rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...sarajevo.docx  · web viewthe work group...

44
Erasmus + Project No 561586‐EPP‐1‐2015‐1‐RS‐ EPPKA2‐CBHE‐JP Enhancement of HE Research Potential Contributing to Further Growth of the WB Region (Re@WBC) WORKPACKAGE 4. QUALITY Ref. No. and Title of Workpackage 4.3-4.4 Re@WBC reporting Title of Deliverable: Re@WBC reporting form Institution: University of Montenegro Author/s of the deliverable Olivera Popovic, Dragana Cvetkovic-Ilic Dissemination Level Internal The European Commission support for the production of this publication does not constitute an endorsement of the contents which reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Upload: phungxuyen

Post on 31-Jan-2018

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Erasmus + Project No 561586 EPP 1 2015 1 RS EPPKA2‐ ‐ ‐ ‐ ‐ ‐ ‐CBHE‐JPEnhancement of HE Research Potential Contributing

to Further Growth of the WB Region (Re@WBC)

WORKPACKAGE 4. QUALITY

Ref. No. and Title of Workpackage 4.3-4.4 Re@WBC reporting

Title of Deliverable: Re@WBC reporting form

Institution: University of Montenegro

Author/s of the deliverable Olivera Popovic, Dragana Cvetkovic-Ilic

Dissemination Level Internal

Dear Partners,

Please use this form for the annual report on the progress of WPs within your institutions, as well as for your internal quality assurance procedures.

With best regards,

Re@WBC Project's Steering Committee

The European Commission support for the production of this publication does not constitute an endorsement of the contents which reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Page 2: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP1. Preparation for the HR research management reform

1.1. Research potential at WBC universities mapped

Start date 01.02.2016.

End date 29.04.2016.

Description of the activity carried out

UES filled questionnaire with great number of different qualitative and quantitative data for mapping research human potential and issues and made report on mapping the research human potential and issues at University of East Sarajevo. These activities are organized within regularly university’s self-evaluation report for 2016. All faculties and academies of University participated in the realization of this activity.

Specific and measurable indicators of achievement

Number of participated faculties: 17Number of people involved in the integration of data: 4Number of chapters in the report: 8Number of replied questions in the questionnaire: 79

Planned resultsDescribed activities per different chapters needed for creating strategy for researchers (SWOT analysis)Identified calls for actions

INSTITUTION University of East Sarajevo

WP1. Preparation for the HR research management reform

1.2. Review of HR strategies at EU partners

Start date 21.03.2016. 19.06.2016.

End date 25.03.2016. 23.06.2016.

2 Quality Control and Monitoring Manuel

Page 3: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Description of the activity carried out

Active participation of UES representatives at meetings, Getting knowledge about recruitment strategy, Empowerment for employability and the stage and job unit, Functioning of technology transfer office, PhD cycle of study, Innovations in Doctoral Training, Supervisor training, Importance of HR strategy for researchers, and internationalization of the scientific community.

Specific and measurable indicators of achievement

Number of educated persons: 4Number of days spent on training: 6

Planned resultsEducation of person that will be able to train academic community at the University of East Sarajevo.

INSTITUTION

WP1. Preparation for the HR research management reform

1.3. Comparative analysis

Start date

End date

Quality Control and Monitoring Manual 3

Page 4: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Description of the activity carried out

Report on mapping the research human potential and issues in University of East Sarajevo. First phase implemented a desk research, based on the “Questionnaire for mapping the research human potential and issues in WBC universities”, which has been developed in scope of Re@WBC project. The questionnaire covers a range of topics relevant for HR management in research institutions, all of which are highlighted in the European Charter and Code, or The Human Resources Strategy for Researchers (HRS4R) process. The completed questionnaire is annexed to this report.For the purpose of a desk research, a work group was established at the university. The work group was coordinated by mrs.JovanaAmovic. Other members of the work group were: prof. StevanTrbojevic, prof. DejanBokonjic, asst. prof. SlavisaMoljevic, mr.NenadMarkovic, MSc. The desk research involved a review of the different legal documents, reports, procedures and manuals and a data collection, which has been performed with collaboration of the various departments and faculties.Most of the activities were carried on by two sectors, Science, Research and Development Office, and Quality Assurance Office at the University. After extensive analysis of the existing data already available in the field of research, the adapted questionnaire was drafted for faculties, in order to provide us with the information only available to them. This adapted version of questionnaire was delivered to the 15 faculties’ secretaries, who filled them in. All collected data was summed up and entered into the final version of the questionnaire. Internal research also included the analysis of the interinstitutional rules and regulations. External research included the analysis of laws and by laws regulating research and higher education ‐in Republic of Srpska and Bosnia and Herzegovina.

Specific and measurable indicators of achievement

Comparative analysis done

Planned resultsComparative analysis was preparatory document for applying for Charter and Code.

INSTITUTION University of East Sarajevo

WP1. Preparation for the HR research management reform

1.4. Action plans for HE management reform

4 Quality Control and Monitoring Manuel

Page 5: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Start date 02.05.2016.

End date 31.05.2016.

Description of the activity carried out

There were several meetings with rector and vice-rectors as well as with key administrative employees who can bring changes with potential HR strategy during May 2016. To all of them questionnaire for mapping research human potential and issues as well as report were presented and explained with special emphasis on calls for actions.

Specific and measurable indicators of achievement

Number of contacted key persons: 7

Planned resultsCommitment to the realization of project activities and to the developing and implementation of Human research strategy.

INSTITUTION

WP1. Preparation for the HR research management reform

1.5. HR offices and centers equipped

Start date 01.12.2016.

End date and now…

Description of the activity carried out

This activity started few months ago. For the first time in B&H there will be organized Join or common procurement of equipment for 2 universities in accordance with national legislation. For now, the agreement between institutions is constituted and signed. Equipment specifications were reviewed and approved.

Specific and measurable indicators of achievement

Equipment specification.

Planned results Procured equipment.

Quality Control and Monitoring Manual 5

Page 6: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.1. University centers and HR offices reinforced

Start date 01.11.2016.

End date 30.12.2016.

Description of the activity carried out

University of East Sarajevo sent necessary information to the project coordinator for writing final report for 2.1.

Specific and measurable indicators of achievement

Number of chapters: 3

Planned results Written report of the University of East Sarajevo

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.2 Administrative staff competences improved

Start date 21.09.2016.

End date 23.09.2016.

Description of the activity carried out

Active participation of representatives of UES in discussions. Getting knowledge about: research strategy of University of Polytechnic Torino, implementation of the UK Concordat to Support the Career Development of Researchers.

Specific and measurable indicators of achievement

Number of educated persons: 3Number of days spent on training: 3

Planned resultsEducation of person that will be able to train academic community at the University of East Sarajevo.

6 Quality Control and Monitoring Manuel

Page 7: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Quality Control and Monitoring Manual 7

Page 8: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.3. University managements educated on the C&C implementation

Start date This activity is not realized yet.

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.4 HRS4R strategy created and adopted at partner universities

Start date 01.06.2016.

End date 03.03.2017.

Description of the activity carried out

Formed work group developed strategy HRS4R. This strategy was adopted by Senate of the University and sent to European Commission for final decision about acceptance.

Specific and measurable indicators of achievement

Number of documents developed: 5

Planned results Submitted HRS4R to European Commission.

8 Quality Control and Monitoring Manuel

Page 9: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Quality Control and Monitoring Manual 9

Page 10: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.5. Training trainers

Start date 14.12.2016.

End date 17.12.2016.

Description of the activity carried out

Participation, active discussion, work in small groups (Coventry meeting).

Specific and measurable indicators of achievement

Number of persons educated: 1Number of days spent on education: 4

Planned results Educated person needed for trainings at home institution.

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.6. Promotion procedures improved

Start date 01.06.2017.

End date 30.06.2017.

Description of the activity carried out

For this purpose, questionnaire on academic promotion was filled and sent to project coordinator. The following topics have been addressed: list academic and/ or scientific titles awarded/promoted, basement of academic promotion,

Specific and measurable indicators of achievement

Number of pages for the created questionnaire: 4Number of people engaged: 4

Planned results Created questionnaire.

10 Quality Control and Monitoring Manuel

Page 11: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Quality Control and Monitoring Manual 11

Page 12: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.7. Plagiarism monitoring tools implemented

Start date 01.12.2016.

End date This activity hasn’t realized yet.

Description of the activity carried out

This activity will be done together for B&H universities.

Specific and measurable indicators of achievement

Specifications of different actions which procured software can do.

Planned results Procurement of appropriate software for plagiarism.

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.8. Ethical committee procedures improved

Start date 15.12.2016.

End date 17.02.2017.

Description of the activity carried out

A report about functionality of ethics committee is made. Following chapters were done: abstract, introduction, national legal framework in the partner country, bodies responsible for ethics, institution’s legal framework and remarks/ suggestions for improvement.

Specific and measurable indicators of achievement

Number of chapters addressed: 5Number of pages: 3Number of persons involved: 4

Planned results Improved ethical committee procedures.

12 Quality Control and Monitoring Manuel

Page 13: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Quality Control and Monitoring Manual 13

Page 14: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP2. Excellent university for the researchers

2.9. Cooperation with scientific diaspora established

Start date 15.12.2016.

End date 27.01.2017.

Description of the activity carried out

All faculties and academies were contacted related to functioning of alumni networks. All information about existence of these networks were sent to the project coordinator for the wider dissemination.

Specific and measurable indicators of achievement

Number of pages done: 1Number of people involved: 6

Planned results Improved contacts with wider auditorium of researchers.

14 Quality Control and Monitoring Manuel

Page 15: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP3. Excellent researchers for the community

3.1. Researchers trained on C&C and HRS4R

Start date seminar

End date

Description of the activity carried out

Working group held 2 seminars and educated 102 researchers from different levels. Special emphasis in education was on significance and role of European charter and code for researchers, developed strategy of human resources for researchers, presentation of internal analysis results, methodology of scientific research work, entrepreneurial skills, connection with industry organization

Specific and measurable indicators of achievement

Number of educated persons at home institution: 102Different sectors addressed: 5

Planned results Educated persons at home institution.

INSTITUTION University of East Sarajevo

WP3. Excellent researchers for the community

3.2. Webpages offer opportunity links

Start date 14.10.2016.

End date until now…

Description of the activity carried out

All researchers are registered in the university information system. Also all researchers are registered in the students’ survey system. And, all researchers will be registered in the eNIR system, recently developed. For now, there is activity related to enter all research results in this system.Other visibilities will be done during getting HR research in excellence code (job vacancies, placement of all researchers on the university web page).

Quality Control and Monitoring Manual 15

Page 16: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Specific and measurable indicators of achievement

Number of researchers registered in the electronic system: 882

Planned resultsEmail databases of researchers, registered researchers in informational system.

16 Quality Control and Monitoring Manuel

Page 17: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP3. Excellent researchers for the community

3.3. Young researchers trained on research methodology

Start date not done yet

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP3. Excellent researchers for the community

3.4. Young researchers trained in various skills

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 17

Page 18: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

18 Quality Control and Monitoring Manuel

Page 19: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP3. Excellent researchers for the community

3.5. Training on teaching methodology

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP3. Excellent researchers for the community

3.6. Pilot Mentoring system introduced

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 19

Page 20: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

20 Quality Control and Monitoring Manuel

Page 21: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP3. Excellent researchers for the community

3.7. Measures for enhancement of multidisciplinarity in research

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP3. Excellent researchers for the community

3.8 Guide book published

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 21

Page 22: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

22 Quality Control and Monitoring Manuel

Page 23: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP4. Quality at Re@WBC

4.1. Quality Assurance Committee (QAC) established

Start date

End date

Description of the activity carried out

Our project team member prof. drDejanBokonjic appointed in this team.QAC will meet regularly to prepare project quality standards, procedures and reports, to discuss and evaluate the progress of the project realization, to monitor the activities of all partners, and manage whatever problems there may arise in the course of the project. It is planned that QAC meets once a year though it is possible to have more frequents meetings if necessary.

Specific and measurable indicators of achievement

Next meeting will be organized in Podgorica from 23/25 March 2017

Planned results

INSTITUTION

WP4. Quality at Re@WBC

4.2. Project quality procedures developed

Start date 15.10.2015

End date End of 2017

Description of the activity carried out

Quality manual developed on the level of the project. UES is following recommendation can be found in the manual.

Specific and measurable indicators of achievement

Word templates and ppt templates developed. Feedback and attendance list createdLogo establishedChecklist for review of deliverables introduced

Quality Control and Monitoring Manual 23

Page 24: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Self assessment report developed

Planned resultsUES is using all developed documents regular during implementation of different activities

24 Quality Control and Monitoring Manuel

Page 25: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP4. Quality at Re@WBC

4.3. WP reports

Start date not applicable yet

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP4. Quality at Re@WBC

4.4. Annual QA reports

Start date

End date

Description of the activity carried out

Template for annual reports developed.Currently filling up template of annual report

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 25

Page 26: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

26 Quality Control and Monitoring Manuel

Page 27: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP4. Quality at Re@WBC

4.5. Reports analysis

Start date

End date

Description of the activity carried out

not done yet

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP4. Quality at Re@WBC

4.6. External monitoring

Start date

End date

Description of the activity carried out

not done yet

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 27

Page 28: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

28 Quality Control and Monitoring Manuel

Page 29: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.1. Project web-site created and regularly updated

Start date

End date

Description of the activity carried out

Project web site is developed on the level of the project by project coordinator. UES made a link on its web site with central project web site. Also UES was regularly sending all deliverables, news and performed activities for the web site to project coordinator

Specific and measurable indicators of achievement

Web site developed and regularly updated

Planned results

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.2. Promotional material distributed

Start date

End date

Description of the activity carried out

Not still done. Procedure for developing of promo material is started.

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 29

Page 30: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

30 Quality Control and Monitoring Manuel

Page 31: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.3. Project results disseminated

Start date

End date

Description of the activity carried out

Dissemination plan is developedSeveral seminars organized for dissemination of project activities.

Specific and measurable indicators of achievement

All activities should be disseminated on the Faculty and University level.

Planned results

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.4. The label "HR Excellence in Research" obtained by a number of WB partner universities

Start date 01.06.2016.

End date until now…

Description of the activity carried out

All necessary documents were submitted recently. UES for reply as positive with minor changes. We clearly defined responsible persons for each activity and also we made robust monitoring plan.

Specific and measurable indicators of achievement

Obtained or not obtained?

Quality Control and Monitoring Manual 31

Page 32: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Planned results Obtained code.

32 Quality Control and Monitoring Manuel

Page 33: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.5. Establishment of awards for young researchers

Start date

End date

Description of the activity carried out

This activity will be carried out during the University day 24 May 2017.

Specific and measurable indicators of achievement

Number of awards for young researchers: ?

Planned results

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.6. Mentoring system adopted

Start date

End date

Description of the activity carried out

not done yet

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 33

Page 34: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

34 Quality Control and Monitoring Manuel

Page 35: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP5. Dissemination and exploitation at Re@WBC

5.7. Strategy on continual training of researchers adopted

Start date

End date

Description of the activity carried out

This strategy has not adopted yet.

Specific and measurable indicators of achievement

Planned results

Quality Control and Monitoring Manual 35

Page 36: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION University of East Sarajevo

WP6. Management at Re@WBC

6.1. Kick-off and coordinating meetings realised

Start date 09.12.2015.

End date 12.12.2015.

Description of the activity carried out

Presentation of the University of East Sarajevo. Active participation in discussions.

Specific and measurable indicators of achievement

Number of persons participated at the meeting: 2Number of days spent at the meeting: 4

Planned results Presented University of East Sarajevo.

INSTITUTION University of East Sarajevo

WP6. Management at Re@WBC

6.1. 1st Steering Committee Meeting

Start date 30.11.2016.

End date 02.12.2016.

Description of the activity carried out

Presentation of situation with realization of activities at University of East Sarajevo.

Specific and measurable indicators of achievement

Number of persons participated at the meeting: 1Number of days spent at the meeting: 3

Planned results Revision of all realized activities until 30.11.2016.

36 Quality Control and Monitoring Manuel

Page 37: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP6. Management at Re@WBC

6.2. Procedures for project management

Start date

End date

Description of the activity carried out

Project management guide developed. We are using this guide as support tool for financial management of our project

Specific and measurable indicators of achievement

Active usage of guide for management of the project

Planned results

Quality Control and Monitoring Manual 37

Page 38: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP6. Management at Re@WBC

6.3. PA signed

Start date 15.10.2015.

End date 15.06.2016.

Description of the activity carried out

Partnership agreement is signed.

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP6. Management at Re@WBC

6.4. Software platform for project management

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

38 Quality Control and Monitoring Manuel

Page 39: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Quality Control and Monitoring Manual 39

Page 40: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INSTITUTION

WP6. Management at Re@WBC

6.5. Day-to-day coordination

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

INSTITUTION

WP6. Management at Re@WBC

6.6. Financial management

Start date

End date

Description of the activity carried out

Specific and measurable indicators of achievement

Planned results

40 Quality Control and Monitoring Manuel

Page 41: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

Quality Control and Monitoring Manual 41

Page 42: rewbc.ni.ac.rsrewbc.ni.ac.rs/wp-content/.../2016/12/...Sarajevo.docx  · Web viewThe work group was coordinated by mrs.JovanaAmović. ... 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP"This

INTERNAL QUALITY ASSURANCE PROCEDURES

REPORT PREPARED BY

DATE

42 Quality Control and Monitoring Manuel

Project number: 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP

"This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein"