUFFALO 2420
CRAIGMILLAR 2971
BALGOWNIE 2972
DRIE FONTEIN 3107
AMSIBIE 3110
ZWARTWATER 3213
PADDAFONTEIN 3214
RAMA 3231
COBURG 3232
DAVELS BERG 3286
BURNSIDE 3287
STERK STRUUM 3306
BOSCHFONTEIN 3307
EARNSCLIFF 3308
HAZELDEEN 3311
GAINSFORD 3313
DOORN KOP 3314
OVERTON 3315
KNOSTROPE 3316
HUDDERSFIELD 3319
MENTEITH 3328
MORGENSTOND 3347
HELENA 3479
CHURCH GROUND 3491
LIVINGSTONE 3539
YOUNGERHILL 3540
KEMPENFELDT 3541
THE PADDOCK 3615
HATTING DALE 3626
GARDENHILL 3665
HLUNGWAN 3684
STONTON 3691
MEYERSLAND 3692
CHARD 3697
GOWANBRAE 3701
TERRACE 3707
KLIP RAND 3723
MARIA 3727
MARIA 3740
LEEUW KUIL 3743
DROOG PLAATS 3744
NOOITGEDACHT 3747
SNIP FONTEIN 3748
PALMIET FONTEIN 3750
KRAAI FONTEIN 3751
JAKHALS FONTEIN 3752
KLIP HOEK 3753
REDBANKS 3755
KALKOEN KRANTZ 3786
DEIGHTON 3805
FORT AGNEW 3808
SPIES 3858
BLAIKIESTON 3950
KLIP RUGH 4092
DROOGMYNKEEL 4093
UITZICHT 4112
GLASGOW 4122
KIRKLAND 4124
HELPMAKAAR 4126
ZUUR KOP 4127
SUMMERVILLE 4245
MERAN 4247
ST GEORGE 4248
BULWER 4250
VAN ROOYEN 4252
BALFOUR 4260
LINDISFARNE 4263
CARNARVON 4264
UITZIGHT NO 2 4276
HARRIOT DALE 4324
GLADSTONE 4331
COTSWOLD 4332
DUNDEE 4339
CARDWELL 4340
DAVELSFONTEIN 4348
ALLETTA 4350
WILLIAMS GELUK 4444
FORFAR 4473
KELVIN GROVE 4474
STONY BRAES 4475
NURSLING 4495
STIRLING 4570
SOFIERO 4577
RODEKOP 4656
REST 4658
THE CORNER 4659
STONEHAMMAR 4723
PERSBERG 4732
LINDE 4733
LOT 2 4761
ONTBEMEND 4972
ZUURFONTEIN 4980
FREIBURG 4985
BAVIAAN-KLOOF 5031
VERMAAK 5045
WINKLE 5054
SPETSKOP 5063
BLOEMHOF 5080
HOPE 5088
LOWLEVEL 5089
GROOTE VLEI 5112
ONGEGUND 5116
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
HESOMDALE 5129
ELSINOR 5135
DEVILS KLOOF 5136
LOT T 5137
EASTKEAL 5138
GARNET 5180
MANDHLENI 5248
SALBO 5252
ROOIFONTEIN 5270
LOT ISIBINDI AA 5271
ISIBINDI B 5272
SHEPLEGH B 5281
BEDRUG 5288
DAAS KRANTZ 5311
KLIP KOP 5323
KLIP ROTS 5324
LUHUNGU 5381
SHEEPRIDGE B 5429
SUNSET 5433
ROODE RAND A 5483
NORA 5488
SIR GARNET 5511
ALVA 5554
SIGTUNA A 5561
SIGTUNA B 5562
DOONE 5566
LOT B OF
JOHANNESBURG
5613
A OF JOHANNESBURG 5614
STOCKHOLM 5642
TROSA 5858
BAVIAANTRAP 6000
ORANGE 6001
B OF ROODE RAND 6453
RAEMOIR 1 6504
PETERSBURG OF ORIBI
VLAKTE
6534
SLAAF 6594
AMO 6710
DOUBLE KRAAL 6754
EAST HESLERTON 6783
DUMMY 6830
STRUISVOGEL POORT 6897
LANGLAAGTE 6898
BELLEEK 6934
RAEMOIR A 6942
BESTERDALE A 7267
LOT B OF SHEPLEGH 7296
VERDRUK 7329
CLIPSHAM 7330
SCUUR RAND NO 1 7331
SCUUR RAND NO 2 7332
THE OAKS 7441
CASURINAS 7442
LEKSAND 7538
THORNHILL 7612
YATTON 7647
EAST LYNNE 7670
2 OF SHEEPRIDGE A 7683
PREETZ B OF ORIBI
VLAKTE
7826
KARLSRUHE OF ORIBI
VLAKTE
7829
IGNISDALE A 7865
BESTERDALE B 7868
WILD DUCK VLEI A 7871
JOBS DALE B 7876
MIDDEL PUNT A 7903
NIETGEDAG B 7938
KLIP KUIL 7995
DROOGE REF 8032
DRIE HOEK 8033
LOT AB ISIBINDI 8067
DUMMY 8108
EBENEZER 8113
MANOR PARK 8147
HEILBRON NO 2 8148
DRIE VOET 8163
ROOIKOP 8190
BIRKENHEIM 8207
AMALINDA OF
PADDAVLEI
8230
HENNING A 8240
CHITRAL 8266
FARVIEW 8290
JOB'S DALE 8291
LUCK 8341
PADDAVLEI A 8357
UELZEN 8419
CORNWALL B 8420
RENIER 8421
FALKENBERG OF
HENNING
8430
WILLOWS 8432
STRIIJBANK 8449
WOODLANDS 8485
OUW KLIP 8489
DONDOLA A 8493
UMNAMATA 8508
GERTS KLOOF 8535
KELVIN GROVE NO 2 8548
BANNOCKBURN NO 2 8549
OVERDALE 8551
HAYFIELD 8568
NKANGALA OF
TANGENT
8569
FORT PINE 8600
LERRYN 8602
HALIFAX 8603
LOT W 8610
NORTHFIELD 8615
SUSHARA 8651
LUSIENNE 8663
CELLE 8671
TRY AGAIN 8674
TRANSVAALIA OF
DONDOLA
8697
GOEDE GELOOF 8703
LOT OSCARSBERG'S
RESERVE A
8738
SWEETWATERS 8748
IZEMFENE B 8802
WILD DUCK VLEI B 8806
ROCKY SPRUIT A 8842
BEACON KOP 8863
CORNELIUSDALE 8864
SCHROEDERS HOPE 8865
EXTENSION 8946
MOUNTAIN TOP 8954
GROVE 9011
SHEEPRIDGE A1 9031
BESTERDALE C 9044
IZEMFERNE A 9146
DRIEHOEK 9171
ADELAIDE 9187
SPIESDALE 9313
JACK'S CORNER 9440
UMGEN 9449
DWARS NEK 9450
GRIMSTON 9540
HILLSIDE 9553
LINCOLN 9693
HAYFIELD 9722
SPRINGFIELD 9753
SWISS VALLEY 9768
IMPATI HEIGHTS 9950
WONDERDAM B 9963
LOT 4 NQUTU 9971
FARM MORTON 9972
LOT 11 NQUTU 9973
EXTREMITY A 10022
A OF WONDERDAM OF
EXTREMITY
10023
LOT 5 NQUTU 10077
GLUTZ 10130
IMPATI 10260
LOT 18 NQUTU 10585
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
WHINSTONE 10616
NONDWENI PLAATS
NO 4
10634
OSTEND 10643
SUB PIETERSDALE OF
IGNISDALE
10674
GOWAN BRAE NO 2 10675
LOT 17 NQUTU 10781
LOT B OF 14 NQUTU 10782
LOT 16A NQUTU 10783
MELROSE 11067
17903
HARROWDALE 11080
MOORLANDS 11127
FUGITIVES DRIFT 11158
NAVARRE 11174
FARVIEW 11262
GIFT 11263
TAYSIDE 11319
GOOD HOPE 11443
DE JAGERS DRIFT 11477
CORBY ROCK 11509
DOORNHOEK 11595
ROCKBOURNE 11596
SLEDMERE 11614
MOUNT NONNIE 11669
WILDERNESS 11859
SUNRISE 11863
VLEI POORT 11918
CLEAR SPRINGS 11957
LA ROCHELLE 11958
BONISA 11959
CAIRNMORE 12014
PADDOCK 12027
GORDON'S LUCK 12072
LOT 2 NQUTU 12179
LOT 3 NQUTU 12180
ST CUTHBERTS 12444
BUFFALO BEND 12648
HAZELDENE 12649
NO 2 NONDWENI 12746
BIGGARSGAT 12753
WILD DUCK VLEI
ANNEXE
12826
WHINSTONE ANNEXE 12845
DE JAGERSDRIFT
SOUTH
12935
OSAKA 12977
MATATANA 13024
BONNY DOONE 13065
STRUISLAAGTE 13066
CORNVILLE 13457
ROOIFONTEIN 13483
SOLMAR NO 2 13553
RAMAK 13696
GLENWOOD 13707
NO 1 NONDWENI 13709
BUFFALO GORGE 13828
THE ALOES 14309
LENTEPLAAS 14432
MAMRE 14459
WEIDEFELD 14474
GT 14522
14523
BANNOCKBURN
ANNEXE C
14524
BANNOCKBURN SAR 14543
VERDRUK S A R 14549
MOSSWAN 14807
OTHELLO 14846
RIETBOKSTROOM 14977
ALTCELLE 14978
BOB'S FOLLY 14979
GIBA 15095
KALWERFONTEIN 15122
POST OFFICE 15172
BRINK 15335
SIGWEJE 15409
MINORCA 15414
SWARTWATER 15417
LENTEDAL 15474
DIEPKLOOF 15521
LONGLANDS 15523
HEILBRON 15594
CLEVELAND 15597
KLIPROTS 15625
BOYUP 15647
CRAIGHEAD 15739
BRICKFIELDS 15750
RESERVE NO 18 15838
IRONDALE A 15935
SPRINGLAKE 16151
SEELANDKOP 16199
LANGSAAN 16200
CHERHAM PARK 16213
RHINO 16214
PATAT 16229
KYKWEER 16294
OUDEPLAAS 16315
PLATBERG 16318
BERGHEIM 16324
BORDEAUX 16341
HAYSPOOR 16386
SPOORSTONE 16399
BLINKWATER 16470
KLEINHOUD 16660
BESTERDALE 16679
SOLMAR 16680
GROENEHOEK 16784
NHLAWE 16911
HARMONIE 16914
16980
FORLORN HOPE 17044
KRUISFONTEIN 17062
SUNSHINE 17128
KARLSRUHE 17207
ILANGA 17222
WINTERHOEK 17223
PADDOCK 17317
GT 17318
BRACKSTONE 17319
17320
THUTHUKANI 17328
EARNSCLIFF 17612
TANGENI 17706
DURNACOL 17900
17902
CHITARA 17917
NYATHINI 18022
RORKE'S DRIFT 18352
HLATHI 18486
Registration Division: HT
MOOIHOEK 1
ZANDSPRUIT 2
ERFSTUK 4
AFGESNIJ 5
ROODEKOP 7
KARNSPEK 8
LEKKERWATER 9
VERKOCHT 13
KWEEKSPRUIT 22
PAARDEFONTEIN 25
NOOITGEDACHT 33
EENKANTLANGS 47
BRAKSPRUIT 52
RUIGTEFONTEIN 54
WELGELUK 56
NOOITGEDACHT 60
WATERHOEK 61
GROOTVLEI 66
POLITIEK 67
MOOIPLAATS 72
NOOITGEDACHT 73
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
FRISCHGEWAAGD 75
VLAKPLAATS 83
NOVEMBERSDRIFT 87
COMMISSIEKRAAL 90
ZWARTKOP 91
LUVUNO 17498
UITKOMST 95
KWAGGASDRIFT 96
VAALBANK 103
FRISCHGEWAAGD 105
KLIPSPRUIT 106
HARTEBEESTSPRUIT 111
VAALSPRUIT 115
BRAKFONTEIN 116
ROODEKOPPE 119
WELTEVREDEN 122
KLIPSPRUIT 124
BLOEMHOF 127
ZAAIFONTEIN 143
WATERVAL 148
WASBANK 149
LEEUW 17499
SPARTELSPRUIT 150
RUSTVERWACHT 151
GROOTHOEK 152
WAAIKRAAL 153
VAALBANK 154
WATERVAL 157
GELUK 158
ZANDSPRUIT 162
STRYDFONTEIN 163
ROODEZAND 165
ROOIPOORT 166
TUSSCHENBIJ 167
ONVERWACHT 169
TWYFELHOEK 17817
KROMELLEBOOG 170
WEIHOEK 171
DOORNKOP 172
WAAIHOEK 173
GOEDE HOOP 177
BEROUW 179
GOEDGELOOF 180
LIJNSPRUIT 181
NYEMBE 184
KLIPFONTEIN 185
RIETVLEI 186
SCHAAPKOPJE 194
VAALKOP 209
VAALBANK 224
VAALKOP 228
AANSTOOT 231
SCHUILHOEK 243
BRAKFONTEIN 246
DOORNLAAGTE 262
DORPSGRONDEN VAN
UTRECHT
266
GOEDGEDACHT 273
NOOITGEDACHT 278
NOOITGEDACHT 279
BEAUFORT 286
WELGEVONDEN 287
FRAAIUITZICHT 291
KLIPFONTEIN 316
UITVLUCHT 319
DOORNHOEK 340
STERKSTROOM A 344
WELGEVONDEN 350
NOOITGEDACHT 356
WELTEVREDEN 371
WATERFALL 374
METSELFONTEIN 379
NOOITGEDACHT 388
BRAKPAN 389
EENSGEVONDEN 408
BRANDKRAAL 505
DUBBELRECHT 508
POTGIETERS RUST 530
WIEMANS RUST 549
APOLOGIE 562
HARTEBEESTBULT 578
MIDLUM 609
LANGVERWACHT 616
BETHEL 623
GEGUND 626
MERCY MANOR 18474
ARCADIA 660
VLEIPLAATS 664
SCHEEPERS NEK 687
SANDHURST 703
STERKSTROOM B 720
GOLDEN VALLEY 751
BRAKFONTEIN 779
ZAAILAAGTE 780
DAGBREEK 786
BEAUFORT 787
LOT A12
DUBBELRECHT
798
LOT A13
DUBBELRECHT
799
LOT A 15
DUBBELRECHT
800
LOT A10
DUBBELRECHT
804
LOT A 5 DUBBELRECHT 805
LUBECK 808
FLENSBURG 815
LOT A 18
DUBBELRECHT
816
NOOITGEDACHT 840
DASSIESHOOGTE 843
BETA 844
WIEMANS RUST 876
YARL 2962
DOORN KOP 2963
FOUNTAIN DALE 3608
WELTEVREDEN 3625
GEDULT 3700
MOOIDOORN HOEK 3722
KAKANINIS KRAAL 3724
ELIZABETH 3726
SPOOKMILL NO 2 3735
VAALBANK 3737
DAVELS SPRUIT 3742
SLOOTEN HOEK 3745
RIET POORT 3754
OMDRAAI 3855
GOEDE HOOP 3857
WITTEKLIP 4257
LEARYDALE 4259
WALMSLEY 4266
KEMPS HOEK 4271
FOUNTAINDALE NO 3 4272
SPOOKMILL 4273
STRUISVOGEL KOP 4275
ROCKYDALE 4277
BRAAK FONTEIN 4278
SCHOONVLAK 4279
ALLEEN 2 4280
SUSPENSE 4326
FORVIE 4520
DARTRY 6968
GARDENS 7239
WESTPORT 7490
JESSIE 7491
KAAL VLAKTE 7496
CRONJE'S FLAT 7506
POONA 7511
ENNIS 7524
CLARE 7525
PERTH 7540
MOY 7549
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
Registration Division: HS
RIVER BANK 8185
GLEN CALDER 8260
MINSTER B 8292
MUNRO'S WINKEL 8293
MOORFIELD WEST 8294
TROWS REST 8298
LANGTON 8327
MORGEN ZON 8328
PIETS RUST 8329
MACCLESFIELD 8418
LANG'S NEK A 8441
LANG'S NEK B 8442
GARDINIA 8486
GREENWICH 8487
FORTS 8502
HERONS COURT 8521
ARMAGH 8555
COOTHILL 8556
COLINDALE 8578
RIVER BEND 8585
INNISKILLING 8590
HIGHTON 8591
ROCKHILL 8611
BATTLEFIELD 8618
BLESBOK 8639
CHELMSFORD 8642
LEOPARD DALE 8643
BLACKMOOR 8665
DRIFT 8684
UP AND DOWN 8701
NIL DESPERANDUM A 8771
STERKFONTEIN A 8772
CLONTARF EAST 8773
TIPPERARY EAST 8774
LEOKOP EAST 8793
MINSTER A 8817
LINCOLN 8820
KROMHOEK 8879
NIL DESPERANDUM B 8894
HAWARDEN 8915
KNOWESLEY 8926
KINGSTON 8943
ALBANY 8944
THE STRIP 8957
KNOCKBREX 9018
GREY RIDGE 9021
EAGLES CLIFF 9049
SPECTACLE SPRUIT 9079
HEATHFIELD 9089
ERIN 9110
WONDERDRAAI 9189
MOORFIELD EAST 9194
HARTEBEEST BULT 9197
GALWAY 9202
GANTON 9242
VULTURES HOME 9269
MARDENASH NO 3 9400
MARDENASH NO 2 9401
TRESPASS 9425
GORDON 9481
LONG KLIP 9492
MOOI KRANTZ 9562
SPOT 9758
MDAGAS KRAAL 9785
INKWELO SIDE 10291
TUIN NO 2 10494
THE NECK 10548
GREY RIDGE NO 3 10559
MAJUBA SOUTH 10614
INKWELO 10640
LAST ATTEMPT 10877
ATTEMPT 18624
LEASE D 11288
GLENDALE 11290
TOP 11634
LEOPARD KLOOF 11849
STEEP GLEN 11865
UNION 11925
THE REST 11994
LANDS NEK RAIL A 12795
LANGS NEK RAIL B 12796
LANGS NEK RAIL C 12797
LANGS NEK RAIL D 12798
LANGA NEK RAIL E 12799
LANGS NEK FOREST A 12800
LANGS NEK FOREST B 12801
LANGS NEK FOREST C 12802
CHONTARF EAST
ANNEXE
12834
ROCKETDALE RAIL 12918
CLONTARF EAST A 12960
ROCKETDALE ANNEXE
A
13052
ROCKETDALE ANNEXE
B
13053
S A R COLINDALE 13822
WHITE HOUSE 14178
REDMAIN 14492
MEADOWSTREAMS 14701
LOSKOP 14724
WARM HOEK 14976
222 POLICE CAMP 15083
DUMBANY 15101
CECILIA 15106
KLEINDAL 15177
LEYBEL 15291
BUFFALO PETROLEUM 15461
BUFFELSHOEK 15469
WOODBURN 15470
MODDERLAAGTE 15517
WYKOM 15763
BOSCOBEL 15775
VAN NIEKERK'S
STROOM
15790
KONIGSBERG 16293
CLON 16376
TARF 16377
TIPPERARY A 16391
TIPPERARY B 16393
TWEEFONTEIN 16423
LENTEVLEI 16524
WYKOM 16958
LEOKOP EAST 16984
BRAK HOEK 16985
SCHUILKLIP 17759
DUMFIRMLINE 17809
TIPPERARY WEST 17810
THE RUINS 17828
STONY RIDGE 18005
HS 18010
POONGA'S KRAAL 18041
TIGER KLOOF 18084
Registration Division: HU
WELVERDIEND 10
BLOEMENDAL 18
WIJDGELEGEN 24
NOOITGEDACHT 36
ZWAARVERDIEND 39
DRIEFONTEIN 42
LOOTSKLOOF 48
BANKEROET 50
LEEUWNEK 51
GROOTGELUK 52
PARADISE 54
BEGINSEL 56
WATERVAL 57
PONGOLA 61
KOPPIE ALLEEN 63
MVUTSINI 67
HARLOO 68
MHLATI 69
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
SPITZKOP 70
PONGOLA 71
SUNLAND 72
UITZICHT 73
RIVERSDALE 75
RENDSBURG 80
TAMBOTI RIDGE 81
DUBULA 91
BEDROG 97
WELVERDIEND 104
MOUNTAIN VIEW 106
DWARSRAND 110
KOUDELAGER 115
MORGENZON 117
DOORNKOP 118
ROODEPOORT 119
MADEMOISELLE 123
17708
WELGEVONDEN 136
KOLFONTEIN 138
ONVERWACHT 142
RIETVLEI 150
DRIEFONTEIN 151
BOSCHHOEK 156
DOORNBOSCH 157
WYKOM 158
BONA ESPERANZA 161
RUSTPLAATS 165
AVONDUUR 167
TYGERSKLOOF 173
VRISCHGEWAAGD 179
WATERVAL 180
RONDEBOSCH 185
LANGVERWACHT 190
GOEDGELOOF 197
STEENBOKLAAGTE 202
ONGELUK 211
LANGVERWACHT 18093
LANGVERWACHT 226
DOORNHOEK 227
WELCOME 229
OASIS 237
BETHEL 247
VOORDAG 251
ALOEBOOM 254
RUSTENBURG 257
LISBON 265
LANGGEWACHT 275
ZOMERVELD 277
VLAKFONTEIN 281
DAGERAAD 288
WINTERSHOEK 295
SMEERTOUW 297
VREDEHOF 299
ONGEMAAKT 301
KROMELLEBOOG 303
VAALKRANTZ 306
WELKOM 314
UITKIJK 315
BEDROG EN ONRECHT
B
326
GROENEWEIDING 345
UITHOEK 348
ZILVERKLIP 351
LANGKRANS 367
RIVERSDALE 372
MAGDALENA 376
GELUK 377
MOOIBANK 378
MPISINI 17756
MORGENZON 390
WEGSPRING 398
BERDINA 399
FRISCHGEWAAGD 401
WATERVAL 423
UITKOMST 424
NOOITGEDACHT 427
ONRECHT 428
UMHLOPA 443
VERDRUKT 444
VAALBANK 450
MORGENZON 460
LANGVERWACHT 476
CHRISTINASDAL 480
BEVENSON 483
WELTEVREDEN 490
FORTUIN 491
METSELFONTEIN 499
WONDERBOOM 500
UITZIGT 501
WELTEVREDEN 510
DONKERHOEK 512
TOOVERNAARSRUST 518
ZALFLAGER 525
MOOIPLAATS 537
WELTEVREDE 540
WAGENDRIFT 541
GELUK 545
WITKLOOF 546
ONVERWACHT 552
WATERVAL 553
NAAUWPOORT 556
GOEDGETROFFEN 557
MORGENZON 559
WONDERFONTEIN 560
LANGVERWACHT 561
WELVERDIEND 563
ROOIPOORT 565
GEWONNEN 572
HEELTEVREDEN 573
LEEUWKOP 580
BLOEMGAARD 585
GOEDHOOP 586
GOEDENMOED 587
GOEDVERTROUW 592
ZEEKOEPAN 593
DOORNHOEK 594
UITKOMST 596
VETSPRUIT 597
UITGEVALLEN 599
MEIJERSHOEK 602
LLANWARNE 603
WELVERDIEND 610
MISGUND 611
NAAUWKLOOF 612
NOOITGEDACHT 614
VEEPLAATS 615
PIETERSRUST 617
VERWYDERD 618
MERIBA 619
NOOITGEDACHT 620
ERFENIS 621
UITZICHT 624
WELVERDIEND 630
LANGFONTEIN 632
LEGERPLAATS 634
ZEEKOEVLEI 635
INGOLOZANA 18067
DOORNHOEK 636
HLOMOHLOMO 638
VERGELEGEN 639
GOEDGELOOF 640
BOSCHHOEK 641
RIETBOKLAAGTE 642
DORDRECHT 643
VERGEVAL 644
MIDDERNACHT 645
LANGGEWACHT 646
LEEUWSPOOR 647
NOOITVERWACHT 648
BLOEMHOF 649
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
UITSCHOT 650
ZANDDUINEN 652
PONGOLA 653
BEDROG 654
SILVERHOUT 668
BERG & DAL 670
BURGERSRUST 672
HELENA 673
PAARDENFONTIEN 674
BETHEL 683
ISIHLENGENI 689
EMYATI 698
EKUHLENGENI 701
VERLIES 705
GROOTDRAAI 707
BEHOUD 708
KEZA 713
WEGSPRING 718
HU 727
KLIPFONTEIN 728
NGOMI 729
LELIESHOEK 730
BONA ESPERANZA 736
CARLSBAD 737
MOOIPLAATS 739
KRETA 741
UITKYK 743
BOSVELD 745
HU 18658
LELIESHOEK 746
KOEDOESBERG 747
RONDEKOP 752
DORINGBOS 753
LEEUWSPOOR 759
WELVERDIEND 766
NEGENUUR 769
SOETVELD 775
FIUME 806
ERINDALE 809
CONFERENCE 811
MAGUT A 817
MAGUT 818
MAGUT B 819
KORTIER 821
UITVAL 828
TIERKLOOF 829
DEMOINA 830
MISTY VALLEY 831
LANGKRANS 833
UITKYK 834
UITKYK 835
HLOMOHLOMO 836
CHENNELS 837
GROOTHOEK 839
HLOMO LODGE 842
MARIANTHA 845
BEHOUD 851
BLOEMENKRANS 853
CHICHESTER 855
MAGDALENA 856
ISIHLENGENI 857
ESENHLABENI 858
LEEUKOP 859
862
KINGHOLME 868
VERGELEN 869
ERIKA 872
WITWATER 873
CLERKNESS 13459
WISTOW 13693
BORKUM 13779
RESERVE NO 12 15832
GLENDAWN 16934
WILHARONA 16935
SIMDLANGETSHA 16956
RIETBOKLAAGTE 16962
RIETBOKLAAGTE 16963
GLENDAWN 16986
VERGELEGEN 17058
MOOIPLAATS 17059
KRANSKOP 17155
HU 17281
CONFERENCE 17314
L'AURENT 17315
MARICA 17330
HU 17535
HU 17542
HU 17543
WATERVAL 17560
DORINGBOS 17592
HU 17598
RONDEKOP 17619
SWISS VALLEY 17662
17981
MORGENZON 18094
HU 18399
Registration Division: HV
LOT H 51 13092
LOT H 52 13093
SUB A OF ITITIHOYA 13116
BARTLOW 13117
BAGNARA 13118
BAGHMATI 13119
BOMBOLO 13120
OKALWENI 13151
LOT H115 13180
BARTENHEIM 13194
INGWENI STATION 13243
CLOETE 13350
ALKMAAR 13434
WARRICK 13436
BOYNE 13468
LOT H 77 13533
LOT H 49 13543
CHAOS 13581
JARABUB 13582
POINCARE 13583
ABU MADI 13584
DUKUMBANE 13626
LOT H 59 13653
LOT H 60 13654
CADILLAC 13666
BUKANDA 13711
CABARET 13712
BACHA 13719
TARZAN 13727
BONZO 13728
TARANAKI 13868
BEUNA VISTA 14044
MKUZI-WES 14403
NTABANKOSI 14594
SPES BONA 15856
KULENI NO 9 15959
UNOHEMU 16012
IMPUNZI 16013
CAIRN BANE 16596
ZAMAZAMA 16924
GRANT 16945
BRONTE 17383
TEMBE NORTH 17497
THANDA 17905
Registration Division: GV
MORRISFIELD 11436
MEDHAM 11558
ATHALIE 11559
JEREMY 11560
ASHBURTON 11686
HORSESHOE BEND 11688
LYNDHURST 11910
VEGA 12044
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
LYTA 12045
UBIZANE 12046
LOT H 27 12419
LOT H 28 12420
LOT H 12 12907
LOT H 11 12908
LOT H 45 12969
LOT H 46 12970
LOT H 7 12971
LOT H 10 12984
LOT H 8 13035
LOT H 9 13036
LOT H 32 13041
LOT H 33 13042
LOT H 98 13043
LOT H 16 13044
LOT H 23 13045
GLENPARK 13069
LOT H 34 13081
LOT H 35 13082
LOT H 4 13097
LOT U 184 13128
LOT K 45 13130
LOT K 9
KWAMBONAMBI
13133
LOT H 29 13268
LOT H 30 13269
LOT H31 13270
LOT H 97 13271
LOT H6 13349
NCEDOMHLOPE 13363
LOT H47 13513
LOT H53 13514
LOT H 2 13691
LOT H19 13996
LOT H20 13997
LOT H44 13998
LOT H 17 14168
LOT H 21 14169
LOT H 22 14170
ABERDOUR 14205
MTOLO 14390
ROOIGROND 15170
RESERVE NO 3 15822
BRUDEE 16056
HLUHLUWE RIVER 16476
HLUHLUWE RIVER 16477
HLUHLUWE RIVER 16478
HLUHLUWE RIVER 16479
HLUHLUWE RIVER 16480
HLUHLUWE RIVER 16482
HLUHLUWE RIVER 16483
HLUHLUWE RIVER 16484
HLUHLUWE RIVER 16485
EILANDSIG 16787
GLENPARK 16878
17238
BRIDGEFIELD 17515
SUKARI 17516
MKONGE 17517
ETEZA 16220
RODWIN 16244
RIADEN 16245
MBOMENI 16256
ARBEIDSVREUGDE 16279
ALBA FORESTRY 16297
MOKANA CANE 16298
RBM 16317
BRANJO 16321
ARGYLL 16327
PEGGY NO 16328 16328
ADPROP 16329
LOT 11 MPOSA 16360
LOT 12 MPOSA 16361
GREEN HILL C 16381
GREEN HILL F 16382
SUGARLAKE 16385
REDCROFT 16403
S A R MPOSA 16434
ZAPOLWANA HILL 16436
MZINGAZI LAKE 16468
HLUHLUWE RIVER 16486
HLUHLUWE RIVER 16487
HLUHLUWE RIVER 16488
HLUHLUWE RIVER 16489
HLUHLUWE RIVER 16490
HLUHLUWE RIVER 16491
BONMUIR 16497
BONELLA 16498
SOMKELE 16499
FAIRWAY 16502
HLUHLUWE RIVER 16537
HLUHLUWE RIVER 16538
BONMART 16557
JOURNEY'S END 16566
DELVILLE 16587
GRANDIS 16588
COTCANE 16633
WOODLANDS 16672
MPOSA 16685
GLEN GRANT 16686
SOKHULU 16687
UMSUNDUZI 16688
ROSS SUGAR 16706
GV 16707
GV 16708
LOT K41 16715
LOT K46 16716
LOT K47 16717
LOT K48 16718
LOT K49 16719
LOT K50 16720
LOT K52 16721
LOT K53 16722
LOT K54 16723
LOT K55 16724
LOT K56 16725
PEASTON 16768
PEASTON 16773
LAKELANDS 16777
SPURWING 16839
LOT 43 16859
CRAIGHILL 16860
ROYDEN 16870
NORTH COAST 17354
MAKARIOS 17377
THE HUTS 17391
PASENA 17671
NARROWS 17393
DUKUDUKU 17395
DUKUDUKU 17396
UMFOLOZI 17424
DORPTOE 17514
KENNEDY 17586
ROSS 17690
EVERGREEN 17894
GV 18361
Registration Division: GU
DOORNKOP 20
SCHURWEKOP 27
WELKOM 28
WELGEVONDEN 29
VLAKPOORT 32
WELTEVREDE 41
NOOITGEZIEN 55
DEWAARD 188
WELGEKOZEN 191
MOORDPLAATS 193
DOORNHOEK 204
ZOEKMY 207
KEURPLAATS 218
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
NOOITVERWACHT 221
VUURSTEEN 242
SCHEEPERSLAAGTE 244
STERKSTROOM 250
HEELGOED 258
GOODLUCK 270
UITZOEK 317
ONVERWACHT 322
PROSPERITY 323
KROONPLAATS 335
UITZICHT 349
UITKIJK 353
HOLLANDIA 384
WINTERSHOEK 400
LANGVERWACHT 410
OUDEWERF 426
ONGEGUNDE
BRAKSLOOT
432
ONTEVREDEN 433
TOGGEKRY 436
OVERVLOED 441
KONINGSKROON 447
WITVOLOOS 453
SCHOONSTROOM 474
BOSCHHOEK 489
VRIENDSCHAP 492
GOEDGELOOF 496
DORSTFONTEIN 526
LOTTERY 531
EENSGEVONDEN 551
HOEDBERG 555
VAALKRANS 564
NOOITGEDACHT 567
OVERVLOED 724
SCHOONSPRUIT 742
HAMBROCK 748
GRENSPLAAS 763
STERKFONTEIN 6111
DOORNHOEK A 6112
WELTEVREDEN 6113
KWAMAGWAZA
MISSION STATION
6115
DIEPKLOOF 6118
NOOITGEDACHT NO 96 6119
MORGENZON A 6126
BOSCHHOEK 6128
TEVREDEN 6129
SWEETHOME 6130
KEURPLAATS 6132
VRISCHGEWAAGD 6133
EIKENDAL 6134
PROTEST 6135
SPESBONA 6136
NOOITGEDACHT 6137
VERGELEGEN 6139
DEANE 6140
SCHUILHOEK 6142
ELIZABETH 6143
NOOITGEDACHT 6144
WELKOM 6145
ROSENBURG 6146
KONIGSBERG 6147
VLAKBULT 6148
SAXONY 6149
MERINO 6150
VERZETHOEK 6151
MORGENZON 6152
LANGGEWACHT 6153
IMFULE MISSION
STATION
6154
BARNEVELD 6156
WANDSBECK 6157
GOLDEN REEF 6158
RUSTVERWACHT 6159
VERGELEGEN 6160
GROENKOP 6161
WITVOLOOS 6553
MORGENZON B 6729
OVERVLOED 7432
WINTERS HOEK 8299
WATERVAL 9144
149B 9500
LOT 244 EMPANGENI 10574
HLANGASA 10963
PROSPECT ESTATE 10974
PICCADILLY 10985
LOT 241 EMPANGENI 11058
EZULWINI 11065
ARCADIA 11079
LOT 1 NTAMBANANA 11372
NEEDMORE 11386
BLACKWOOD 11394
THE PYRAMIDS 11425
ELLINGHAM 11478
CANELANDS 11479
DRISDERNAN 11541
THORNCREEK 11542
GLENMORE 11543
MAJATCHA 11583
BURTON GARTH 11584
HILL CREST 11585
NEWLANDS 11588
NTAMBANANA 11724
HILL TOP 11745
FATIMA 11785
SPES BONA 11829
SANDOWN 12025
SEVERNDALE 12135
LOT 263 EMPANGENI 12144
HANDLEY CROSS 12187
LOT 2 NTAMBANANA 12365
LOT 303 EMPANGENI 12670
LOT 277 EMPANGENI 12671
LOT 312 EMPANGENI 12694
LOT 275 EMPANGENI 12724
LOT 279 EMPANGENI 12778
LOT 281 EMPANGENI 12782
MARS 12874
LOT 272 EMPANGENI 12922
VULCAN 12991
LOT 315 EMPANGENI 13039
LOT 321 EMPANGENI 13040
LOT 309 EMPANGENI 13050
LOT 316 EMPANGENI 13051
LOT 280 EMPANGENI 13074
LOT 274 EMPANGENI 13216
LOT 310 EMPANGENI 13252
LOT 252 EMPANGENI 13313
ENTONJANENI 13356
LOT 262 EMPANGENI 13375
COOLIDGE 13386
LOT 291 EMPANGENI 13387
LOT 290 EMPANGENI 13388
LOT 289 EMPANGENI 13389
LOT 292 EMPANGENI 13399
LOT 285 EMPANGENI 13400
LOT 264 EMPANGENI 13548
LOT 269 EMPANGENI 13551
LOT 311 EMPANGENI 13741
LOT 308 EMPANGENI 13742
LOT 320 EMPANGENI 13745
LOT 307 EMPANGENI 13746
STOCKVILLE 13904
LOT 254 EMPANGENI 14014
LOT 278 EMPANGENI 14015
LOT 273 EMPANGENI 14129
LOT 313 EMPANGENI 14334
LOT 314 EMPANGENI 14335
FULENI RESERVE 14375
LOT 317 EMPANGENI 14404
LOT 319 EMPANGENI 14405
LOT 318 EMPANGENI 14496
DUBE RIDGE 15223
Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)
SLR Consulting (Pty) Ltd
WINDY RIDGE 15304
BOEGOENEK 15636
LOT 271 EMPANGENI 15728
DOORNHOEK B 15736
RESERVE NO 5 15824
RESERVE NO 11 15831
RESERVE NO 20 15840
SYLVIA 16305
NOBAMBA 16505
MDONI 16562
SKYE BLUE 16653
SPRINGFIELD 16670
COOLIDGE 17225
INHLAZATJE 17387
BHUCHANANA 17700
GU 18296