rhino oil and gas exploration south africa (pty) · pdf filerhino oil and gas exploration...

17
SLR Consulting (Africa) (Pty) Ltd 1 INTRODUCTION Rhino Oil and Gas Exploration South Africa (Pty) Ltd intends to lodge an application for an exploration right with the Petroleum Agency South Africa (PASA) in terms of section 79 of the Minerals and Petroleum Resources Development Act, 28 of 2002 (MPRDA). The application will be made over the area where Rhino Oil & Gas currently holds a Technical Co-operation Permit (108 TCP). Minerals included in the application are oil, gas, condensate, coal bed methane, helium and biogenic gas. The exploration area is broad and encompasses large parts of northern KwaZulu-Natal (see Figure 1). In this application Rhino Oil & Gas will only apply for approval to undertake early-phase exploration for oil and gas which might be located within suitable geological strata. The purpose of the work would be solely to determine the presence of any possible petroleum resource which could be investigated further. The 3- year exploration work programme will be restricted to non- invasive techniques, as well as seismic surveys and the drilling of less than 10 core boreholes. ENVIRONMENTAL AUTHORISATION PROCESS Prior to the granting of an Exploration Right for the proposed project an environmental assessment process must be conducted and approved by PASA in terms of the National Environmental Management Act, 107 of 1998 (NEMA). Rhino Oil & Gas will make an application to PASA for environmental authorisation. The 2014 Environmental Impact Assessment Regulations (GN R982 promulgated in terms of NEMA) are applicable as the need for an exploration right triggers activity 18 in Listing Notice 2 (GN R984). The EIA Regulations define the assessment process which includes: a scoping phase, environmental impact assessment (EIA) phase and an environmental management programme (EMPr). Public participation is a key component of the environmental assessment process. SLR Consulting (Pty) Ltd (SLR), an independent firm of environmental consultants, has been appointed by Rhino Oil & Gas to manage the environmental assessment process. This document has been prepared by SLR to inform you about: * the application and proposed project activities; * the environmental assessment process to be followed; and * how you can have input into the environmental assessment. The primary objective of the scoping process is to identify the key issues that need to be addressed in the assessment phase that will follow. FRACKING or NOT? No hydraulic fracturing (fracking) is included in the 3-year exploration programme proposed. Rhino Oil & Gas have stated that there is not currently enough information to determine what techniques might be required for future gas extraction. If a resource was identified and subsequently proven to be commercial, then hydraulic fracturing could be one of the potential techniques for gas production. However, a lot of investigation, multiple environmental assessments and authority approvals would be required before reaching that point. This includes: 1. Complete the early phase exploration as proposed and approved through this application. 2. If the early-phase exploration were to confirm the presence of a potential resource, then Rhino Oil & Gas would seek further approval from PASA for the additional exploration work required to investigate this. Any further approval would be subject to an additional environmental assessment process with further public consultation. Approvals are also likely to be required under other legislation. 3. Undertake the detailed phases of exploration as approved. 4. If the detailed exploration led to the discovery of a commercial resource suitable for development then Rhino Oil & Gas would need to secure a production right from PASA. Any application for a production right has to be subject to an environmental assessment process with further public consultation. Approvals are also likely to be required under other legislation. 5 Develop the production project. All future exploration or production activities that may arise if resources are discovered are therefore beyond the scope of the current scoping and EIA process. Rhino Oil and Gas Exploration South Africa (Pty) Ltd BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION ON VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP) February 2016 HOW TO RESPOND Responses to this document can be submitted by means of the attached comments sheet, by direct submission and/or through communication with SLR. WHO TO CONTACT: Matthew Hemming or Ntsako Baloyi (011) 467 0945 (Tel) or (011) 467 0978 (Fax) or [email protected] or [email protected]

Upload: phamque

Post on 07-Mar-2018

238 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Africa) (Pty) Ltd 1

INTRODUCTION

Rhino Oil and Gas Exploration South Africa (Pty) Ltd intends to lodge an application for an exploration right with the Petroleum

Agency South Africa (PASA) in terms of section 79 of the

Minerals and Petroleum Resources Development Act, 28 of

2002 (MPRDA). The application will be made over the area

where Rhino Oil & Gas currently holds a Technical Co-operation

Permit (108 TCP). Minerals included in the application are oil,

gas, condensate, coal bed methane, helium and biogenic gas.

The exploration area is broad and encompasses large parts of

northern KwaZulu-Natal (see Figure 1).

In this application Rhino Oil & Gas will only apply for approval to

undertake early-phase exploration for oil and gas which might

be located within suitable geological strata. The purpose of the

work would be solely to determine the presence of any possible

petroleum resource which could be investigated further. The 3-

year exploration work programme will be restricted to non-

invasive techniques, as well as seismic surveys and the drilling

of less than 10 core boreholes.

ENVIRONMENTAL AUTHORISATION PROCESS

Prior to the granting of an Exploration Right for the proposed

project an environmental assessment process must be

conducted and approved by PASA in terms of the National

Environmental Management Act, 107 of 1998 (NEMA). Rhino

Oil & Gas will make an application to PASA for environmental

authorisation. The 2014 Environmental Impact Assessment

Regulations (GN R982 promulgated in terms of NEMA) are

applicable as the need for an exploration right triggers activity

18 in Listing Notice 2 (GN R984). The EIA Regulations define the

assessment process which includes: a scoping phase,

environmental impact assessment (EIA) phase and an

environmental management programme (EMPr). Public

participation is a key component of the environmental

assessment process.

SLR Consulting (Pty) Ltd (SLR), an independent firm of

environmental consultants, has been appointed by Rhino Oil &

Gas to manage the environmental assessment process. This

document has been prepared by SLR to inform you about:

∗ the application and proposed project activities;

∗ the environmental assessment process to be followed; and

∗ how you can have input into the environmental assessment.

The primary objective of the scoping process is to identify the

key issues that need to be addressed in the assessment phase

that will follow.

FRACKING or NOT?

No hydraulic fracturing (fracking) is included in

the 3-year exploration programme proposed.

Rhino Oil & Gas have stated that there is not

currently enough information to determine

what techniques might be required for future

gas extraction.

If a resource was identified and subsequently

proven to be commercial, then hydraulic

fracturing could be one of the potential

techniques for gas production. However, a lot

of investigation, multiple environmental

assessments and authority approvals would be

required before reaching that point. This

includes:

1. Complete the early phase exploration as

proposed and approved through this

application.

2. If the early-phase exploration were to

confirm the presence of a potential resource,

then Rhino Oil & Gas would seek further

approval from PASA for the additional

exploration work required to investigate this.

Any further approval would be subject to an

additional environmental assessment process

with further public consultation. Approvals are

also likely to be required under other

legislation.

3. Undertake the detailed phases of exploration

as approved.

4. If the detailed exploration led to the

discovery of a commercial resource suitable for

development then Rhino Oil & Gas would need

to secure a production right from PASA. Any

application for a production right has to be

subject to an environmental assessment

process with further public consultation.

Approvals are also likely to be required under

other legislation.

5 Develop the production project.

All future exploration or production activities

that may arise if resources are discovered are

therefore beyond the scope of the current

scoping and EIA process.

Rhino Oil and Gas Exploration South Africa (Pty) Ltd

BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION

ON VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP)

February 2016

HOW TO RESPOND

Responses to this document can be submitted by means of the attached comments sheet, by direct submission

and/or through communication with SLR.

WHO TO CONTACT: Matthew Hemming or Ntsako Baloyi (011) 467 0945 (Tel) or (011) 467 0978 (Fax) or

[email protected] or [email protected]

Page 2: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Africa) (Pty) Ltd 2

108 TCP

Page 3: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Africa) (Pty) Ltd 3

BRIEF OVERVIEW OF PROPOSED EXPLORATION

APPLICATION

Once an application for an exploration right is lodged by

Rhino Oil and Gas, it may be accepted by the Petroleum

Agency South Africa. Acceptance of the application by PASA

only permits the applicant to continue with the necessary

process and does not constitute authorisation.

An application for environmental authorisation in terms of

the National Environmental Management Act, 1998 will then

be required by PASA. The scoping and EIA process will be

subject to the timeframes prescribed in the Environmental

Impact Assessment Regulations 2014.

GENERAL

The 3-year exploration work programme proposed by Rhino

Oil and Gas is aimed at determining if there is an oil or gas

resource in the area that would warrant further exploration.

Year 1: the evaluation of geological data through a

comprehensive desk-top study. Much of this data is only

available to parities whom hold exploration rights. Sub-

surface structural features and stratigraphy will be mapped.

Data on source-rock geochemistry will be acquired. Geological models may be developed.

Year 2: further geochemical data analysis as well as the

possible use of apatite fission track analysis and full tensor

gradiometry gravity (FTG) surveys.

Year 3: purchase and/or undertaking seismic surveys. The

final exploration activity would be the drilling of core

boreholes at target sites identified from the earlier work.

No pressure testing, hydraulic fracturing or water abstraction

is included in the proposed exploration work.

LOCATION

In broad terms the exploration right application extends

from Newcastle/Utrecht in the north west across to Vryheid

and to Pongola in the north east. In the south east the area

includes Melmoth and is inland of the N2 highway. The

southern boundary is contiguous with the boundary of the

other Rhino application (291 ER). It includes nearly 5 500

farms over an area of just less than 2 000 000 ha. (see

attached Figure and list of farms).

Physical, on-the-ground exploration activities will only be

undertaken at a limited number of sites. The exact location

of the target sites can only be determined once Rhino has

completed the initial phases of exploration and examined

the available data.

The application area excludes all properties where the

granting of an exploration right is prohibited by Section 48

of the MPRDA. All other properties are included, even where

a constraint may restrict exploration activity. Rhino Oil & Gas

will ensure that their activities are only undertaken at sites

where it is lawful and environmentally responsible to do so.

FTG SURVEYS

Full tensor gradiometry gravity (FTG) surveys will be

undertaken to image subsurface geology in order to aid

exploration. Such surveys will be flown in fixed wing aircraft

and require no access to farms.

DRILLING

A maximum of 10 core holes are planned across the

exploration area. These are stratigraphic wells with no

purpose beyond exploration. Core holes would be drilled by

a truck or trailer mounted, mobile drilling rig very similar in

size to a water borehole rig. Drill sites will be accessed using

existing roads and farm tracks. The drill rig will be

accompanied by supporting equipment (vehicles, trailers,

compressors, water tanks, pumps, caravan etc). A typical

exploration rig and equipment requires an operating area of

approximately 1 000 m2. See photos below.

Rock core will be extracted from the target strata and

removed to a laboratory. Samples will be examined,

described and tested for gas related properties.

Once drilling is completed the rig, all associated equipment

and waste products will be removed from site. The core hole

will be capped pending further investigation or sealed with

cement if not required further.

SEISMIC SURVEYS

Rhino will purchase seismic data where available and may

commission seismic surveys to image subsurface geology.

During a survey low frequency acoustic waves are generated

and the reflected waves recorded. Analysis of the return

waves provides information about rock types and possible

gases or fluids in rock formations.

Rhino is planning up to 125 km of two-dimensional (2D)

surveys. Survey teams generate controlled acoustic energy

(using explosives, air gun or seismic vibrator) and record the

return waves in geophones laid at set spacing in a linear

alignment.

Survey teams require short-term access to farms to place

survey equipment and record the data. Survey lines will

follow existing access roads and disturbances with due

consideration of environmental constraints.

STAFF AND HOUSING

Early phase exploration will create relatively few job

opportunities as most work is contracted to specialist service

providers. The company will recruit locally as far as possible.

A seismic survey team comprises about 2o staff. A drill-rig is

normally manned by a crew of up to 5 persons. No on site

housing facilities are planned. Staff will be accommodated

in nearby towns or at locations agreed with land owners.

TIMING

The exploration work programme is planned over a 3 year

period. The programme is divided in phases with successful

completion of one phase informing the next.

FTG surveys are completed in a matter of hours. Seismic

surveys are undertaken over a period of months but the

personnel and equipment are on site for short periods.

Drilling at each site can take 1 to 3 months to complete.

ENVIRONMENTAL MANAGEMENT

An environmental management programme will be written

to prescribe commitments needed to ensure

Page 4: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Africa) (Pty) Ltd 4

environmentally responsible operations. A key aspect will be

the restriction or prohibition of exploration activities at sites

which have been identified to be incompatible with

exploration.

The establishment, management and rehabilitation of all

exploration sites will be done in consultation with land

owners. The process of managing the operations, the

impacts thereof and rehabilitating the exploration sites will

be conducted in terms of the EMPr approved by PASA.

LAND ACCESS

It is likely that access will be required to only a few of the

properties within the exploration area and then for a short

period. Private property will only ever be accessed with prior

consent of the landowner and then in terms of a written

agreement.

The locality of exploration sites is largely flexible and can be

adapted to minimise disturbance to land owners, occupiers,

agriculture and the environment.

MOTIVATION FOR THE PROPOSED PROJECT

Petroleum products remain a vital source of energy. Natural

gas comprises mostly methane and is a relatively clean,

environmentally friendly form of energy. It can be used to

generate electricity or provide heat for domestic and

industrial purposes. Once extracted gas can be easily

contained, transported and safely used in many applications.

The type of downstream use is entirely dependent on the

commercial scale of the resource.

FUTURE EXPLORATION OR PRODUCTION

The current application is only to authorise the work as

described above (and in detail in the Scoping Report). Any

further exploration work to evaluate an identified resource or

a future production would require further approval from

PASA in terms of the MPRDA & NEMA. Such approvals will

be subject to the relevant legal requirements which include

further public consultation and environmental assessment.

Rhino maintains that is not useful to speculate on the

possible future direction of the project as the range of

options is vast and the available information very limited.

PHOTOS

Typical FTG Survey plane

Schematic of seismic survey

Example of drilling operations

Rock core recovered for analysis

Page 5: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Africa) (Pty) Ltd 5

PUBLIC RESPONSE TO DATE

Rhino Oil & Gas is currently in progress with 4 other

exploration right applications similar to this one,

including one in the adjacent area of central KwaZulu-

Natal (KZN 291 ER).

See:http://www.rhinoresourcesltd.com/areas or http://www.petroleumagencysa.com/index.php/maps

Consultation in those areas has elicited significant

response to the applications. Overall the public

response is very much opposed to the exploration

right application. The issues that have been raised are

too numerous to elaborate on here but are detailed in

the reports for those projects. Various key issues arose

and SLR consulted with PASA on the issues that were

material to the overall application and the EIA process.

A summary of each issue and an extract of the response

from PASA are provided below:

Issue 1: Most persons participating in the EIA process

stated their opposition or lodged an objection. Many of

the objections were made with reasons relating to

production and fracking. It is clear that the EIA process

will not be able to resolve such objections. What

mechanisms exist for these objections to be addressed?

PASA: “There is no mechanism under NEMA to address

objections, however as part of the EIA process the EAP

must consider issues raised and engage with respective

parties to resolve or provide clarity on issues raised.

Section 10 of the MPRDA provides for the Regional

Mining Development and Environmental Committee to

consider and advise the Minister on objections received in

respect of applications.”

Issue 2: Most IAPs have demanded that the current EIA

process present details on production and undertake an

assessment of potential production (including fracking)

related impacts, even though the current application

does not cover further exploration or production. What

is PASA’s instruction with regards the scope of the

current EIA?

PASA: “The current EIA is aligned with the proposed

exploration work programme submitted with the

application for an exploration right. If the applicant

wanted to pursue any activities beyond the scope of the

proposed work programme then environmental

authorisation for such activities would have to be

obtained. This process provides for further engagement

with IAPs and in-depth assessment of the associated

issues.”

Issue 3: Many IAPs have asked why the current Karoo

Strategic Environmental Assessment (SEA) on Shale

Gas Development is not applicable to all areas of South

Africa. Moreover, the IAPs have demanded that all

exploration right applications and related EIA processes

be stopped until the SEA is complete. What is PASA’s

response in this regard?

PASA: “The scope and terms of reference for the SEA are

finalised and the assessment has commenced. Queries on

the SEA should be directed to the Department of

Environmental Affairs as the driver of that process.”

Issue 4: IAPs have raised the concern that many

properties/sites within the application areas are either

protected outright or incompatible with exploration

and/or the production of oil and gas. In some instances

legislation prevents exploration work from taking place

in these areas. The question has been asked “why

undertake an EIA to obtain exploration rights in areas

where any gas, if it were to be found, would not be able

to be extracted because of the restrictions imposed by

protected area legislation and Regulation 122 of the

Petroleum Regulations (GN R 466 of 2015) relating to

the location of wells?”. The demand is that the

application be stopped, all of the future non-

compatible/unlawful areas removed and then a new EIA

be commenced for the revised area. What is PASA’s

response in this regard?

PASA: “The EAP has the responsibility to identify

environmental attributes; to assess the risks and impacts

and provide appropriate mitigation measures. In doing so

the EAP has the obligation to consider and apply the

provisions of the relevant environmental legislation.

PASA, as the regulator, has no authority to direct the

EAP or applicant to stop the EIA to remove incompatible

areas. The application will be evaluated in line with the

provisions of NEMA and other relevant legislation. The

Agency will make recommendations that will be aligned

with the relevant provisions to ensure that specified

environment receives the necessary protection.”

The application and the scoping and EIA process for this

project will be undertaken in accordance with the

guidance from PASA.

PUBLIC MEETINGS

The following public scoping meetings have been

arranged, the details are as follows:

Date and Time Venue

Wednesday 2 March

14h00

Ulundi, Multi-Purpose Hall,

Cnr King Zwelethini & King

Mpande Streets

Thursday 3 March at

14h00

Dundee High School, Cnr

Tatham & Oxborrow

Streets,

Monday 7 March at

14h00

Pongola, Thokoza Hall,

adjacent to TSB Sugar Mill

Tuesday 8 March at 14h00

Melmoth Town Hall, Reinhold Street,

Wednesday 9 March at

14h00

Vryheid, Cecil Emmett Hall at Eeufees Sports Centre, Utrecht Road

Thursday 10 March at

14h00

Newcastle, Richview Civic

Hall, off Boundary Street

Friday 11 March at 14h00

Dannhauser, Annieville

Community Hall, Annieville

Road

You are invited to attend.

Page 6: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Africa) (Pty) Ltd 6

POTENTIAL ENVIRONMENTAL IMPACTS

Relevant issues identified during scoping will be

investigated as part of the EIA process. The following

issues and impacts are examples of concerns related to

exploration. Their inclusion in this list is no relation to

the probability of occurrence nor an indication of

possible significance.

Farm Safety – Access by unknown persons to farms has

the potential to influence security on farms. Operating

heavy vehicles and equipment may pose safety risks.

Run away fires may present a potential safety risks for

both people and livestock.

Farm Infrastructure – farms roads, gates and fences

may be damaged during exploration activity. Soil and land capability– activities at the seismic and

drill sites may affect soils and land capability if poorly

regulated and not rehabilitated. Biodiversity – activities at the seismic and drill sites

have the potential to disturb and/or destroy vegetation,

habitat units and related ecosystem functionality,

including the disturbance of protected species. Surface water – The proposed activities at the seismic

and drill sites has the potential to pollute surface water

resources through consumptive use and the discharge

of contaminants. Groundwater – the proposed drilling has the potential

to consume and contaminate groundwater resources

which could impact availability to other groundwater

users and the ecosystem. Air – The proposed project has the potential to

contribute to air pollution, particularly through dust

emissions from vehicles on gravel roads and the release

of gas from boreholes. Noise and vibrations – The proposed project has the

potential to cause noise pollution during drilling

activities. Seismic surveys may cause damage to

structures and disturb livestock and wildlife. Visual – the placement of seismic and drilling

equipment has the potential to create short-term visual

impacts. Heritage resources – the proposed project has limited

potential to damage heritage resources. Land use –The seismic and drill sites may conflict with

land use for the duration. Socio-economic – Positive impacts include limited job

creation and stimulation of the local and regional

economy. Potential negative socio-economic impacts

include potential for increased crime, spread of disease

and pressure on support services provision.

Cumulative and future impacts – although the current

work may have limited impacts, a concern is that

approval of this work could open the way for future,

larger-scale projects in the area. There is concern that

these may have much greater impact. Approval might

be difficult to stop if investment has been made.

ENVIRONMENTAL ASSESSMENT

The assessment process will aim to:

• provide information on the project & alternatives

• provide information on the potentially affected

environment;

• provide an assessment of the significance of the

identified impacts;

• report on management measures required to

mitigate impacts to an acceptable level; and

• allow for informed, transparent and accountable

decision-making by the relevant authorities.

STEPS IN THE ASSESSMENT PROCESS Pre Application phase (January to April 2016)

Identify and inform IAPs & regulatory authorities of the proposed project (via direct consultation, newspaper

advertisements, site notices, this document) Receive issues and responses from IAPs. Submit application to PASA (ito NEMA)

Scoping phase (April 2016 to June 2016) Continued consultation and receipt of responses.

Identify issues that need to be addressed. Define outstanding issues and terms of reference for

work to address potential impacts Compile scoping report

Make draft scoping report available for review by IAPs and other regulatory authorities.

Collect IAP comments, update Scoping Report and forward to decision making Authorities (by 20 April).

EIA and EMP phase( July to December 2016) Undertake any specialist investigations.

Assess impacts of proposed project and compile EIA and EMP report.

Make this available to IAPs and regulatory authorities for review.

Host possible public-feedback meetings. Collect IAP comments, update EIA and EMPr and

forward to decision making Authorities. Decision and Appeal

PASA to review EIA and EMPr and make a decision. Notify IAPs and regulatory authorities.

Appeal process in terms of Appeal Regulations

REGISTER AND COMMENT

All stakeholders are invited to register as Interested &

Affected Parties (IAP). You must register as an IAP if

you would like more information or wish to participate

in the environmental assessment of the project.

To register, or to raise any environmental issues or

concerns regarding the project, please complete the

Response Form and return it to SLR at your earliest

convenience. IAPs registered on the project’s database

will receive notification of further meetings, report

review periods and the decision.

Page 7: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

SLR Consulting (Pty) Ltd

Rhino Oil and Gas Exploration South Africa (Pty) Ltd

BACKGROUND INFORMATION ON PROPOSED PETROLEUM EXPLORATION ON

VARIOUS FARMS IN NORTHERN KWAZULU-NATAL (108 TCP)

REGISTRATION AND RESPONSE FORM FOR INTERESTED AND AFFECTED PARTIES

NAME

FARM/PROPERTY or

ORGANISATION

STREET OR POSTAL

ADDRESS

POSTAL CODE

WORK/ DAY TELEPHONE

NUMBER

FAX NUMBER

CELL PHONE NUMBER E-MAIL

PREFERRED CORRESPONDENCE (circle) POST FAX EMAIL SMS

DATE Signature

DETAILS OF OTHER PEOPLE WHO OWN LAND IN THE AREA OR YOU FEEL SHOULD BE INFORMED:

PLEASE IDENTIFY YOUR INTEREST IN THE PROPOSED PROJECT:

PLEASE WRITE YOUR COMMENTS AND QUESTIONS HERE:

(use additional pages if required)

Please return completed forms to:

Matthew Hemming or Ntsako Baloyi

(011) 467 0978 (Fax) or Po Box 1596, Cramerview 2060

[email protected] or [email protected]

Page 8: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

Farm Name & Number

Registration Division: GT

WASBANK 1076

UITHOEK 1078

VERMAAKS KRAAL 1124

SOM'S HOEK 1151

KLEINE WATERVAL 1152

ASYN KRAAL 1158

RUIGTE FONTEIN 1179

GELEGENFONTEIN 1204

UITVAL 1244

KLEIN FONTEIN 1262

BOSCH HOEK 1312

UITHOEK 1335

ZONDAGRIVIERSPOORT 1361

FITTY PARK 1364

KROMME-ELLEM-

BOOG

1365

UITKYK 1366

OPMERKZAAMHEID 1394

KUICK VLEI 1396

BUFFELS HOEK 1931

HOLLYWOOD 2028

KROM POORT 2155

UITKYK 2156

KLIP BERG 2158

GOWRIE 2248

BEAUVALE 2249

WHITE BANK 2251

CINDERFORD 2252

VALKOP 2253

MCHJEAANE 2254

CRAIGSIDE 2272

COALFIELD 2273

STRATFORD 2367

KILBURNIE 2390

LYELL 2393

LENNOX 2395

LANGE FONTEIN 2397

MOOI SPRUIT 2398

DEWAAR 2400

BEITH 2401

TENTEN'S KRAAL 2405

KELVIN 2407

STANMORE 2412

DALRY 2413

OUTFALL 2414

PRESTWICK 2415

MAYBOLE 2419

LINKS OF BUFFALO 2420

CRAIGMILLAR 2971

BALGOWNIE 2972

DRIE FONTEIN 3107

AMSIBIE 3110

ZWARTWATER 3213

PADDAFONTEIN 3214

RAMA 3231

COBURG 3232

DAVELS BERG 3286

BURNSIDE 3287

STERK STRUUM 3306

BOSCHFONTEIN 3307

EARNSCLIFF 3308

HAZELDEEN 3311

GAINSFORD 3313

DOORN KOP 3314

OVERTON 3315

KNOSTROPE 3316

HUDDERSFIELD 3319

MENTEITH 3328

MORGENSTOND 3347

HELENA 3479

CHURCH GROUND 3491

LIVINGSTONE 3539

YOUNGERHILL 3540

KEMPENFELDT 3541

THE PADDOCK 3615

HATTING DALE 3626

GARDENHILL 3665

HLUNGWAN 3684

STONTON 3691

MEYERSLAND 3692

CHARD 3697

GOWANBRAE 3701

TERRACE 3707

KLIP RAND 3723

MARIA 3727

MARIA 3740

LEEUW KUIL 3743

DROOG PLAATS 3744

NOOITGEDACHT 3747

SNIP FONTEIN 3748

PALMIET FONTEIN 3750

KRAAI FONTEIN 3751

JAKHALS FONTEIN 3752

KLIP HOEK 3753

REDBANKS 3755

KALKOEN KRANTZ 3786

DEIGHTON 3805

FORT AGNEW 3808

SPIES 3858

BLAIKIESTON 3950

KLIP RUGH 4092

DROOGMYNKEEL 4093

UITZICHT 4112

GLASGOW 4122

KIRKLAND 4124

HELPMAKAAR 4126

ZUUR KOP 4127

SUMMERVILLE 4245

MERAN 4247

ST GEORGE 4248

BULWER 4250

VAN ROOYEN 4252

BALFOUR 4260

LINDISFARNE 4263

CARNARVON 4264

UITZIGHT NO 2 4276

HARRIOT DALE 4324

GLADSTONE 4331

COTSWOLD 4332

DUNDEE 4339

CARDWELL 4340

DAVELSFONTEIN 4348

ALLETTA 4350

WILLIAMS GELUK 4444

FORFAR 4473

KELVIN GROVE 4474

STONY BRAES 4475

NURSLING 4495

STIRLING 4570

SOFIERO 4577

RODEKOP 4656

REST 4658

THE CORNER 4659

STONEHAMMAR 4723

PERSBERG 4732

LINDE 4733

LOT 2 4761

ONTBEMEND 4972

ZUURFONTEIN 4980

FREIBURG 4985

BAVIAAN-KLOOF 5031

VERMAAK 5045

WINKLE 5054

SPETSKOP 5063

BLOEMHOF 5080

HOPE 5088

LOWLEVEL 5089

GROOTE VLEI 5112

ONGEGUND 5116

Page 9: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

HESOMDALE 5129

ELSINOR 5135

DEVILS KLOOF 5136

LOT T 5137

EASTKEAL 5138

GARNET 5180

MANDHLENI 5248

SALBO 5252

ROOIFONTEIN 5270

LOT ISIBINDI AA 5271

ISIBINDI B 5272

SHEPLEGH B 5281

BEDRUG 5288

DAAS KRANTZ 5311

KLIP KOP 5323

KLIP ROTS 5324

LUHUNGU 5381

SHEEPRIDGE B 5429

SUNSET 5433

ROODE RAND A 5483

NORA 5488

SIR GARNET 5511

ALVA 5554

SIGTUNA A 5561

SIGTUNA B 5562

DOONE 5566

LOT B OF

JOHANNESBURG

5613

A OF JOHANNESBURG 5614

STOCKHOLM 5642

TROSA 5858

BAVIAANTRAP 6000

ORANGE 6001

B OF ROODE RAND 6453

RAEMOIR 1 6504

PETERSBURG OF ORIBI

VLAKTE

6534

SLAAF 6594

AMO 6710

DOUBLE KRAAL 6754

EAST HESLERTON 6783

DUMMY 6830

STRUISVOGEL POORT 6897

LANGLAAGTE 6898

BELLEEK 6934

RAEMOIR A 6942

BESTERDALE A 7267

LOT B OF SHEPLEGH 7296

VERDRUK 7329

CLIPSHAM 7330

SCUUR RAND NO 1 7331

SCUUR RAND NO 2 7332

THE OAKS 7441

CASURINAS 7442

LEKSAND 7538

THORNHILL 7612

YATTON 7647

EAST LYNNE 7670

2 OF SHEEPRIDGE A 7683

PREETZ B OF ORIBI

VLAKTE

7826

KARLSRUHE OF ORIBI

VLAKTE

7829

IGNISDALE A 7865

BESTERDALE B 7868

WILD DUCK VLEI A 7871

JOBS DALE B 7876

MIDDEL PUNT A 7903

NIETGEDAG B 7938

KLIP KUIL 7995

DROOGE REF 8032

DRIE HOEK 8033

LOT AB ISIBINDI 8067

DUMMY 8108

EBENEZER 8113

MANOR PARK 8147

HEILBRON NO 2 8148

DRIE VOET 8163

ROOIKOP 8190

BIRKENHEIM 8207

AMALINDA OF

PADDAVLEI

8230

HENNING A 8240

CHITRAL 8266

FARVIEW 8290

JOB'S DALE 8291

LUCK 8341

PADDAVLEI A 8357

UELZEN 8419

CORNWALL B 8420

RENIER 8421

FALKENBERG OF

HENNING

8430

WILLOWS 8432

STRIIJBANK 8449

WOODLANDS 8485

OUW KLIP 8489

DONDOLA A 8493

UMNAMATA 8508

GERTS KLOOF 8535

KELVIN GROVE NO 2 8548

BANNOCKBURN NO 2 8549

OVERDALE 8551

HAYFIELD 8568

NKANGALA OF

TANGENT

8569

FORT PINE 8600

LERRYN 8602

HALIFAX 8603

LOT W 8610

NORTHFIELD 8615

SUSHARA 8651

LUSIENNE 8663

CELLE 8671

TRY AGAIN 8674

TRANSVAALIA OF

DONDOLA

8697

GOEDE GELOOF 8703

LOT OSCARSBERG'S

RESERVE A

8738

SWEETWATERS 8748

IZEMFENE B 8802

WILD DUCK VLEI B 8806

ROCKY SPRUIT A 8842

BEACON KOP 8863

CORNELIUSDALE 8864

SCHROEDERS HOPE 8865

EXTENSION 8946

MOUNTAIN TOP 8954

GROVE 9011

SHEEPRIDGE A1 9031

BESTERDALE C 9044

IZEMFERNE A 9146

DRIEHOEK 9171

ADELAIDE 9187

SPIESDALE 9313

JACK'S CORNER 9440

UMGEN 9449

DWARS NEK 9450

GRIMSTON 9540

HILLSIDE 9553

LINCOLN 9693

HAYFIELD 9722

SPRINGFIELD 9753

SWISS VALLEY 9768

IMPATI HEIGHTS 9950

WONDERDAM B 9963

LOT 4 NQUTU 9971

FARM MORTON 9972

LOT 11 NQUTU 9973

EXTREMITY A 10022

A OF WONDERDAM OF

EXTREMITY

10023

LOT 5 NQUTU 10077

GLUTZ 10130

IMPATI 10260

LOT 18 NQUTU 10585

Page 10: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

WHINSTONE 10616

NONDWENI PLAATS

NO 4

10634

OSTEND 10643

SUB PIETERSDALE OF

IGNISDALE

10674

GOWAN BRAE NO 2 10675

LOT 17 NQUTU 10781

LOT B OF 14 NQUTU 10782

LOT 16A NQUTU 10783

MELROSE 11067

17903

HARROWDALE 11080

MOORLANDS 11127

FUGITIVES DRIFT 11158

NAVARRE 11174

FARVIEW 11262

GIFT 11263

TAYSIDE 11319

GOOD HOPE 11443

DE JAGERS DRIFT 11477

CORBY ROCK 11509

DOORNHOEK 11595

ROCKBOURNE 11596

SLEDMERE 11614

MOUNT NONNIE 11669

WILDERNESS 11859

SUNRISE 11863

VLEI POORT 11918

CLEAR SPRINGS 11957

LA ROCHELLE 11958

BONISA 11959

CAIRNMORE 12014

PADDOCK 12027

GORDON'S LUCK 12072

LOT 2 NQUTU 12179

LOT 3 NQUTU 12180

ST CUTHBERTS 12444

BUFFALO BEND 12648

HAZELDENE 12649

NO 2 NONDWENI 12746

BIGGARSGAT 12753

WILD DUCK VLEI

ANNEXE

12826

WHINSTONE ANNEXE 12845

DE JAGERSDRIFT

SOUTH

12935

OSAKA 12977

MATATANA 13024

BONNY DOONE 13065

STRUISLAAGTE 13066

CORNVILLE 13457

ROOIFONTEIN 13483

SOLMAR NO 2 13553

RAMAK 13696

GLENWOOD 13707

NO 1 NONDWENI 13709

BUFFALO GORGE 13828

THE ALOES 14309

LENTEPLAAS 14432

MAMRE 14459

WEIDEFELD 14474

GT 14522

14523

BANNOCKBURN

ANNEXE C

14524

BANNOCKBURN SAR 14543

VERDRUK S A R 14549

MOSSWAN 14807

OTHELLO 14846

RIETBOKSTROOM 14977

ALTCELLE 14978

BOB'S FOLLY 14979

GIBA 15095

KALWERFONTEIN 15122

POST OFFICE 15172

BRINK 15335

SIGWEJE 15409

MINORCA 15414

SWARTWATER 15417

LENTEDAL 15474

DIEPKLOOF 15521

LONGLANDS 15523

HEILBRON 15594

CLEVELAND 15597

KLIPROTS 15625

BOYUP 15647

CRAIGHEAD 15739

BRICKFIELDS 15750

RESERVE NO 18 15838

IRONDALE A 15935

SPRINGLAKE 16151

SEELANDKOP 16199

LANGSAAN 16200

CHERHAM PARK 16213

RHINO 16214

PATAT 16229

KYKWEER 16294

OUDEPLAAS 16315

PLATBERG 16318

BERGHEIM 16324

BORDEAUX 16341

HAYSPOOR 16386

SPOORSTONE 16399

BLINKWATER 16470

KLEINHOUD 16660

BESTERDALE 16679

SOLMAR 16680

GROENEHOEK 16784

NHLAWE 16911

HARMONIE 16914

16980

FORLORN HOPE 17044

KRUISFONTEIN 17062

SUNSHINE 17128

KARLSRUHE 17207

ILANGA 17222

WINTERHOEK 17223

PADDOCK 17317

GT 17318

BRACKSTONE 17319

17320

THUTHUKANI 17328

EARNSCLIFF 17612

TANGENI 17706

DURNACOL 17900

17902

CHITARA 17917

NYATHINI 18022

RORKE'S DRIFT 18352

HLATHI 18486

Registration Division: HT

MOOIHOEK 1

ZANDSPRUIT 2

ERFSTUK 4

AFGESNIJ 5

ROODEKOP 7

KARNSPEK 8

LEKKERWATER 9

VERKOCHT 13

KWEEKSPRUIT 22

PAARDEFONTEIN 25

NOOITGEDACHT 33

EENKANTLANGS 47

BRAKSPRUIT 52

RUIGTEFONTEIN 54

WELGELUK 56

NOOITGEDACHT 60

WATERHOEK 61

GROOTVLEI 66

POLITIEK 67

MOOIPLAATS 72

NOOITGEDACHT 73

Page 11: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

FRISCHGEWAAGD 75

VLAKPLAATS 83

NOVEMBERSDRIFT 87

COMMISSIEKRAAL 90

ZWARTKOP 91

LUVUNO 17498

UITKOMST 95

KWAGGASDRIFT 96

VAALBANK 103

FRISCHGEWAAGD 105

KLIPSPRUIT 106

HARTEBEESTSPRUIT 111

VAALSPRUIT 115

BRAKFONTEIN 116

ROODEKOPPE 119

WELTEVREDEN 122

KLIPSPRUIT 124

BLOEMHOF 127

ZAAIFONTEIN 143

WATERVAL 148

WASBANK 149

LEEUW 17499

SPARTELSPRUIT 150

RUSTVERWACHT 151

GROOTHOEK 152

WAAIKRAAL 153

VAALBANK 154

WATERVAL 157

GELUK 158

ZANDSPRUIT 162

STRYDFONTEIN 163

ROODEZAND 165

ROOIPOORT 166

TUSSCHENBIJ 167

ONVERWACHT 169

TWYFELHOEK 17817

KROMELLEBOOG 170

WEIHOEK 171

DOORNKOP 172

WAAIHOEK 173

GOEDE HOOP 177

BEROUW 179

GOEDGELOOF 180

LIJNSPRUIT 181

NYEMBE 184

KLIPFONTEIN 185

RIETVLEI 186

SCHAAPKOPJE 194

VAALKOP 209

VAALBANK 224

VAALKOP 228

AANSTOOT 231

SCHUILHOEK 243

BRAKFONTEIN 246

DOORNLAAGTE 262

DORPSGRONDEN VAN

UTRECHT

266

GOEDGEDACHT 273

NOOITGEDACHT 278

NOOITGEDACHT 279

BEAUFORT 286

WELGEVONDEN 287

FRAAIUITZICHT 291

KLIPFONTEIN 316

UITVLUCHT 319

DOORNHOEK 340

STERKSTROOM A 344

WELGEVONDEN 350

NOOITGEDACHT 356

WELTEVREDEN 371

WATERFALL 374

METSELFONTEIN 379

NOOITGEDACHT 388

BRAKPAN 389

EENSGEVONDEN 408

BRANDKRAAL 505

DUBBELRECHT 508

POTGIETERS RUST 530

WIEMANS RUST 549

APOLOGIE 562

HARTEBEESTBULT 578

MIDLUM 609

LANGVERWACHT 616

BETHEL 623

GEGUND 626

MERCY MANOR 18474

ARCADIA 660

VLEIPLAATS 664

SCHEEPERS NEK 687

SANDHURST 703

STERKSTROOM B 720

GOLDEN VALLEY 751

BRAKFONTEIN 779

ZAAILAAGTE 780

DAGBREEK 786

BEAUFORT 787

LOT A12

DUBBELRECHT

798

LOT A13

DUBBELRECHT

799

LOT A 15

DUBBELRECHT

800

LOT A10

DUBBELRECHT

804

LOT A 5 DUBBELRECHT 805

LUBECK 808

FLENSBURG 815

LOT A 18

DUBBELRECHT

816

NOOITGEDACHT 840

DASSIESHOOGTE 843

BETA 844

WIEMANS RUST 876

YARL 2962

DOORN KOP 2963

FOUNTAIN DALE 3608

WELTEVREDEN 3625

GEDULT 3700

MOOIDOORN HOEK 3722

KAKANINIS KRAAL 3724

ELIZABETH 3726

SPOOKMILL NO 2 3735

VAALBANK 3737

DAVELS SPRUIT 3742

SLOOTEN HOEK 3745

RIET POORT 3754

OMDRAAI 3855

GOEDE HOOP 3857

WITTEKLIP 4257

LEARYDALE 4259

WALMSLEY 4266

KEMPS HOEK 4271

FOUNTAINDALE NO 3 4272

SPOOKMILL 4273

STRUISVOGEL KOP 4275

ROCKYDALE 4277

BRAAK FONTEIN 4278

SCHOONVLAK 4279

ALLEEN 2 4280

SUSPENSE 4326

FORVIE 4520

DARTRY 6968

GARDENS 7239

WESTPORT 7490

JESSIE 7491

KAAL VLAKTE 7496

CRONJE'S FLAT 7506

POONA 7511

ENNIS 7524

CLARE 7525

PERTH 7540

MOY 7549

Page 12: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

Registration Division: HS

RIVER BANK 8185

GLEN CALDER 8260

MINSTER B 8292

MUNRO'S WINKEL 8293

MOORFIELD WEST 8294

TROWS REST 8298

LANGTON 8327

MORGEN ZON 8328

PIETS RUST 8329

MACCLESFIELD 8418

LANG'S NEK A 8441

LANG'S NEK B 8442

GARDINIA 8486

GREENWICH 8487

FORTS 8502

HERONS COURT 8521

ARMAGH 8555

COOTHILL 8556

COLINDALE 8578

RIVER BEND 8585

INNISKILLING 8590

HIGHTON 8591

ROCKHILL 8611

BATTLEFIELD 8618

BLESBOK 8639

CHELMSFORD 8642

LEOPARD DALE 8643

BLACKMOOR 8665

DRIFT 8684

UP AND DOWN 8701

NIL DESPERANDUM A 8771

STERKFONTEIN A 8772

CLONTARF EAST 8773

TIPPERARY EAST 8774

LEOKOP EAST 8793

MINSTER A 8817

LINCOLN 8820

KROMHOEK 8879

NIL DESPERANDUM B 8894

HAWARDEN 8915

KNOWESLEY 8926

KINGSTON 8943

ALBANY 8944

THE STRIP 8957

KNOCKBREX 9018

GREY RIDGE 9021

EAGLES CLIFF 9049

SPECTACLE SPRUIT 9079

HEATHFIELD 9089

ERIN 9110

WONDERDRAAI 9189

MOORFIELD EAST 9194

HARTEBEEST BULT 9197

GALWAY 9202

GANTON 9242

VULTURES HOME 9269

MARDENASH NO 3 9400

MARDENASH NO 2 9401

TRESPASS 9425

GORDON 9481

LONG KLIP 9492

MOOI KRANTZ 9562

SPOT 9758

MDAGAS KRAAL 9785

INKWELO SIDE 10291

TUIN NO 2 10494

THE NECK 10548

GREY RIDGE NO 3 10559

MAJUBA SOUTH 10614

INKWELO 10640

LAST ATTEMPT 10877

ATTEMPT 18624

LEASE D 11288

GLENDALE 11290

TOP 11634

LEOPARD KLOOF 11849

STEEP GLEN 11865

UNION 11925

THE REST 11994

LANDS NEK RAIL A 12795

LANGS NEK RAIL B 12796

LANGS NEK RAIL C 12797

LANGS NEK RAIL D 12798

LANGA NEK RAIL E 12799

LANGS NEK FOREST A 12800

LANGS NEK FOREST B 12801

LANGS NEK FOREST C 12802

CHONTARF EAST

ANNEXE

12834

ROCKETDALE RAIL 12918

CLONTARF EAST A 12960

ROCKETDALE ANNEXE

A

13052

ROCKETDALE ANNEXE

B

13053

S A R COLINDALE 13822

WHITE HOUSE 14178

REDMAIN 14492

MEADOWSTREAMS 14701

LOSKOP 14724

WARM HOEK 14976

222 POLICE CAMP 15083

DUMBANY 15101

CECILIA 15106

KLEINDAL 15177

LEYBEL 15291

BUFFALO PETROLEUM 15461

BUFFELSHOEK 15469

WOODBURN 15470

MODDERLAAGTE 15517

WYKOM 15763

BOSCOBEL 15775

VAN NIEKERK'S

STROOM

15790

KONIGSBERG 16293

CLON 16376

TARF 16377

TIPPERARY A 16391

TIPPERARY B 16393

TWEEFONTEIN 16423

LENTEVLEI 16524

WYKOM 16958

LEOKOP EAST 16984

BRAK HOEK 16985

SCHUILKLIP 17759

DUMFIRMLINE 17809

TIPPERARY WEST 17810

THE RUINS 17828

STONY RIDGE 18005

HS 18010

POONGA'S KRAAL 18041

TIGER KLOOF 18084

Registration Division: HU

WELVERDIEND 10

BLOEMENDAL 18

WIJDGELEGEN 24

NOOITGEDACHT 36

ZWAARVERDIEND 39

DRIEFONTEIN 42

LOOTSKLOOF 48

BANKEROET 50

LEEUWNEK 51

GROOTGELUK 52

PARADISE 54

BEGINSEL 56

WATERVAL 57

PONGOLA 61

KOPPIE ALLEEN 63

MVUTSINI 67

HARLOO 68

MHLATI 69

Page 13: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

SPITZKOP 70

PONGOLA 71

SUNLAND 72

UITZICHT 73

RIVERSDALE 75

RENDSBURG 80

TAMBOTI RIDGE 81

DUBULA 91

BEDROG 97

WELVERDIEND 104

MOUNTAIN VIEW 106

DWARSRAND 110

KOUDELAGER 115

MORGENZON 117

DOORNKOP 118

ROODEPOORT 119

MADEMOISELLE 123

17708

WELGEVONDEN 136

KOLFONTEIN 138

ONVERWACHT 142

RIETVLEI 150

DRIEFONTEIN 151

BOSCHHOEK 156

DOORNBOSCH 157

WYKOM 158

BONA ESPERANZA 161

RUSTPLAATS 165

AVONDUUR 167

TYGERSKLOOF 173

VRISCHGEWAAGD 179

WATERVAL 180

RONDEBOSCH 185

LANGVERWACHT 190

GOEDGELOOF 197

STEENBOKLAAGTE 202

ONGELUK 211

LANGVERWACHT 18093

LANGVERWACHT 226

DOORNHOEK 227

WELCOME 229

OASIS 237

BETHEL 247

VOORDAG 251

ALOEBOOM 254

RUSTENBURG 257

LISBON 265

LANGGEWACHT 275

ZOMERVELD 277

VLAKFONTEIN 281

DAGERAAD 288

WINTERSHOEK 295

SMEERTOUW 297

VREDEHOF 299

ONGEMAAKT 301

KROMELLEBOOG 303

VAALKRANTZ 306

WELKOM 314

UITKIJK 315

BEDROG EN ONRECHT

B

326

GROENEWEIDING 345

UITHOEK 348

ZILVERKLIP 351

LANGKRANS 367

RIVERSDALE 372

MAGDALENA 376

GELUK 377

MOOIBANK 378

MPISINI 17756

MORGENZON 390

WEGSPRING 398

BERDINA 399

FRISCHGEWAAGD 401

WATERVAL 423

UITKOMST 424

NOOITGEDACHT 427

ONRECHT 428

UMHLOPA 443

VERDRUKT 444

VAALBANK 450

MORGENZON 460

LANGVERWACHT 476

CHRISTINASDAL 480

BEVENSON 483

WELTEVREDEN 490

FORTUIN 491

METSELFONTEIN 499

WONDERBOOM 500

UITZIGT 501

WELTEVREDEN 510

DONKERHOEK 512

TOOVERNAARSRUST 518

ZALFLAGER 525

MOOIPLAATS 537

WELTEVREDE 540

WAGENDRIFT 541

GELUK 545

WITKLOOF 546

ONVERWACHT 552

WATERVAL 553

NAAUWPOORT 556

GOEDGETROFFEN 557

MORGENZON 559

WONDERFONTEIN 560

LANGVERWACHT 561

WELVERDIEND 563

ROOIPOORT 565

GEWONNEN 572

HEELTEVREDEN 573

LEEUWKOP 580

BLOEMGAARD 585

GOEDHOOP 586

GOEDENMOED 587

GOEDVERTROUW 592

ZEEKOEPAN 593

DOORNHOEK 594

UITKOMST 596

VETSPRUIT 597

UITGEVALLEN 599

MEIJERSHOEK 602

LLANWARNE 603

WELVERDIEND 610

MISGUND 611

NAAUWKLOOF 612

NOOITGEDACHT 614

VEEPLAATS 615

PIETERSRUST 617

VERWYDERD 618

MERIBA 619

NOOITGEDACHT 620

ERFENIS 621

UITZICHT 624

WELVERDIEND 630

LANGFONTEIN 632

LEGERPLAATS 634

ZEEKOEVLEI 635

INGOLOZANA 18067

DOORNHOEK 636

HLOMOHLOMO 638

VERGELEGEN 639

GOEDGELOOF 640

BOSCHHOEK 641

RIETBOKLAAGTE 642

DORDRECHT 643

VERGEVAL 644

MIDDERNACHT 645

LANGGEWACHT 646

LEEUWSPOOR 647

NOOITVERWACHT 648

BLOEMHOF 649

Page 14: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

UITSCHOT 650

ZANDDUINEN 652

PONGOLA 653

BEDROG 654

SILVERHOUT 668

BERG & DAL 670

BURGERSRUST 672

HELENA 673

PAARDENFONTIEN 674

BETHEL 683

ISIHLENGENI 689

EMYATI 698

EKUHLENGENI 701

VERLIES 705

GROOTDRAAI 707

BEHOUD 708

KEZA 713

WEGSPRING 718

HU 727

KLIPFONTEIN 728

NGOMI 729

LELIESHOEK 730

BONA ESPERANZA 736

CARLSBAD 737

MOOIPLAATS 739

KRETA 741

UITKYK 743

BOSVELD 745

HU 18658

LELIESHOEK 746

KOEDOESBERG 747

RONDEKOP 752

DORINGBOS 753

LEEUWSPOOR 759

WELVERDIEND 766

NEGENUUR 769

SOETVELD 775

FIUME 806

ERINDALE 809

CONFERENCE 811

MAGUT A 817

MAGUT 818

MAGUT B 819

KORTIER 821

UITVAL 828

TIERKLOOF 829

DEMOINA 830

MISTY VALLEY 831

LANGKRANS 833

UITKYK 834

UITKYK 835

HLOMOHLOMO 836

CHENNELS 837

GROOTHOEK 839

HLOMO LODGE 842

MARIANTHA 845

BEHOUD 851

BLOEMENKRANS 853

CHICHESTER 855

MAGDALENA 856

ISIHLENGENI 857

ESENHLABENI 858

LEEUKOP 859

862

KINGHOLME 868

VERGELEN 869

ERIKA 872

WITWATER 873

CLERKNESS 13459

WISTOW 13693

BORKUM 13779

RESERVE NO 12 15832

GLENDAWN 16934

WILHARONA 16935

SIMDLANGETSHA 16956

RIETBOKLAAGTE 16962

RIETBOKLAAGTE 16963

GLENDAWN 16986

VERGELEGEN 17058

MOOIPLAATS 17059

KRANSKOP 17155

HU 17281

CONFERENCE 17314

L'AURENT 17315

MARICA 17330

HU 17535

HU 17542

HU 17543

WATERVAL 17560

DORINGBOS 17592

HU 17598

RONDEKOP 17619

SWISS VALLEY 17662

17981

MORGENZON 18094

HU 18399

Registration Division: HV

LOT H 51 13092

LOT H 52 13093

SUB A OF ITITIHOYA 13116

BARTLOW 13117

BAGNARA 13118

BAGHMATI 13119

BOMBOLO 13120

OKALWENI 13151

LOT H115 13180

BARTENHEIM 13194

INGWENI STATION 13243

CLOETE 13350

ALKMAAR 13434

WARRICK 13436

BOYNE 13468

LOT H 77 13533

LOT H 49 13543

CHAOS 13581

JARABUB 13582

POINCARE 13583

ABU MADI 13584

DUKUMBANE 13626

LOT H 59 13653

LOT H 60 13654

CADILLAC 13666

BUKANDA 13711

CABARET 13712

BACHA 13719

TARZAN 13727

BONZO 13728

TARANAKI 13868

BEUNA VISTA 14044

MKUZI-WES 14403

NTABANKOSI 14594

SPES BONA 15856

KULENI NO 9 15959

UNOHEMU 16012

IMPUNZI 16013

CAIRN BANE 16596

ZAMAZAMA 16924

GRANT 16945

BRONTE 17383

TEMBE NORTH 17497

THANDA 17905

Registration Division: GV

MORRISFIELD 11436

MEDHAM 11558

ATHALIE 11559

JEREMY 11560

ASHBURTON 11686

HORSESHOE BEND 11688

LYNDHURST 11910

VEGA 12044

Page 15: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

LYTA 12045

UBIZANE 12046

LOT H 27 12419

LOT H 28 12420

LOT H 12 12907

LOT H 11 12908

LOT H 45 12969

LOT H 46 12970

LOT H 7 12971

LOT H 10 12984

LOT H 8 13035

LOT H 9 13036

LOT H 32 13041

LOT H 33 13042

LOT H 98 13043

LOT H 16 13044

LOT H 23 13045

GLENPARK 13069

LOT H 34 13081

LOT H 35 13082

LOT H 4 13097

LOT U 184 13128

LOT K 45 13130

LOT K 9

KWAMBONAMBI

13133

LOT H 29 13268

LOT H 30 13269

LOT H31 13270

LOT H 97 13271

LOT H6 13349

NCEDOMHLOPE 13363

LOT H47 13513

LOT H53 13514

LOT H 2 13691

LOT H19 13996

LOT H20 13997

LOT H44 13998

LOT H 17 14168

LOT H 21 14169

LOT H 22 14170

ABERDOUR 14205

MTOLO 14390

ROOIGROND 15170

RESERVE NO 3 15822

BRUDEE 16056

HLUHLUWE RIVER 16476

HLUHLUWE RIVER 16477

HLUHLUWE RIVER 16478

HLUHLUWE RIVER 16479

HLUHLUWE RIVER 16480

HLUHLUWE RIVER 16482

HLUHLUWE RIVER 16483

HLUHLUWE RIVER 16484

HLUHLUWE RIVER 16485

EILANDSIG 16787

GLENPARK 16878

17238

BRIDGEFIELD 17515

SUKARI 17516

MKONGE 17517

ETEZA 16220

RODWIN 16244

RIADEN 16245

MBOMENI 16256

ARBEIDSVREUGDE 16279

ALBA FORESTRY 16297

MOKANA CANE 16298

RBM 16317

BRANJO 16321

ARGYLL 16327

PEGGY NO 16328 16328

ADPROP 16329

LOT 11 MPOSA 16360

LOT 12 MPOSA 16361

GREEN HILL C 16381

GREEN HILL F 16382

SUGARLAKE 16385

REDCROFT 16403

S A R MPOSA 16434

ZAPOLWANA HILL 16436

MZINGAZI LAKE 16468

HLUHLUWE RIVER 16486

HLUHLUWE RIVER 16487

HLUHLUWE RIVER 16488

HLUHLUWE RIVER 16489

HLUHLUWE RIVER 16490

HLUHLUWE RIVER 16491

BONMUIR 16497

BONELLA 16498

SOMKELE 16499

FAIRWAY 16502

HLUHLUWE RIVER 16537

HLUHLUWE RIVER 16538

BONMART 16557

JOURNEY'S END 16566

DELVILLE 16587

GRANDIS 16588

COTCANE 16633

WOODLANDS 16672

MPOSA 16685

GLEN GRANT 16686

SOKHULU 16687

UMSUNDUZI 16688

ROSS SUGAR 16706

GV 16707

GV 16708

LOT K41 16715

LOT K46 16716

LOT K47 16717

LOT K48 16718

LOT K49 16719

LOT K50 16720

LOT K52 16721

LOT K53 16722

LOT K54 16723

LOT K55 16724

LOT K56 16725

PEASTON 16768

PEASTON 16773

LAKELANDS 16777

SPURWING 16839

LOT 43 16859

CRAIGHILL 16860

ROYDEN 16870

NORTH COAST 17354

MAKARIOS 17377

THE HUTS 17391

PASENA 17671

NARROWS 17393

DUKUDUKU 17395

DUKUDUKU 17396

UMFOLOZI 17424

DORPTOE 17514

KENNEDY 17586

ROSS 17690

EVERGREEN 17894

GV 18361

Registration Division: GU

DOORNKOP 20

SCHURWEKOP 27

WELKOM 28

WELGEVONDEN 29

VLAKPOORT 32

WELTEVREDE 41

NOOITGEZIEN 55

DEWAARD 188

WELGEKOZEN 191

MOORDPLAATS 193

DOORNHOEK 204

ZOEKMY 207

KEURPLAATS 218

Page 16: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

NOOITVERWACHT 221

VUURSTEEN 242

SCHEEPERSLAAGTE 244

STERKSTROOM 250

HEELGOED 258

GOODLUCK 270

UITZOEK 317

ONVERWACHT 322

PROSPERITY 323

KROONPLAATS 335

UITZICHT 349

UITKIJK 353

HOLLANDIA 384

WINTERSHOEK 400

LANGVERWACHT 410

OUDEWERF 426

ONGEGUNDE

BRAKSLOOT

432

ONTEVREDEN 433

TOGGEKRY 436

OVERVLOED 441

KONINGSKROON 447

WITVOLOOS 453

SCHOONSTROOM 474

BOSCHHOEK 489

VRIENDSCHAP 492

GOEDGELOOF 496

DORSTFONTEIN 526

LOTTERY 531

EENSGEVONDEN 551

HOEDBERG 555

VAALKRANS 564

NOOITGEDACHT 567

OVERVLOED 724

SCHOONSPRUIT 742

HAMBROCK 748

GRENSPLAAS 763

STERKFONTEIN 6111

DOORNHOEK A 6112

WELTEVREDEN 6113

KWAMAGWAZA

MISSION STATION

6115

DIEPKLOOF 6118

NOOITGEDACHT NO 96 6119

MORGENZON A 6126

BOSCHHOEK 6128

TEVREDEN 6129

SWEETHOME 6130

KEURPLAATS 6132

VRISCHGEWAAGD 6133

EIKENDAL 6134

PROTEST 6135

SPESBONA 6136

NOOITGEDACHT 6137

VERGELEGEN 6139

DEANE 6140

SCHUILHOEK 6142

ELIZABETH 6143

NOOITGEDACHT 6144

WELKOM 6145

ROSENBURG 6146

KONIGSBERG 6147

VLAKBULT 6148

SAXONY 6149

MERINO 6150

VERZETHOEK 6151

MORGENZON 6152

LANGGEWACHT 6153

IMFULE MISSION

STATION

6154

BARNEVELD 6156

WANDSBECK 6157

GOLDEN REEF 6158

RUSTVERWACHT 6159

VERGELEGEN 6160

GROENKOP 6161

WITVOLOOS 6553

MORGENZON B 6729

OVERVLOED 7432

WINTERS HOEK 8299

WATERVAL 9144

149B 9500

LOT 244 EMPANGENI 10574

HLANGASA 10963

PROSPECT ESTATE 10974

PICCADILLY 10985

LOT 241 EMPANGENI 11058

EZULWINI 11065

ARCADIA 11079

LOT 1 NTAMBANANA 11372

NEEDMORE 11386

BLACKWOOD 11394

THE PYRAMIDS 11425

ELLINGHAM 11478

CANELANDS 11479

DRISDERNAN 11541

THORNCREEK 11542

GLENMORE 11543

MAJATCHA 11583

BURTON GARTH 11584

HILL CREST 11585

NEWLANDS 11588

NTAMBANANA 11724

HILL TOP 11745

FATIMA 11785

SPES BONA 11829

SANDOWN 12025

SEVERNDALE 12135

LOT 263 EMPANGENI 12144

HANDLEY CROSS 12187

LOT 2 NTAMBANANA 12365

LOT 303 EMPANGENI 12670

LOT 277 EMPANGENI 12671

LOT 312 EMPANGENI 12694

LOT 275 EMPANGENI 12724

LOT 279 EMPANGENI 12778

LOT 281 EMPANGENI 12782

MARS 12874

LOT 272 EMPANGENI 12922

VULCAN 12991

LOT 315 EMPANGENI 13039

LOT 321 EMPANGENI 13040

LOT 309 EMPANGENI 13050

LOT 316 EMPANGENI 13051

LOT 280 EMPANGENI 13074

LOT 274 EMPANGENI 13216

LOT 310 EMPANGENI 13252

LOT 252 EMPANGENI 13313

ENTONJANENI 13356

LOT 262 EMPANGENI 13375

COOLIDGE 13386

LOT 291 EMPANGENI 13387

LOT 290 EMPANGENI 13388

LOT 289 EMPANGENI 13389

LOT 292 EMPANGENI 13399

LOT 285 EMPANGENI 13400

LOT 264 EMPANGENI 13548

LOT 269 EMPANGENI 13551

LOT 311 EMPANGENI 13741

LOT 308 EMPANGENI 13742

LOT 320 EMPANGENI 13745

LOT 307 EMPANGENI 13746

STOCKVILLE 13904

LOT 254 EMPANGENI 14014

LOT 278 EMPANGENI 14015

LOT 273 EMPANGENI 14129

LOT 313 EMPANGENI 14334

LOT 314 EMPANGENI 14335

FULENI RESERVE 14375

LOT 317 EMPANGENI 14404

LOT 319 EMPANGENI 14405

LOT 318 EMPANGENI 14496

DUBE RIDGE 15223

Page 17: Rhino Oil and Gas Exploration South Africa (Pty) · PDF fileRhino Oil and Gas Exploration South Africa (Pty) Ltd ... undertaken at a limited number of sites. ... further exploration

Summary List of Properties in 108 TCP – includes all* portions of the listed farms but not those portions that are protected(E&OE)

SLR Consulting (Pty) Ltd

WINDY RIDGE 15304

BOEGOENEK 15636

LOT 271 EMPANGENI 15728

DOORNHOEK B 15736

RESERVE NO 5 15824

RESERVE NO 11 15831

RESERVE NO 20 15840

SYLVIA 16305

NOBAMBA 16505

MDONI 16562

SKYE BLUE 16653

SPRINGFIELD 16670

COOLIDGE 17225

INHLAZATJE 17387

BHUCHANANA 17700

GU 18296